Unfinished Pow UTOL
Unfinished Pow UTOL
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
III. EQUIPMENT
1 5 WELDING MACHINE 250.00 1,250.00
1 5 PRESS CUTTER 250.00 1,250.00
2,500.00
PREPARED BY:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY DADAOR
Approved by:
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
MUNICIPALITY OF BANGUI
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
I.LABOR:
Prepared by:
JULIE M. GAGALIOAN
Committee on Infra
Checked and Verified by:
ALBERT D. BALOALOA
Engineer II,OIC
Approved by:
EVELYN GUMALLAOI
Barangay Chairman
MUNICIPALITY OF BANGUI
Approved By:
ROGELIO ACIDO
Punong Barangay
A.Materials
5 PCS PVC PIPE 1/2 85.00 425.00
3 PCS ELBOW 1/2 33.00 99.00
1 PC SURFACE BOX 43.00 43.00
1 PC SET AIRCON OUTLET 145.00 145.00
1 PC SAFETY BREAKER OMNI 590.00 590.00
2 PCS ELECTRIC TAPE BIG 58.00 116.00
15 PCS C-CLAMP 5.00 75.00
10 PCS TOX W/ SCREW 5.00 50.00
1 pc PLASTIC MOULDINGS 5/8 90.00 90.00
50 METERS THHN CABLE(3.5) 28.00 1,400.00
Materials 3,033.00
Prepared by:
ALBERT D. BALOALOA
Engineer II/OIC
Approved By:
Approved By:
ROGELIO ACIDO
Punong Barangay
BARANGAY TAGUIPURO
SOURCE OF FUND:
Approved by:
WILFRED A. GACES
Barangay Chairman
BARANGAY TAGUIPURO
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
I.MATERIALS
134 pcs. 4'' Concrete Hollow Blocks 9.50 1,273.00
9 pcs. 9mm. RSB 100.00 900.00
4 pcs. 10mm. RSB 160.00 640.00
12 bgs. Portland Cement 285.00 3,420.00
3.1 cu.m. Fine Sand 350.00 1,085.00
1 kgs. # 16 Tie Wire 100.00 100.00
1 kgs. Asstd. CWN 80.00 80.00
MATERIAL COST 7,498.00
Approved by:
WILFRED A. GACES
Barangay Chairman
BARANGAY TAGUIPURO
SOURCE OF FUND:
Approved by:
WILFRED A. GACES
Barangay Chairman
BARANGAY DADAOR
SOURCE OF FUND:
AVERAGE OUTPUT:
I.MATERIALS
16 pcs. Ordinary Plywood 450.00 7,200.00
173 bd.ft 65-2''x2''x8' TNG 62.00 10,726.00
1.5 kgs. 3'' CWN 80.00 120.00
1.5 kgs. 2'' CWN 80.00 120.00
2 kgs. 1' CWN 80.00 160.00
40 bd.ft 4-1''x10''12' TNG 62.00 2,480.00
0.5 kgs. 3'' Concrete Nail 115.00 57.50
66.66 bd.ft 8-1''x10''10' TNG 62.00 4,132.92
MATERIAL COST 24,996.42
Approved by:
WILFRED A. GACES
Barangay Chairman
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY MALASIN
I.ELECTRICAL WORKS:
A.Materials
40 pcs. Prismatic Bulbl 220.00 8,800.00
10 pcs. Receptacle 120.00 1,200.00
TOTAL COST 10,000.00
Prepared by:
REYNALDO SAGUCIO
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
CHARLIE A. MABINI
Barangay Captain
Municipal Engineer
Approved by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
BARANGAY PAYAC
Prepared by:
AVELINO BALIGCOT
Committee on INFRA
ARNEL S. SAGUCIO
Municipal
Approved by:
BENNY GUIMOD
Brgy. Captain
BARANGAY PAYAC
SOURCE OF FUND:
B.Labor
9 8 DAYS LABORER 270.00 19,440.00
B.Labor 19,440.00
TOTAL PROJECT COST 19,440.00
Prepared By:
REYSON B. LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
ELMER FAYLOGNA
Punong Barangay
BARANGAY TAGUIPURO
A.Materials:
15 pcs. 0.40 m. X0.60 m. RC Pipe 350.00 5,250.00
0.5 kgs. Tie Wire 80.00 40.00
2 pcs. 10mm. RSB 135.00 270.00
1 bags. Portland Cement 290.00 290.00
Materials 5,850.00
B.Labor
2 5 DAYS MASON 375.00 3,750.00
4 5 DAYS LABORER 270.00 5,400.00
B.Labor 9,150.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
WILFRED A. GACES
Punong Barangay
PROGRAM OF WORKS AND COST ESTIMATES FOR THE FABRICATION OF TINUNO GRILLS
FOR FIESTA CELEBRATION SAN LORENZO, BANGUI, ILOCOS NORTE.
