A formal systematic process of risk assessment and safe work methods is required to identify hazards, evaluate risks, and implement control measures to ensure safety. Special risk assessments are needed for young workers, pregnant women, disabled workers, and lone workers due to their unique risk factors. A permit-to-work system using 4 elements of issue, receipt, clearance, and cancellation should be implemented for high risk activities.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
93 views31 pages
Factors To Be Considered in Developing A SSW
A formal systematic process of risk assessment and safe work methods is required to identify hazards, evaluate risks, and implement control measures to ensure safety. Special risk assessments are needed for young workers, pregnant women, disabled workers, and lone workers due to their unique risk factors. A permit-to-work system using 4 elements of issue, receipt, clearance, and cancellation should be implemented for high risk activities.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31
Safe System of Work
A formal systematic, documented process of examining a work,
Identifying the hazards & define safe work methods by ensuring safety of Person, Equipment, Material & Environment • Factors to be considered in developing a SSW Nature of the work, Hazards & Risk involved Legal requirements Competency of person identifying hazards & doing the work, PPE requirements, Level of supervision Equipment design, adjustability, suitability for work & environment, inspection & maintenance Quality & quantity of material, waste management House keeping requirements, availability of Atmospheric monitoring, Emergency procedures & communication Recommendations fromAuditors, Insurance, Risk assessor, accident investigator etc Risk Assessment A formal systematic documented process of Identifying the hazards, evaluate risk and recommend control measure in order to eliminate Hazard or reduce risk to acceptable level as far as reasonably practical • Steps of Risk Assessment – Identify the hazard – Identify who (number of people) might be harmed and how they might be harmed. – Evaluate the risk and recommend control measure – Record all significant finding and implement control measure – Review as and when required Hazard Identification Health & Safety hazards can be identified by • workplace Inspections( Using technique of observation, Interview, Examination of records) • Reference to:- • Legislation: ‐ Standards, guidance documents. • Manufacturers’ information: ‐ Safe use, maintenance, cleaning. • Incident data: ‐ Accidents, near-misses, ill health. • Task analysis: ‐ Analyses job components before the job starts. Identify who might be harmed & how • Workers/operators/ helpers/ supervisors. • Managers/Maintenance staff. • Cleaners. • Contractors. • Visitors/ Inspectors. • Members of the public (also trespassers). Identify Unsafe Acts & Conditions Evaluate the Risk& Recommend Control measures • Risk ( Likely hood X Severity) can be evaluated using – Qualitative method ( Using terms like, High, Medium , Low) – Semi quantitative method( Using numericals & action verb for Severity, likelihood & Risk rating)
▪ Reasonably Practical Control measures need to
recommended as per hierarchy of controls Record Significant Findings& Implement control measures • Significant finding need to recorded as a matter of evidence of management commitment and reference for review. • Ensure that all implemented control measures are effective in preventing accident, ill health and no additional hazard/ risk is generated. Review •Significant change in: • Process. • Substances. • Equipment. • Workplace environment. • Personnel. • Law. •If it is no longer valid: • Accident. • Near-miss. • Ill health. • Periodically, e.g. annually. Risk Assessment Team • Manager responsible for the work & area of operation • Technical Specialist • OHS specialist • Supervisors • Workers involved in the task Qualities of a Risk Assessor (Factors to be considered when selecting team for Risk Assessment) Knowledge about – Hazards & Risk involved in their job – Technical knowledge – Legal requirements applicable – Selection & use of reasonably practical control measures. – Emergency procedures& communication • Skill – Report Writing – Inspection, Communication, Experience • Attitude – Dedication, committed Criteria for Risk Assessment to be suitable and sufficient • Risk assessment is suitable when it meet with the Nature of job, legal requirements & sufficient when the residual risk is reduced to Acceptable, tolerable level within ALARP. • For which – State the name/competence of assessor., sign, date – Identify significant hazards and risks. – Identify persons at risk. ‐ Workers and others, e.g. visitors and vulnerable. – Evaluate effectiveness of current controls. – Identify additional controls. – Record significant findings. – Enable employer to prioritise controls & check effectiveness after implementation. – State validity period for review if there