Proposed 5 Storey Cluster Condominium at Tanjung Labuh, 83300 Batu Pahat, Johor Bill B: Infrastructure Works BIL Description Unit QTY Rate

This document provides a bill of quantities for infrastructure works for a proposed 5 storey condominium development in Batu Pahat, Johor. It includes items for sewer manholes, sewer pipes, excavation works, and testing and commissioning of sewer lines. Quantities, unit rates and estimated costs are provided for each item. Notes specify that rates include all necessary accessories, excavation works, backfilling and compaction to specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
47 views6 pages

Proposed 5 Storey Cluster Condominium at Tanjung Labuh, 83300 Batu Pahat, Johor Bill B: Infrastructure Works BIL Description Unit QTY Rate

This document provides a bill of quantities for infrastructure works for a proposed 5 storey condominium development in Batu Pahat, Johor. It includes items for sewer manholes, sewer pipes, excavation works, and testing and commissioning of sewer lines. Quantities, unit rates and estimated costs are provided for each item. Notes specify that rates include all necessary accessories, excavation works, backfilling and compaction to specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 6

Proposed 5 Storey Cluster Condominium at Tanjung Labuh, 83300

Batu Pahat, Johor

BILL B : INFRASTRUCTURE WORKS


BIL DESCRIPTION UNIT QTY RATE

ALL AS PER RELEVANT DRAWING AND SPECIFICATIONS OF


WORKS

Notes :
All rates shall include all testing in accordance to specification or
as per authorities's requirement and to the statisfication of the
S.O's

B.1 Manhole
Supply and construct the following approved JPP
sewer manhole c/w cover. Rate to include all necessary
excavation, backfilling, precast R.C. manhole, concrete
base, lean concrete, reinforcement, heavy duty ductile
iron frame and cover, stainless steel steps and all
details as per drawing and as per specification.

a) Manhole depth not exceeding 2M depth no 4 148.46

b) Ditto, exceeding 2M but not exceeding 3M depth no 0 148.46

1.1 Testing & Commissioning


Testing of sewer line as per specification (Rate to sum 2,500
include 100% CCTV inspection)

TO COLLECTION RM
Proposed 5 Storey Cluster Condominium at Tanjung Labuh, 83300
Batu Pahat, Johor

BILL B : INFRASTRUCTURE WORKS


BIL DESCRIPTION UNIT QTY RATE

B.2 SEWERAGE WORKS


Supply, install and lay underground 225mm diameter m 100 280
VC pipe complete with flexible joint. Rate to include
all necessary accessories (bend, tee), excavation,
embedded in carefully campacted 20mm aggregate
and top compacted carefully with selected backfilling.
Supply, concrete, lay and install underground 225mm
diameter x 150mm diameter vcp tee joint. no 4 135

Soil Description and Existing Services


1) The ground water lable was established at
3.00m below existing ground level.
2) The work is to be carried out a minimum
distance of 50m from a canal the normal level
which is 3.00m below ground water level.
3) Telephone wire cross over the site at a height
of 15.00m on the line shown on the location drawing

Sewerage Pipe
A. Excavating trenches to receive pipes size 225mm
diameter, starting at ground level, maximum depth
not exceeding 2.00m deep, average deep including
earthwork support, treating bottoms, filling in,
compaction and dsiposal of surplus spoil. m 58 12.00

B. Extra over excavating trenches to receive pipes


size 225mm diameter, starting at ground level,
maximum depth not exceeding 2.00m deep,
average deep 1.50m deep, including earthwork
support, treating bottoms, filling in, compaction and
disposal of surplus spoil for excavation in rock. m 7 15

C. Excavating trenches to received pipes size 225mm


diameter, starting at ground level, maximum m 7 15
depth not exceeding 2.00m deep,average deep
1.50m deep, including earthwork support,
TO COLLECTION RM
Proposed 5 Storey Cluster Condominium at Tanjung Labuh, 83300
Batu Pahat, Johor

BILL B : INFRASTRUCTURE WORKS


BIL DESCRIPTION UNIT QTY RATE

treating bottoms, filling in, compaction and


disposal of surplus spoil. m 72 12

D. Extra over excavating trenches to receive pipes


size 225mm diameter, starting at ground level,
maximum depth not exceeding 2.00m deep,
average deep 1.75m deep, including earthwork
support, treating bottoms, filling in, compaction and
disposal of surplus spoil for excavation in rock. m 9 10

E. Excavating trenches to receive pipes size 225mm


diameter, starting at ground level, maximum depth
not exceeding 4.00m deep, average deep 2.00m
including earthwork support, treating bottoms, filling in
compaction and dsiposal of surplus spoil. m 48 8

F. Extra over excavating trenches to receive pipes


size 225mm diameter, starting at ground level,
maximum depth not exceeding 4.00m deep,
average deep 2.0m deep, including earthwork
support, treating bottoms, filling in, compaction and
disposal of surplus spoil for excavation in rock. m 5 10

G. Excavating trenches to receive pipes size 225mm


diameter, starting at ground level, maximum depth
not exceeding 4.00m deep, average deep 2.25m
including earthwork support, treating bottoms, filling in,
compaction and dsiposal of surplus spoil. m 10 8
TO COLLECTION RM
AMOUNT
(RM)

594

2,500.00

31633.84
AMOUNT
(RM)

28,000

540

696.00

105

105

29446
AMOUNT
(RM)

864

90

384

50

80
1,468.00