0% found this document useful (0 votes)
454 views77 pages

A204TPL-AISH-L-STD-0001-C3-Application of Standards Pipe Supports & Pipe Support Note PDF

This document provides details on pipe support standards and notes for the Aishwariya Field Development Project. It describes the pipe support system, which uses standardized supports and components to reduce costs. Section 1 outlines the design approach for supports. Section 2 lists the parts of the pipe support system, including application standards, support notes, standardized supports for larger pipes, and specifications. Section 3 provides general notes on dimensions and welds. Section 4 covers materials, structural components, standardized parts, spring supports, insulation, and load bearing items. Section 5 lists additional design notes.

Uploaded by

Ajad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
454 views77 pages

A204TPL-AISH-L-STD-0001-C3-Application of Standards Pipe Supports & Pipe Support Note PDF

This document provides details on pipe support standards and notes for the Aishwariya Field Development Project. It describes the pipe support system, which uses standardized supports and components to reduce costs. Section 1 outlines the design approach for supports. Section 2 lists the parts of the pipe support system, including application standards, support notes, standardized supports for larger pipes, and specifications. Section 3 provides general notes on dimensions and welds. Section 4 covers materials, structural components, standardized parts, spring supports, insulation, and load bearing items. Section 5 lists additional design notes.

Uploaded by

Ajad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 77

CAIRN ENERGY INDIA PTY LIMITED

APPLICATION OF STANDARD PIPE SUPPORTS &

PIPE SUPPORT NOTES

Doc No : A204TPL-AISH-L-STD-0001

C3 20-11-2012 Re-Issued for Construction RB GPB AGV


C2 07-11-2012 Re-Issued for Construction RB GPB AGV
C1 22-10-2012 Issued for Construction RB GPB AGV
KAR/
A2 30-05-2012 Issued for Client Review AA AGV
GPB

Prepared Checked
Rev Date Purpose of Issue Approval Approval
by by
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

LIST OF CONTENT PAGE NO

1 THE PIPE SUPPORT SYSTEM HAS BEEN DESIGNED AS FOLLOWS:............................ 3


2 THE SYSEM IS MADE UP AS FOLLOWS:.......................................................................... 3
3 GENERAL ........................................................................................................................... 4
4 MATERIALS ........................................................................................................................ 4
5 DESIGN............................................................................................................................... 5
6 MATERIALS SPECIFICATIONS.......................................................................................... 7

Page 2 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

1 THE PIPE SUPPORT SYSTEM HAS BEEN DESIGNED AS FOLLOWS:

1.1 All supports are fully dimensioned and individually numbered for lines 3" (80) NB and
larger. Thus supports may be fabricated by a sub-contractor and shipped to job-site
ready for installation.
1.2 Lines less than 3" (80) NB are generally field supported except:
Alloy and stress relieved lines that require welded attachments at support locations.
Also, cold service lines that require special load bearing insulation at support location.
For typical field supports, refer to PIP-STD-101-C017
1.3 Two or more standard supports may be combined into a single more complex support.
This facility greatly reduces the number of special pipe support drawings that have to be
produced.
1.4 Maximum use is made of the range of standard pipe support components commercially
available (clamps, U-bolts etc.), thus minimising fabrication costs.
1.5 Material sizes have been rationalised, minimising the range of items on the Bills of
Material for Structural Components.

2 THE SYSEM IS MADE UP AS FOLLOWS:

2.1 APPLICATION OF STANDARDS


This is an explanation of the working of the system.

2.2 PIPE SUPPORT NOTES


This is a list of notes for the guidance and instruction of the Pipe Support Fabricator and
Erector.

2.3 STANDARD PIPE SUPPORTS - LINES 3” (80) NB AND LARGER.


All standard pipe supports in the system are detailed on individual sketches. These are
arranged into groups for convenience as listed in the index. Each support is detailed on
a separate sheet which includes a material list and, where applicable, design limitations.

2.4 SPECIFICATION FOR PIPE SUPPORTS


The documents covered in 2.2 above are amended as necessary by the addition of
supplementary "Contract Pipe Support Notes" to meet the individual requirements of the
Contract and issued together with documents in 2.1 and 2.3 above under a common
cover as the "Specification for Pipe Supports".

2.5 SPECIAL PIPE SUPPORTS


Supports that cannot be defined by a standard or combination of standards are drawn
up as special pipe supports.

Page 3 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

2.6 CONTRACT STANDARDS


Contract Standards are those specials that can be used in more than one location on a
contract and are drawn in standard format. e.g. special pipe shoes etc.

3 GENERAL
3.1 All dimensions are in millimeters unless otherwise specified.
3.2 All welds to be ¼" (6 mm) continuous fillet unless otherwise specified.
3.3 All screw threads to be in accordance with material specification, sheet 7.
3.4 Orientations given on Drawings are in degrees clockwise with Ref. North as zero.

4 MATERIALS

Material Specifications are given in sheet 6.

4.1 STRUCTURAL
4.1.1 Structural materials are identified by Item number. A list of materials against Item
number is given in sheet 11 & 12.
4.1.2 The materials required for the fabrication of pipe supports are listed on Bills of Materials.
4.1.3 The materials required for the fabrication of supports for small bore lines are to be
estimated at site.

4.2 STANDARD COMPONENTS


4.2.1 Standard components are identified by Standard No. (E.g. PS3-1-2) and are detailed in
"Support Ref: PS3-1, Spec: PIP-STD-101-C003 (this is an internal document number of
MMPL).
4.2.2 The components required for the assembly/fabrication of pipe supports are listed on Bills
of Materials.
4.2.3 The components required for the assembly/fabrication of supports for small bore lines
are to be estimated at site.
4.2.4 All standard components are purchased complete from specialist suppliers and not
fabricated by the Pipe Support Fabricator.

Page 4 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

4.3 SPRING SUPPORT ASSEMBLIES


4.3.1 Spring Support Assemblies are identified by Spring number on isometrics and are
quantified on the specification for spring support.
4.3.2 Assemblies will be supplied complete with all components as listed in the specification
by the spring support required.

4.4 LOW FRICTION SLIDE PLATES


4.4.1 Low Friction Slide Plates will be purchased complete from specialist suppliers to
according to drawings.

4.5 LOAD BEARING INSULATION


4.5.1 Normal load bearing insulation for pipe hangers etc. i.e. "Foam glass" section will be
part of insulation contractors supply.
4.5.2 High density load bearing items such as "Permali" blocks will be supplied as part of Pipe
Support function.
4.5.3 Carbon Steel Saddles to be banded to the outside of the insulation sheathing. Banding
will be part of insulation contractor’s supply.

5 DESIGN

The following notes and those in Section 4 "General" will normally apply unless
otherwise contractually required.
5.1 Pipes that require stress analysis and are entered on the Stress Critical line list shall be
supported in compliance with the appropriate stress sketch.
5.2 Welding procedures to be in accordance with relevant Piping Fabrication Specification.
5.3 All the attachment (primary support) to the carbon steel pipe will be an aid to erection it
will be added to the Isometric and supplied with the fabricated pipe.
5.4 Pipe support welded attachments to heat treated or impact tested carbon steel piping,
and to all other materials (low alloy, stainless steel, non-ferrous etc.) must be indicated
on the piping isometric be of the same material and supplied with the fabricated pipe.
5.5 Pipe support clips for the support of Pipes from vessels to be supplied by vessel
fabricator.
5.6 Hanger rods to be straight and threaded both ends. Where eye rods are required these
are to be made by combining straight rod and weld less eye nut locked to rod with a
hexagonal nut.
5.7 Insulation for personnel protection at "u" bolt or clamp type guides to be cut back to
allow for piping movements up to ±75 mm.

Page 5 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

5.8 Spring supports will be used as required to support moving lines and to protect
equipment nozzles etc.
5.9 Where lines are subjected to Hydro-test then supports will be designed to carry the
greater of Hydrostatic Test Load or Operating Load.
5.10 Where items of equipment are to be regularly maintained by removal from lines (e.g.
Temporary strainers at pumps) then piping shall be supported so that temporary
supports will not be required during the maintenance period.
5.11 Control valve station will be supported at both ends, one end preferably being anchored
except where indicated otherwise on a stress sketch.
5.12 Lines insulated for personnel protection are not normally elevated on pipe shoes.
5.13 Stainless Steel, non-ferrous metals and Galvanized Steels shall be insulated from
Carbon Steel support materials to avoid the affects of Galvanic Corrosion.
5.14 Supports not covered under this standard, (dimensions and or loads), known as ‘Special
Pipe Supports’ shall be designed and issued by civil group.
5.15 All pipe support foundations, including holding down bolts and rubbing plates where
specified are included in civil engineering scope of supply.
5.16 Nuts on holding down bolts are left loose until final stages of construction to allow for
settlement.
5.17 Each support or support assembly as shipped shall be plainly marked in paint or metal
tagged with its complete mark no.
5.18 All sliding surfaces to be liberally coated with grease or graphite paste prior to support
erection.
5.19 Lines with a wall thickness of such 10 or less, running in pipe racks/ pipe-tracks or
crossing a common top of steel elevation, shall be supported on a wear plate fabricated
from parent pipe material.

Page 6 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

6 MATERIALS SPECIFICATIONS

6.1 CARBON STEEL


Rolled Sections IS 2062 with minimum yield stress 250 N/sqmm
Fabrication conform to IS 800

Plate and Bars IS 2062(Gr.A) with minimum yield stress 250N/sq.mm


Fabrication conform to IS 800

Pipe (for support) IS 1978 Yield strength 240 N/sq. mm

Bolts, Nuts & Washers IS 1363 & IS 5369 (UNO)

6.2 STAINLESS STEEL


Plate and Bars ASTM A240 GR 316 / 304H
Pipe ASTM A312 GR 316 / 304H
Bolts, Nuts & Washers ASTM A320 GR B8M (Type 316)

6.3 CROME- MOLY (1.1/4 CR ½ Mo, 2.1/4 Cr 1 Mo)


Plate ASTM A387 GR 2 or equal
Pipe ASTM A335 P22 / A335 P11 / A691 CL 22

6.4 Threads: all bolts, nuts, rod and attachments to be threaded ISO. Metric course to be
3643.

6.5 Adhesive: devcon ek1 epoxy two packs or similar epoxy adhesive suitable for a
seawater environment.

Page 7 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

Table Of Basic Spans And Unit Line Weights For CS Material Up To 350 deg. C
Basis of Design- Material- CS A106 B
Pipe density- 7833Kg/m3 (0.283lb/in3)
Allowable stress at 350 deg. C -17000 PSI
Insulation material-Calcium silicate
Insulation density-171.556 Kg/m3 (0.0061lb/in3)
Insulation thikness-2 inch
Water density-1000Kg/m3 (62.4285lb/ft3)
BASIC SPAN ‘L’
PIPE SCH THK BARE PIPE PIPE + BARE PIPE PIPE + LIQUID + PIPE
SIZE EMPTY INSULATION WATER-FILLED INSULATION SIZE
SPAN WEIGHT SPAN WEIGHT SPAN WEIGHT SPAN WEIGHT
IN. mm IN.
m Kg/m m Kg/m M Kg/m m Kg/m
¾” XS 3.91 4.00 2.19 3.00 4.26 3.00 2.45 3.00 4.52 ¾”
1” XS 4.54 4.00 3.21 3.00 5.46 4.00 3.65 3.00 5.92 1”
1½” XS 5.08 5.00 5.35 5.00 8.02 5.00 6.49 4.00 9.14 1½”
2 STD 3.91 6.00 5.41 5.00 8.39 5.00 7.54 5.00 10.52 2
3 STD 5.49 7.00 11.38 7.00 15.12 7.00 16.10 6.00 19.84 3
4 STD 6.02 8.00 16.13 8.00 20.55 7.00 24.28 7.00 28.71 4
6 STD 7.11 10.00 28.03 10.00 33.89 9.00 46.53 9.00 52.40 6
8 STD 8.18 12.00 41.94 11.00 49.16 10.00 74.02 10.00 81.26 8
10 STD 9.27 13.00 59.79 13.00 68.46 11.00 110.28 11.00 118.96 10
12 STD 9.53 14.00 73.21 14.00 83.25 12.00 145.67 12.00 155.71 12
+14 STD 9.53 15.00 81.72 15.00 92.61 13.00 170.08 12.00 180.97 14
+16 STD 9.53 16.00 93.72 16.00 105.98 13.00 210.78 13.00 223.03 16
+18 STD 9.53 17.00 105.73 17.00 119.34 14.00 255.53 14.00 269.13 18
+20 STD 9.53 18.00 117.73 18.00 132.71 14.00 304.30 14.00 319.28 20
+24 STD 9.53 20.00 141.73 20.00 159.44 15.00 413.95 15.00 431.65 24

Page 8 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT

APPLICATION OF STANDARD PIPE DOCUMENT NUMBER:


A204TPL-AISH-L-STD-0001
SUPPORTS & PIPE SUPPORT NOTES
Revision C3

Span Ls Based on limitation of stress-

Ls = SQRT (( Sh*Z) / 2.4*w) ……….Eq. 1

Where,
Ls- Allowable Pipe Span in ft.
Z- Modulus of section of pipe in in3.
w- Total weight of pipe lb/ft
Sh- tensile stress for pipe material at design temp 350 deg C in psi.

NOTE- The maximum allowable bending stress due to the uniform weight, w ,is limited to ½
of the allowable stress for the material at the given temperature .The B 31.3 code
limits the allowable longitudinal stresses to the basic allowable stress. Since ½ of the
allowable stress is used for pressure in the longitudinal direction, ½ of the allowable
stress can be used for pipe weight bending stresses.

Span Ld based on limitation of allowable deflection of 5/8 in-

Ld = (4thRT)((∆*E*I)/(17.1*w)) …….. Eq.2


Where,
E- Modulus of elasticity of pipe mat, at design temp 350 deg. C in PSI

I- Area moment of Inertia in in4


w- Total weight of pipe lb/ft.
Sh- tensile stress for pipe material at design temp 350 deg C in psi.

NOTE- The maximum allowable bending stress due to the uniform weight, w ,is limited to ½
of the allowable stress for the material at the given temperature .The B 31.3 code
limits the allowable longitudinal stresses to the basic allowable stress. Since ½ of the
allowable stress is used for pressure in the longitudinal direction, ½ of the allowable
stress can be used for pipe weight bending stresses.

Span should be taken minimum of equation 1 & 2.

Page 9 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

TABLE OF BASIC SPANS AND UNIT LINE WEIGHTS FOR SS MATERIAL UP TO 350 C
Basis of Design-

Material- SS A312 304L

Pipe density- 8027Kg/m3 (0.29lb/in3)

Allowable stress at 350 deg C -13700psi.

