This document provides information on a project to provide bituminous concrete (BT) pavement from CK Road to Bayana Palli Village in Chennur Mandal, Andhra Pradesh. The estimated cost is 182 lakh rupees funded by PMGSY Phase II. Subgrade stabilization will be done using Terrazyme. Periodic data on rut depth, cracking, potholes, and other metrics will be collected to monitor the pavement's performance. Initial data collected includes soil properties, traffic volumes, drainage details, and material specifications.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
40 views
New Format
This document provides information on a project to provide bituminous concrete (BT) pavement from CK Road to Bayana Palli Village in Chennur Mandal, Andhra Pradesh. The estimated cost is 182 lakh rupees funded by PMGSY Phase II. Subgrade stabilization will be done using Terrazyme. Periodic data on rut depth, cracking, potholes, and other metrics will be collected to monitor the pavement's performance. Initial data collected includes soil properties, traffic volumes, drainage details, and material specifications.
Type of adjoining land (agricultural, built 2 Agricultural Land up, canals, ponds, etc) Annual average rainfall Yearly - 710mm 3 Monthly variation of rainfall 0mm in January to 137mm in October Variation of average monthly air Maximum - 15 oC 4 temperatures (maximum and minimum) Minimum - 44 oC Depth of ground water table from 5 Max than 5m pavement surface 6 Original construction or up-gradation Original construction Number and type of CD works within the 1No - 2ms pan slab culvert 7 length of the pavement section 10 Nos - 1000 mm Pipe culvert KM 3.10 to KM 5.427 of total KM 0.00 to Chainage of section (From KM.. To KM, KM 8.83 8 location with reference to permanent land Location of start @ KM / of CK road NH marks) 44 9 Length of section 2.327 / 8.83 KM
Cross sectional details of the original and Original New Section
new sections. (formation width, shoulder FW 6.00/8.00 (Builtup/Op) 10 width, carriageway width, side slopes) of Roadway 6.00 m the original and new sections CW 3.75 3.75m
Height of embankment of the original and
11 new roads 12 Year and month of opening to traffic Sectional details include the details of 13 layers of old pavement if any (material - Nil - type, width and thickness of each layer) Provision mae for surface drainage 14 - (whether side drains provided?)
Provision made for subsurface drainage
(whether drainage layer provided, what is the material used in the drainage layer, 15 - No - width and thickness of drainage layer, arrangement made for end pluggin the drainage layer etc)
16 Dry density of each layer and shoulder Subgrade - 1.97 Gm/CC, Shoulder -
Special features such as adjacent ponds,
17 canals, slope retaining structures etc
Subgrade soil type (classification) and
18 CBR (soaked and unsoaked) used in the CBR - 5.20% (KM ) preparation of the estimate 19 Traffic (CVPD) assumed for design 53 CUPD Average CBR (soaked or unsoaked) 20 value of subgrade as determined during construction 21 CBR value of the borrow soil used
24 shoulder (PI, CBR, field dry density). (carryout complete wet sieve analysis) 25 Grade of bitumen used UG 30 Type and Rate of emulsion used for Prime coat - SS1 26 prime and tack coats Tack coat - RS1 Condition of the CD works located within 27 or nearer to the section. Assessment of the effectiveness of the 28 surface drainage Name of the Work Providing BT to the road from CK road to Bayana Palli (V) Kailangagir Kona of Chennur Mandal
Est. Cost Rs. 182.00 Lakhs Grant :
Type of Technology adopted Subgrade stabilisation using Terrazyme
Periodic data collection :
Subject on which data would be
S.No. Observed Data collected Rut depth measured using a 3m bar in 1 each 25m section Percent of bituminous surface cracked 2 (based onvisual estimation) and class of cracks
3 Extent of edge failures, if any
4 Condition of shoulder
5 Number and extent of potholes
6 Extent patching done
7 Length, width and depth of depressions
8 Extent of raveling
9 Longitudinal and transverse cracks
Traffic volume count (to be done yearly
twice -3 day average with loading assessment on visual observation) 10 Specific trends in terms of seasonal variations in the loads carried by the vehicles will be useful for analyzing the performance of the pavement Subgrade moisuture content at three to 11 four locations for each section 12 Surface Roughness using MERLIN Dynamic Cone Penetration Value of 13 different layers at three to four locations for each section
14 Cross slope (camber) -
15 Condition of side slopes, side drains
Identify presence of trapped water in any
16 of the layer
Identify failures that can be associated
17 with embankment failure
Rainfall in 2019 - 258.2 mm
Data on the seasonal variation of rainfall 18 airtemp - 23.05.2019 Max - 44 oC and air temperatures will also be useful Min - 30 oC