Bending Moment Calculation - Anticreep Center, One Cantilever, Tangent Track
Bending Moment Calculation - Anticreep Center, One Cantilever, Tangent Track
Wind Blowing
Parpendicular to Wind Blowing Parallel
Wind Loads Lever Arm Load track to Moment
Bending track -Y
Bending Moment axis
m (Kgf) X- Axis Y - Axis Load BM(Kgf-m)
IR Catenary + 1/2 Dropper 7 47 332 0
IR Contact Wire + 1/2 Dropper 5.8 55 321 0
Earth Wire 7.33 55 407
AntiCreep Wire 7 28 198
Mast (WxL) 4.05 250 1014 247 998.91
Bracket 7.1 40 284
Total Wind Load 334.05 40.00
Total BM Due to Wind Load (Kgf-m) 2272 0 1283
For Normal Mast
d=D x β X (T'-T) 0m
Where
D = Distance of the mast from the anticreep 0
β = Co-efficient of linear expension 1.7E-05
T' = Maximum Temprature =65 oC 65
T = Avg. Normal Temprature =35 oC 35
Due to all the loads acting on the bracket will produce BM along YY' axis of
the BFB
BM at the base due to horizntal loads = Horizental Load X (d/a) X Ht above
the Foundation
BM at the base due to vertical load W = Wxd (OHE)
∑Hy Sum of all the horizental Forces Acting parallel to the track Kgf
∑Mxx Sum of all the Moments Acting Perpendicular to the track 3254.421 Kgf-m
∑Myy Sum of all the Moments Acting parallel to the track 0.00 Kgf-m
σbcx.cal Calculated bending compressive stress in the extreme fibre 638.12 Kgf/cm2
σbcy.cal Calculated bending compressive stress in the extreme fibre 0.00 Kgf/cm2
σbcx Premissible bending compressive stress in extreme fibre. 1616 Kgf/cm2
σbcy Premissible bending compressive stress in extreme fibre. 2242 Kgf/cm2
The Worst stressed section is obviously near the top of the foundation
Therefore
If Ratio (𝜎𝑎𝑐.𝑐𝑎𝑙)/𝜎𝑎𝑐≤0.15
and
(𝜎𝑎𝑐.𝑐𝑎𝑙)/𝜎𝑎𝑐+(𝜎𝑏𝑐𝑥.𝑐𝑎𝑙)/𝜎𝑏𝑐𝑥+(𝜎𝑏𝑐𝑦.𝑐𝑎𝑙)/𝜎𝑏𝑐𝑦≤1.0
0.42