Team Analysis: School of Engineering PRJ 62404 Engineering Design and Analysis
The student updated their supervisor on their engineering design project progress over two weeks. They connected components to the chassis using soldering but were still learning programming codes. They received a new chassis and continued working on codes. The team's stage was norming as members helped each other solve problems and gave feedback, while designing and implementing their project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
41 views1 page
Team Analysis: School of Engineering PRJ 62404 Engineering Design and Analysis
The student updated their supervisor on their engineering design project progress over two weeks. They connected components to the chassis using soldering but were still learning programming codes. They received a new chassis and continued working on codes. The team's stage was norming as members helped each other solve problems and gave feedback, while designing and implementing their project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
SCHOOL OF ENGINEERING
PRJ 62404 ENGINEERING DESIGN AND ANALYSIS
Team Analysis
Name: Covyn Yong Keen Lok
Week & Supervisor
date Updated team activities Feedback Signature & Date Week 9 Connected the wheels and the wire We are working 23/10/2019 using soldering and placed all the cooperatively by helping components on the chassis. The one another to solve issues. programming code wasn’t The coding part was quite complete yet as we are still difficult that I need to spend learning on how to code. more time on learning the Moreover, we couldn’t get a clean code. chassis due to insufficient supply in the laboratory
24/10/2019 We are able to get a new chassis
from the laboratory. We are still working on the programming code.
Team stage: Norming
Justification: In this stage, team members will help one another to solve problems, appreciate the help of your team members. Team members are getting close to each other and will give feedback to each other task. We are currently building the chassis, tires, interior component, exterior component and programming the Arduino board. Project status: Design and implement