Master’s Thesis in the International Master’s programme Product Development
JONAS HELGESSON
JONAS HELGESSON
ISSN 1652-8557
Department of Product & Production Development
Chalmers University of Technology
SE-412 96 Göteborg
Sweden
Telephone: + 46 (0)31-772 1000
Cover:
Bucket for underground loader in EDEM simulation with particle velocity displayed.
Chalmers reproservice
Göteborg, Sweden 2010
Optimization of bucket design for underground loaders
Master’s Thesis in the Master’s programme Product Development
JONAS HELGESSON
Department of Product & Production Development
Chalmers University of Technology
Abstract
An optimized bucket design is important for increasing productivity and loading
performance for underground loaders. Design theories are today difficult to evaluate
due to lack of verification methods. Later year’s development of simulation software
and computers has made it possible to verify the design by simulating the loading
process. The purpose with this thesis has been to both develop and use a simulation
model of the loading process for one of Atlas Copco's underground loaders.
A simulation model was developed in the program EDEM. EDEM uses the Discrete
Element Method for simulating granular materials, which in this case was blasted
rock. Factors such as particle flow, particle compression and loading setup adds
complexity and uncertainty to the task. Nevertheless was a model that was able to
detect force variations from small design changes developed.
The tractive effort is the horizontal force the loader can generate. This the critical
factor when loading rocks, with use of EDEM different bucket designs could be
evaluated by studying the horizontal force in the simulations. The simulation model
was compared with practical tests.
The edge thickness of the bucket lip was the individual design parameter that had the
largest influence on the horizontal force; a thin edge generated lower force. In general
a bucket with sharp and edgy shape gave lower forces. The attack angle (bottom
angle) had low influence on the horizontal force.
Key words: Bucket design, bucket filling, DEM simulation, underground loader
I
II
Table of Contents
ABSTRACT I
PREFACE V
NOTATIONS VI
1 INTRODUCTION 1
1.1 Project Background 1
1.2 Company Background 1
1.3 Problem Description 1
1.4 Purpose 1
1.5 Limitations 2
1.6 Method 2
2 THEORY 3
2.1 Machine 3
2.2 Working Cycle 3
2.3 Loading Material 4
2.4 General Bucket Background 5
2.5 Bucket Loading Theory 5
2.6 Description of Discrete Element Method 6
2.6.1 DEM Program Theory 7
3 EXECUTION 9
3.1 Practical Test of Scoop Loading 9
3.2 Simulation Model in EDEM 10
3.2.1 Selecting Parameters in EDEM 10
3.2.2 Defined Motion Path in EDEM 12
3.2.3 Bucket Design Parameters 13
3.2.4 EDEM Setup Description 14
3.2.5 Evaluation of Output from EDEM Simulations 15
4 RESULTS 17
4.1 Outcome of Practical Test 17
4.1.1 Loading Test 17
4.1.2 Penetration Test 17
III
4.2 Investigating the Influence of Design Parameters 17
4.2.1 GII Bucket 17
4.2.2 Lip Profile 18
4.2.3 Base Plate Profile 19
4.2.4 Side Plate Profile 20
4.2.5 Support Plate 21
4.2.6 Edge Thickness 21
4.2.7 Lip Chamfer Angle 22
4.2.8 Lip Angle 23
4.2.9 Attack Angle 24
4.2.10 Side Plate Angle 25
4.2.11 GET 25
5 CONCLUSIONS 26
5.1 Practical Test 26
5.2 Investigating the Influence of Design Parameters 26
5.2.1 GII Bucket 26
5.2.2 Lip Profile 26
5.2.3 Base Plate Profile 26
5.2.4 Side Plate Profile 27
5.2.5 Support Plate 27
5.2.6 Edge Thickness 27
5.2.7 Lip Chamfer Angle 27
5.2.8 Lip Angle 27
5.2.9 Attack Angle 27
5.2.10 Side Plate Angle 28
5.2.11 GET 28
6 DISCUSSION 28
6.1 Reflections on EDEM 28
6.2 Recommendations 29
7 REFERENCES 30
7.1 Literature 30
7.2 Internet Sources 30
7.3 Interviewees 31
A APPENDIX 32
A1 Technical Specification ST7 32
A2 Mining Process 33
A3 Bucket Motion in EDEM 35
A4 Force Graphs GIII 35
IV
Preface
The purpose of this thesis is to develop and use a simulation model of the loading
process for buckets of underground loaders. The thesis was initiated both by Atlas
Copco Roc Drills AB (Atlas Copco) and Chalmers University of Technology. The
project has been financed by Atlas Copco and performed at the department for
underground loaders in Örebro, Sweden. The time frame for this project has been
January 2010 – June 2010.
