Initial Environmental Examination (IEE) Checklist Report
Initial Environmental Examination (IEE) Checklist Report
For
_______________________________________________
Project Name or Title
________________________________________________________
________________________________________________________
Telephone : _________________________
Fax : _________________________ E-mail :______________
A. GENRAL INFORMATION
2.a Capitalization:
Authorized: [ ] Paid-Up: [ ]
2.b Project Cost:
2.b.1 Site Development: [ ]
2.b.2 Building structure: [ ]
3. Project Components
1
4. Project Site: (Attach location and vicinity maps and photographs
of front, left, right, and rear views of the project site as ANNEX
2.)
4.a Land
4.a.1 Total Land Area, sq. m.
4.a.2 Land Area to be occupied, sq. m.
4.a.3 Is the area owned or leased
4.a.3.1. If leased, period covered
(Attach document, TCT, as ANNEX 3)
[ ] Industrial [ ] Residential
[ ] Commercial [ ] Others, pls. Specify
___________________________________________________
2
Others, please specify
(Use additional sheet, if necessary.)
1. Physical environment
3
[ ] Very steeply Mountainous (above 50)
2. Biological Environment
3. Socio-Economical Environment
4
3.c Are there health facilities (e.g., clinic, etc.) within the
project site?
[ ] Yes [ ] No
3.d Are the required benefits under the Labor code and other
regulations to be enjoyed by the staff? ________
If yes, please enumerate:
_______________________________________________
_______________________________________________
_______________________________________________
3.e Are the local inhabitants to be benefit by the project? ____
Please elaborate
_______________________________________________
_______________________________________________
_______________________________________________
3.f Are the cultural norms/morals and lifestyle of the local
inhabitants to be affected by the project?
______________ Please elaborate.
_______________________________________________
_______________________________________________
_______________________________________________
_______________________________________________
3.g Are there any opposition on the project? [ ]No [ ]Yes
(Attach document to support the answer as ANNEX 6.)
4. Project Impacts
5
stockpiling
of
sand/gravel
materials in
the site?
Is there
drilling,
boring, &
hammering
activities?
Is there any
slope
modification
of ground
leveling?
Is there
increased
traffic
movement
in the area?
Is there
public/comm
unity access
to/through
the area
affected?
Is there as
increased
economic
activity in
the area?
Is there as
increased
availability
of people in
the area?
Is there
displacemen
t of people
in the area?
Is the
displacemen
t involve
relocation of
affected
parties?
(Use additional sheet, if necessary.)
6
Components Answer Describe the Describe your
/ impacts Mitigating/
Parameters Yes No Enhancement
Measures
Will the
project
generate
wastewater?
Is there an
effect on the
quality of
the
receiving
body of
water?
Is there as
increase in
surface run-
off to other
area?
Is there an
increase in
water
demand?
Is there air
pollution
sources
equipment
to be
installed?
Is there a
generation
of solid
waste?
Is there an
increase
traffic
movement
in the area?
Is there an
increased
availability
of
employment
?
Is there an
increase in
pollution
from
migration?
Is there an
increase in
land value?
7
Is the
project’s
structure
affect or
obstruct the
view from
adjacent
areas?
Is there an
increase in
noise level
in the area?
Will it affect
the peace
order in the
area?
Others,
please
specify.
(Use additional sheet, if necessary.)
PROPONENT’S COMMITMENTS
8
Comply with existing environmental rules and
regulations, guidelines and criteria?
Comply w/ the MMoP
Construct, maintain and properly operate an adequate
and appropriate treatment facility for your liquid
wastes?
Contribute towards the operation and maintenance of a
municipal sewerage facility?
Construct, maintain and properly operate an adequate
and appropriate storage and disposal facility for your
solid waste?
Contribute towards the operation and maintenance of a
municipal solid waste management/disposal facility?
Maintain the cleanliness of your general surroundings?
Extend social benefits to the community?
Organize and conduct information, education and
communication (IEC) activities on environmental,
health and other civic issues?
Pay environment tax of free should this be deemed
necessary by the appropriate authority to maintain an
environmental – friendly area?
Contribute (cost-sharing basis) in government
undertakings on pertinent ( fast-food related) issued
( e.g., workshop, training, etc.)
Other, please specify
b) Establish an EMF/GF?
If yes, what is your proposed annual contribution?
____Yes _____ No
______________PhP/year
ATTACHMENTS
PERMITS/CLEARANCES ATTACHED?
Demolition Permit
Excavation Permit
Electrical Permit
Sanitary Permit
9
Building Permit
Water Rights Permit (NWRB)
.
PERMITS/CLEARANCES ATTACHED?
Locational Clearance/Certificate of
Locational Viability
DTI/SEC Registration
Safety (Fire) Permit
Municipal/Business Permit
DESCRIPTION ATTACHED?
Transfer Certificate of Title
Colored Photos of the site
(different perspectives)
Project Vicinity Map/sketch
DESCRIPTION ATTACHED
Map/delineation of primary &
secondary impact areas
Endorsement from the LGU
(Barangay Certificate)
Construction schedule in chart
from
ACCOUNTABILITY STATEMENT
__________________________________________
(Projects Proponent’s Signature Over Printed Name)
10