Engineering Company: Leakage Reactance Measurement

Teroría del ensayo de reactancia de fuga en transformadores

Uploaded by

Ramón Guillán
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

n y

o m pa
n g C
eeri
i n
Leakage Reactance Measurement
n g
l e E
ob
©D
Robert Brusetti
Doble Engineering Co.

©2017 Doble Engineering Company. All Rights Reserved.


DISCUSSION OUTLINE
I. Objective
II. Physics
n y
III. Definition
o m pa
n g C
IV. Setup and test methodology e e ri
n g i n
V. Data analysis oble E
©D

©2017 Doble Engineering Company. All Rights Reserved.


2
Objective: Leakage Reactance Measurement
• What is it?
– The measurement of the transformer impedance with the secondary
winding short circuited by applying a voltage to the primary and
measuring the corresponding current. ny p a
• Ohm’s Law: Z=V/I
C om
rin g
• Why?
i n e e
– E
Assess physical conditionn g
of the transformer (Geometry of Specimen)
b l e
• Attempting toodetect
©D
winding movement or deformation
• How?
– Using a single phase high current low voltage source
– Measure voltage across and current through an individual winding

©2017 Doble Engineering Company. All Rights Reserved.


3
DISCUSSION OUTLINE

I. Objective
II. Physics
n y
o m pa
III. Definition
n g C
eeri
En gin
IV. Setup and test methodology
V. Data analysis Dob le
©

©2017 Doble Engineering Company. All Rights Reserved.


4
Exciting Current Load Conditions

IexIL + I2 Φmain I2

a n y
V1 v/t ΦL ΦL o m p V V2~0
C
2
ZLOAD
i n g
g i n eer
l e En
Do b V/T > V/TS
©
• Current in primary IL supports the ΦL
.
©2017 Doble Engineering Company. All Rights Reserved.
5
DISCUSSION OUTLINE
I. Objective
II. Physics
n y
III. Definition
o m pa
n g C
IV. Setup and test methodology eeri
n g i n
V. Data analysis oble E
©D

©2017 Doble Engineering Company. All Rights Reserved.


6
Leakage Flux
• With the secondary winding electrically shorted the current in the
primary winding is only required to support the leakage flux.
n y
om winding, that does pa
• Text Book: Flux due to the current in the C primary
i n g
rdue to the current in the
e
not link the secondary and the flux
i n e
g
En not link the primary winding.
secondary winding that does
b l e
© Do
• Practical: The flux that is not confined to the core for the entire
length of it path. The flux which is present in the unit permeability
space.
©2017 Doble Engineering Company. All Rights Reserved.
7
Unit Permeability Space

• Unit Permeability Space; includes the space between the


windings, within the windings and between the windings and
the tank a n y
m p
n g Co
eeri
i n
Top yoke

En g
b l e
© Do Leak age channel

Outer wind ing Core leg

In ner win ding

Bottom yoke
©2017 Doble Engineering Company. All Rights Reserved.
8
Practical Transformer Model
• From an energy transfer point-of-view, the elements in this circuit
represent the imperfections in a transformer

Primary winding dc
n y
Secondary winding dc
resistance Leakage reactance and losses
o m pa resistance
L2 C
g
rin
Rdc-1 RL-1 L1 RL-2 Rdc-2
+ e e
n g i n
le E
E D o b C
Cins Rins ©
Dielectric
losses and
Lm Rm N1 N2
Turns ratio
capacitance
-
Exciting current and losses

©2017 Doble Engineering Company. All Rights Reserved.


9
Results are expressed in Percent
• Impedance and Reactance are expressed in ohms
– Will vary considerably based on size of unit
– Depends from which winding test is performed n y
o m pa
n g C
• It is preferable to express impedance in terms of percent or per
unit. eeri
g i n
n base impedance

l
Measured value dividede Eby
D b
o into a limited range of values
– ©
Consolidates results
• High single digits or mid-teens
– The same regardless of which side of transformer test is performed

©2017 Doble Engineering Company. All Rights Reserved.


10
General Formula:
% Z = 100 × ( Z m Z b )
= Zm × ( S 3 Φ V ) × 100 2
y
LL
= [( 1 10 ) Zm ][ S 3 Φ ( inKVA p a n 2
o m ) / V
C LL ( inKV ) ]
rin g
i n e e
Zm is the measured E g
n impedance, if three phase
b l e
othe three
average
© D
of
Zb is the base impedance
S3Φ is the 3-phase base power rating of the winding
VLL is the line-to-line base voltage of the winding
©2017 Doble Engineering Company. All Rights Reserved.
11
DISCUSSION OUTLINE
I. Objective
II. Physics
n y
III. Definition
o m pa
n g C
IV. Setup and test methodology eeri
n g i n
V. Data analysis oble E
©D

©2017 Doble Engineering Company. All Rights Reserved.