The student performing the work has been Jonas Helgesson. Supervisor from Atlas
Copco has been Stefan Nyqvist and assistant supervisors have been Anders Fröyseth,
Andreas Nord and Morgan Norling. Examiner and supervisor from Chalmers has been
senior lecturer Göran Brännare from the Department of Product and Production
Development, Chalmers University of Technology, Göteborg, Sweden.
I would like to thank all in the department for underground loaders at Atlas Copco for
their support and help, especially Stefan Nyqvist, Anders Fröyseth, Martin Hellberg,
Kjell Karlsson and Andreas Nord. I would also like to thank my supervisor at
Chalmers, Göran Brännare.
Örebro 23rd of June 2010
Jonas Helgesson
V
Notations
deg Degrees
CAE Computer Aided Engineering
COR Coefficient of Restitution
DEM Discrete Element Method
ECTS European Credit Transfer System
EDEM Engineering Discrete Element Method
FEM Finite Element Method
G Shear modulus
GET Ground Engagement Tools
LHD Load Haul Dump
MBS Multi Body Simulation
mm Millimetre
rpm Revolutions per minute
s Seconds
ST Scoop Tram
α Inclination of soil pile
β Inclination of the initial phase of trajectory
∆t Time step
δ Attack angle
µs Static Friction
µr Rolling Friction
ν Poisson's ratio
VI
1 Introduction
1.1 Project Background
This report is the result of a master’s thesis conducted at Atlas Copco Rock Drills AB
(Atlas Copco) in Örebro during spring 2010. It covers 30 ECTS (European Credit
Transfer System) points.
Atlas Copco wants to investigate the design of the buckets for underground loaders
used for loading rocks. Within the company there are some theories and knowledge
about how the design of the bucket influences the loading performance, but the lack of
verification of this information makes it difficult to optimize the design.
Development of simulation software and computers has made it possible to simulate
the loading process of a bucket, this development has realized possibilities to gain
knowledge in this area.
A computer software named EDEM (Engineering Discrete Element Method) has
successfully been used for simulations of rock crushing at Chalmers. Other actors
have used EDEM for bucket simulations, this emphasizes the possibility to use EDEM
for simulating the loading process.
1.4 Purpose
The purpose of this thesis is to develop a simulation model of the loading process for
buckets of underground loaders. The influence from different design parameters will
then be investigated, to generate guidelines for the design of the next generation of
buckets at Atlas Copco.
1
Another aspect of the thesis is to investigate the potential of the computer software
and look for more areas of application than only design of buckets.
In an educational view the purpose of this thesis is to gain knowledge in the following
areas: The discrete element method, working with simulation programs and get an
understanding for the relation between reality and a virtual simulation.
1.5 Limitations
The main focus will be on investigating the bucket design. One moving trajectory for
the bucket will be defined and used in the simulations. The thesis will focus on Atlas
Copco’s scooptram ST7, see Figure 1, with a standard bucket. No full scale testing of
modified buckets will be performed. Other design aspects, such as wear resistance and
rigidity will not be prioritized.
If time is available also other sizes of loaders will be investigated.
1.6 Method
A simulation model of the loading process for buckets of underground loaders will be
developed. The model will then be used to investigate which parameters that affect
the loading result. The final step will be to optimize the loading parameters to achieve
an efficient loading process. Program to be used for this task is EDEM, also ADAMS
can be necessary to use. Real tests will be performed to analyze today’s existing
buckets and to generate result to use for verification of simulations.
Existing knowledge on the market and within Atlas Copco will be collected and
compiled.
2
2 Theory
2.1 Machine
The Atlas Copco ST7 is a LHD (Load-Haul-Dump) machine and is used for loading
blasted rock material in mines. In general it works as a normal wheel loader, the
difference is the compact design to be able to navigate in narrow underground paths
and the high loading weight capacity due to the heavy loading material. Compared to
a wheel loader the operator’s visibility is much more limited. It is difficult for the
operator to get a good view of the material flow into the bucket during loading. For
technical specification of ST7 see Appendix A1.
3
Figure 3: The rock is transported to truck with bucket in tramming position.