LABOR
2 5 DAYS LABORER 300.00 3,000.00
2 5 DAYS WELDER/TINSMITH 500.00 5,000.00
8,000.00
RENTALS
1 5 DAYS WELDING MACHINE 795.00 3,975.00
3,975.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
SOURCE OF FUND:
I. MATERIALS: 1 LOT
II. LABOR:
1 6 DAYS LABORER 270.00 1,620.00
1 4 DAYS PAINTER 428.00 1,712.00
1 6 DAYS WELDER/TINSMITH 428.00 2,568.00
TOTAL LABORL COST 5,900.00
III. EQUIPMENT:
1 6 DAYS WELDING MACHINE 250.00 1,500.00
TOTAL EQUIPMENT COST 1,500.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY DADAOR
A. MATERIALS
1 SET 1.50 X 2.10 DOOR GRILLS 5,000.00 5,000.00
MATERIAL COST 5,000.00
B. LABOR
1 2 DAYS WELDER 428.00 856.00
1 2 DAYS LABORER 270.00 540.00
LABOR COST 1,396.00
C. EQUIPMENT
1 2 DAYS WELDING 300.00 600.00
1 2 DAYS CUT OOF MACHINE 270.00 540.00
EQUIPMENT COST 1,140.00
A. MATERIALS
4 SETS 1.80 X 1.20 WINDOW GRILLS 3,500.00 14,000.00
1 SET 1.0 X 1.2 WINDOW GRILLS 1,700.00 1,700.00
1 SET .50 X .60 WINDOW GRILLS 650.00 650.00
MATERIAL COST 16,350.00
B. LABOR
1 4 DAYS WELDER 428.00 1,712.00
1 4 DAYS LABORER 270.00 1,080.00
LABOR COST 2,792.00
C. EQUIPMENT
1 4 DAYS WELDING 300.00 1,200.00
1 4 DAYS CUT OF MACHINE 270.00 1,080.00
EQUIPMENT COST 2,280.00
A. MATERIALS
1 SET 1.50 X 2.10 DOUBLE PANNEL DOOR(GLASS) 12,050.00 12,050.00
MATERIAL COST 12,050.00
B. LABOR
1 3.5 DAYS TINSMINTRY 428.00 1,498.00
1 3.5 DAYS LABORER 270.00 945.00
LABOR COST 2,443.00
Prepared by:
JULIE M. GAGALIOAN
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
EVELYN G. GUMALAOI
Punong Barangay
BARANGAY TMALASIN
B.LABOR COST
7 2.5 DAYS LABORER 280.00 4,900.00
LABOR COST 4,900.00
Approved by:
CHARLIE MABINI
Barangay Chairman
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY TMALASIN
B.LABOR COST
1 2.5 DAYS WELDER 428.00 1,070.00
1 2.5 DAYS LABORER 280.00 700.00
LABOR COST 1,770.00
Approved by:
CHARLIE MABINI
Barangay Chairman
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
B.LABOR COST
1 0.5 DAYS Carpenter 370.00 185.00
1 0.5 DAYS Laborer 270.00 135.00
LABOR COST 320.00
SUB TOTAL 1,900.00
UNIT COST 4,750.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE PAINTING OF EXTERIOR WALLS
OF THE PRODUCTION CENTER FOR THE PAG ASA YOUTH ASSOCIATION
LOCATED AT BARANGAY SAN LORENZO,BANGUI,ILOCOS NORTE
SOURCE OF FUND:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
SOURCE OF FUND:
I.DE-CLOGGING OF CANALS :6
Average output/day=1.50 cu.m.