Insulation material-Calcium silicate

Insulation density-171.556Kg/m3 (0.0061lb/in3)

Insulation thikness-2 inch

Density of water-1000 Kg/m3 (62.42lb/ft3)

BASIC SPAN ‘L’

PIPE SCH THK BARE PIPE EMPTY PIPE + INSULATION BARE PIPE WATER- PIPE + LIQUID + PIPE
SIZE FILLED INSULATION SIZE

In SPAN WEIGHT SPAN WEIGHT SPAN WEIGHT SPAN WEIGHT


IN. IN.
mm m Kg/m m Kg/m m Kg/m m Kg/m
¾” 40S 2.87 4.00 1.71 3.00 3.77 3.00 2.04 3.00 4.11 ¾”
1” 40S 3.38 4.00 2.56 3.00 4.81 4.00 3.10 3.00 5.35 1”
1½” 40S 3.68 5.00 4.11 5.00 4.95 5.00 5.41 4.00 8.06 1½”
2 10S 2.77 6.00 4.01 5.00 6.98 5.00 6.34 5.00 9.32 2
3 10S 3.05 7.00 6.82 6.00 10.56 6.00 12.13 6.00 15.88 3
4 10S 3.05 8.00 8.83 7.00 13.26 7.00 17.95 7.00 22.37 4
6 10S 3.40 10.00 14.16 9.00 20.02 8.00 34.48 8.00 40.37 6
8 10S 3.76 12.00 20.55 11.00 27.77 9.00 55.44 9.00 62.67 8
10 10S 4.19 13.00 28.22 12.00 36.89 10.00 82.85 10.00 91.52 10
12 10S 4.57 14.00 36.57 14 46.62 11.00 113.82 11.00 123.86 12
14 10S 4.78 15.00 42.46 14 53.33 11.00 135.95 11.00 146.84 14
16 10S 4.78 16.00 48.60 15 60.85 12.00 171.57 12.00 183.83 16
18 10S 4.78 17.00 54.76 16 68.36 12.00 211.22 12.00 224.84 18
20 10S 5.54 18.00 70.41 17 85.39 13.00 263.24 13.00 278.22 20
24 10S 6.35 20.00 96.08 19 113.78 14.00 374.41 14.00 392.11 24

Page 10 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3
LIST OF STRUCTURAL MATERIALS

Size1 Size2 Thickn. Weight Size1 Size2 Thickn. Weight


Item Description Form Item Description Form
[mm] [mm] [mm] [Kg/m] [mm] [mm] [mm] [Kg]
1 Universal Beams I 203 133 25.00 61 Flat 300 10 23.55
2 Universal Beams I 305 127 37.00 62 Flat 250 10 19.63
3 63 Flat 200 10 15.70
4 64 Flat 150 10 11.78
5 Universal Columns I 305 305 158.00 65 Flat 140 10 10.99
6 Universal Columns I 254 254 73.00 66 Flat 120 10 9.42
7 Universal Columns I 203 203 46.00 67 Flat 100 10 7.85
8 Universal Columns I 152 152 23.00 68 Flat 80 10 6.28
9 ISMB200 I 200 100 24.20 69 Flat 230 10 18.06
10 Channel MC250 C 250 80 28.29 70
11 Channel C 203 76 23.82 71 Flat 300 15 35.63
12 Channel MC150 C 150 75 17.88 72 Flat 250 15 29.69
13 Channel C 102 51 10.42 73 Flat 200 15 23.75
14 MC 300 C 300 90 36.30 74 Flat 150 25 29.55
15 MC 200 C 200 75 23.82 75 Flat 100 25 19.70
16 MC 100 C 100 50 10.42 76 Flat 600 6 28.26
17 77 Flat 450 6 21.20
18 78 Flat 300 6 14.13
19 79 Flat 50 6 2.36
20 80 Flat 100 6 4.71
21 81 Pipe - SCH40 600 17.5 255.00
22 Structural Tee T 133 102 12.50 82
23 83 Pipe - Std 350 9.52 81.20
24 84 Pipe - Std 300 9.52 73.80
25 85 Pipe - Std 250 9.27 60.20
26 86 Pipe - Std 200 8.18 42.50
27 87 Pipe - Std 150 7.11 28.20
28 Equal Angle L 150 150 12 27.30 88 Pipe - Std 100 6.02 16.10
29 Equal Angle L 120 120 12 21.60 89 Pipe - Std 80 5.49 11.30
30 Unequal Angle L 150 90 12 21.60 90 Pipe - Std 65 5.16 8.62
31 Unequal Angle L 125 75 12 17.80 91 Pipe - Std 50 3.91 5.43
32 Equal Angle L 100 100 12 17.80 92 Pipe - XS 25 4.55 2.23
33 Equal Angle L 80 80 10 11.90 93 Pipe - XS 40 5.08 5.40
34 Equal Angle L 60 60 8 7.09 94
35 Equal Angle L 50 50 6 4.47 95
36 Equal Angle L 40 40 5 2.97 96
37 97
38 98
39 99
40 Flat 585 20 100
41 101 Rod 72
42 Flat 400 20 62.80 102 Rod 68
43 Flat 350 20 54.95 103 Rod 64
44 Flat 300 20 47.10 104 Rod 56
45 Flat 250 20 39.25 105 Rod 48
46 Flat 600 12 56.76 106 Rod 42
47 Flat 500 12 47.30 107 Rod 36
48 Flat 450 12 42.57 108 Rod 30
49 Flat 400 12 37.84 109 Rod 24
50 Flat 350 12 33.11 110 Rod 20
51 Flat 300 12 28.38 111 Rod 16
52 Flat 250 12 23.65 112 Rod 12
53 Flat 200 12 18.92 113 Rod 10
54 Flat 150 12 14.19
55 Flat 100 12 9.46 138 Bolt 20 90
56 Flat 600 10 47.10 139 Bolt 20 100
57 Flat 500 10 39.25
58 Flat 450 10 35.33
59 Flat 365 10 28.65

Page 11 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

Support Index

Sr. Support Type Page


No. No. No.
1 PS3-1 STANDARD U-BOLT CLAMP 14
2 PS3-1S STANDARD U-BOLT CLAMP (Stainless steel line) 15
3 PS3-2 STANDARD U-BOLT GUIDE 16
4 PS3-2S STANDARD U-BOLT GUIDE (Stainless steel line) 17
5 PS3-4 STANDARD ANCHOR STRAP 18
6 PS3-32 STANDARD BASE PLATE 19
7 PS6-1 TEE POST 20
8 PS6-2 GOAL POST 21
9 PS6-3 DOUBLE CHANNEL GOAL POST TYPE SUPPORT 22
10 PS6-4 INVERTED ‘L’ SUPPORT 23
11 PS7-1 BASE SUPPORT FOR WELD ELBOW (CARBON STEEL) 24
12 PS7-4 BASE SUPPORT FOR STRAIGHT PIPE (CARBON STEEL) 25
13 G7-6 BASE GUIDE 26
14 PS7-9 ADJUSTABLE BASE SUPPORT FOR WELD ELBOW 27
(CARBON STEEL)
15 PS7-10 ADJUSTABLE BASE SUPPORT FOR STRAIGHT PIPE 28
(CARBON STEEL)
16 G7-19 ADJUSTABLE BASE GUIDE 29
17 PS7-21 TWO DIRECTIONAL BRACING FOR SMALL BORE BRANCH 30
TO HEADER CONNECTIONS
18 PS8-3 STANDARD PIPE SUPPORT FOUNDATIONS 30A/B/C
19 PS8 & STEEL PLATE 31
PS8S
20 PS9-1 CANTILEVER BRACKET OFF COLUMN 32
21 PS9-2 BRACED BRACKET OFF COLUMN 33
22 PS9-3 TRAPEZE FRAME 34
23 PS9-4 HALF TRAPEZE 35
24 PS9-5 GOAL POST 36
25 PS9-8 T-POST 37
26 PS9-9 HALF FRAME AT COLUMN 38
27 PS9-10 HALF TRAPEZE FRAME AT COLUMN 39
28 PS9-11 SINGLE TRIM STEEL 40
29 PS9-12 DOUBLE TRIM STEEL 41
30 PS9-13 CANTILEVER FROM BEAM 42
31 PS9-14 ''U' BOLT TYPE SUPPORT 43
32 PS9-15 SUPPORT FOR VERTICAL LINE FROM BEAM 44
33 PS9-16 HOSE STATION SUPPORT 45
34 G9-17 HOSE STATION GUIDE 46
35 G9-18 GUIDE BRACKET WITH 'U' BOLT 47
36 G9-19 GUIDE BRACKET WITH STRAP 48
37 G9-20 BOX GUIDE FROM BEAM 49
38 G9-24 GUIDE FOR VERTICAL LINES 50

Page 12 of 74
AISHWARIYA FIELD DEVELOPMENT PROJECT
DOCUMENT NUMBER:
APPLICATION OF STANDARD PIPE A204TPL-AISH-L-STD-0001

SUPPORTS & PIPE SUPPORT NOTES


Revision C3

39 G9-25 GUIDE FROM COLUMN FOR VERTICAL LINE 51


40 PS11-1 PIPE SHOE 52
41 PS11-2 PIPE SHOE 53
42 G11-6 GUIDE FOR BARE PIPE (UP TO 600 NB) 54
43 G11-6S GUIDE FOR BARE PIPE 55
44 G11-7 GUIDE FOR INSULATED PIPE 56
45 G11-7A ADJUSTABLE GUIDE 57
46 G11-8 HOLD DOWN GUIDE FOR INSUL. PIPE 58
47 PS11-10 REINFORCING PLATE 59
48 PS11-11 LINE STOP FOR BARE PIPE(UP TO 1050 NB) 60
49 PS11-12 LINE STOP FOR INSULATED PIPE (UP TO 300 NB) 61
50 PS11-13 LINE STOP FOR INSUL. PIPE (350 TO 1800 NB) 62
51 PS11-14 CLAMPED PIPE SHOE FOR SS PIPE (UP TO 300 NB) 63
52 PS11-20 EROSION PAD FOR CS PIPE 50 NB & LARGER 64
53 G11-27 GUIDE FOR BARE PIPE (UP TO 300 NB) 65
54 PS11-64 GUIDE FOR UNINSULATED PIPES 14" TO 48" 66
55 PS12-1 STANDARD TRUNNION (CS) 67
56 PS12-2 STANDARD TRUNNION (CS) 68
57 PS12-4 STANDARD TRUNNION (CS) 69
58 PS12-5 STANDARD TRUNNION (CS) 70
59 PS13-11 STANDARD LOWER ASSEMBLY DOUBLE SUPPORT FROM 71
BELOW
60 PS13-13 HANGER LOWER ASSEMBLY WITH TURN BUCKLE 72
61 PS16-1 STANDARD SUPPORT FROM LARGER PIPE 73
62 PS16-2 STANDARD MULTIPLE SUPPORT FROM LARGE PIPE 74

Page 13 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD U-BOLT CLAMP

`0'MM GAP
PIP
E

O/
ØA D
M
K

S
N

A MAX. LOAD (KG)


STANDARD NO PIPE SIZE N M K S MAX. G
DIA Fy HORIZONTAL LOAD

PS3-1-0.5 15 - 1/2" 8 30 50 25 7 0.35 340 125


PS3-1-0.7 20 - 3/4" 8 35 60 30 10 0.15 340 100
PS3-1-1 25 - 1" 8 45 65 25 10 1.80 340 80
PS3-1-1.5 40 - 1 1/2" 10 60 90 35 16 0.85 540 110
PS3-1-2 50 - 2" 10 75 100 35 16 2.35 540 90
PS3-1-2.5 65 - 2 1/2" 12 90 130 50 19 2.5 700 150
PS3-1-3 80 - 3" 16 110 150 50 19 2.55 1500 250
PS3-1-4 100 - 4" 16 135 175 50 19 2.35 1500 190
PS3-1-6 150 - 6" 20 195 235 55 19 3.35 2000 250
PS3-1-8 200 - 8" 20 245 295 65 19 2.95 2000 200
PS3-1-10 250 - 10" 20 300 350 65 22 3.50 2000 250
PS3-1-12 300 - 12" 20 350 400 65 22 3.05 2000 250
PS3-1-14 350 - 14" 24 385 440 70 22 2.70 2500 250
PS3-1-16 400 - 16" 24 435 490 65 22 2.30 2500 250
PS3-1-18 450 - 18" 24 485 540 70 22 1.90 2500 250
PS3-1-20 500 - 20" 24 540 600 70 22 4.00 2500 250
PS3-1-22 550 - 22" 24 590 650 70 22 3.60 2500 250
PS3-1-24 600 - 24" 24 640 700 70 22 3.20 2500 250
SYMBOL ILLUSTRATION :PS3-1-0.5

NOTE :- VENDOR TO CONFORM MAX LOAD CAPACITY.

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-1


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 14 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD U-BOLT CLAMP (Stainless steel line)

`0'MM GAP
PIP
E

O/
ØA D
M
K

S
N

A MAX. LOAD (KG)


STANDARD NO PIPE SIZE N M K S MAX. G
DIA Fy HORIZONTAL LOAD

PS3-1s-0.5 15 - 1/2" 8 30 50 25 7 0.35 340 125


PS3-1s-0.7 20 - 3/4" 8 35 60 30 10 0.15 340 100
PS3-1s-1 25 - 1" 8 45 65 25 10 1.80 340 80
PS3-1s-1.5 40 - 1 1/2" 10 60 90 35 16 0.85 540 110
PS3-1s-2 50 - 2" 10 75 100 35 16 2.35 540 90
PS3-1s-2.5 65 - 2 1/2" 12 90 130 50 19 2.5 700 150
PS3-1s-3 80 - 3" 16 110 150 50 19 2.55 1500 250
PS3-1s-4 100 - 4" 16 135 175 50 19 2.35 1500 190
PS3-1s-6 150 - 6" 20 195 235 55 19 3.35 2000 250
PS3-1s-8 200 - 8" 20 245 295 65 19 2.95 2000 200
PS3-1s-10 250 - 10" 20 300 350 65 22 3.50 2000 250
PS3-1s-12 300 - 12" 20 350 400 65 22 3.05 2000 250
PS3-1s-14 350 - 14" 24 385 440 70 22 2.70 2500 250
PS3-1s-16 400 - 16" 24 435 490 65 22 2.30 2500 250
PS3-1s-18 450 - 18" 24 485 540 70 22 1.90 2500 250
PS3-1s-20 500 - 20" 24 540 600 70 22 4.00 2500 250
PS3-1s-22 550 - 22" 24 590 650 70 22 3.60 2500 250
PS3-1s-24 600 - 24" 24 640 700 70 22 3.20 2500 250
SYMBOL ILLUSTRATION :PS3-1s-0.5

NOTE :- VENDOR TO CONFORM MAX LOAD CAPACITY.