Figure 5: Material used for performing loading tests, the yellow ruler has a length of 50cm.
4
2.4 General Bucket Background
Compared to standard wheel loaders the bucket equipped on underground loaders has
a more robust design, see Figure 6 and Figure 7. The more robust design for
underground loaders is required due to intensive operation conditions in mines.
Severe wear on the bucket during operation leads to a bucket having a lifetime of
approximately 8000h, the lip is usually replaced after 500-1500h. To replace a worn
out bucket is an expensive cost for mining companies.
The hard and aggressive loading material is difficult to penetrate with a bucket. Low
penetration force is therefore a prioritized area when designing buckets for mining
industry.
The height and width of the bucket is limited by the machine size. The bucket shall be
2-3dm wider than the machine and not reach above the machine body.
Figure 6: Volvo wheel loader bucket. Figure 7: ST7 GIII standard bucket.
Figure 8: Measured forces for dragline bucket. Figure 9: Forces on each bucket part.
5
Maciejewski [7] did a study where the aim was to optimize the digging process and
bucket trajectories. It was shown that the most energy efficient bucket is the one
where the pushing effect on the back wall is minimized.
Esterhuyse [5] and Rowlands [9] investigated the filling behaviour of scaled dragline
buckets. The bucket with the shortest fill distance was found to produce the highest
peak in drag force. When filling an underground loader the peaks in drag force are
critical since at these points the machine start to slip.
An interesting design parameter on the bucket is the attack angle (bottom angle). The
effects of the attack angle have been studied by Maciejewski [7]. Attack angles of 5˚,
15˚ and 30˚ were tested, the result is seen below in Figure 10 and Figure 11. The
bucket was moved into the pile horizontally.
β - inclination of the initial phase of trajectory (equal to 0˚ in test)
α - inclination of soil pile (equal to 50˚ in test)
δ - attack angle
Figure 10: Scheme of rotational cycle. Figure 11: Specific energy versus the attack
angle for different bucket motion.
When only a translational motion was applied to the bucket the total energy for
loading increased dramatically with a higher attack angle, see Figure 11. But when a
rotational motion was added to the bucket the change in energy was close to zero.
Atlas Copco's loaders are using a rotational motion. According to Maciejewski's study
a variation of the attack angle, on Atlas Copco's bucket, will have a low impact on
loading energy.
6
For more complex problems, e.g. components of flexible material, the finite element
method (FEM) is used. FEM divides the component into small elements. The
behaviour of each element is approximated by simple mathematical description with
finite degrees of freedom. With use of FEM a correct behaviour of the component can
be calculated. FEM is used for individual components/bodies with known boundary
conditions.
Figure 12: Left, typical FEM application. Right, typical DEM application.
A problem, such as calculating the motion of a pile of rock, generates too complicated
computations if every stone is taken into account. The FEM approach is based on that
the material remain in the same position throughout the simulation and is there for not
suitable to use for simulations of a granular material.[6]
The most common method to use for analysing granular material, e.g. a pile of rock, is
DEM. DEM is treating the rock pile as a collection of independent units, each stone in
the pile is an individual unit and each stone is free to move according to its forces.
The behaviour of the stones is calculated from contact between them, velocity and
deformability. With use of DEM a good approximation of blasted rock can be reached
if the problem dimensions, material properties and boundary conditions are properly
defined [6]. Compared to FEM, DEM is used for units in motion and FEM is focused
on material deformation. Typical examples of FEM and DEM are displayed in Figure
12.
2.6.1 DEM Program Theory
A DEM program involves a lot of complicated computations. A simplified description
of the computations process follows below:
A timestep, ∆t, is defined in the DEM program. ∆t specify with what interval the
position and motion of the particles should be recalculated. The following loop (1-5)
is run every timestep in the DEM program and describes more into detail how a DEM
program works.
1. Position and motion of each particle is registered
2. Particle contact detection
The problem domain is divided into a cubical mesh. Position of
particles in the same "cube" are compared to track if intersection
appear.
3. Contact zones are determined
4. Intersection distances are determined
7
5. Forces are determined
The forces are calculated with use of all previous collected data about
motion and contact, together with material and material interaction
properties.