is no significant change. Criteria for Risk Assessment to be suitable and sufficient • Risk assessment is suitable when it meet with the Nature of job, legal requirements & sufficient when the residual risk is reduced to Acceptable, tolerable level within ALARP For which:- • All hazards need to be identified by a competent team & the name, signature mention on it along with date. • All people who can be affected need to be identified especially the vulnerable category along with how they can be affected. • Risk need to be evaluated using qualitative or semi quantitative methode . • Evaluate effectiveness of existing control measure before recommending additional controls. • All finding need to recorded, implement controls, evaluate its effectiveness. • Put a date for review ( annually)unless required People requiring special risk assessment: • Young people. • New or expectant mothers. • Disabled workers. • Lone workers. Why Young Persons need special risk assessment? • Under 18 (national law). • Lack of experience. • Physical and mental maturity. • Poor risk perception. • Influenced by peer group. • Eager. • Control measures: ‐ Prohibit certain high-risk activities, e.g. high-risk machinery. ‐ Restrict work patterns and hours, e.g. no overtime. ‐ Additional Training ‐ Work only under supervision. ‐ Enforce PPE use Identify factors you will consider when deciding the level of supervision required for young workers • Nature of work, Hazards & Risk involved in it • Legal requirements for the job. • Level of knowledge • Age • Qualification • Project experience • Behaviour pattern seen during interview • Medical reports & perceptions • Presence of negative peer • Availability of resources : eg PPE, Training facility, communication • Recommendations: Risk Assessor, Auditors etc. Why Pregnant Woman need special risk assessment? • Pregnant lady involves more This needs to be Controlled than one life and the baby may be affected from Hazards: by: • Certain chemicals, e.g. lead. • Eliminate them from • Certain biological agents, e.g. certain high risk activates rubella virus. Eg: Night shift, lab work • Manual handling. • Buddy system • Temperature extremes. • Maternity leave • Whole-body vibration. • Ionising radiation. • Review emergency • Night shifts. procedure & First Aid • Stress. measures • Violence. • Noise Why Disabled worker need special risk assessment? • Select as per Health and fitness criteria for some • Have difficulty in jobs – Sensing the hazard • Modify equipment as per – Communicating the hazard need – Responding to hazard • Rearrange the workplace as the needs Eg Ramp in place of stairs • Provisioning of safety device • Buddy system • Review emergency procudure. Why Lone working needs Risk Assessment Precautions Hazards • Remote supervision. • Lack of assistance if things go wrong. • Logging workers’ locations. • Communication with • Mobile phones or radios(if colleagues more permitted). difficult, • Lone-worker alarm systems. (Out of eyesight, Out of earshot) • Procedures for lone workers. • Emergency procedures. • Training for workers. • No lone working for high- risk activities, e.g. confined spaces. (if reasonable Practical) A university employees security guard after working hours. Identify steps you can take to ensure his OHS? • Eliminate lone working with • Increase frequency of Inspections. buddy system if practicable. • Training on all foreseeable • Security cabin emergencies • High wall around campus • SOP for lone working • Security gate • Remote supervision: CCTV, GPS, • Access control : ID card Visit Patrol, Log book • Panic Alarm • Prohibition signage: Trespassing • Communication device • Risk assessment (Phone) • Shift work, Health check up • Welfare, Emergency procedures • PPE based on climate/ culture. When PTW is used • Use only for High Risk Activity. • Use only for non routine works • When work is done outside the designated area. • Where information need to be passed to all concerned about the high risk activity. • Where ever Isolations/ LOTO required. 4 elements of PTW
1. Issue.
2. Receipt.
3. Clearance/return to service.
4. Cancellation.
May also be an extension
Issue • Permit Number • Date, Time, Location of work • Nature of work • Duration of work • Details of Equipment, Material , People involved • List of hazards • Details of controls applied Additional Informations • Details of PPE • Atmospheric monitoring reports/ house keeping details • Topic of TBT • Isolations (LOTO) • Emergency communication measures Name of the person issuing permit, Sign, Date, Designation Receipt • Declaration from the workers that they are fully competent to do the work, fully aware of the hazards, controls to be applied including the emergency procedure & communication, takes responsibility of the equipments, materials they use. • Name, Sign, Date, Designation of permit receiver Clearance • Declaration from the work participants that the work finished safely, men & material exited safely and the workplace may be handed over.