A.LABOR
10 4 DAYS LABORER 250.00 10,000.00
Prepared by:
Approved by:
ROGELIO ACIDO
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BARUYEN
Prepared by:
Checked & Verified by:
Approved By:
PROGRAM OF WORKS AND COST ESTIMATES FOR THE PAINTING OF BASKETBALL COURT AT PEOPLE
CENTER FOR THE BASKETBALL TOURNAMENT AT BRGY. SAN LORENZO, BANGUI, ILOCOS NORTE.
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REPAIR OF ROOF EVES CEILING
OF 4 UNITS STALLS BESIDE MUNICIPAL WET MARKET LOCATED AT
BARANGAY SAN LORENZO,BANGUI, I.N.
III.PAINTING WORKS:
A. MATERIALS
1 GALS FLAT LATEX 700.00 700.00
1 GALS EMI GLOSS LATEX 800.00 800.00
1 SET ROLLER TRAY W/ FOAM 175.00 175.00
1 PCS. 1'' PAINT BRUSH 120.00 120.00
MATERIAL 1,795.00
B.LABOR
1 1 DAYS PAINTER 375.00 375.00
1 1 DAYS LABORER 270.00 270.00
LABOR 645.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
MUNICIPALITY OF BANGUI
Prepared by:
ARNEL S SAGUCIO
Municipal Engineer
Approved By:
MUNICIPALITY OF BANGUI
Prepared by:
ARNEL S SAGUCIO
Municipal Engineer
Approved By:
Prepared by:
CONSTANTE SAGUCIO
Committee on INFRA
Checked and verified by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FREDDIE J. BALBAG
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
Prepared By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY MASIKIL
Prepared by:
SAMUEL ACOB
Committee on INFRA
Checked and verified by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
ROSARIO M. VALIENTE
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
MUNICIPALITY OF BANGUI
III.EQUIPMENT:
1 3 DAY WELDING MACHINE 350.00 1,050.00
1 3 CUT OFF MACHINE 250.00 750.00
EQUIPMENT COST 1,800.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
BARANGAY PAYAC
PROGRAM OF WORKS AND COST ESTIMATES FOR THE CONSTRUCTION
OF SHED FOR SANJERA ALAO-AO LOCATED AT BARANGAY PAYAC, BANGUI, I.N.
QTY. UNIT DESCRIPTION UNIT COST TOTAL
I. MATERIALS
14 PCS 0.50 X 8' CORRUGATED G.I SHEET 480.00 6,720.00
57 BDFT 11 - 2" X 4" X 8' TNG 65.00 3,705.00
26 BDFT 3 - 2" X 4" X 13' TNG 65.00 1,690.00
13 BDFT 2 - 2" X 4" X 10' TNG 65.00 845.00
64 BDFT 16 - 2" X 3" X 8' TNG 65.00 4,160.00
1 PACK VULCASEAL 100.00 100.00
4 KLS TWISTED NAIL 100.00 400.00
3 PCS RIDGE ROLL 380.00 1,140.00
0.5 CU.M MSG 400.00 200.00
3 BAGS PORTLAND CEMENT 285.00 855.00
1 KLS TIE WIRE 100.00 100.00
7 PCS 10MM RSB 165.00 1,155.00
TOTAL MATERIALS 21,070.00
II. LABOR
2 3 DAYS CARPENTER 375.00 2,250.00
5 3 DAYS LABORER 270.00 4,050.00
6,300.00
Prepared By:
REYSON B. LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY manayon
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REPAIR AND MAINTENANCE OF
OF STREET LIGHTS LOCATED AT BARANGAY MANAYON BANGUI,I.N.