It is of importance that the timestep is selected correctly to avoid large intersections
which will result in large unrealistic forces. The simulation time is related to the
timestep, a smaller timestep generate longer run times. [12]
8
3 Execution
3.1 Practical Test
est of Scoop Loading
A practical loading test was performed in connection to Lovisagruvan situated in
Västmanland, Sweden.. The test was performed at surface level,
level abovee the mine. Two
ST7 machines were used and two different buckets,
buckets GII and GIII (see Figure 13), was
mounted on the machines. The buckets had equal capacity, built for a material density
of 2.2ton/m³ and had a volume of 3.1m³.
3.1m³
Figure 13: ST7 GIII bucket, left, and ST7 GII bucket, right.
A pile of greystone,
eystone, with a density of approximately 1,6ton/m³, was built up to use for
the loading test, Figure 14.
14 The material had an average diameter between 10 to 15cm.
Compared to a normal loading material in a mine this was more loosened
loosen up and the
density was lower, which
hich make it an easy material to load.
Twoo types of loading procedures were
were tested. One where efficient loading was
prioritized i.e. a combination of short loading cycle and high filling grade was the
aim. In the second test
st maximum filling was prioritized.
prioritized. Each test was performed 10
times with bothth buckets. The result was generated by measuring the weight of the load
and the time for performing a loading cycle.. Other factors were also taken into
account, the operator's opinion
opi and the visual image of the test.
An additional test was performed where the penetration distance of the bucket wasw
measured. The loader was driven into the pile until the wheels started to slip, without
any tilting of the bucket
9
3.2 Simulation Model
M in EDEM
EDEM (Engineering Discrete Element Method) is a program developed in Scotland
by the company DEM Solutions. The program uses DEM to simulate granular
materials in motion. EDEM models the material
material as a group of individually particles
that interact only at the inter-particle
inter contact points. [11]
10
Table 1: Material parameters used in EDEM.
Material parameters
Material Rock Steel Ground
Poisson's ratio, ν 0.25 0.3 0.25
Shear modulus, G [MPa] 240 7 000 1
Density [kg/m³] 3000 8000 1000
Particle diameter [mm] 70-120 - -
Interaction parameters
Interaction materials rock-rock rock-steel rock-ground
Coefficient of restitution, COR 0.2 0.2 0,2
Static friction, µs 0.65 0.4 0.5
Rolling friction, µr 0.1 0.05 0.05
Material parameters:
Shear modulus, G
The value of shear modulus (stiffness) have a high impact on the calculation time for
the simulations in EDEM, a high shear modulus of the granular material generates a
very long calculation time. Also a high shear modulus can give unrealistic forces
when the material is exposed for compression forces [17]. To save calculation time
and avoid high force peaks a reduction of the shear modulus is preferred. As long as
the shear modulus is high enough to prevent any large interpenetration of particles the
simulation will generate a reliable result. [8]
24 000MPa is seen as an appropriate value for shear modulus of rock but in the
simulations a value of 240MPa has been used. According to DEM Solutions the shear
modulus can normally be reduced 100 times.
Density
In EDEM the density is specified for solid material, for Atlas Copcos buckets the
density are defined for broken material. Solid material expands approximately about
1.5-1.7 times when it becomes broken [16]. In the simulation a standard bucket that is
designed for a maximum density of 2.2ton/m³ is used and the bulk material have a
solid density of 3ton/m³ which generates a density of 1.875ton/m³ for broken material
with an expansion factor of 1.6.
Interaction parameters:
Coefficient of Restitution, COR
The COR value describes the bounciness of the particles or the inverse of the
damping. An appropriate COR value is 0.25 for rock-rock and 0.3 rock-steel. A lower
COR value gives lower force peaks and a more stable simulation [19], because of this
the COR value was slightly reduced to 0.2 for both rock-rock and rock-steel.
Static Friction, µs. Rolling Friction, µr
The friction coefficients are exaggerated compared to the real values. This is because
the particles in EDEM have a smooth and rounded surface. A real stone has waviness
on the surfaces and also small irregularities. To get the almost round particles to
behave as realistic stones the friction coefficients are increased.
11
3.2.2 Defined Motion Path in EDEM
CAD models of buckets were imported into EDEM. The models are given a specified
motion that digs through a pile of granular material that consists of 11 000 particles.
The motion is defined by speed and acceleration for a limited time period in the
program. Rotational velocity is also added around the buckets rotation point.
The bucket follows a specified motion path that is fixed through the rock pile. When
peaks in forces appear on a real bucket small motions occur due to tire deflection,
cylinder compression or motion slowdown. This kind of parameters are not possible
to add in EDEM. To get a more realistic behaviour, a model of the loader needs to be
built in a separate computer program, e.g. ADAMS, and then imported into EDEM.
