Master Data
1) Define Distribution Keys
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Material List > Item Data >
Item Data from related areas > Define Distribution Keys -done
2) Determine Person responsible for Resource
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine
Person responsible - done
3) Define Planner Group-
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner
-done
4) Define Capacity Planner
IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning
> Determine Capacity Planner - done
5) Determine Standard Value Parameter
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value >
Define Parameter -done
6) Define Setup Groups and Setup Group Categories
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and
phases > Define set up groups and set up group categories - not done
7) Define copy setting between plants-Process
IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting
between plantsnot done
8) Define Set up Control Recipe destination
IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up
control recipe destinationnot done
9) Define MRP controller
IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller -done
10) Special Procurement
IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement
types -done
11) Define Floats (Scheduled Margin Key)-
IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin
Key) -done
12) Define Splitting of Forecast requirements for MRP-
IMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splitting of
forecast requirements of MRP -not done
13) Maintain Correction Factors for Forecast
IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction
factors for forecast -not done
14) Carry out Overall Maintenance of Plant Parameters
Maintaining plant parameters in MRP
IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall
maintenance of plant parameters -done
15) Define Planning Horizon
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning
Horizon -done
16) Activate Requirement planning
IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning
-done
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
Range of coverage profile
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of
coverage profile (Dynamic Safety Stock) -done
18) Define Stock in Transfer and Blocked Stock Availability
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define
Stock in transfer and blocked stock -done
19) Define MRP Areas
IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas -
done
20) Carry out maintenance of MRP groups
IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP
groups -done
21) Define Scope of total Planning - MRP
IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning- not
done