Ecr Eco Workflows

This document provides step-by-step instructions for creating an Engineering Change Request (ECR) in the system and routing it through the approval process. It involves selecting the ECR option, filling out required fields including dates, reasons, object type, and bill of materials, getting supervisor approval to change the status to ready for changes, routing it to four approvers, converting the ECR to an Engineering Change Order by the coordinator, allowing bom changes by the reviewer, getting bom approval, closing the ECO, and releasing the ECO. The status can be checked at any time. Saving is required after each step.

Uploaded by

Basu Gudageri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
288 views28 pages

Ecr Eco Workflows

This document provides step-by-step instructions for creating an Engineering Change Request (ECR) in the system and routing it through the approval process. It involves selecting the ECR option, filling out required fields including dates, reasons, object type, and bill of materials, getting supervisor approval to change the status to ready for changes, routing it to four approvers, converting the ECR to an Engineering Change Order by the coordinator, allowing bom changes by the reviewer, getting bom approval, closing the ECO, and releasing the ECO. The status can be checked at any time. Saving is required after each step.

Uploaded by

Basu Gudageri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 28

ECR creating screen CC31

1
Make sure the ECR option is checked

Select change Type

2
Fill up the boxes: Dates & Reason,
(Type and Status will automatically come
from the previous screens)

Fill up the
boxes:
2. Object
Type
2. Objects
(See next page)

3
Fill up required fields
BOM
(See previous page)

4
Check ECR request

5
Check ECR , click continue and save

6
EC Supervisor checks for ECR (STEP 1)

7
Changing status

8
9
EC Supervisor changing status: from checking ECR
(STEP 1) to ECR ready for changes (STEP 2)

10
Click checkmark
and save

11
ECR 500000000038 disappeared from mailbox,
after pressing the “Refresh” button
and ready for approvals

12
Approvers 1, 2, 3, 4 will have a same
screen and procedure

13
Click checkmark
and Always save!
14
Password required for Approver
(Do not forget to save!)

15
ECR 500000000038 disappeared from the mailbox (refresh)
after all Approvers – approved ECR

16
EC Coordinator will convert ECR into ECO

17
Click checkmark
and always Save
18
ECR converted into ECO and
disappeared from mailbox

19
BOM Reviewer can change BOM

20
BOM change screen

21
BOM approval

22
BOM closing changes

23
Closing ECO

24
Closing ECO
(Do not forget to save)

25
Releasing ECO

26
Releasing ECO

27
Status Report, to check on ECR/ECO
(Screen CC33)

28