This is a complicated and time consuming task, which is not covered in this thesis.
The motion cycle used in EDEM is defined by studying the exact motion from the
practical test session. The defined cycle can be seen in Appendix A3. Figure 17 shows
snapshots of the cycle at different time steps.
12
3.2.3 Bucket Design Parameters
P
By studying the design parameters separately,, an optimum value for each parameter is
hopefully found. The
he design parameters are assumed to act independent of each other
which makes this method reliable.
reliable
Figure 19: Side plate profile, attack angle and base plate Figure 20: Side plate angle
profile.
Figure 21: Lip angle Figure 22: Chamfer angle and edge thickness.
13
The base plate exists to give space for bucket attachment. Some competitors has a
design without base plate. This gives a smooth inner design but the disadvantage is
that the rotation point is moved backwards and the centre of mass is moved forward.
3.2.4 EDEM Setup Description
Two different paths of movement in the loading cycle has been used. One path where
the bucket lip follow the ground and one path where the bucket path is 300mm above
the bottom plate, see Figure 24 and Figure 25.
14
Figure 26: The span between side boundary and bucket is 285mm.
One simulation cycle takes 2.5 hours to simulate.
3.2.5 Evaluation of Output from EDEM Simulations
The goal with simulations was to design a bucket that was easy to fill. In reality a
good measure of this is the amount of load in the bucket after a performed loading
cycle. In EDEM all buckets follow the same path which gives almost equal load,
instead differences are seen on the forces acting on the bucket.
The horizontal force is of large interest since it is in direct relation to the tractive
effort required for executing the loading cycle. A large vertical force increases the
front wheel grip and gives the machine a higher tractive effort. The forces are
presented in graphs, see Figure 27, and the average force over time was calculated and
used for comparison. The loading cycle is 11s but only the average force for the first
7s was used as a comparison value. During the first 7s the buckets penetration
capability is important, to use the result from the complete cycle add more insecurity
to the result.
Figure 27: Graph of horizontal force for GIII bucket in low simulation setup.
The torque around the buckets rotation point can be plotted, this torque is in relation
to the buckets breakout force.
15
With a function in EDEM the weight of the load in the bucket was measured, see
Figure 28, this made it possible to relate the forces to the amount of load.
16
4 Results
4.1 Outcome of Practical Test
4.1.1 Loading Test
A difference between the GIII and the GII bucket was possible to distinguish in the
loading result. The newly developed bucket, GIII, was easier to fill compared to the
older, GII. GII had a heap that was displaced in the front end of the bucket and in the
rear part of the bucket there was most often an empty gap that led to a lower filling
grade. In 85% of the loading cycles GIII had a good filling, compared to only 30% for
GII. GIII had also a slightly faster loading time.
During the loading cycle the rpm was measured and the pressure in the hoist and
dump cylinders. The rpm value gave a rough estimation of the machines tractive
effort into the pile. The rpm value did vary between loading cycles and was
sometimes fluctuating and sometimes constant during bucket filling. A rough
estimation is that the upper level during the loading was 1700rpm, which can be
translated to a tractive effort of 110kN, see Figure 70 in Appendix A1 for explanation.
4.1.2 Penetration Test
The result of the penetration test was that the GIII bucket had a 10-20% deeper
penetration. But since the pile shape seemed to has a large impact on the result no
conclusions were drawn from this test.
The old GII Bucket was less efficient to fill compared to the Normal GIII Bucket.
This result corresponds with the practical test. The load was 200kg lower than with
Normal Bucket.
17
4.2.2 Lip Profile
Figure 30: GIII, Normal
Load 4720.1kg
Horizontal force per kg load 15,9N/kg
Vertical force per kg load -3.4N/kg
Horiz. force compared to normal 0.0%
Horiz. force comp. - high setup 0.0%
V/straight and V-21deg has a slightly smaller horizontal force than normal M-shaped
lip, both for high and low test cycle. The low horizontal force for V-16deg low setup
can probably be seen as a simulation variation.
Graphs of horizontal and vertical force for the GIII bucket are shown in Appendix A4.
18
4.2.3 Base Plate Profile
Bucket without base plate, but with the wrapper moved inwards to keep constant
volume, did not decrease horizontal force. A logical result is generated for bucket
without base plate and a larger volume.