Material: A234 or Equivalent

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-1S


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 15 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD U-BOLT GUIDE

PI
PE

O/
ØA D
M

S
K

A MAX. LOAD (KG)


STANDARD NO PIPE SIZE N M K S MAX. HORIZONTAL
DIA Fy LOAD

PS3-2-0.5 15 - 1/2" 8 40 50 30 10 340 125


PS3-2-0.7 20 - 3/4" 8 45 55 30 10 340 100
PS3-2-1 25 - 1" 8 50 65 35 10 340 80
PS3-2-1.5 40 - 1 1/2" 10 65 85 40 16 540 110
PS3-2-2 50 - 2" 10 80 100 40 16 540 90
PS3-2-2.5 65 - 2 1/2" 12 95 120 50 19 700 150
PS3-2-3 80 - 3" 16 115 140 60 19 1500 250
PS3-2-4 100 - 4" 16 140 165 55 19 1500 190
PS3-2-6 150 - 6" 20 195 225 65 19 2000 250
PS3-2-8 200 - 8" 20 250 275 65 19 2000 200
PS3-2-10 250 - 10" 20 305 335 75 22 2000 250
PS3-2-12 300 - 12" 20 355 385 75 22 2000 250
PS3-2-14 350 - 14" 24 390 425 80 22 2500 250
PS3-2-16 400 - 16" 24 440 475 80 22 2500 250
PS3-2-18 450 - 18" 24 495 525 80 22 2500 250
PS3-2-20 500 - 20" 24 545 575 80 22 2500 250
PS3-2-22 550 - 22" 24 595 625 80 22 2500 250
PS3-2-24 600 - 24" 24 645 675 80 22 2500 250
SYMBOL ILLUSTRATION: PS3-2-0.5
NOTE :- VENDOR TO CONFORM MAX LOAD CAPACITY.

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-2


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 16 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD U-BOLT GUIDE (Stainless steel line)

PI
PE

O/
ØA D
M

S
K

A MAX. LOAD (KG)


STANDARD NO PIPE SIZE N M K S MAX. HORIZONTAL
DIA Fy LOAD

PS3-2s-0.5 15 - 1/2" 8 40 50 30 10 340 125


PS3-2s-0.7 20 - 3/4" 8 45 55 30 10 340 100
PS3-2s-1 25 - 1" 8 50 65 35 10 340 80
PS3-2s-1.5 40 - 1 1/2" 10 65 85 40 16 540 110
PS3-2s-2 50 - 2" 10 80 100 40 16 540 90
PS3-2s-2.5 65 - 2 1/2" 12 95 120 50 19 700 150
PS3-2s-3 80 - 3" 16 115 140 60 19 1500 250
PS3-2s-4 100 - 4" 16 140 165 55 19 1500 190
PS3-2s-6 150 - 6" 20 195 225 65 19 2000 250
PS3-2s-8 200 - 8" 20 250 275 65 19 2000 200
PS3-2s-10 250 - 10" 20 305 335 75 22 2000 250
PS3-2s-12 300 - 12" 20 355 385 75 22 2000 250
PS3-2s-14 350 - 14" 24 390 425 80 22 2500 250
PS3-2s-16 400 - 16" 24 440 475 80 22 2500 250
PS3-2s-18 450 - 18" 24 495 525 80 22 2500 250
PS3-2s-20 500 - 20" 24 545 575 80 22 2500 250
PS3-2s-22 550 - 22" 24 595 625 80 22 2500 250
PS3-2s-24 600 - 24" 24 645 675 80 22 2500 250
SYMBOL ILLUSTRATION: PS3-2s-0.5
NOTE :- VENDOR TO CONFORM MAX LOAD CAPACITY.
Material: A234 or Equivalent

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-2S


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 17 of 74
Mott MacDonald Pvt. Ltd.

STANDARD ANCHOR STRAP

10" TO 14" Z=90


16" TO 20" Z=120

Z W

T
10" TO 20" - 4 BOLTS 1/2" TO 8" - 2 BOLTS

CL STRAP R
E RAD = 1.5 T (MIN)
C
GAP

A A

B B

E W x T STEEL BOLT
STANDARD NO PIPE SIZE PIPE O/D A B C R
HOLE ∅ SIZE SIZE
PS3-4-0.5 15 - 1/2" 21.3 38 56 7 12 12 35 x 5 10
PS3-4-0.7 20 - 3/4" 26.7 41 59 9 12 15 35 x 5 10
PS3-4-1 25 - 1" 33.4 44 62 13 12 18 35 x 5 10
PS3-4-1.5 40 - 1 1/2" 48.3 61 83 19 15 26 35 x 8 12
PS3-4-2 50 - 2" 60.3 66 88 25 15 32 35 x 8 12
PS3-4-2.5 65 - 2 1/2" 73.0 81 110 30 19 39 50 x 10 16
PS3-4-3 80 - 3" 88.9 89 118 38 19 47 50 x 10 16
PS3-4-4 100 - 4" 114.3 102 131 50 19 60 50 x 10 16
PS3-4-6 150 - 6" 168.3 132 169 77 24 87 60 x 10 20
PS3-4-8 200 - 8" 219.1 171 207 102 24 113 60 x 15 20
PS3-4-10 250 - 10" 273.0 196 230 128 24 140 150 x 15 20
PS3-4-12 300 - 12" 323.9 224 260 154 24 165 150 x 15 20
PS3-4-14 350 - 14" 355.6 239 275 169 24 181 150 x 15 20
PS3-4-16 400 - 16" 406.4 280 320 195 27 206 200 x 20 24
PS3-4-18 450 - 18" 457.2 306 345 219 27 232 200 x 20 24
PS3-4-20 500 - 20" 508.0 331 375 245 27 257 200 x 20 24

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-4


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 18 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD BASE PLATE

C
150
GROUT TO SUIT 20 GROUT TO SUIT

4 OFF 25x6x150 LG ANCHOR BOLTS


FISH TAIL TANGS A BY ERECTOR A
50 50 HOLE 0 22 TO BE INSTALLED 50 50 HOLE 0 22
(FOR M20 BOLT) TO MANUFACTURERS (FOR M20 BOLT)
INSTRUCTIONS
50 50

A
50 50

6 PS-3-32-11 TO 14 PS-3-32-21 TO 24

ANCHOR BOLTS
A BY ERECTOR A
50 50 HOLE 0 22
EXISTING (FOR M20 BOLT)
STEEL
50
A

A
6
50

C
PS-3-32-31 TO 34 PS-3-32-41 TO 44

DIMENSIONS MATERIAL SUMMARY PER ASSY.


WEIGHT PER
STANDARD NO FISH TAIL TANGS 25x6
'A' 'C' PLATE ASSEMBLY (Kg)
THICK PLATE

PS3-32-11 TO 14 350 10 225 225 6


PS3-32-21 TO 24 560 12 226 226 12
PS3-32-31 TO 34 660 20 227 227 20
PS3-32-41 TO 44 500 10 228 228 20

SEE REGISTER OF PIPE SUPPORTS FOR:-


SUPPORTED LINE IDENTITY

SYMBOL ILLUSTRATION:
PS3-32-41

C3 20/11/2012 Re-issued for Contrn. RSB GPB AGV PS3-32


C2 7/11/2012 Re-issued for Contrn. RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued for Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C003
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 19 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


TEE POST

MATERIAL LIST STANDARD


Remark
STANDARD NO STRUCTURAL FOUNDATION `A' `B' REMARKS
NO.
ITEM QTY.
PS6-1-1 35 A + B LONG PS8-3 500 600 P = 180 Kg/m
PS6-1-2 33 A + B LONG PS8-3 700 800 P = 325 Kg/m
PS6-1-3 32 A + B LONG PS8-3 1000 1000 P = 350 Kg/m
P =700 Kg/m or
PS6-1-4 9 A + B LONG PS8-3
1500 2000 W = 1400 Kg
COL. MC 200 BOX 100 MM
2A LONG,
PS6-1-5 15, 16 APART TO BE CONNECTED PS8-3 P = 5000 kg / m
2BLONG
WITH BATTEN PLATE OF 200 2900 1000
15, 2A LONG, COL. MC200 BOX & BEAM W= 300 Kg , Faxial
PS6-1-6 PS8-3
9 B LONG MB200 2150 500 = 900 kg

Note: This drawing should be read along with PS8-3


Base plate on the top of the concrete is counted under support PS8-3

SYMBOL ILLUSTRATION :
PS6-1-3-DIMA-DIMB-DIMC-DIMD-EL.I- ά

C3 11/20/2012 Re-Issued For construction RSB GPB AGV


PS6-1
C2 11/7/2012 Re-Issued For construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C006
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 20 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GOAL POST

MATERIAL LIST STANDARD


Remark
STANDARD NO STRUCTURAL FOUNDATION `A' `C' `D' REMARK
NO.
ITEM QTY.
PS6-2-1 35 2A + B LONG _ PS8-3 500 900 450 W = 700 Kg
PS6-2-2 33 2A + B LONG _ PS8-3 700 2000 1000 W =1300 Kg
PS6-2-3 12 4A+2B +300 LONG Member MC150 BOX PS8-3 1500 5200 2600
W = 1000 Kg

PS6-2-3A 12 4A+2B +300 LONG Member MC150 BOX PS8-3 1500 2600 1300
W = 3000 Kg
PS6-2-4 12 4A+2B +300 LONG Member MC150 BOX PS8-3 1500 3600 1800
W = 7000 Kg
PS6-2-5/ 1 10 4A+2B +300 LONG Member MC250 BOX PS8-3 2000 5000 2500
W =10000 Kg
PS6-2-5/ 0 16 4A+2B +300 LONG Member MC100 BOX PS8-3 1000 3200 1600
W = 1400 Kg
12, 4A LONG,
PS6-2-6 MC150 BOX PS8-3 400 1500 750
16 2B LONG W = 18,000 Kg
NOTE:
1)This drawing should be read along with PS8-3
2) ARRANGEMENT I - GENERAL ARRANGEMENT
ARRANGEMENT II - PS6-2-1 / PS6-2-2 SYMBOL ILLUSTRATION :
ARRANGEMENT III - PS6-2-3 /3A/4/5-1/5-0/6
3) Base plate on the top of the concrete is counted under support PS8-3 PS6-2-DIMA-DIMB-DIMC-EL.I

C3 11/20/2012 Re-Issued For construction RSB GPB AGV


PS6-2
C2 11/7/2012 Re-Issued For construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C006
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 21 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


DOUBLE CHANNEL GOAL POST TYPE SUPPORT

`B'
`C' `D'
EL.I

REF. POINT
`A'

REF.POINT

EL.II
DETAILS BY CIVIL

ELEVATION

STANDARD FOUNDATION PS-8-3


X sq. x T thk. (BY CIVIL DEPT)

PLAN

MATERIAL LIST
DIMENSIONS STANDARD
STANDARD NO STRUCTURAL FOUNDATION NO.
REMARKS
ITEM QTY. ITEM QTY. Max A X T
PS6-3-1 13 2A+2B LONG 52 500 1500 250 12 PS-8-3 w= 125 kg/m
PS6-3-2 12 2A+2B LONG 52 500 2000 250 12 PS-8-3 w= 300 kg/m
PS6-3-3 11 2A+2B LONG 52 500 2000 250 12 PS-8-3 w= 400 kg/m

Note: Base plate on the top of the concrete is counted under support PS8-3

SYMBOL ILLUSTRATION :

PS-6-3-DIMA-DIMB-DIMC-EL.I

C3 11/20/2012 Re-Issued For construction RSB GPB AGV PS6-3


C2 11/7/2012 Re-Issued For construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C006
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 22 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


INVERTED L SUPPORT

`B'
MC200
`P'
REF.POINT
COLUMN MC300 BOX.

EL . I.

ITEM 35/33/32/12/14/15 SECTION 'A-A'


'
`N
ITEM 64/63/52/51

ITEM 33 `T' THK


`A'

α°
Mx,Mz

`X'Sq

EL . II.
PS-8-3 DETAILS BY CIVIL
`B'

MATERIAL LIST
DIMENSIONS STANDARD
STANDARD NO STRUCTURAL MAX. A FOUNDATION `A' `B' REMARKS
NO.
ITEM QTY. ITEM QTY. X T
PS6-4-1 35 A+B+25 64 150 150 10 500 500 300 P = 1300 Kg
PS6-4-2 33 A+B+40 63 200 200 10 1000 700 400 P = 350 Kg
PS6-4-3 32 A+B+50 52 250 250 12 1500 1000 500 P = 400 Kg
PS-8-3
PS6-4-4 12 A+B+50 51 300 300 12 1500 1000 500 P = 600 Kg
column14, 2A+100,
PS6-4-5 beam15, B+50, 47 500 500 12 3400 3400 800 P = 180 Kg
bracing 33 1.5 B + 50

SYMBOL ILLUSTRATION :
PS6-4-DIMA-DIMB

C3 11/20/2012 Re-Issued For construction RSB GPB AGV


PS6-4
C2 11/7/2012 Re-Issued For construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C006
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 23 of74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


BASE SUPPORT FOR WELD ELBOW (CARBON STEEL)

TRIM TO SUIT IN FIELD


DO NOT CUT HOLE IN PIPE
`T' THICK
NOTE - 3

25
CL EL I

C
X SQ.

TRUNNION `S' REF.POINT


3 DIA.

'A'
TACK WELD BASE PLATE VENT
`B'

DETAIL OF BASE PLATE


TO TRUNNION FOR
TRANSPORTATION

50
6
IF REQUIRED
T.O.P. EL.II

REF. POINT
H.P.P.