Prepared By:
MICHELLE G. LAGUYO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
EDUARDO A. AGAG
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
BARANGAY MANAYON
SOURCE OF FUND:
Prepared by:
ELPIDIO V. ANCHETA
President-Prok Binyadora
ARNEL S. SAGUCIO
Municipal Engineer
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
A. LABOR
2 2.5 DAYS LABORER 270.00 1,350.00
1 2.5 DAYS MASON 370.00 925.00
LABOR COST 2,275.00
SUB TOTAL COST 8,890.00
A. LABOR
1 0.5 DAYS LABORER 270.00 135.00
1 0.5 DAYS MASON 370.00 185.00
LABOR COST 320.00
SUB TOTAL COST 1,775.00
A. LABOR
1 1.5 DAYS LABORER 270.00 405.00
1 1.5 DAYS MASON 370.00 555.00
LABOR COST 960.00
SUB TOTAL COST 4,050.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
BARANGAY PAYAC
SOURCE OF FUND:
II. EQUIPMENT
III. LABOR
Prepared by:
REYSON B. LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved By:
FIDEL A. CIMATU JR
Municipal Mayor
BARANGAY abaca
B.LABOR:
10 14.5 DAYS LABORER 270.00 39,150.00
LABOR 39,150.00
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH A. SUMUGAT JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY abaca
SOURCE OF FUND:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH A. SUMUGAT JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE ESTABLISHMENT OF 3 UNITS NURSERY
LOCATED AT BARANGAY BARUYEN,BANGUI I.N.
SOURCE OF FUND:
A. MATERIALS
B. EQUIPMENT
DESCRIPTION
1 14 DAYS WELDING MACHINE 300.00 4,200.00
1 14 DAYS CUT OFF MACHINE 280.00 3,920.00
TOTAL EQUIPMENT COST 8,120.00
C. LABOR
1 14 DAYS MASON 375.00 5,250.00
2 14 DAYS LABORER 270.00 7,560.00
1 14 DAYS WELDER 375.00 5,250.00
TOTAL LABOR COST 18,060.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
PROGRAM OF WORKS AND COST ESTIMATES FOR THE FABRICATION OF ROAD SIGANGES
ALONG NATIONAL HIGHWAY OF THE MUNICIPALITY BANGUI, ILOCOS NORTE
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
A. MATERIALS
5 PCS 1 1/2 G.I. PIPE SCH 40 1,650.00 8,250.00
2 ROLLS PLAIN G. SHEETS .50mm 550.00 1,100.00
3 KGS WELDING ROD 120.00 360.00
8 PCS 1"X 3/16 FLAT BAR 350.00 2,800.00
1.5 CU.M. MIXED GRAVEL AND SAND 500.00 750.00
2 LTR EPOXY PRIMER CATALYS 275.00 550.00
2 LTR ENAMEL WHITE 250.00 500.00
2 PCS 2" PAINT BRUSH 80.00 160.00
2 LTR ASSTD TIN TING COLOR 250.00 500.00
2 BOTTLE LACQUER THINNER 50.00 100.00
2 BOTTLE PAINT THINNER 50.00 100.00
6 BGS PORTLAND CEMENT 300.00 1,800.00
TOTAL MATERIALS 16,970.00
B. EQUIPMENT
DESCRIPTION
1 3 DAYS WELDING MACHINE 350.00 1,050.00
1 3 DAYS CUT OFF MACHINE 250.00 750.00
TOTAL EQUIPMENT COST 1,800.00
C. LABOR
2 3 DAYS WELDER 375.00 2,250.00
2 3 DAYS LABORER 270.00 1,620.00
2 3 DAYS PAINTER 375.00 2,250.00
TOTAL LABOR COST 6,120.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE ESTABLISHMENT OF THREE (3)
UNITS NURSERY AT BARANGAY PAYAC AND LANAO, BANGUI ILOCOS NORTE
SOURCE OF FUND:
A. MATERIALS
B. EQUIPMENT
DESCRIPTION
1 12 DAYS WELDING MACHINE 300.00 3,600.00
1 12 DAYS CUT OFF MACHINE 280.00 3,360.00
TOTAL EQUIPMENT COST 6,960.00
C. LABOR
1 12 DAYS MASON 375.00 4,500.00
2 12 DAYS LABORER 270.00 6,480.00
1 12 DAYS WELDER 375.00 4,500.00
TOTAL LABOR COST 15,480.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
A. MATERIALS
B. LABOR
2 6 DAYS PAINTER 375.00 4,500.00
2 6 DAYS CARPENTER 375.00 4,500.00
2 6 DAYS LABORER 270.00 3,240.00
TOTAL LABOR COST 12,240.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