19
4.2.4 Side Plate Profile
Side plate profile with a more edgy shape in lower part decrease horizontal force
compared to normal profile.
20
4.2.5 Support Plate
Figure 45: No support plate
Load 4775.0kg
Horizontal force per kg load 15,5N/kg
Vertical force per kg load -3.8N/kg
Horiz. force compared to normal -2.7%
21
4.2.7 Lip Chamfer Angle
Chamfer angle horizontal force,
edge 25mm -low setup
17
Force per Load [N/kg]
16
15
14
20 25 30
Chamfer angle [deg]
16 16
15 15
14 14
10 20 30 10 20 30
Chamfer angle [deg] Chamfer angle [deg]
Figure 50: Chamfer angle plotted against Figure 51: Chamfer angle plotted against
horizontal force for lip with 8mm thickness, low horizontal force for lip with 8mm thickness, high
setup. setup.
For buckets with edge thickness 8mm the chamfer area is larger and differences are
distinguished. Chamfer angle of 20deg generates lowest horizontal forces for both
high and low setup.
22
4.2.8 Lip Angle
Angled lip horizontal force, low setup Angled lip horiz. force, high setup
18 18
Force per Load [N/kg]
17 17
16 16
15 15
-2 -1 0 1 2 0 1 2
Lip angle [deg] Lip angle [deg]
Figure 55: Horizontal forces for angled lip. Figure 56: Horizontal forces for angled lip, high
setup.
Horizontal forces were lowest for lip without angle.
23
4.2.9 Attack Angle
-3 -3
-4 -4
1 2 3 4 5 6 1 2 3 4 5 6
Attack angle [deg] Attack angle [deg]
Figure 58: Vertical forces for attack angle, low Figure 59: Vertical forces for attack angle, high
setup. setup.
Attack angle horiz. force, low setup Attack angle horiz. force, high setup
18 18
Force per Load [N/kg]
Force per Load [N/kg]
17 17
16 16
15 15
1 2 3 4 5 6 1 2 3 4 5 6
Attack angle [deg] Attack angle [deg]
Figure 60: Horizontal forces for attack angle, Figure 61: Horizontal forces for attack angle,
low setup. high setup.
For both horizontal and vertical force it is difficult to distinguish a trend in relation to
bottom angle.
24
4.2.10 Side Plate Angle
16
15
0 1 2 3
Side plate angle [deg]
Figure 62: Side plate angle.
Figure 63: Horizontal forces for side plate angle.
Horizontal force is lowest for side plates with an angle of 1 and 2deg.
The outer side of the side plates were flat for all buckets in this test. Bucket with no
angle of side plate but with a flat outer side had a 4.8% larger horizontal force
compared to a normal bucket. A normal side plate has a reinforcement plate along the
side profile.
4.2.11 GET
Figure 64: GET
Load 5065.5kg
Horizontal force per kg Load 14.3N/kg
Vertical force per kg Load -4.1N/kg
Horiz. force compared to normal -10.1%
Horiz. force comp. - high setup -7.0%
GET (Ground Engagement Tools) is a new lip under development at Atlas Copco.
The lip consists of five exchangeable plates made of high strength steel. As seen in
Figure 64 the lip has a thin edge compared to normal lip. The buckets loading
capacity is larger due to a longer lip. This lip shape generates the lowest horizontal
force of all buckets.
Atlas Copco's own field tests have shown an increased loading efficiency of about
10% for this bucket.
25
5 Conclusions
5.1 Practical Test
The worse result for the GII bucket is believed to be related to a couple of differences
in the design.
26
forces for this bucket did decrease. From the result of this test there is no reduction in
horizontal force when replacing base plate by moving the wrapper inwards.
Compared to a bucket without base plate but with constant volume, the base plate get
into contact with the material earlier but the wrapper plate in the pockets get into
contact with the material later. This generates only a small difference between the two
buckets.
5.2.4 Side Plate Profile
The lower part of the side plate has most interaction with loading material and the
design of this part is there for important. Side plate profile 2 has a sharp shape in the
lower part and this is the reason to why the horizontal force is lower for this profile.
The bad result for profile 4 partly depends on the reduction in loaded material for that
design.
From the test with thinner edge thickness of the lip it was shown that a thinner edge
largely reduces the forces. This can also be applied on the side profile edges, but this
has not been confirmed by tests.