PS-8-3
OR EXISTING STEEL

MATERIAL LIST
TRUNNION BASE PLATE
STANDARD NO PIPE NB TRUNNION 'S'
SIZE (SQxTHK.)
NB SCH. NB SCH. LOAD (KG) C
PS7-1-1 2" 80 1 1/2" 80 130 71 1 1/2" 100x6
PS7-1-2 3" 40 2" 40 159 92 2" 100x6
PS7-1-3 4" 40 3" 40 351 138 3" 150x10
PS7-1-4 6" 40 4" 40 621 186 4" 150x10
PS7-1-5 8" 40 6" 40 1415 271 6" 200x12
PS7-1-6 10" 40 6"/8" 40 1200/2500 290/352 8" 300x20
PS7-1-7 12 STD 8"/10" 40 2100/3500 369/443 10" 350x20
PS7-1-8 14 STD 10"/12" 40 3000/4460 472/561 12" 400x20
PS7-1-9 16 STD 10"/12"/14" 40 2900/4060/4750 491/558/613 14" 400x20
PS7-1-10 18 STD 10"/12"/14" 40 2500/3730/4300 515/572/615 16" 450x20
PS7-1-11 20 STD 12"/14"/16" 40 3400/4000/5170 594/630/698
PS7-1-12 24 STD 14"/16" 40 3800/4500 677/731

NOTE
1) TRUNNION MATERIAL SAME AS PARENT PIPE SPEC.
2) IN CASE SCH. OF TRUNNION AS MENTIONED IN THE TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THK.
AVAILABLE
3) REINFORCING PAD TO BE USED WITH THIS SUPPORT MADE FROM PARENT PIPE SPEC / MATERIAL (IF REQUIRED)

SYMBOL ILLUSTRATION :
PS7-1-3-DIMA-DIM B

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS7-1
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 24 of74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


BASE SUPPORT FOR STRAIGHT PIPE (CARBON STEEL)

TRIM TO SUIT IN FIELD


DO NOT CUT HOLE IN PIPE

CL EL I
`T' THICK

`C'
TRUNNION `S'

X SQ.
3 DIA VENT
`A'

DETAIL OF BASE PLATE


6

50
TACK WELD BASE PLATE
TO TRUNNION FOR
TRANSPORTATION
IF REQUIRED

REF. POINT
PS8-3

MATERIAL LIST
TRUNNION BASE PLATE
STANDARD NO PIPE NB TRUNNION 'S'
SIZE (SQxTHK.) X*T
NB SCH. NB SCH. LOAD (KG) C
PS7-4-1 2" 80 1 1/2" 80 130 10 1 1/2" 100x6
PS7-4-2 3" 40 2" 40 159 12 2" 100x6
PS7-4-3 4" 40 3" 40 351 21 3" 150x10
PS7-4-4 6" 40 4" 40 621 22 4" 150x10
PS7-4-5 8" 40 6" 40 1415 39 6" 200x12
PS7-4-6 10" 40 6"/8" 40 1200/2500 29/55 8" 300x20
PS7-4-7 12 STD 8"/10" 40 2100/3500 43/76 10" 350x20
PS7-4-8 14 STD 10"/12" 40 3000/4460 64/104 12" 400x20
PS7-4-9 16 STD 10"/12"/14" 40 2900/4060/4750 53/83/105 14" 400x20
PS7-4-10 18 STD 10"/12"/14" 40 2500/3730/4300 46/66/85 16" 450x20
PS7-4-11 20 STD 12"/14"/16" 40 3400/4000/5170 58/73/101
PS7-4-12 24 STD 14"/16" 40 3800/4500 57/77

NOTE
1) TRUNNION MATERIAL SAME AS PARENT PIPE SPEC.
2)
IN CASE SCH. OF TRUNNION AS MENTIONED IN THE TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THK. AVAILABLE

3) REINFORCING PAD TO BE USED WITH THIS SUPPORT MADE FROM PARENT PIPE SPEC / MATERIAL (IF REQUIRED)

SYMBOL ILLUSTRATION :

PS7-4-3-DIM A-DIM B

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS7-4


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 25 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


BASE GUIDE

EXISTING BASE
SUPPORT
PS7-1 OR 4
GUIDES WELDED
TO FOUNDATION
PLATE (BY FIELD)

EL. II T.O.P. EL.II

H.P.P.
PS8-3

DO NOT WELD ALONG


DO NOT WELD ALONG

3 MM GAP
INNER EDGE (TYP)
INNER EDGE (TYP) (TYP)
6

(TYP)
(TYP)
6

20 (TYP)

=
C
L PIPE
`A'
=

20 (TYP)

3 MM GAP
(TYP)
(TYP)
3 MM GAP 3 MM GAP 6 FOR (TYP)
(TYP) (TYP) G7-6-1-1 6
G7-6-2-1
G7-6-3-1

20 (TYP)

20 (TYP)
`A'
= =

G7 - 6 - 1 - L G7 - 6 - 1 - G

MATERIAL LIST
STANDARD MAX GUIDE FORCE
STRUCTURAL REMARKS
NO (KG)
ITEM QTY. DIM. 'A'
G7-6-1 35 310 150 FOR SUPPORT BASE PLATES 200 SQ
250
AND SMALLER (GUIDE)

G7-6-2 33 510 250 FOR SUPPORT BASE PLATES 250 AND


400
300 SQ (GUIDE)

G7-6-3 33 710 350 FOR SUPPORT BASE PLATES 350 SQ


400
AND LARGER (GUIDE)

G7-6-1-1 35 620 300 FOR SUPPORT BASE PLATES 200 SQ


250 AND SMALLER
(NOMINAL ANCHOR)
G7-6-2-1 33 1020 500 FOR SUPPORT BASE PLATES 250 AND
400
300 SQ(NOMINAL ANCHOR)

G7-6-3-1 33 1420 700 FOR SUPPORT BASE PLATES 350 SQ


400 AND LARGER (NOMINAL
ANCHOR)

NOTE
1) TRUNNION MATERIAL SAME AS PARENT PIPE SPEC.
2) IN CASE SCH. OF TRUNNION AS MENTIONED IN THE TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THK.
AVAILABLE
3) REINFORCING PAD TO BE USED WITH THIS SUPPORT MADE FROM PARENT PIPE SPEC / MATERIAL (IF REQUIRED)
4) GUIDE SUPPORT TO BE USED FOR TRUNNION

SYMBOL ILLUSTRATION :
FOR NOMINAL ANCHOR G7-6-1-L
FOR GUIDE G7-6-1-G

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G7-6
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 26 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


ADJUSTABLE BASE SUPPORT FOR WELD ELBOW (CARBON STEEL)

TRIM TO SUIT IN FIELD 'Y' (TYP)


DO NOT CUT HOLE IN PIPE NOTE - 3

`Z' sq
6

25
`T' THICK
C
L EL I

C
4 HOLES
X SQ. 22 DIA
3 DIA 10 THK.

'A'
TRUNNION `S'
VENT PLATE
DETAIL OF BASE PLATE
JACK SCREWS
`B'

20 DIA

50
6
TACK WELD BASE PLATE
TO TRUNNION FOR
TRANSPORTATION ADJUSTABLE NUT WELDED ALL ROUND
IF REQUIRED BASE PLATE (6mm WELD)
SEE DETAIL `A' 50 NOM

REF. POINT
PS8-3

DETAIL `A'

MATERIAL LIST
STANDARD NO PIPE NB TRUNNION 'S'
NB SCH. NB SCH. LOAD (KG) C
PS7-9-1 2" 80 1 1/2" 80 130 71
PS7-9-2 3" 40 2" 40 159 92
PS7-9-3 4" 40 3" 40 351 138
PS7-9-4 6" 40 4" 40 621 186
PS7-9-5 8" 40 6" 40 1415 271
PS7-9-6 10" 40 6"/8" 40 1200/2500 290/352
PS7-9-7 12 STD 8"/10" 40 2100/3500 369/443
PS7-9-8 14 STD 10"/12" 40 3000/4460 472/561
PS7-10-9 16 STD 10"/12"/14" 40 2900/4060/4750 53/83/105
PS7-10-10 18 STD 10"/12"/14" 40 2500/3730/4300 46/66/85
PS7-10-11 20 STD 12"/14"/16" 40 3400/4000/5170 58/73/101

J ' SCREWS
BASE PLATE
TRUNNION SIZE ITEM Y Z
(SQxTHK.) ITEM QTY.

1 1/2" 62 250x10 160 100 138 4


2" 61 300x10 170 110 138 4
3" 61 300x10 200 140 138 4
4" 50 350x12 230 170 138 4
6" 42 400x20 280 220 139 4
8" 41 450x20 330 270 139 4
10" 39 500x20 390 330 139 4
12" 38 550x20 440 380 139 4
14" 40 600x20 470 410 139 4
16" 37 650x20 520 460 139 4

NOTE
1) TRUNNION MATERIAL SAME AS PARENT PIPE SPEC.
2) IN CASE SCH. OF TRUNNION AS MENTIONED IN THE TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THK. AVAILABLE
3) REINFORCING PAD TO BE USED WITH THIS SUPPORT MADE FROM PARENT PIPE SPEC / MATERIAL ( IF REQUIRED)

SYMBOL ILLUSTRATION :
PS7-9-2-DIM A-DIM 'B'

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS7-9
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 27 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


ADJUSTABLE BASE SUPPORT FOR STRAIGHT PIPE (CARBON STEEL)

TRIM TO SUIT IN FIELD


DO NOT CUT HOLE IN PIPE 'Y' (TYP)
NOTE - 3

CL EL I

Z
`C'
TRUNNION `S'
`T' THICK
4 HOLES
3 DIA VENT 22 DIA

`A'
X SQ.
10 THK.
`B'

PLATE
JACK SCREWS DETAIL OF BASE PLATE
20 DIA 6 50

TACK WELD BASE PLATE


TO TRUNNION FOR
ADJUSTABLE NUT WELDED ALL ROUND
TRANSPORTATION
BASE PLATE (6mm WELD) SEE DETAIL `A'
IF REQUIRED
50 NOM

REF. POINT

PS8-3

DETAIL `A'

MATERIAL LIST
STANDARD NO PIPE NB TRUNNION 'S'
NB SCH. NB SCH. LOAD (KG) C
PS7-10-1 2" 80 1 1/2" 80 130 10
PS7-10-2 3" 40 2" 40 159 12
PS7-10-3 4" 40 3" 40 351 21
PS7-10-4 6" 40 4" 40 621 22
PS7-10-5 8" 40 6" 40 1415 39
PS7-10-6 10" 40 6"/8" 40 1200/2500 29/55
PS7-10-7 12 STD 8"/10" 40 2100/3500 43/76
PS7-10-8 14 STD 10"/12" 40 3000/4460 64/104
PS7-10-9 16 STD 10"/12"/14" 40 2900/4060/4750 53/83/105
PS7-10-10 18 STD 10"/12"/14" 40 2500/3730/4300 46/66/85
PS7-10-11 20 STD 12"/14"/16" 40 3400/4000/5170 58/73/101

BASE PLATE BOLT'S


TRUNNION SIZE ITEM (SQ x THK.) Y Z
ITEM QTY.
(X x T) MM (MM) (MM)
1 1/2" 62 250x10 160 100 138 4
2" 61 300x10 170 110 138 4
3" 61 300x10 200 140 138 4
4" 50 350x12 230 170 138 4
6" 42 400x20 280 220 139 4
8" 41 450x20 330 270 139 4
10" 39 500x20 390 330 139 4
12" 38 550x20 440 380 139 4
14" 40 600x20 470 410 139 4
16" 37 650x20 520 460 139 4
NOTE
1) TRUNNION MATERIAL SAME AS PARENT PIPE SPEC.
2) IN CASE SCH. OF TRUNNION AS MENTIONED IN THE TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THK.
AVAILABLE
3) REINFORCING PAD TO BE USED WITH THIS SUPPORT MADE FROM PARENT PIPE SPEC / MATERIAL (IF REQUIRED)
SYMBOL ILLUSTRATION :
PS7-10-2-DIM A-DIM 'B'

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS7-10
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 28 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


ADJUSTABLE BASE GUIDE

REFERENCE 10 THK
POINT PLATE
EXISTING BASE
GUIDE WELDED TO
SUPPORT FOUNDATION PLATE
(BY FIELD)
'Y' (TYP)
NUT WELDED ALL ROUND
(6mm WELD)
50(NOM.)
EL. II

Z
`T' THICK
4 HOLES
X SQ. 22 DIA
PS8-3
DETAIL OF TRUNION BASE PLATE

DO NOT WELD ALONG


INNER EDGE (TYP)

3 MMGAP
DO NOT WELD ALONG (TYP)
INNER EDGE (TYP) 6

(TYP)
(TYP)
6

C
L PIPE
`L'
=

3 MMGAP
(TYP)

(TYP)
6
3 MM GAP 3 MM GAP FOR (TYP)
(TYP) (TYP) G7-19-1-1 6
G7-19-2-1
G7-19-3-1
`L'
= =

G7 - 19 - 1 - L G7 - 19 - 1 - G

MATERIAL LIST
DIMENSIONS MAX GUIDE
STANDARD NO GUIDES REMARKS
FORCE (KG)
ITEM QTY. L -

G7-19-1 33 100 50 - 400 FOR TRUNNION SIZE 1 1/2" - 4" (GUIDE)

G7-19-2 33 200 100 - 400 FOR TRUNNION SIZE 6" - 12" (GUIDE)

G7-19-3 33 400 200 - 400 FOR TRUNNION SIZE 14" - 16" (GUIDE)

FOR TRUNNION SIZE 1 1/2" - 4"


G7-19-1-1 33 200 50 - 400
(NOMINAL ANCHOR)

FOR TRUNNION SIZE 6" - 12"


G7-19-2-1 33 400 100 - 400
(NOMINAL ANCHOR)

FOR TRUNNION SIZE 14" - 16"


G7-19-3-1 33 800 200 - 400
(NOMINAL ANCHOR)

J ' SCREWS
TRUNNION BASE PLATE
ITEM Y Z
SIZE (SQxTHK.) ITEM QTY.

1 1/2" 62 250x10 160 100 138 4


2" 61 300x10 170 110 138 4
3" 61 300x10 200 140 138 4
4" 50 350x12 230 170 138 4
6" 42 400x20 280 220 139 4
8" 41 450x20 330 270 139 4
10" 39 500x20 390 330 139 4 SYMBOL ILLUSTRATION :
12" 38 550x20 440 380 139 4
14" 40 600x20 470 410 139 4
16" 37 650x20 520 460 139 4
FOR NOMINAL ANCHOR G7-19-1-L
NOTE : FOR GUIDE G7-19-1-G
1) IF DEGREE NOT MENTIONED IN ILLUSTRATION, CONSIDER PARALLEL TO LINE AXIS.
2) PEDESTAL INSERT PLATE TO BE PROVIDED BY CIVIL.

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G7-19


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 29 of 74
Mott MacDonald Pvt. Ltd.
STANDARD PIPE SUPPORTS

TWO DIRECTIONAL BRACING FOR SMALL BORE BRANCH TO HEADER CONNECTIONS

Type A

Notes:
1. Material shall be of compatible specification to that of pipe (and flange).
2. To be confirmed during fabrication.
3. To be called up only in accordance with job note or pipestress requirements.
Symbol illustration: PS7-21/A

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS7-21
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C007
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 30 of 74
PROJECT :
AISHWARIYA FIELD DEVELOPMENT PROJECT
EPC (LSTK) WORKS
PROJECT :
AISHWARIYA FIELD DEVELOPMENT PROJECT
EPC (LSTK) WORKS
PROJECT :
AISHWARIYA FIELD DEVELOPMENT PROJECT
EPC (LSTK) WORKS
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STAINLESS STEEL PLATE

C
6
EXISTING STEEL

EXISTING STEEL

STANDARD NO. DIM 'A' DIM 'C' PLATE

PS8-8-1 250 6 6THK.x250 SQ


PS8-8-2 300 6 6THK.x300 SQ
PS8-8-3 420 6 6THK.x420 SQ
PS8-8-4 560 6 6THK.x560 SQ
PS8-8-8 560 6 6THK.x560 SQ
SS PLATE ON STEEL
S.S. PLATE
6
`X'
`t' = 6 mm

10 mm

EXISTING SUPPORT
EMBEDED C.S. PLATE

H.P.P.