12
Test Methods
• In the field
– Three Phase Equivalent Test
• All three phases of secondary winding are electrically short circuited
Single phase source excites two phases each in seriesany

• Measurement is conducted on three groupsC m p
ofotwo phases
ri n g

i n e e
Sum of three impedances and/or reactance is used to calculate final %

E n
impedance and/or %reactanceg which is then compared to nameplate or
benchmark
o b le
– ©D
Per Phase Test
• Single phase source performs individual test on each phase.
• Only corresponding phase on secondary winding is electrically short circuited
• Individual impedance and/or reactance are used to calculate individual %
impedance and/or % reactance which is then compared among phases or
benchmark ©2017 Doble Engineering Company. All Rights Reserved.
13
Information needed to perform test
• From Nameplate (or factory test report)
– To calculate base impedance

• Base power rating (in MVA)
n y
pa
• Voltage (L-L) rating of winding from which test is performed
o m
– Reference to tap position
n g C
e e i
r test connections
n g i n
– Winding vector diagram to determine

e E
As tested configuration of apparatus
l
D o b
– Record all tap positions
©
– Note any special winding configurations
• Connection of stabilizing winding (buried tertiary)
• Connection of configurable winding

©2017 Doble Engineering Company. All Rights Reserved.


14
Nameplate

n y
o m pa
n g C
eeri
g i n
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.


15
Nameplate

n y
o m pa
n g C
eeri
g i n
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.


16
Per Phase Measurement
• Energize one phase of the primary winding
– Delta winding across the Phase terminals (H1-H3, H2-H1, H3-H2)
– Wye winding Phase to Ground (H1-H0, H2-H0, H3-H0)
a n y
m
• Electrically short circuit the corresponding secondary
o p winding
n g C
– Reference the nameplate vector diagram
e e ri
n g
• Leave all other bushing terminalsi n floating
l e E
D o
– Except stabilizing b
winding leave as configured for service and note in
test results©
• Results:
– % Leakage Reactance for each phase

©2017 Doble Engineering Company. All Rights Reserved.


17
Referencing the Vector Diagram

n y
o m pa
n g C
eeri
g i n
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.


18
Basic Per Phase Connections

Instrume
nt
n y
o m pa
n g C
eeri
g i n
l e En
Do b
©Instrument

©2017 Doble Engineering Company. All Rights Reserved.


19
Three Phase Equivalent Measurement
• Change in Doble’s Recommendation
– Past Recommendation
• Perform Three Phase Equivalent as part of initial test

n y
– Intent was to compare with Nameplate value, however a complete correlation never
materialized
o m pa
– Updated Recommendation
n g C
Three Phase Equivalent only performed
e e i
r if investigation warrants
n

n g i
• Exceptions
l e E
b
oThree Phase Equivalent and Per Phase to establish benchmark
– Wye Delta winding
D
configurations where test is performed for the Wye winding
©
» Initial:
» Routine: Per Phase routine test
» Investigate: Three Phase Equivalent
– Units with inaccessible neutral
» Three Phase Equivalent
• Per Phase test not possible
©2017 Doble Engineering Company. All Rights Reserved.
20
Three Phase Equivalent Measurement cont’d
• All windings tested across bushing line terminals
– Neutral not part of test circuit but must be ungrounded
• Energize two phases of the primary winding at a time
n y
pa
– Across the line terminals (H1-H3, H2-H1, H3-H2)
• Short circuit the secondary winding
C o m
i n g
– All three phases except neutral
g i n eer
n floating
E
• Leave all other bushing terminals
b l e
Except stabilizingowinding
©D
– leave as configured for service and note in test
results
• Results:
– % Leakage Reactance
• Three measurements one result

©2017 Doble Engineering Company. All Rights Reserved.


21
Basic Three Phase Equivalent Connections

Instrument

n y
o m pa
n g C
eeri
g i n
l e En
Do b
©
Instrument

©2017 Doble Engineering Company. All Rights Reserved.


22
DISCUSSION OUTLINE
I. Objective
II. Physics
n y
III. Definition
o m pa
n g C
IV. Setup and test methodology eeri
n g i n
V. Data analysis oble E
©D

©2017 Doble Engineering Company. All Rights Reserved.


23
Analysis of Test Results
• Per-Phase Tests
– Per-Phase is the preferred method
• Comparison between phases
• Less physical area included in each measurement
n y
– Initial test
o m pa
• Used to established benchmark
n g C
eeri
• Results acceptable if every value is within 3% average of three readings.
g i n
En
– Subsequent test
b l e
Do
• Acceptable difference is <2% of the established benchmark of the respective phase
• ©
Three-Phase Equivalent Test
– Investigative test only
– Analysis
• “Ideal” within 3-4% of nameplate
– 5-7% not necessarily indicative of a problem
• If a benchmark exist should be <2%
©2017 Doble Engineering Company. All Rights Reserved.
24
Nameplate Information

n y
o m pa
n g C
eeri
g i n
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.


25
Per Phase Results
Initial Test

n y
o m pa
n g C
eeri
g i n
Next Test
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.


26
Three Phase Equivalent
Initial Test

n y
o m pa
n g C
eeri
g i n
Next Test
l e En
Do b
©

©2017 Doble Engineering Company. All Rights Reserved.