5.2.5 Support Plate
The result shown for different support plate design was logical, the forces increase
with larger support plates. The difference of 2.7% without support plate is that large
that a design without support plate is motivated to prioritize.
By having a smoother angle in the end closest to the lip, forces may be reduced
without deleting the support plates
5.2.6 Edge Thickness
The edge thickness has a large influence on horizontal force; a thinner edge generates
a smaller horizontal force. From the test this is seen as the most important design
parameter.
5.2.7 Lip Chamfer Angle
A logical result for the chamfer angle is that the horizontal force decreased for lower
angles, which give a sharper edge. For an edge thickness of 8mm a chamfer angle of
20deg had lowest horizontal forces for both high and low setup. This is probably
related to simulation variation and it is risky to conclude that a chamfer angle of
20deg is better than 10deg. But it could at least be seen that the difference between
10deg and 20deg has a negligible effect on horizontal force.
For a lip with 25mm edge thickness the chamfer area is small and the chamfer angle
has a low influence on the forces.
5.2.8 Lip Angle
A horizontal lip was shown to generate lowest horizontal force. The hypothesis was
that an lip angled downwards were going to increase vertical force and improve tire
grip, this wasn't shown in neither high or low simulation setup.
5.2.9 Attack Angle
In the result for different attack angles no readable trend was distinguished. The
hypothesis was that a large angle was going to generate higher vertical forces but that
wasn't shown. The result did coincide with the study performed by Maciejewski [7],
27
see Figure 10 and Figure 11. For a rotational loading motion the attack angle has a
small influence on forces. Without rotation a high attack angle will increase the
horizontal force.
5.2.10 Side Plate Angle
An side plate angle of 1 and 2 deg showed lowest forces in this test. But all buckets in
the side angle test showed a higher horizontal force than the standard bucket. This was
because the buckets used in the side angle test had a flat outer surface. The normal
GIII bucket has reinforcement plates along the edge which adds a gap of 20mm to the
rear part of the side plate, see Figure 66. This gap creates the same clearance as an
angled plate, but without adding an angle inside the bucket which decrease the
volume and increase friction forces.
5.2.11 GET
The GET Bucket showed lowest horizontal force of all buckets in the test. The
explanation to this is seen clearly when individual design parameters on the GET
bucket is studied. A thin edge thickness has been shown to be the individual most
important parameter and on the GET bucket the edge thickness is 7mm. The side
plates continues on the lip sides and has a sharp angle, this design is shown to be
efficient in
Figure 42.
6 Discussion
6.1 Reflections on EDEM
From the beginning a realistic material was the goal to generate. In the first simulation
setup the particles flow path was the dominating factor on the result. This gave a large
result variation and it was hard to distinguish how individual design parameters did
influence the result. The particles used had 5-spheres and an edgy shape and also a
large size variation. To decrease the influence from the particle flow path on the result
a more smooth material was created. The particles shape was changed to the one
shown in Figure 16. This particle only consist of 3-spheres bonded close together, the
particles where also smaller with a lower size variation.
28
Even if this new material wasn't the most realistic one it was able to produce a
readable result. The same problem appears in reality when buckets are tested, the
particles flow path will have a large influence on the result.
6.2 Recommendations
To increase the reliability in the simulations more accurate settings are recommended
to use, but this will largely increase simulation time. By simulating with a shorter
timestep the simulations will be more reliable. Multiple runs with the same bucket
will generate the same result and force peaks will be reduced. To compensate for that
different particle flow paths not is generated with this setup the recommendation is to
create multiple piles with the same kind of particles and outer size, but with an
internal difference of the particles placement in the pile. By simulating each bucket
design in 10 different piles with a shorter timestep for both low and high setup, the
accuracy and reliability in the simulation would increase.
Other improvements to make are to improve simulation material and build a model of
the motion in ADAMS to get a more realistic movement of the bucket.
For future simulations larger design changes are recommended to study and different
bucket sizes.
29
7 References
7.1 Literature
1. Atlas Copco (2010): Atlas Copco annual report 2009, Atlas Copco AB,
Stockholm, Sweden, 2010
2. Atlas Copco (2008): Mining Methods in Underground mining, Third edition.
Linder U, Atlas Copco AB, Örebro, Sweden, 2008
3. Coetzee C J, Basson A H, Vermeer P A (2006): Discrete and continuum
modelling of excavator bucket filling, Journal of Terramechanics, No 44 , 2007,
177–186 pp.