• Name, Sign, Date, Designation of people
cleared Cancellation/Extension • Declaration that the workplace has been inspected and found safe after clearance. • Isolations can be removed. • Service can be resumed • Name of the person cancelling the permit, sign, date, time, designation • If the work is not finished permit may be extended under conditions. Reasons why a PTW may fail • PTW remaining as a paper work • All hazards not identified • Control measure not provided/ applied • Communication about the work not done • Isolations, LOTO not applied/ removed • Permit issued, hazard identification by incompetent person • Equipment material unsuitable for work/environment & changed during work • No proper clearance after job(eg: tools leftout) • Cancellation/ extension with out inspecting workplace or by incompetent person. Why Hot work needs PTW Hazards Precautions • Remove flammable • Radiation exposure(UV) materials. • Metal Fume • Fire-retardant • Ergonomic issues from blankets/screens. posture • Floor swept of debris. • Stress due to continuous • Floors damped down, if focus, hot environment necessary. • Fire/Explosion • Fire extinguishers at hand. • Electric shock • “Fire-watcher” present. • Falling of cylinders • Post-work checks to ensure • Trip hazards no smouldering embers. • Only competent people to work • Use Fire resistant PPE • Follow appropriate welding methode Why Hot work needs PTW Precautions • Only competent worker to do hot work Hazards • They must wear flame resistant • Radiation exposure(UV) PPE/RPE • Metal Fume • Must have TBT, Supervision & Job • Ergonomic issues from posture rotation. • Stress due to continuous focus, hot • Use only quality assure equipment/ environment material after inspection/ maintenance. • Fire/Explosion • Use of safety device- earthing, flash • Electric shock back arrestor, fire extinguisher with fire • Falling of cylinders watcher. • Trip hazards • Remove all combustible material, cover things which cannot be removed, damp wooden floors and provide flame proof screens in the hot work area. • Use metal catch tray and Local Exhaust system, signages, spot lighting. • Follow manufactures recommendation and safe welding methodes. • Work must be justified Why Work on live electrical line needs PTW Hazard Precautions • Electric shock • Justify the work/ if possible work on • Fire / explosion dead system.(Isolation/LOTO) • Burn • Reduce voltage if justified • Arching • Barricade work area to prevent unauthorised access • Maintain safe distance from Overhead lines • Use non conductive materials/tools • Use of earthing, fuse, RCD etc • Only competent people to work • Ensure supervision/ Signage • Job rotation for workers: reduce Fatigue • Emergency procedure • Use insulated rated PPE Why Confined Space need SSW Hazards Precautions – Enclosed in nature • Only minimum Competent people. (ventilation will be • Supervision. restricted and access/ • Communication. egress may be difficult). • Atmospheric testing/monitoring. – One or more foreseeable • Ventilation. specified risks exist: • Removal of residues. – Fire or explosion. • Isolation, lock off of in-feeds and out-feeds. – Loss of consciousness • Isolation, lock off of from gas, fumes, electrical/mechanical hazards. vapour, lack of oxygen. • PPE. – Drowning. • Access/egress. – Asphyxiation from • Fire prevention. free-flowing solid. • Lighting. – Loss of consciousness • Suitable equipment, materials to be used. from temperature. • Emergency/rescue procedures. 1.What arrangements shall be done when people need to work alone? 2. Explain why young people are vulnerable to accidents? 3.On what conditions a risk assessment can fail? 4.Explain factors to be considered when developing SSW? 5. Explain the principles of Risk Assessment? 6. Why a PTW system is used for some work activities? (3M) 7. What type of work activities would you use a PTW? (5m) 8. What do you need to have in place for PTW to work in practice? (8 M0 9. What roles should be allocated in a PTW? (4m)