ELEVATION

`X'

`Y'

PLAN

H.P.P. = HIGH POINT OF PAVING

NOTE: FOR PS8-8S PROVIDE S S PLATE A234 GRADE OR EQUIVALENT

SYMBOL ILLUSTRATION:
PS8-8-X-Y
PS8-8S-X-Y

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS8-8 & 8S
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C008

REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 31 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


CANTILEVER BRACKET OFF COLUMN

`P'
'B' `P' 'B'

50 `A' `A'
EXISTING COLUMN

REF. POINT
(TYP)

6
EL. I EL. I

REF.POINT ITEM NO ITEM NO

PS9-1-11 TO 14 PS9-1-21 TO 24

`P'
'B'
`A'

6
EL. I

REF.POINT ITEM NO

PS9-1-31 TO 34

MATERIAL LIST
STANDARD NO
ITEM QUANTITY LOAD
NO. PS9-1-11 TO 14 PS9-1-21 TO 24 PS9-1-31 TO 34
PS-9-1-11/21/31 33 P= 150 kg/ 100 kg/ 100 kg
PS-9-1-12/22/32 13 P= 150 kg/ 150 kg/ 150 kg
'A' + 50 LONG 'A' LONG 'A' LONG
PS-9-1-13/23/33 12 P= 500 kg/ 500 kg/ 500 kg
PS-9-1-14/24/34 1 P= N.A./ 800 kg/ 800 kg

MAX. 'A' = 1000


SYMBOL ILLUSTRATION :
PS-9-1-12-DIM 'A'-DIM 'B'-EL..I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS9-1
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009

REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 32 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


BRACED BRACKET OFF COLUMN

`P' `P'
6 REF.POINT
REF.POINT 6
`B'
`B'
EL. I EL. I

6
EXISTING COLUMN

45° 45°
(TYP)

6
ITEM NO ITEM NO
6
6
6

'C'
'C'

50 `A' `A'
`P'
REF.POINT PS9-2-11 TO 14 PS9-2-21 TO 24

`B' `A'

EL. I `B'

6
45°

ITEM NO

6 6
6

'C'

`A' CONSTRUCTION DETAIL


FOR & SECTIONS

PS9-2-31 TO 34

MATERIAL LIST
STANDARD NO ITEM QUANTITY LOAD
NO. PS9-2-11 TO 14 PS9-2-21 TO PS9-2-31 TO 34
24
PS-9-2-11/21/31 33 P= 800 kg/ 470 kg/ 470 kg
PS-9-2-12/22/32 13 2.5 x P= 400 kg/ 280 kg/ 280 kg
2.5 'A' LONG 2.5 'A' LONG
PS-9-2-13/23/33 12 (A+50)LONG P= 1050 kg/ 840 kg/ 840 kg
PS-9-2-14/24/34 1 P= 1200 kg./ 910 kg/ 910 kg

NOTE :
1) MAX. 'A' = 1500

SYMBOL ILLUSTRATION :
PS-9-2-12-DIM 'A'-DIM 'B'-DIM'C'-EL..I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-2


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 33 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


TRAPEZE FRAME

EXISTING STEEL

(TYP)
6
`P'
(TYP)
ITEM NO. 6

`W'
EL I

'E'

REF. POINT
`C' `B' `D'
REF. POINT

MATERIAL LIST
'B' 'C' & 'D'
STANDARD NO 'A' MAX LOAD
ITEM QUANTITY MAX MIN

PS9-3-1 33 2A+B+C+D 1000 1000 90 W=800 kg or P= 700 kg


PS9-3-2 13 2A+B+C+D 1000 1250 110 W=300 kg or P= 300 kg
PS9-3-3 12 2A+B+C+D 1000 1500 160 W=1100 kg or P= 1100 kg

SYMBOL ILLUSTRATION :
PS9-3-1-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-DIM 'E'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS9-3
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 34 of 74
Mott-MacDonald Consultants (I) Pvt. Ltd.

STANDARD PIPE SUPPORTS


HALF TRAPEZE

EXISTING STEEL

`P'
`C' `B'
6
'D'
`W'

10
(MIN) 6
EL I

ITEM NO REF. POINT

PS9-4-11 TO 14

EXISTING STEEL

`P2' `P1'
`C' 6 `B'

`W'

6
EL I

REF. POINT
'D'
ITEM NO

PS9-4-21 TO 24

MATERIAL LIST
'A' 'C'
STANDARD NO 'B' MAX LOAD
ITEM QUANTITY MAX MAX

PS9-4-11 & 21 33 A+B+C L'G 600 500 500 P= 300 kg/ P1+P2= 470 kg
PS9-4-12 & 22 13 A+B+C L'G 1000 1000 1000 W= 170 kg or P= 150 kg/ W= 170 kg or P1+P2= 170 kg
PS9-4-13 & 23 12 A+B+C L'G 1000 1500 1500 W= 360 kg or P= 280 kg/ W= 360 kg or P1+P2= 360 kg
PS9-4-14 10 A+B+C L'G 1000 1500 1500 W= 900Kg

Note: MOMENT IN MZ TO BE LIMITED TO 55Kg.m FOR PS9-4-11&ps9-4-21

SYMBOL ILLUSTRATION :
PS9-4-11-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-4


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 35 of 74
Mott-MacDonald Consultants (I) Pvt. Ltd.

STANDARD PIPE SUPPORTS


GOAL POST

`P'
REF.POINT

`W'

EL I

6 (TYP)
6

ITEM NO

`A'
(TYP)
6

EXISTING STEEL

C B D

MATERIAL LIST
'A' 'B' 'C' & 'D'
STANDARD NO LOAD
ITEM QUANTITY MAX MAX MIN

PS9-5-1 33 2A+B+C+D 1000 1000 90 W= 900 kg or P= 700 kg

2A+B+C+D-
PS9-5-2 13 1000 1250 110 W= 280 kg or P= 280 kg
200
2A+B+C+D-
PS9-5-3 12 1000 1500 160 W= 1100 kg or P= 1100 kg
300

SYMBOL ILLUSTRATION :
PS9-5-1-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D-DIM 'E'-EL.I

PS9-5
C3
C2
20/11/2012
7/11/2012
Re-Issued For Construction
Re-Issued For Construction
RSB
RSB
GPB
GPB
AGV
AGV
abc SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 36 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


T-POST

`B' `C'
'D'
`P' `P'
`B' `C' `W'

EL I REF. POINT

REF. POINT

6
6 ITEM NO

`A '
REF. POINT

EXISTING STEEL

MATERIAL LIST 'B' & 'C'


STANDARD NO 'A' MAX LOAD
MAX
ITEM QTY
PS-9-8-1 33 A+B+C 1000 1000 W= 450 kg or P+P= 300 kg
PS-9-8-2 13 A+B+C-100 1000 1250 W= 200 kg or P+P= 200 kg
PS-9-8-3 12 A+B+C-150 1000 1500 W= 750 kg or P+P= 550 kg

SYMBOL ILLUSTRATION :
PS-9-8-2-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-8


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009

REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 37 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HALF FRAME AT COLUM N

'D'
`P'

`W'

EL I

REF. POINT
6

EXISTING CO LUM N
(TYP)
6
`A'

ITEM NO

EXISTING BEAM

`C' `B'

REF. POINT

MATERIAL
'C'
STANDARD NO 'A' MAX 'B' MAX LOAD
ITEM QUANTITY
MAX MIN
PS9-9-1 33 A+B+C 1000 1000 500 90 W= 900 kg or P= 700 kg
PS9-9-2 13 A+B+C-100 1000 1500 750 110 W= 280 kg or P= 280 kg
PS9-9-3 12 A+B+C-150 1000 2000 1000 160 W= 1100 kg or P=1100 kg

SYMBOL ILLUSTRATION :
PS9-9-2-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-9


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 38 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HALF TRAPEZE FRAME AT COLUMN

EXISTING BEAM

EXISTING COLUM N
6
`A'

`P'
ITEM NO
6 6

`W'
EL I

REF.POINT
D

`C' `B'

REF.POINT

MATERIAL
'C'
STANDARD NO 'A' MAX 'B' MAX LOAD
ITEM QUANTITY
MAX MIN
PS9-10-1 33 A+B+C 1000 1000 500 90 W= 900 kg or P= 700 kg
PS9-10-2 13 A+B+C 1000 1500 750 110 W= 280 kg or P= 280 kg
PS9-10-3 12 A+B+C 1000 2000 1000 160 W= 1100 kg or P=1100 kg

SYMBOL ILLUSTRATION :
PS9-10-1-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-10


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 39 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


SINGLE TRIM STEEL

DRILL `F' DIA FOR


DRILL `F' DIA FOR
HANGER ROD
HANGER ROD
ITEM NO `D'
`P'
`P1' `P1'
`E '

REF.POINT `W' `B' `A' `C'


EL I
`P'
`D' (TYP)
REF.POINT
6
`W'
`A' EL I

(TYP)
6

ITEM NO

EXISTING STEEL EXISTING STEEL

REF.POINT REF.POINT

(TYP) (TYP)
6 6

PS9-11-11 TO 14 PS9-11-21 TO 24

MATERIAL LIST
QUANTITY 'A' 'B' & 'C'
STANDARD NO ITEM LOAD
PS9-11-11 TO MAX MAX
NO. PS9-11-21 TO 24
14
PS9-11-11 & 21 33 'A' LONG A+B+C L'G 1000 500 W= 1400 kg or P= 700 kg/ W= 1400 kg or P= 700 kg & P1= 350 kg
PS9-11-12 & 22 13 'A' LONG A+B+C L'G 1500 500 W= 1100 kg or P= 500 kg/ W= 1100 kg or P= 500 kg & P1= 450 kg
PS9-11-13 & 23 12 'A' LONG A+B+C L'G 2000 750 W= 2100 kg or P= 1100 kg/ W= 2100 kg or P= 1100 kg & W1= 1500 kg or P1= 700 kg

PS9-11-22-DIM 'A'-DIM 'B'-DIM 'C'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-11


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 40 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


DOUBLE TRIM STEEL

6 (TYP)

`P'
`E '

`W' (TYP)
6
EL I `P1' `P1'
`B' `A' `C'
REF. POINT `P'
`A'
`W'
EL I

REF. POINT

EXISTING STEEL EXISTING STEEL


`D '

`D '
REF. POINT

REF. POINT
(TYP)
ITEM NO ITEM NO 6

(TYP)
6

PS9-12-11 TO 14 PS9-12-21 TO 24

MATERIAL LIST
QUANTITY 'B' & 'C'
STANDARD NO ITEM 'A' MAX LOAD
MAX
NO. PS9-12-11 TO 14 PS9-12-21 TO 24

PS9-12-11 & 21 33 2 x 'A' LONG 2(A+B+C) L'G 1000 500 W= 2800 kg or P=1400 kg/ W= 2800 kg or P= 1400 kg & P1= 700 kg
PS9-12-12 & 22 13 2 x 'A' LONG 2(A+B+C) L'G 1500 500 W= 2200 kg or P= 1000 kg/ W= 2200 kg or P= 1000 kg & P1= 900 kg

PS9-12-13 & 23 2 x 'A' LONG 2(A+B+C) L'G 2000 750 W= 4200 kg or P= 2200 kg/ W= 4200 kg or P= 2200 kg & W1= 3000 kg or P1=1400 kg
12

SYMBOL ILLUSTRATION :
PS9-12-22-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-12


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 41 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


CANTILEVER FROM BEAM

'D'
EXISTING BEAM
`A' `B'
`C' 15 MIN.
50

EL I 6

REF. POINT
DRILL `E' DIA ITEM NO
FOR HANGER ROD
PS9-13-11 TO 14

`A'
`C'

50
`D'

EL I
EXISTING BEAM

REF. POINT
ITEM NO
6
DRILL `E' DIA
'E'
FOR HANGER ROD
PS9-13-21 TO 24

MATERIAL LIST
QUANTITY 'A' 'B'
STANDARD NO ITEM LOAD
PS9-13-11 TO MAX MAX
NO. PS9-13-21 TO 24
14
PS9-13-11 & 21 33 A + B LONG 'A' LONG 500 500 CHECK FOR BEAMS STIFFNESS

PS9-13-12 & 22 13 A + B LONG 'A' LONG 750 750 CHECK FOR BEAMS STIFFNESS

PS9-13-13 & 23 12 A + B LONG 'A' LONG 750 750 CHECK FOR BEAMS STIFFNESS

PS9-13-14 & 24 11 A + B LONG 'A' LONG

SYMBOL ILLUSTRATION :
PS9-13-11-DIM 'A'-DIM 'B'-DIM'C'-DIM 'D'-DIM 'E'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS9-13
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 42 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


'U' BOLT TYPE SUPPORT

EXISTING BEAM

REF.
POINT
6

ITEM NO
`A'

`W'
`U' BOLT
(GUIDE OR CLAMP)

EL I
`C'

`P'

2 HOLES `D' DIA


ON `V' BACKMARK

PIPE MATERIAL DIMENSIONS


STANDARD NO A MAX LOAD (W)
SIZE ITEM QUANTITY P V
PS9-14-0.5 15-1/2" 35 A+45 LONG 750 45 30 P= 200 kg
PS9-14-0.7 20-3/4" 35 A+50 LONG 750 50 30 P= 200 kg
PS9-14-1 25-1" 35 A+55 LONG 750 55 30 P= 200 kg
PS9-14-1.5 40-1 1/2" 35 A+65 LONG 750 65 30 P= 200 kg
PS9-14-2 50-2" 35 A+75 LONG 750 75 30 P= 200 kg
PS9-14-2.5 65-2 1/2" 33 A+90 LONG 1000 90 45 P= 400 kg
PS9-14-3 80-3" 33 A+100 LONG 1000 100 45 P= 400 kg
PS9-14-4 100-4" 33 A+115 LONG 1000 115 45 P= 400 kg
PS9-14-6 150-6" 33 A+145 LONG 1000 145 45 P= 400 kg

SYMBOL ILLUSTRATION :
PS9-14-1.5-DIM 'A'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS9-14
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 43 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


SUPPORT FOR VERTICAL LINE FROM BEAM
`P'

ITEM 33 STANDARD TRUNNION ATTACHMENT


(PS12-2 OR PS12-4)

`E'
EL I
REF.POINT

NOTE:- EXTREME CARE MUST BE


TAKEN WHEN SELECTING THIS
SUPPORT TO CHECK THAT THE
BEAM IS OF ADEQUATE STIFFNESS
IF IN DOUBT CHECK WITH
`A' `B'
STRUCTURAL SECTION
`C'

REF.POINT
EXISTING BEAM

`D'
`D'

(TYP)
6

MATERIAL
'A'
STANDARD NO CANTILEVER BRACE LOAD
MAX
ITEM QTY ITEM QTY
PS9-15-1 33 2(A+B) 33 2D+160 500 P= 400 kg
PS9-15-2 13 2(A+B) 33 2D+100 750 P= 800 kg
PS9-15-2 13 2(A+B) 33 2D+100 1000 P= 500 kg
PS9-15-3 12 2(A+B) 33 2D+150 1000 P= 1400 kg
PS9-15-4/2 10 2(A+B) 28 2D+150 1500 P= 2000 kg
PS9-15-4/3 11 2(A+B) 32 2D+150 1500 P= 1400 kg
PS9-15-4/4 12 2(A+B) 33 2D+150 1500 P= 600 kg

SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-15


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls
REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 44 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HOSE STATION SUPPORT

`P'

REF.
POINT

E X IS T IN G C O L U M N
EL I

`W'
CLAMP TYPE `U' BOLT

ITEM NO.
`B ' = 5 0 0

REF.
POINT

DRILL TO SUIT ON SITE


`A ' = 50 0

MATERIAL
STANDARD NO REMARKS
ITEM QTY
PS9-16-1 13 A+B P=350Kg & W=400Kg
PS9-16-2 12 A+B P=450Kg & W=500Kg

NOTE :
MAX. `A' = 1000
SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS9-16


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls

REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 45 of 74


Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HOSE STATION GUIDE

REF.
6 POINT EL I

E X IS T IN G C O LU M N
GUIDE TYPE `U' BOLT

ITEM NO.
`B '

REF.POINT

DRILL TO SUIT ON SITE


`A '

MATERIAL
STANDARD NO REMARKS LOAD (KG)
ITEM QTY
G9-17-1 13 A+B 450

MAX. 'A'= 1000

SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-17


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls
REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 46 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE BRACKET WITH 'U' BOLT

GUIDE TYPE `U'-BOLT


(PS3-2)
EXISTING 6
STEEL

REF.POINT EL I

45
ELEVATION 2 HOLES 18 DIA

`T'

ITEM NO

REF. POINT
50 `A' `P'

PLAN
`W'

MATERIAL DIMENSIONS
STANDARD NO PIPE SIZE 'A' MAX LOAD
ITEM QTY P T

G9-18-0 UPTO 50-2" 33 A+140 1000 90 80

G9-18-1 80-3" 33 A+140 1000 90 115 W= 150 kg

G9-18-2 100-4" 33 A+155 1000 105 140

SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-18


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls
REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 47 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE BRACKET WITH STRAP

6 6

`V'
`V'

EL I EL I

REF. POINT REF.


