Results are aggregated to the top level and you can drill
down to see work allocation and capacity of Group and
Sub-Group members.
If you ever need to replace a resource across an entire project, you can do so by
utilizing the “Replace Resource” button that can be found in the Utilities menu on the
project Ribbon.
The reassignment will be applied to the entire project (or whatever Parent it is applied
on).