B. LABOR
2 8 DAYS PLUMBER 375.00 6,000.00
2 8 DAYS LABORER 375.00 6,000.00
TOTAL LABOR COST 12,000.00
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
B. LABOR
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
BRGY ABACA
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
B. LABOR
1 4.5 DAYS MASONRY 375.00 1,687.50
2 4.5 DAYS LABORER 270.00 2,430.00
TOTAL LABOR COST 4,117.50
Prepared by:
AYESHA C. MABINI
SK Chairman
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY ABACA
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
B. LABOR
Prepared by:
AYESHA C. MABINI
SK Chairman
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY ABACA
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. MATERIALS
Prepared by:
AYESHA C. MABINI
SK Chairman
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY PAYAC
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
I. EXCAVATION WORKS
Prepared by:
REYSON B. LAZARO
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL V. SALLUTAL
Punong Barangay
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE PURCHASE OF CRUDE OIL
FOR HEAVY EQUIPMENTS TO BE USED DURING TYPHOON ROSITA
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
A. EQUIPMENT:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION OF TWO (2)
UNITS STREET LIGHT LOCATED AT BARANGAY UTOL, BANGUI, ILOCOS NORTE
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
I. ELECTRICAL WORKS:
II.LABOR:
1 5.5 DAYS ELECTRICIAN 428.00 2,354.00
2 5.5 DAYS LABORER 270.00 2,970.00
5,324.00
Approved by:
REMIGIO G. CASTRO
Barangay Captain
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE DESILTING OF BADUANG CREEK
OF PUROK NAMNAMA AND PUROK BARIKIR LOCATED AT BARANGAY
UTOL, BANGUI, ILOCOS NORTE
SOURCE OF FUND:
QTY. UNIT DESCRIPTION UNIT COST TOTAL
I. DESILTING WORKS:
LABOR
10 8 DAYS LABORER 250.00 20,000.00
20,000.00
Approved by:
REMIGIO G. CASTRO
Barangay Captain
BRGY. DADAOR
I. DECLOGGING WORKS:
LABOR
15 4.5 DAYS LABORER 300.00 20,250.00
TOTAL 20,250.00
Prepared by: Verified by:
Approved by:
BRGY. DADAOR
I. MATERIALS
TOTAL 8,400.00
Scope of Work: Self Help
Approved by:
BRGY. DADAOR
I. MATERIALS
II. LABOR
1 3.5 DAYS PAINTER 375.00 1,312.50
2 3.5 DAYS LABORER 270.00 1,890.00
3,202.50
TOTAL 13,966.50
Approved by:
BRGY. MALASIN
A. LABOR
TOTAL 11,880.00
Approved by:
CHARLIE MABINI
Barangay Chairman
I. EQUIPMENTS
TOTAL 4,042.80
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
I. MATERIALS
TOTAL 9,000.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY PAYAC
SOURCE OF FUND:
SCOPE OF WORKS:
0.60m. H x 0.50m. W x 15 m. L
B. LABOR
B. LABOR
Prepared by:
REYSON LAZARO
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL V. SALLUTAL
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BRGY PAYAC
SOURCE OF FUND:
SCOPE OF WORKS:
0.30m. W x 1.50m H x 6.0m. L
0.60m. W x 0.50m. H x 6.0m. L Foundation
A.MATERIALS
9 CU.M. BOULDERS 650.00 5,850.00
1 ROLL NYLON WIRE 95.00 95.00
6 BD.FT 2''X2''X8 FT TNG 65.00 390.00
3.5 CU.M. MSG 350.00 1,225.00
43 BAGS PORTLAND CEMENT 290.00 12,470.00
MATERIAL COST 20,030.00
B. LABOR
Prepared by:
REYSON LAZARO
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL V. SALLUTAL
Punong Barangay
BRGY PAYAC
PROGRAM OF WORKS AND COST ESTIMATES FOR THE PAINTING OF BRGY. STAGE
LOCATED AT SITIO ALAO-AO BRGY. PAYAC , BANGUI I.N.