POINT

2 HOLES 24 DIA.
4 HOLES 24 DIA.

STANDARD GUIDE
E XISTIN G

E XISTIN G
STRAP (PS3-3) STANDARD GUIDE
BEAM

BEAM
STRAP (PS3-3)

`T' REF.POINT `T'

REF. POINT

50 `A' `P'
`P'
50 `A'

`W'
G9-19-11 & 12 G9-19-21 & 22
`W'

MATERIAL DIMENSIONS
PIPE
STANDARD NO CANTILEVER BOLTS LOAD
SIZE 'A' MAX T P V
ITEM QTY ITEM QTY
G9-19-11 150-6" 32 'A'+225 130 2 1000 264 175 55
W= 350 kg
G9-19-12 200-8" 32 'A'+265 130 2 1000 342 215 55
G9-19-21 250-10" 12 'A'+290 130 4 1000 392 240 31 W= 175 kg
G9-19-22 300-12" 11 'A'+320 130 4 1000 448 270 56 W= 250 kg

SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-19


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls
REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 48 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


BOX GUIDE FROM BEAM

EXISTING (TYP)
6
STEELWORK

EL I
REF. POINT

(TYP)
`C' `C' 6

(TYP)
3 M IN
REF. POINT

`D'
`D'
`A' `B'

`W'

MATERIAL
STANDARD NO PIPE SIZE 'A' MAX LOAD
ITEM QTY
G9-20-0 UPTO 300-12" 33 2(A+B)+4D 1000 W= 300 kg
G9-20-1 350-14" 12 2(A+B)+4D 1000 W= 300 kg
G9-20-2 400-16" 12 2(A+B)+4D 1000 W= 300 kg
G9-20-3 450-18" 12 2(A+B)+4D 1000 W= 300 kg
G9-20-4 500-20" 12 2(A+B)+4D 1000 W= 300 kg
G9-20-5 600-24" 12 2(A+B)+4D 1000 W= 300 kg

SYMBOL ILLUSTRATION :
G9-20-2-DIM 'A'-DIM 'B'-DIM 'C'-DIM 'D'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-20


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls
REV DATE DESCRIPTION BY CHKD APP FILE NAME SHEET NO. 49 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR VERTICAL LINES

DRILL `D' DRILL `D'


DIA TO SUIT DIA TO SUIT

= 90 =
6 6
REF.POINT

`V'
EL I EL I

A 10 A 10
(1000 MAX) (1000 MAX)
`P'
`T'

EXISTING EXISTING
COLUMN COLUMN
`C'

`P'
REF.POINT
REF.POINT

`W/2'
`T'

`P'
`B'

6
`T'

6
`P'

TYPE-1 TYPE-2
`W'
G9-24-11 TO 17 G9-24-21 TO 27

`W/2'
FOR PIPE SIZES 100(4") N.B. & BELOW USE `U'-BOLT (PS3-2)
FOR PIPE SIZES 150(6") N.B. & ABOVE USE STRAP (PS3-3)

MATERIALS
PIPE DIMENSIONS
STANDARD NO BRACKET BOLTS LOAD
SIZE
ITEM QTY(TYPE1) QTY(TYPE2) ITEM QTY(TYPE1) QTY(TYPE2) 'D' 'T' 'P' 'V'
G9-24-11 & 21 0.75 33 A+B+C+200 A + 200 - - - 18 75 45
G9-24-11 & 21 1" 33 A+B+C+200 A + 200 - - - 18 75 45
G9-24-11 & 21 1.5" 33 A+B+C+200 A + 200 - - - 18 75 45
W= 120 kg
G9-24-11 & 21 2" 33 A+B+C+200 A + 200 - - - 18 100 45
REF.PS3

G9-24-11 & 21 3" 33 A+B+C+200 A + 200 - - - 18 100 45


G9-24-12 & 22 4" 33 A+B+C+230 A + 230 - - - 18 115 45
G9-24-13 & 23 6" 32 A+B+C+340 A + 340 130 4 2 24 170 55
W= 180 kg
G9-24-14 & 24 8" 32 A+B+C+410 A + 410 130 4 2 24 210 55
G9-24-15 & 25 10" 12 A+B+C+460 A + 460 130 8 4 24 230 -
W= 200 kg
G9-24-16 & 26 12" 12 A+B+C+520 A + 520 130 8 4 24 260 -
NOTE : DRILL HOLES TO SUIT DISTANCE AT SITE

SYMBOL ILLUSTRATION :
G9-24-14-DIM 'A'-DIM 'B'-DIM 'C'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-24


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 ######## Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 50 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FROM COLUMN FOR VERTICAL LINE

100
REF. POINT 6
`B'

EL. I

OR

SECTION `B-B'
`B'

`A' 10
(1000 MAX)

REF. POINT ITEM 36


EXISTING CUT TO SUIT
COLUMN

3MM
GAP
= =
'B'

3 MM
6 GAP `W'
PIPE SHOE
(PS11-1, PS11-4)

MATERIAL
STANDARD NO CANTILEVER END PIECE GUIDES LOAD B
ITEM QTY ITEM QTY ITEM QTY
G9-25-1 33 'A'L'G 33 160 36 160 W= 120 kg 160
G9-25-2 32 'A'L'G 32 160 36 200 W= 190 kg 200
G9-25-3 12 'A'L'G 32 200 36 200 W= 800 kg 200
G9-25-4 11 'A'L'G 32 200 36 200 W= 1100 kg 250

MAXIMUM LINE SIZE 300 (12") NB


SYMBOL ILLUSTRATION :
G9-25-3-DIM 'A'-DIM 'B'-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV G9-25


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C009
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 51 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


PIPE SHOE (UP TO 300 NB) FOR C.S./ S.S / Cr.Mo PIPE (SEE NOTE 9)

45 °
CONTINUOUS WELD (4MM TYP)

FOR 4" NB.& BELOW

*
*
*PS11-1-1C/
PS11-1-1A/
PS11-1-1B/
12

60 60 60 APPROX. 60

100x6 RIBS

200
150
100
ONLY FOR LINE SIZE

'B'
200mm (8")-300mm (12") &
LINE SIZE UPTO 150mm (6")
WHEN B > 150
'C'
** *

300 (ITEM 61 OR 51) PS11-1-1 /3 135 FOR 12 THK PLT.


4MM WELD 450 (ITEM 58 OR 48) PS11-1-1 /4 125 FOR 10 THK. PLT.
600 (ITEM 56 OR 46) PS11-1-1 /6
*

TYPICAL DESIGNATION PS11-1-1 B/4 = 150 HIGH SHOE x 450 LONG.

SUPP. NO PIPE SIZE MATERIAL LIST


SHOE SHOE RIB RIB REMARK
ITEM QTY. ITEM QTY.
ITEM 61 FOR '/3', 58 FOR CAN BE CUT
PS11-1-1A/* NOTE 1 A' LONG _ _
' /4' , 56 FOR '/6' FROM BEAM
ITEM 51 FOR '/3', 48 FOR 2x CAN BE CUT
PS11-1-1B/* NOTE 1 B' LONG 80
' /4' , 46 FOR '/6' (B+25) FROM BEAM
ITEM 51 FOR '/3', 48 FOR 2x CAN BE CUT
PS11-1-1C/* NOTE 1 C' LONG 80
' /4' , 46 FOR '/6' (C+25) FROM BEAM

DESIGN LIMITATIONS & NOTES

NOTE:
1 MAXIMUM LINE SIZE 300 (12") N.B.
2 MAXIMUM INSULATION THICKNESS, EXCLUDING OUTER COVER = SHOE HEIGHT - 20.
3 GIVE DIMENSIONS 'A', 'B' & 'C' IN PIPE SUPPORT REGISTER ONLY IF NON STANDARD
DIMENSIONS REQUIRED.
4 FOR SHOE OF LENGTH 'A' > 450 & 'B' ≥ 150 FIT ADDITIONAL RIBS AT MID POINT.
5 MAX LOADS ARE BASED ON STD WALL CARBON STEELPIPE WITH 1.5MM CORROSION ALLOWANCE, TEMP OF2000C
AND PRESSURE OF 16 bar g. INTEGRITY OF PIPING OF OTHER SCHEDULES TO BE CHECKED FOR APPLIED LOADS.
6 FOR SLOPING LINES CUT SHOE TO SUIT SLOPE
7 PROVIDE ADDITIONAL RIB AT CENTER FOR LINE TEMP EXCEEDS 200deg.
8 WEAR PAD PS11-10-2 TO BE CONSIDERED ALONG WITH THIS SHOE FOR SS PIPE
9 NOT TO BE USED FOR LINES ABOVE 400 DEG.C DESIGN TEMP.
SYMBOL ILLUSTRATION : PS11-1-1A/3

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-1
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 52 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


PIPE SHOE (350 UP TO 600 NB) FOR C.S./ S.S / Cr.Mo PIPE (SEE NOTE 2)

Rinforcing PAD 'A' Thk. cut from


Material of same or compatible
Specification to supported pipe
FULL WELD
FIT TWO RIBS 300 APART FOR SHOE
RIB LENGTH 600. NOTCH RIBS 25 RAD.
FOR DRAIN.

APPROX.
2

'Y'(REF)
10

100

200
'B'

150

WEEP HOLE
T1

'A' * ** 25 25
PS11-2- A/
PS11-2- B/
PS11-2- C/
300 (ITEM 61 OR 51)
PS11-2- /3
* 'X'
PS11-2- /4
PS11-2- /6** 450 (ITEM 58 OR 48)
600 (ITEM 56 OR 46)
NOTE: REF DIM'N 'Y' IS GIVEN FOR
100 HIGH SHOE ONLY

*TYPICAL DESIGNATION PS11-2-16 B/4 = 150 HIGH SHOE x 450 LONG FOR 16" LINE

MATERIAL LIST
PIPE DIMENSIONS 2 x (C+25) LONG_
STANDARD NO BASE PLATE SIDE PLATES RIB
SIZE
ITEM QTY ITEM QTY ITEM QTY 'X' 'Y' T2
PS11-2-14 350-14" 61, 58 200 61, 58 or 220 64 B-25 200 116 10 10 ITEM 51& 61: FOR 300 LONG
400-16" or 56 200 56 210 64 200 114 10 10 SHOE
PS11-2-16 B-25
ITEM 48 & 58: FOR 450 LONG
PS11-2-18 450-18" 51 250 51 230 63 B-25 250 123 12 12
SHOE
PS11-2-20 500-20" 48 300 48 250 62 B-25 300 133 12 12 ITEM 46 & 56: FOR 600 LONG
PS11-2-22 550-22" or 300 or 250 62 B-25 300 130 12 12 SHOE
PS11-2-24 600-24" 46 350 46 260 61 350 139 12 12
B-25

DESIGN LIMITATIONS & NOTES:-

1 MAXIMUM INSULATION THICKNESS, EXCLUDING OUTER COVER = SHOE HEIGHT - 20


2 NOT TO BE USED FOR LINES ABOVE 4000C. DESIGN TEMPERATURE
3 MAX LOADS ARE BASED ON STD WALL CARBON STEELPIPE WITH 1.5MM CORROSION
ALLOWANCE, TEMP OF2000C AND PRESSURE OF 16 bar g. INTEGRITY OF PIPING OF
OTHER SCHEDULES TO BE CHECKED FOR APPLIED LOADS.
4 FOR SLOPE LINES, CUT SHOE TO SUIT SLOPE
5 FOR VARIABLE LENGTH(A) OR HEIGHT(B) REFER ISO / SUPPORT REGISTER.
6 REINFORCEMENT PAD TO BE CONSIDERED ALONG WITH THIS SHOE SUPPORT.
SYMBOL ILLUSTRATION :- PS11-2-14

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-2
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 53 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR BARE PIPE (UP TO 600 NB)

CLEARENCE

3 3

FOR MATERIAL
SEE TABLE
'A'

CONTINUOUS
FILLET WELD

80

CHANNEL GUIDES ANGLE GUIDES

TYPICAL PLAN VIEW G11-6-1-ONLY

PIPE MATERIAL DIM'N


STANDARD NO MAX GUIDE FORCE (KG) REMARKS
SIZE
ITEM QTY A
G11-6-1/1 UP TO 36 80 40 150
40-
1.1/2"
G11-6-1/2 UP TO 68 80 40 200
40-
1.1/2"
G11-6-2/1 50-2" 35 110 55 400
G11-6-2/2 50-2" 55 110 55 350
G11-6-3 80-3" 35 140 70 400
G11-6-4 100-4" 35 170 85 400
G11-6-6 150-6" 33 220 110 800
G11-6-8 200-8" 33 270 135 800
G11-6-10 250-10" 33 330 165 800
G11-6-12 300-12" 33 380 190 800
G11-6-14 350-14" 13 410 205 1250
G11-6-16/1 400-16" 12 460 230 1500
G11-6-16/2 400-16" 13 460 230 1250
G11-6-18 450-18" 13 510 255 1250
G11-6-20 500-20" 13 560 180 1250
G11-6-22 550-22" 13 610 305 1250
G11-6-24 600-24" 13 660 330 1250
G11-6-30 750-30" 13 800 400 1250

SYMBOL ILLUSTRATION :- G11-6-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-6
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 54 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR BARE PIPE (stainless steel line)

CLEARENCE

3 3

FOR MATERIAL
SEE TABLE
'A'

CONTINUOUS
FILLET WELD

80

CHANNEL GUIDES ANGLE GUIDES

TYPICAL PLAN VIEW G11-6-1-ONLY

PIPE MATERIAL DIM'N


STANDARD NO MAX GUIDE FORCE (KG) REMARKS
SIZE
ITEM QTY A
G11-6s-1/1 UP TO 36 80 40 150
40-
1.1/2"
G11-6s-1/2 UP TO 68 80 40 200
40-
1.1/2"
G11-6s-2/1 50-2" 35 110 55 400
G11-6s-2/2 50-2" 55 110 55 350
G11-6s-3 80-3" 35 140 70 400

Material: A234 or Equivalent

SYMBOL ILLUSTRATION :- G11-6s-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-6S
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 55 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR INSULATED PIPE (UP TO 1800 NB)

STANDARD
PIPE SHOE

NO WELD ON
INSIDE FACE

3 3
100 G11-7-1,2
FOR MATERIAL
SEE TABLE (UPTO 24"(600))

L 100x100x12 1/2 UNIVERSAL BEAM


(2 OFF) (305 x 127)
(2 OFF)
100

100

3 3 3 3

G11-7-4 G11-7-5
(FOR 26"(650)-48"(1200)) (FOR 52"(1350)-72"(1800))

STANDARD MATERIAL MAX GUIDE FORCE


REMARKS
NO (KG)
ITEM QTY

G11-7-1 35 200 400

G11-7-2 33 200 800

G11-7-4 32 200 1200

G11-7-5 2 200 1600

G11-7-0 68 200 200

SYMBOL ILLUSTRATION :
G11-7-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-7
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 56 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


ADJUSTABLE GUIDE

(SHOE REF.)
25x18Ø SLOT
FOR M16 BOLT
(BOLT NOT DRAWN)

G G 40 25
CL CL

35

150
50
50
35
-DIMENSION G TO BE SPECIFIED ON ISO ETC. G MAY BE SPECIFIED AS ZERO TO
TO PROTECT PUMP NOZZLE ETC.
-INSTALL AS FOLLOWS -PART TIGHTEN BOLTS-ASJUST GAP TO SPECIFIED DIMENSION
G- FULLY TIGHTEN BOLTS- CHECK G- FINAL WELD TO SECURE AS SHOWN
-ALLOWABLE LOAD 2040 KG.

