The internship took place at Rayalaseema Thermal Power Project (RTPP) in Andhra Pradesh, India from July 7-19, 2019. RTPP operates 5 coal-fired power generating units with a total capacity of 1650MW. During the internship, the student learned about the power generation process including the Rankine cycle, boiler components and operations, turbine components and visit to other plant divisions. The key learnings included understanding the plant workflow, organizational structure, boiler and turbine concepts, and efficiency improvement measures.

Uploaded by

Goutham Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views1 page

Internship Poster - Template

The internship took place at Rayalaseema Thermal Power Project (RTPP) in Andhra Pradesh, India from July 7-19, 2019. RTPP operates 5 coal-fired power generating units with a total capacity of 1650MW. During the internship, the student learned about the power generation process including the Rankine cycle, boiler components and operations, turbine components and visit to other plant divisions. The key learnings included understanding the plant workflow, organizational structure, boiler and turbine concepts, and efficiency improvement measures.

Uploaded by

Goutham Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Industrial Internship at RAYALASEEMA THERMAL POWER PROJECT

Duration : 07/06/2019 to 07/07/2019


PALLI GOUTHAM REDDY| 17BME0720 | School of Mechanical
Organization Information Engineering
Rayalaseema Thermal Power Project is a 1050MW coal plant in Muddanur, Cuddapah, district, Andhra Pradesh, India, operated by
Andhra Pradesh Power Generation Corporation (APGENCO). It comprises 5 units, each 210 MW, built between 1994 and 2010.
Rayalaseema Thermal Power Plant was developed under 3 stages namely stages I, II and III. It stood first in-country during 98-99,
2002–03, 2003–04 and second during 99-2000, 2001-02. The station has received Meritorious productivity awards for six consecutive
years and an Incentive award for seven consecutive years. BHEL commissioned stage IV unit 1x600MW in March 2018 leading to a
total installed capacity of RTPP to 1650MW.

Day to Day Activities


Day Date Activity
1 07/06/2019 introduction to RTPP. Rules and regulations followed in RTPP and safety measures should be followed in RTPP. Hierarchy in RTPP.
2 08/06/2019 Brief overview about the essential inputs to the power project. Visited the workshop and the work done by the workers.
3 10/06/2019 Power plant overview. There are 5 stages in the thermal power plant.
4 11/06/2019 class about auxiliary systems of the Power plant which consists of cooling pond, condenser and the pumps.
5 12/06/2019 Class on the Carnot cycle. To calculate thee efficiency of Carnot cycle.
6 13/06/2019 Class on the Rankine cycle.
7 14/06/2019 Class on the importance and improving Rankine cycle efficiency.
8 15/06/2019 A group discussion and suggestions about improving Rankine cycle efficiency.
9 17/06/2019 Introduction to steam generators. The boilers used in RTPP are the Babcock and Wilcox boilers.
10 18/06/2019 Introduction about the components of the boiler. Furnace ,drum, soot blowers, coal piping burners and Igniters and oil burners.
11 19/06/2019 Classification of boilers. Boilers are classified in many ways based on their position, size, amount of steam generated and circulation
12 20/06/2019 Discussion about high pressure and low-pressure boilers and firetube and water tube boilers.
13 21/06/2019 Boiler mountings and accessories. Mountings are used for safety where as accessories are used to increase the boiler efficiency.
14 22/06/2019 Performance of boilers. The parameters are evaporative capacity, equivalent evaporation, factor f evaporation, boiler efficiency.
15 24/06/2019 Explanation about boiler draught cooling tower.
16 26/06/2019 Explanation about boiler drum and electrostatic precipitator.
17 27/06/2019 Class on economizer. Location of economizer in the boiler and the function of economizer.
18 28/06/2019 Class on super heaters. Location of super heater in the boiler and the function of super heater in the boiler.
19 29/06/2019 Class on air pre-heaters. Location of air pre-heaters and the function of air pre-heaters..
20 01/07/2019 Discussion on overall plant efficiency improvement.
21 02/07/2019 Combustion equipment and firing methods and pulverized coal firing.
22 03/07/2019 Coal handling and preparation and ash handling and preparation.
23 04/07/2019 Turbine overview and components of the turbine. Geometrical dimensions of the turbine.
24 05/07/2019 Took a day to visit the electrical department in the thermal power plant. Visited steam generators in other divisions.
25 06/07/2019 I passed my greetings to my guide and the managers, junior engineers, workers as they shared knowledge to me and took my
certificate.

Key Learning Experience/Skills Acquired Certificate


• Understood the process flow involved in the power plant.

• Understood the organization structure and hierarchy of the organization.

• Concepts of Total Quality Management and Implementation.

• Gained hands on experience in assembly or tooling .

• Gained knowledge about the boiler and turbine and efficiency of the
rankine cycle.

• Understood various machining and fabrication process.

• Understood the work environment.

Provide the necessary proof for the key learning experiences you have
mentioned .

Supervisor of the Organization


Mr. G Sree Ramulu
Organization Name :RAYALASEEMA THERMAL POWER PROJECT
Contact Details including mail ID and Phone Number
9440907113, [email protected]