Process Analysis: IENG 301 Fundamentals of Work Study and Ergonomics
Process Analysis: IENG 301 Fundamentals of Work Study and Ergonomics
IENG 301
FUNDAMENTALS OF
WORK STUDY AND
ERGONOMICS
PROCESS ANALYSIS
The chart usually begins with the raw material entering the
factory and follows it through every step, such as
transportation to storage, inspection, machining operations,
and assembly, until it becomes either a finished unit itself or a
part of a subassembly.