BILL OF MATERIAL
100x75L
M16 BOLT x50 LONG WASHER,
0.3 M 2m NUT

G=GUIDE GAP

NOTE:1 THIS GUIDE TO BE USED FOR STRAIN SENSITIVE EQUIPMENTS.


2 LAST SUFFIX IN TAG REPRESENTS GUIDE GAP SPECIFIED. SYMBOL ILLUSTRATION :
G11-7A -G

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-7A
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 57 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HOLD DOWN GUIDE FOR INSUL. PIPE (UP TO 600 NB)

Fv (kN)

3 ± 1 m m GA P TYP .

MIN.

Fc (kN)

3 ± 1 mm GAP TYP.

B
A
C
10

USE FULL PENETRATION


WELD (TYP)
F
D

SHOE THK. (+3 ± 1)

PLATE OR MAXI.
SHOE
STANDARD NO BASE A B C D E F LOADS
PLATE
THK. FC FV
G11-8-1 10 10 43 25 30 25 13 34 20
10 20 43 25 30 25 13 205 122
G11-8-2 12 10 44 25 30 25 15 34 15
12 20 44 25 30 25 15 205 122
G11-8-3 15 15 93 40 70 75 18 205 122
G11-8-4 20 20 93 40 70 75 23 205 108

USE IN CONJUNCTION WITH STANDARD PIPE SHOES

SYMBOL ILLUSTRATION :

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-8
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xlsPIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 58 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


REINFORCING PLATE

6Ø WEEP HOLE

SEE
NOTE 2
120°
APPROX.

FULL WELD 'A'


WEAR PLATE TO 350 STD. LGTH.
PIPE. FABRICATE FROM MATERIAL OF
SAME SPECIFICATION AS PARENT
PIPE(1/3 PIPE OFFCUT)

SIZE REINFORCING PLATE


2" 94 x 350
3" 94 x 350
4" 118 x 350
6" 174 x 350
8" 228 x 350
10" 283 x 350
12" 336 x 350
14" 369 x 350
16" 421 x 350
18" 480 x 350
20" 530 x 350
22" 575 x 350
24" 640 x 350
28" 750 x 350
30" 800 x 350
36" 960 x 350
40 1050 x 350
42" 1120 x 350

Material: Plate to be cut from pipe of same material and schedule


as that to which it will be welded.
NOTE: 1. SUFFIX '2' REPRESENTS WEEP HOLE TYPE PAD TO BE USED.
2. WEAR PAD TO BE FULL WELDED THROUGHOUT.
3. PLATE TO BE CUT FROM PIPE OF SAME MATERIAL AND SCHEDULE.

SYMBOL ILLUSTRATION: PS11-10-2- 'PIPE SIZE'

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-10
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 59 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


LINE STOP FOR BARE PIPE(UP TO 1050 NB)

3 3 CLEARANCE 3 3 CLEARANCE 3 3 CLEARANCE

STEEL BEAM STEEL BEAM


(TYP) (TYP)

CONC. BEAM CONC. BEAM


(TYP) (TYP)
1 00

1 00

1 00
ITEM 67 ITEM 35 OR 33 OR 22 ITEM 10/11/12/13
6 6 6
UPTO 1 1/2" FOR 2" TO 4" FOR 6" & ABOVE

PIPE MATERIAL MAX AXIAL PIPE MATERIAL MAX AXIAL


STANDARD NO STANDARD NO
SIZE FORCE (KG) SIZE FORCE (KG)
ITEM QTY ITEM QTY
UP TO PS11-11-28 700-28" 11 230 13000
PS11-11-1 40- 67 200 200
1.1/2" PS11-11-30 750-30" 11 230 13000
PS11-11-2 50-2" 35 230 400 PS11-11-32 900-32" 11 225 13000
PS11-11-3 80-3" 33 250 800 PS11-11-34 900-34" 11 225 13000
PS11-11-4 100-4" 33 235 800 PS11-11-36 900-36" 11 225 13000
PS11-11-6 150-6" 13 220 3000 PS11-11-38 900-38" 10 225 15000
PS11-11-8 200-8" 13 245 3000 PS11-11-40 900-40" 10 225 17000
PS11-11-10 250-10" 12 235 7500 PS11-11-42 900-42" 10 225 19000
PS11-11-12 300-12" 12 230 7500
PS11-11-14 350-14" 12 235 7500
PS11-11-16 400-16" 12 230 7500
PS11-11-18 450-18" 12 230 7500
PS11-11-20 500-20" 11 225 13000
PS11-11-22 550-22" 11 225 13000
PS11-11-24 600-24" 11 220 13000
PS11-11-26 650-26" 11 220 13000

SYMBOL ILLUSTRATION : PS11-11-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-11
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 60 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


LINE STOP FOR INSULATED PIPE (UP TO 300 NB)

3 3 CLEARANCE

PIPE SHOE

100
FOR MATERIAL
SEE TABLE
10(MIN) WELD DETAIL

CONC. BEAM 'A'


STEEL BEAM

PIPE MATERIAL
STANDARD NO MAX AXIAL FORCE (KG) REMARKS
SIZE
ITEM QTY
PS11-12-1 UP TO 34 200
500
40-1 1/2"
PS11-12-2 50-2" 33 200 800
PS11-12-2.5 65-2 1/2" 33 200 800
PS11-12-3 80-3" 33 200 800
PS11-12-4 100-4" 33 200 800
PS11-12-6 150-6" 33 200 800
PS11-12-8 200-8" 22 200 1000
PS11-12-10 250-10" 22 200 1000
PS11-12-12 300-12" 22 200 1000

USE IN CONJUNCTION WITH PIPE SHOES (NON STANDARD LENGTH) S


WELDED TYPE PS11-1
CLAMPED TYPE (LIGHT LOADS ONLY)

SYMBOL ILLUSTRATION :
NOTE : PS11-12-1
1 DIMENSION 'A' SHALL BE REFERRED FROM SHOE STD.
2 DIMENSION 'C' = 100, UNLESS NOTED OTHERWISE.

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-12
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 61 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


LINE STOP FOR INSUL. PIPE (350 TO 1800 NB)

3 3 CLEARANCE
STEEL OR CONC. BEAM
`B'

PIPE SHOE
CONCRETE BEAM PS11-2
NON STANDARD
LENGTH

`C'
FOR MATERIAL `B'
SEE TABLE

15(MIN)
STEEL BEAM
'A'

`C'
`C'

MIN.
= =
VIEW `B-B' WELD DETAIL
(FOR 14"(350)-24"(600)) VIEW `B-B'
(FOR 26"(650)-72"(1800))

MATERIAL
STANDARD NO PIPE SIZE DIM 'C' MAX AXIAL FORCE (KG) REMARKS
ITEM QTY
PS11-13-14 350-14" 8 200 100 1500
PS11-13-16 400-16" 8 200 100 1500
PS11-13-18 450-18" 8 200 100 1500
PS11-13-20 500-20" 8 200 100 1500
PS11-13-22 550-22" 8 200 100 1500
PS11-13-24 600-24" 8 200 100 1500
PS11-13-26 650-26" 8 300 150 1500
PS11-13-28 700-28" 8 300 150 1500
PS11-13-30 750-30" 8 300 150 1500
PS11-13-32 800-32" 8 300 150 1500
PS11-13-34 850-34" 8 300 150 1500
PS11-13-36 900-36" 8 300 150 1500
PS11-13-42 1050-42" 8 300 150 1500
PS11-13-48 1200-48" 8 300 150 1500
PS11-13-54 1350-54" 2 300 150 1500
PS11-13-60 1500-60" 2 300 150 1500
PS11-13-66 1650-66" 2 300 150 1500
PS11-13-72 1800-72" 2 300 150 1500
SYMBOL ILLUSTRATION :
PS11-13-14

NOTE :
1 DIMENSION 'A' SHALL BE REFERRED FROM SHOE STD.
2 DIMENSION 'C' = 100, UNLESS NOTED OTHERWISE.
SYMBOL ILLUSTRATION :
PS11-13-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-13
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 62 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


CLAMPED PIPE SHOE FOR SS PIPE (UP TO 300 NB)

3MM THICK LINER 'TICO HT.'


OR EQUAL BONDED TO INSIDE
OF CLAMPS WITH SEA WATER
PS3-30 RESISTANT CEMENT. LINER
WIDTH=CLAMP WIDTH + 10MM

*
*
* PS11-14- C/
PS11-14- A/
PS11-14- B/
200
100
150
'B'
'C'

100x6 RIBS
ONLY FOR LINE SIZE
200mm (8")-300mm (12")
25 25 'D'(133)

'A' NOTE 2
***

300 PS11-14- /3
450 PS11-14- /4
600 PS11-14- /6

*TYPICAL DESIGNATION PS11-14-8B/4 = 150 HIGH SHOE x 450 LONG FOR 8" NB. PIPE

MATERIAL
PIPE
STANDARD NO CLAMP SHOE LINER RIB REMARKS
SIZE
STD. NO. QTY ITEM QTY ITEM QTY ITEM QTY
PS11-14-2 50-2" PS3-30-2 2 'A' LG 201 440 - -
PS11-14-3 80-3" PS3-30-3 2 'A' LG 201 620 - -
PS11-14-4 100-4" PS3-30-4 2 'A' LG 201 770 - -
PS11-14-6 150-6" PS3-30-6 2 PS11-1 'A' LG 201 1,120 - -
PS11-14-8 200-8" PS3-30-8 2 'A' LG 201 1,440 80
2X
PS11-14-10 250-10" PS3-30-10 2 'A' LG 201 1,770 80
(B+25)
PS11-14-12 300-12" PS3-30-12 2 'A' LG 202 2,100 80
NOTES 1) MAXIMUM CONTINUOUS SERVICE TEMP. 1500C
2) MAX LOAS ARE BASED ON STD WALL SS PIPE,
TEMP OF1500C AND PRESSURE OF 16 bar g. INTEGRITY OF PIPING OF
OTHER SCHEDULES TO BE CHECKED FOR APPLIED LOADS.
3) THIS SHOE TO BE USED FOR GUIDING LOAD UPTO 1000kg ONLY.

SYMBOL ILLUSTRATION :- PS11-14-2

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-14
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 63 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


EROSION PAD FOR CS PIPE 50 NB & LARGER

2
`A'
STANDARD = 400

`R'

ذ
M
6M

ITEM 78 SEAL WELD 6Ø WEEP HOLE RADIUS ALL CORNERS


TO PIPE MIN.12MM UP TO 4"NB
25MM 6"NB & ABOVE

PIPE SIZE 2" 3" 4" 5" 6" 8" 10" 12" 14" 16" 18" 20"
I/RAD 'R' 30 44.5 57 71 84 109.5 136.5 162 178 203 229 254
∅0 MATERIAL QUANTITY FOR STANDARD PAD (A=400) ITEM NO. 78
TYPE 1 60 35 50 65 80 95 120 150 175 190 215 245 270
TYPE 2 90 55 75 95 115 140 180 220 260 285 325 365 405
TYPE 3 120 70 100 125 155 185 235 295 345 380 435 485 540

PIPE SIZE 22" 24" 28" 30" 36" 42


I/RAD 'R' 279.5 305 356 381 457 533
∅0 MATERIAL QUANTITY FOR STANDARD PAD (A=400) ITEM NO. 78
TYPE 1 60 295 325 376 402 482 562
TYPE 2 90 450 485 500 536 643 842
TYPE 3 120 595 645 751 804 964 1123

NOTES :-
1) STANDARD NUMBER TO BE PS11-20/*-** * = TYPE
** = PIPE SIZE
2) PLUG WEEP HOLE WITH MASTIC AFTER INSTALLATION.
3) EROSION PAD TO BE MADE UP OF SAME MATERIAL AS PIPE MATERIAL.

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-20
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 64 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR BARE PIPE (UP TO 300 NB)

L
NA
MI
5 NO R
1. EA
CL

`A' `A'
100
* *
SEE NOTE 2

PIPE MATERIAL DIM'N


STANDARD NO REMARKS
SIZE
ITEM QTY A
3"-80 98
G11-27-1 35 200
4"-100 104
G11-27-2 6"-150 34 200 130
8"-200 170
G11-27-3 33 200
10-250 180
G11-27-4 12"-300 32 200 220

NOTES : 1) FOR USE WITH BARE PIPES WITH OR WITHOUT WEAR PLATE
2) DIMENSION 'A' IS FOR LAYOUT PURPOSES ONLY AND IS BASED
ON WEAR PLATE THICKNESS
3) TO BE USED FOR WATER LINES ONLY.

SYMBOL ILLUSTRATION :- G11-27-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


G11-27
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 65 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


GUIDE FOR UNINSULATED PIPES 14" TO 48" (350 TO 1200NB)

REINFORCING PAD
PS-11-20
REF. NOTE 1

2
MAX WEIGHT
PIPE DIM MAX
STD NO. MATERIAL SUMMARY PER ASSY
SIZE 'H' FORCE (N)
(KG)
14 100
ISMC150 (ITEM NO.12)
18" 100
PS11-64-1 7000 60 X60 X8L X600 LG 7
20" 100 (ITEM NO.38)
24" 120
30" 140
ISMC 175(ITEM NO.15) 400 LG
36" 160
PS11-64-2 10000 100 X 100 X12L X600 LG 18
42" 180 (ITEM NO.32)
48" 200

Notes:
1. PS11-10 ,if required ,to be called up separately.Material not to this drawing.
2. Maximum axial pipe movement 100mm.
3. For materials and general notes refer to page 3 and 5 of this document.

