0% found this document useful (0 votes)
225 views2 pages

Sewerage Testing Price

This document provides unit rates for sewerage work items in RM (Malaysian Ringgit). It lists two work items - sewerage connections and sewerage testing. For connections, the range is RM1,000-RM5,175 and average is RM1,287.50 for location A and RM4,725 for location D. For testing, the fixed rate is RM50 per meter for location E. Contact information is provided for any questions about the rates.

Uploaded by

Aana Sams
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
225 views2 pages

Sewerage Testing Price

This document provides unit rates for sewerage work items in RM (Malaysian Ringgit). It lists two work items - sewerage connections and sewerage testing. For connections, the range is RM1,000-RM5,175 and average is RM1,287.50 for location A and RM4,725 for location D. For testing, the fixed rate is RM50 per meter for location E. Contact information is provided for any questions about the rates.

Uploaded by

Aana Sams
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 13.06.2019

Work Item Unit Overall Average (RM)


SEWERAGE No Location Range (RM) Average (RM) RM 3006.25
SEWERAGE
A 1000.00 - 1575.00 1287.50
Connections To Existing Works
Connect to existing pipework including all requisite D 4000.00 - 5175.00 4725.00
connectors and fittings all as per drawing No.
..........................., test all connections and make
good any defects and leave the whole pipework in
perfect

SEWERAGE m Location Range (RM) Average (RM) RM 50.00


SEWERAGE
E 50.00 50.00
TESTING
Test the whole of the sewerage system in the
presence of the S.O with water or other approved
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Water Leakage Test' between manhole work
at the end of the installation to the satisfaction of the
S.O.

1/2
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 13.06.2019

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: [email protected]