4. Coetzee C J, Els D N J (2007): The numerical modelling of excavator bucket
filling using DEM. Journal of Terramechanics No 46, 2009, 217–227 pp.
5. Esterhuyse SWP (1997) The influence of geometry on dragline bucket filling
performance. M.Sc. Thesis Mechanical Engineering, University of Stellenbosch,
Stellenbosch, South Africa.
6. Jing L, Stephansson O (2007): Fundamentals of Discrete Element Methods for
Rock Engineering, Theory and Applications. Elsevier, Amsterdam, Netherlands,
2007, 7-14 pp.
7. Maciejewski J, Jarzcebowski A (2002): Laboratory optimization of the soil
digging process, Journal of Terramechanics, No 39, 2002, 161–179 pp.
8. Nezami E, Hashash Y, Zhao D, Ghaboussi J (2006): Simulation of front end
loader bucket–soil interaction using discrete element method, International
Journal for Numerical and Analytical Methods in Geomechanics, No 31, 2007,
1147-1162 pp.
9. Rowlands JC (1991): Dragline bucket filling. Ph.D Thesis, University of
Queensland, Queensland, Australia.
10. Takahashi H (1999): Analysis on the Resistive Forces acting on the Bucket in
Scooping Task of Piled Fragment Rocks by Use of Distinct Element Method.
11. Torres R. (2008): Soil-bucket interaction, A new approach, Master Thesis.
Department of Aeronautical and Vehicle Engineering, Kungliga Tekniska
Högskolan, Stockholm, Sweden
12. Zhao D, Nezami E, Hashash Y, Ghaboussi J (2006): Three-dimensional discrete
element simulation for granular materials, International Journal for Computer-
Aided Engineering and Software, No 7, 2006
30
15. RoyMech (2009), Friction Factors, viewed 18 March 2010,
<http://www.roymech.co.uk/Useful_Tables/Tribology/co_of_frict.htm>
7.3 Interviewees
16. Lars Bergqvist - Senior Advisor - Mining, Atlas Copco
17. David Curry - Ph.D. CAE, DEM Solutions
18. Totte Nilsson - Machine Operator, Atlas Copco
19. Morgan Norling - Senior MBS Analyst, Atlas Copco
20. Stefan Nyqvist - Mechanical Designer, Atlas Copco
21. Erik Svedlund - Product Manager, Atlas Copco
31
A Appendix
A1 Technical Specification ST7
32
Figure 69: Breakout force description.
Engine Power 193hp
Atlas Copcos loaders have four wheel drive. The engine power is divided between
the drive line and the hydraulic pump. This gives a reduced tractive effort when the
bucket is in motion by the hydraulics, e.g. when it is tilted.
Tractive Effort 150kN
The maximal tractive effort for the ST7 machine, measured on concrete floor with full
bucket, is 150kN, at 2200rpm [19]. In real tests a rough estimation of the maximal
tractive effort during the loading cycle was 120kN (1800rpm). For relation between
tractive effort and rpm, see Figure 70. An exact tractive effort is hard to calculate
since it is dependent of the grip of the wheels, the wheel diameter and the amount of
the engine power used for the hydraulic pressure.
160
140
120
100
80 kN
60
40
20
0
1500 1600 1700 1800 1900 2000 2100 2200
A2 Mining Process
The most appropriate mining process to use in a mine is dependent of the shape of the
orebody. Since the shape of orebodies never looks exactly the same, the most
effective mining method is individual for each mine.
The different mining methods can be divided into two main groups based on the dip
of the orebody, those two groups are described on next page. There exist also several
additional variants of both methods.
33
Mining in steep orebodies
Where the dip exceeds 50 degrees, mining method for steep orebody is applied. The
blasted material gravitate to a collection level where loading and main hauling are
carried out, see Figure 71.[2]
34
A3 Bucket Motion in EDEM
Table 3: Bucket motion specified in EDEM.
Translational motion Rotational motion
Horizontal Horiz. acc. Vertical
Time [s] [m/s] [m/s²] [m/s] Time [s] [deg/s]
1 0-1.5 0.5 1 1.5-3 1.33
2 1.5-7.5 0.32 2 3-6 3.33
3 7.5-9 0.53 0.033 3 6-7.5 8
4 9.75-10.125 -5 4 7.5-9 16
5 10.125-10.5 -1.875 5 9-9.375 4
35