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS11-64
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C011
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 66 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD TRUNNION (CS)

C
L TRUNNION

TRIM TO SUIT IN FIELD 6 WELD FOR TRUNNION < 6"


DO NOT CUT HOLE IN PIPE 10 WELD FOR TRUNNION > 6"

WELD DETAIL

TRUNNION `S' `N'

REF. POINT REF. POINT


C

EL.I.

B
(TYP)
A
α° ORIENTATION
(TYP)

TRUNNION

MOMENT CAPACITY PER TRUNNION- KG M


PIPE PIPE
1 1/2" 10" 12"
SIZE SCH. (SCH.
2" (SCH. 3" (SCH. 4" (SCH. 6" (SCH. 8" (SCH.
(SCH. (SCH.
16" (SCH.
80) 40) 40) 40) 40 STD.)
80) STD.) STD.)
STANDARD NO.
2 40 15 33
PS12-1-1
3 40 12 26 58
PS12-1-2
4 40 29 63 105
PS12-1-3
6 40 34 75 124 269
PS12-1-4
8 40 87 144 313 531
PS12-1-5
10 STD 100 165 358 608 944
PS12-1-6
PS12-1-7 12 STD 160 346 588 913 1284
PS12-1-8 14 STD 152 331 561 871 1226
PS12-1-9 16 STD 309 524 815 1147 1806
PS12-1-10 18 STD 291 494 768 1081 1703
PS12-1-11 20 STD 469 729 1025 1615
PS12-1-12 24 STD

1) DESIGN LIMITATIONS CARBON STEEL LINES UP TO 4000C


2)TRUNNION MATERIAL SAME AS THAT OF PARENT PIPE SPEC FOR CARBON STEEL.USE CARBON STEEL TRUNION
NOT TO BE USED FOR PIPES <= 20 SCH
3)IN CASE TRUNNION SCH. AS MENTIONED IN TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THICKNESS
AVAILABLE.
4) =00 BELONGS TO PLANT NORTH. CLOCKWISE DIRECTION IS POSITIVE
SYMBOL ILLUSTRATION :
PS12-1-1-DIM'A'-DIM 'B'-DEG.-EL-I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS12-1


C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 67 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD TRUNNION (CS)

CL TRUNNION

6 WELD FOR TRUNNIONS < 6"


2xTRUNNION OD
10 WELD FOR TRUNNIONS > 6"

TRUNNION `S' WELD DETAIL `N'
REF.POINT
NOTE 7 α° ORIENTATION

EL.I.

REFER NOTE 6
B
(TYP.) TRIM TO SUIT IN FIELD REF POINT
A
DO NOT CUT HOLE IN PIPE
(TYP.)

TRUNNION
MOMENT CAPACITY PER TRUNNION- KG M
PIPE PIPE 1 1/2" 10" 12"
2" (SCH. 3" (SCH. 4" (SCH. 6" (SCH. 8" (SCH. 16" (SCH.
SIZE SCH. (SCH.
80) 40) 40) 40) 40
(SCH. (SCH.
STD.)
STANDARD NO. 80) STD.) STD.)
PS12-2-1 2 40 15
PS12-2-2 3 40 12 26
PS12-2-3 4 40 29 63
PS12-2-4 6 40 34 75 124
PS12-2-5 8 40 87 144 313
PS12-2-6 10 STD 100 165 358 608
PS12-2-7 12 STD 160 346 588 913
PS12-2-8 14 STD 152 331 561 871 1226
PS12-2-9 16 STD 309 524 815 1147
PS12-2-10 18 STD 291 494 768 1081 1703
PS12-2-11 20 STD 469 729 1025 1615
PS12-2-12 24 STD

1)DESIGN LIMITATIONS CARBON LINES UP TO 4000C


2)TRUNNION MATERIAL SAME AS THAT OF PARENT PIPE SPEC FOR CARBON STEEL.USE CARBON STEEL TRUNNION
NOT TO BE USED FOR PIPES <= 20 SCH
3)IN CASE TRUNNION SCH. AS MENTIONED IN TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THICKNESS
AVAILABLE.
4) ά =00 BELONGS TO PLANT NORTH AND POSITIVE IN CLOCKWISE DIRECTION.
5) 2 Nos STIFFENERS, 6 THK PLATE TO BE WELDED AT EITHER ENDS TO PREVENT OVALITY.FOR TRUNNION SIZE 8" & ABOVE.
6) PROVIDE LIMITS STOPS AS PER SKETCH WHEREVER CALLED WITH THIS TAG.
7) PROTECTION SHIELD TO BE USED FOR 8" AND ABOVE PIPE SIZES.

SYMBOL ILLUSTRATION :
PS12-2-1-DIM'A'-DIM 'B'-TRUNNION SIZE.-EL.I - ά

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS12-2
C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 68 of 74
Mott-MacDonald Pvt.Ltd
STANDARD PIPE SUPPORTS
STANDARD DOUBLE REINFORCED TRUNNION (CS)

CL TRUNNION VENT HOLE 6Ø

6 WELD FOR TRUNNION < 6"


10 WELD FOR TRUNNION > 6"

`D '
`E' OR 10 WELD (WHICHEVER SMALLER)
`E'
REF .POINT 0°
WELD AND PAD
PAD `N' α° ORIENTATION
DETAILS REF. POINT
TRUNNION `S'
(TYP.)

EL.I.

REFER NOTE 6
B C
(TYP.)
TRIM TO SUIT IN FIELD
A
DO NOT CUT HOLE IN PIPE
(TYP.)

TRUNNION
MOMENT CAPACITY PER TRUNNION- KG M PAD WIDTH
PIPE PIPE 1 1/2" 10" 12" D
2" (SCH. 3" (SCH. 4" (SCH. 6" (SCH. 8" (SCH. 16" (SCH.
SIZE SCH. (SCH.
80) 40) 40) 40) 40
(SCH. (SCH.
STD.)
STANDARD NO. 80) STD.) STD.)
PS12-4-1 2 40 50 25
PS12-4-2 3 40 110 25
PS12-4-3 4 40 115 251 40
PS12-4-4 6 40 128 278 459 40
PS12-4-5 8 40 310 512 1111 50
PS12-4-6 10 STD 343 568 1231 2087 50
PS12-4-7 12 STD 545 1183 2005 3115 65
PS12-4-8 14 STD 520 1129 1913 2973 4182 65
PS12-4-9 16 STD 1056 1790 2781 3912 65
PS12-4-10 18 STD 995 1687 2622 3688 5808 65
PS12-4-11 20 STD 1601 2487 3499 5510 75
PS12-4-12 24 STD

1)DESIGN LIMITATIONS CARBON LINES UP TO 4000C


2)TRUNNION MATERIAL SAME AS THAT OF PARENT PIPE SPEC FOR CARBON STEEL.USE CARBON STEEL TRUNION
NOT TO BE USED FOR PIPES <= 20 SCH

3)IN CASE TRUNNION SCH. AS MENTIONED IN TABLE IS NOT AVAILABLE, THEN USE NEAREST EQUIVALENT THICKNESS AVAILABLE.

4) =00 BELONGS TO PLANT NORTH AND POSITIVE IN CLOCKWISE DIRECTION.


5) 2 Nos STIFFENERS, 6 THK PLATE TO BE WELDED AT EITHER ENDS TO PREVENT OVALITY.FOR TRUNNION SIZE 8" & ABOVE.
6) PROVIDE LIMIT STOPS AS PER SKETCH WHEREVER CALLED WITH THIS TAG.
7) REINFORCEMENT PAD TO BE MADE FROM PARENT PIPE SPEC.
SYMBOL ILLUSTRATION :
PS12-4-1-DIM'A'-DIM 'B'-DEG.-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS12-4
C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 69 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD TRUNNION (CS)

EL.I. CL PIPE CL TRUNNION

MIN. 25mm
CLEAR WITH ANY OBSTRUCTION
TRUNNION `S' (CHECK ACTUAL PIPE MOVEMENT)

CL TRUNNION
TRIM TO SUIT IN FIELD
DO NOT CUT HOLE IN ELBOW

6 WELD FOR TRUNNION < 6"


10 WELD FOR TRUNNION > 6"

WELD DETAIL


TRUNNION "S" NORTH
STANDARD NO REMARKS
ITEM DESCRIPTION
PS12-5-1 91 50 (2") NB SCH 40

PS12-5-2 89 80 (3") NB SCH 40

PS12-5-3 88 100 (4") NB SCH 40


270° 90°
PS12-5-4 87 150 (6") NB SCH 40

PS12-5-5 86 200 (8") NB SCH 40

PS12-5-6 85 250 (10") NB SCH 40

180°

1) 2 Nos STIFFENERS, 6 THK PLATE TO BE WELDED AT ENDS OF TRUNNION TO


PREVENTS OVALITY.FOR TRUNNION SIZE 8" & ABOVE.
2) DESIGN LIMITATIONS CARBON STEEL & LOW ALLOY LINES UP TO 4000C
3) FOR SS/DUPLEX/HASTEALLOY MATLS. WEAR PAD TO BE USED SYMBOL ILLUSTRATION :
& TRUNNION MATL TO BE AS PER PARENT PIPE SPEC.
PS12-5-1-DIM'A'-DIM 'B''-ά DEG.-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS12-5
C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 70 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD LOWER ASSEMBLY - DOUBLE SUPPORT FROM BELOW

THREADLENGTH
(BOTHENDS)
NUT, LOCK NUT
AND WASHER
150

GAP=RODDIA.+6
ROD ROD
DIA DIA

80 `B' 80
= =
`A'

`Y' 100x10 PLATE


WITH CENTRAL HOLE
DIA= ROD DIA.+6
EL.I

100 SECTION `S'


`X'

`Y'

STD. PLATE WASHER


TYP PS3-15

100x10 PLATE

SECTION `Y-Y'

ROD 300x6 PL. FOR LINES UP AND


LOCK
UNCL.
NUT250 DIA.
WASHER PLATE MAX LD
DIM
STANDARD NO PER ROD
X (KG)

DIA QTY 300x20 PL.


QTY FOR LINES
QTY
BIGGER
ITEM
THAN
QTY
600 DIA
ITEM QTY ITEM QTY

PS13-11-116 16 111 13 2x(B+160) 200 156 4 166 4 146 4 67 245 820

PS13-11-120 20 110 13 2x(B+160) 205 155 4 165 4 145 4 67 255 1225

PS13-11-124 24 109 13 2x(B+160) 210 154 4 164 4 144 4 67 260 2250


2 x 'A' LONG

PS13-11-220 20 110 12 2x(B+160) 255 155 4 165 4 145 4 67 255 1225

PS13-11-224 24 109 12 2x(B+160) 260 154 4 164 4 144 4 67 260 2250

PS13-11-230 30 108 12 2x(B+160) 270 153 4 163 4 143 4 67 275 2825

PS13-11-336 36 107 11 2x(B+160) 325 152 4 162 4 142 4 67 285 5250

DESIGN LIMITATIONS FOR 2 x MAX. ROD LOAD AT MID SPAN

STANDARD NO. -116 -120 -124 -220 -224 -230 -336


'B' MAX. (MM) 2500 2000 1200 3500 2900 2500 2000

SYMBOL ILLUSTRATION:
PS13-11-116-DIMA-DIMB-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS13-11
C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 71 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


HANGER LOWER ASSEMBLY WITH TURNBUCKLE

NUT, LOCK NUT


AND WASHER
(TYP)

150 THREAD
(TYP)

TURN BUCKLE

`A'
PS-13-14
`A'

TURN BUCKLE
LOCK NUT
PS-13-14
(TYP)
ROD ROD
DIA DIA
150 THREAD
(TYP) WELDLESS EYE
NUT PS3-10
`X'
`X'

EL.I

3 BOLT CLAMP
2 BOLT CLAMP PS3-8
PS3-6

PS13-13-110 TO 136 PS13-13-210 TO 236


TYPICAL DESIGNATION PS13-13-212/4-DIM `A' = HANGER WITH 3 BOLT CLAMP FOR 4" N.B. PIPE

MATERIAL
MAX
DIM'N
STANDARD NO HANGER ROD LOCK NUT WASHER LOAD
"X'
(kg)
DIA 44 QTY ITEM QTY ITEM QTY ITEM QTY

PS13-13-110 10 113 158 1 168 2 1 275


148

PS13-13-112 12 112 157 1 167 2 147 1 500

PS13-13-116 16 111 156 1 166 2 146 1 820

PS13-13-120 20 110 155 1 165 2 1 1225


145
SEE STD NO. PS13-12

PS13-13-124 24 109 154 1 164 2 144 1 2250


A' LONG

PS13-13-130 30 108 153 1 163 2 143 1 2825

PS13-13-136 36 107 152 1 162 2 142 1 5275

PS13-13-210 10 113 158 1 168 2 148 1 275

PS13-13-212 12 112 157 1 167 2 147 1 500


PS13-13-216 16 156 1 166 2 146 1 820
PS13-13-220 20 155 1 165 2 145 1 1225
PS13-13-224 24 109 154 1 164 2 144 1 2250
PS13-13-230 30 108 153 1 163 2 143 1 2825
PS13-13-236 36 107 152 1 162 2 142 1 5275

SYMBOL ILLUSTRATION: PS13-13-212/4"-DIMA-EL.I

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS13-13
C2 07/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C012
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 72 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD SUPPORT FROM LARGER PIPE (BOP's LEVEL)

B C

STD U-BOLT STD U-BOLT


PS3-1 OR PS3-2 PS3-1 TACK
WELD TO PIPE
DRILL 2 HOLES
DRILL 2 HOLES TO SUIT U-BOLTS
TO SUIT U-BOLTS

EL.I

SECTION `S'

50 50
MIN MIN
A

SECTION "S"
STANDARD NO REMARKS
ITEM QTY
PS16-1-1 33 A' LONG
PS16-1-2 32 A' LONG

SYMBOL ILLUSTRATION :- PS16-1-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV


PS16-1
C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C016

REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 73 of 74
Mott MacDonald Pvt. Ltd.

STANDARD PIPE SUPPORTS


STANDARD MULTIPLE SUPPORT FROM LARGE PIPE

STD U-BOLT PS3-1 B


TACK WELD TO PIPE

END PLATE (2 REQD.)

EL.I
TYP
X

SECTION `S'

DRILL 2 HOLES
TO SUIT U-BOLT
A

SECTION "S" END PLATE


STANDARD NO REMARKS
ITEM QTY ITEM QTY DIM. X
PS16-2-1 33 A' LONG 67 130 LG 130
PS16-2-2 32 A' LONG 67 150 LG 150

SYMBOL ILLUSTRATION :- PS16-2-1

C3 20/11/2012 Re-Issued For Construction RSB GPB AGV PS16-2


C2 7/11/2012 Re-Issued For Construction RSB GPB AGV SUPPORT TAG NO.
C1 18/10/2012 Issued For Construction RSB GPB AGV SUPPORT.xls PIP-STD-101-C016
REV DATE DESCRIPTION BY CHKD APP FILE NAME SPECIFICATION NO. SHEET NO. 74 of 74

You might also like