100% found this document useful (1 vote)
505 views4 pages

Standard Calibration Procedure Hydrometer Doc. No. Call/SCP/033 Rev. 00 May 01, 2015

This document outlines the standard calibration procedure for hydrometers at Qstar Engineering. It describes preliminaries like entering equipment details and inspecting the hydrometer. The calibration procedure involves maintaining the hydrometer at a controlled temperature, taking measurements against standard solutions at minimum 2-3 values, recording results, and issuing a calibration certificate and sticker upon completion. Related documents include calibration forms and the master list of documents.

Uploaded by

Ajlan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
505 views4 pages

Standard Calibration Procedure Hydrometer Doc. No. Call/SCP/033 Rev. 00 May 01, 2015

This document outlines the standard calibration procedure for hydrometers at Qstar Engineering. It describes preliminaries like entering equipment details and inspecting the hydrometer. The calibration procedure involves maintaining the hydrometer at a controlled temperature, taking measurements against standard solutions at minimum 2-3 values, recording results, and issuing a calibration certificate and sticker upon completion. Related documents include calibration forms and the master list of documents.

Uploaded by

Ajlan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Standard Calibration Procedure

Doc. No. Call/SCP/033 Rev. 00 May 01, 2015


Hydrometer

STANDARD CALIBRATION PROCEDURE

HYDROMETER

Prepared by

Muhammad Ajlan Signature Date : 01.05.2015

Reviewed by

Muhammad Sarwar Signature Date : 01.05.2015

Approved by

Qaswar Mehmood Signature Date : 01.05.2015

Controlled Copy No. Uncontrolled Copy

Issued to :

Page 1 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/033 Rev. 00 May 01, 2015
Hydrometer

This document is the property of Qstar Engineering, and is issued only for persons or entity as
written on this document. It is not to be retransmitted, printed or copied without prior written
permission of company.

Table of Contents

Sr. No. Title Page No(s).


1.0 Scope 03
2.0 Standard Equipment 03
3.0 Preliminary Operations 03
4.0 Calibration Procedure 03
5.0 Related Documents 03

Page 2 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/033 Rev. 00 May 01, 2015
Hydrometer

1.0 Scope

This procedure provides guidelines for calibration of Hydrometer.

2.0 Standard Equipment

2.1 Reference Weighing Scale & Measuring Cylinder traceable to international standard
reference materials shall be used as standard for calibration.
2.2 The Reference shall be kept under controlled environmental conditions e.g. dust free
environment and Lab. temperature 22°C ± 3°C. Lab Humidity 60%RH ± 20%RH.

3.0 Preliminary Operations

3.1 The details of Hydrometer received for calibration shall be entered in the Calibration Job
Form (Form: Call/001).
3.2 Inspection of Hydrometer for general condition shall be carried out.
3.3 The Hydrometer shall be inspected and marked () in relevant block of equipment's
primary inspection section of Calibration Data Sheet (Form: Call/013).

4.0 Calibration Procedure

4.1 The Hydrometer to be calibrated shall be maintained at laboratory temperature for 01


hour’s minimum.
4.2 The Measurements of Hydrometer shall be taken against the standard gram per milli litre
by dipping the Hydrometer into the solution.
4.3 The Hydrometer shall be checked at minimum 2 to 3 times against standard solutions of
different values.
4.4 The relevant section of Calibration Data Sheet (Form: Call/013) shall be marked.
4.5 After completion of calibration all the equipment shall be secured.
4.6 Calibration Certificate (Form: Call/002) shall be issued for calibrated Hydrometer as per
Calibration Data Sheet Record (Form: Call/013) record.
4.7 A Calibration Sticker (Form: Call/003) containing following information shall be affixed
on the calibrated Hydrometer.
Page 3 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/033 Rev. 00 May 01, 2015
Hydrometer

a) Item code
b) Calibrated on
c) Next calibration date

5.0 Related Documents

All the latest formats are documented in Master List of Document / Record and placed in CQF
file for reference.
All the latest Standard Calibration Procedures (SCP) are controlled and issued to concerned
Calibration Engineers.

Page 4 of 4

You might also like