GWC Application New PDF
GWC Application New PDF
(II)Postal address
(IV)Taluk Name :
I Crop
II Crop
III Crop
DECLARATION
I hereby declare that the above particulars are true to the best of my knowledge
and I herewith enclosed all the certificates and documents for Departmental
perusal.Based on the document verification only the service charges are paid to the
Government . I will forego the charges and I will not claim the refund of service charges
in the case of incorrectness of facts in the certificate.
Place :
1. First well’s (in S.F No.) depth is --------------m and the spacing is------------- m,
2. Second well’s (in S.F No.) depth is --------------m and the spacing is-------------m,
3. Third well’s (in S.F No.) depth is --------------m and the spacing is------------ m,
4. Fourth well’s (in S.F No.) depth is --------------m and the spacing is------------- m,
5. Fifth well’s (in S.F No.) depth is --------------m and the spacing is--------------m,
6. Sixth well’s (in S.F No.) depth is --------------m and the spacing is--------------m,
Date:
Application-Annexure – II
Certificate on Spacing between proposed pumping wells and Palar river bank.
m vide above cited G.O. / does not fall in the Palar River basin.
And
-------------------------- District does not fall with in the vicinity of 250 m from any public
Date:
Application-Annexure – III
for pumping ----------------------Litres of Ground water from the well located in S.F. No. --
purposes and to transport ground water from the above location to different places .
Place: President ,
Certificate on Spacing between proposed pumping wells and Selected River banks.
(Vide G.O (1D) No.223 Environment & Forest (S3) Department dated 02.09.1998)
(Applicable only to the 14 types of industries cited in Annexure of G.O (Ms) No.213, for
Cauvery and its tributaries, Pennaiyaru, Palar, Vaigai & Thamiraparani Rivers)
Certified that the spacing between the Applicant Thiru. --------------------------for M/s-------
Date:
Application-Annexure – V
(Note: If the distance exceeds 10 km, exact distance need not be mentioned)
Date:
Application-Annexure – VI
Certificate of Assurance
I assure that in the case of the, SG &SWRDC , WRD, issue the Ground
water Clearance to me / the firm , for industrial / commercial / Infrastructures
purposes, the electricity connection obtained for the purpose of Agriculture will be
changed to “ Commercial Purpose”.
Place: Applicant
Date:
Witness:
1.
2.
Application-Annexure – VII
Certificate of Assurance
Place: Applicant
Date:
Witness:
1.
2.
Application-Annexure – VIII
Certificate of Assurance
separate bore well will be constructed, maintained and handed over to SG &SWRDC in
Place: Applicant
Date:
Application for the Groundwater Clearance -NOC-List of Documents to be
enclosed with the Application
1. Attested copy (Notary public) of registered land ownership document in the name of applicant or
registered lease agreement for a minimum period of 10 years in the name of applicant.
3. Not to scale topo sketch showing the location of the applicant wells and the industry, surrounding
wells with the spacing.
6. Annexure I - The distance between the proposed well for groundwater extraction and
nearest wells and the depth of the wells to be certified by the revenue inspector of that area.
7. Annexure II - The distance between the well proposed for extraction and the bank of Palar river
(Palar basin rules) to be certified by the revenue inspector of that area (which is applicable for Palar
basin area) and the certificate of the distance between proposed well and nearby Drinking Water
supply scheme wells .
8. Annexure III - “No objection certificate” from the concerned village Panchayat for the proposed
quantity of groundwater extraction and transportation of ground water if any.
9. Annexure IV - The distance between the well proposed for extraction and nearest surface water
body such as tank, canal, stream, river etc., to be certified by the revenue inspector of that area.
10.Annexure V - The distance between the proposed well for groundwater extraction and the
coastal line (beach) to be certified by the revenue inspector of that area
11. Annexure VI - Undertaking letter by applicant regarding the change of EB service for agriculture
to commercial in the event of awarding groundwater availability certificate.
12. Annexure VII – Undertaking from the applicant towards construction of RWH if groundwater
availability certificate is awarded.
13. Annexure VIII - Applicants should submit the undertaking that they must erect and handover
one borewell to the State Ground and Surface Water Resources Data Centre for observation of
water level and quality.
14. Annexue IX (Certificate from local body for Surface Water Supply)
16.Under taking of the applicant regarding the pumping test for issuing NOC.
18. If existing company – copy of ISI Certificate, TNPCB Certificate, Food safety certificate etc.,