SOURCE OF FUND:
A.MATERIALS
1 GALS FLAT LATEX WHITE 750.00 750.00
5 PCS SAND PAPER 50.00 250.00
2 PCS 6'' ROLLER BRUSH 85.00 170.00
2 SETS PAIN TRAY W/ ROLLER 150.00 300.00
2 PCS 4'' PAINT BRUSH 180.00 360.00
1 GALS SEMI GLOSS LATEX 850.00 850.00
MATERIAL COST 2,680.00
B. LABOR
Prepared by:
REYSON LAZARO
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL V. SALLUTAL
Punong Barangay
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
A. MATERIALS
LENSDA
7 PCS 2"Ø G.I PIPE SCH 40 1,625.00 11,375.00
9 PCS 1 1/2"Ø G.I PIPE SCH 40 1,177.00 10,593.00
8 PCS 1 1/2"Ø G.I COUPLING 40 110.00 880.00
1 PC 1 1/2"Ø G.I UNION 40 245.00 245.00
6 PCS 2"Ø G.I COUPLING 40 150.00 900.00
1 PCS 2"Ø G.I UNION 40 475.00 475.00
10 ROLLS TEFLON TAPE (BIG) 45.00 450.00
TOTAL MATERIALS 24,918.00
TALNA-REGTA
13 PCS 2"Ø G.I PIPE SCH 40 1,625.00 21,125.00
11 PCS 2"Ø G.I COUPLING 40 150.00 1,650.00
4 PCS 2"Ø G.I UNION 40 475.00 1,900.00
9 ROLLS TEFLON TAPE (BIG) 45.00 405.00
TOTAL LABOR COST 25,080.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
BRGY ABACA
SOURCE OF FUND:
SUB-TOTAL 25,200.00
II.A.PLASTERING WORKS 0.50 CU.M.
0.5 CU.M. FINE SAND 800.00 400.00
9 BGS PORTLAND CEMENT 290.00 2,610.00
3,010.00
B. LABOR
Prepared by:
JULIO ALABA
Committee on Infra
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY sn lorenzo
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REHABILITATION OF MULTI PURPOSE HALL
OF BRGY. SAN LORENZO BANGUI ILOCOS NORTE
B.LABOR
1 3 DAYS CARPENTER 428.00 1,284.00
1 3 DAYS LABORER 270.00 810.00
LABOR 2,094.00
IRINEO RAMOS
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
BARANGAY sn lorenzo
PROGRAM OF WORKS AND COST ESTIMATES FOR THE PAINTING OF BASKETBALL COURT
LOCATED AT PUROK NAMNAMA BRGY. SAN LORENZO BANGUI ILOCOS NORTE
IRINEO RAMOS
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY sn lorenzo
II.ACCESSORIES : 1 LOT
A. MATERIALS
5 PCS 3'' UNION MECHANICAL/MECHANICAL 2,800.00 14,000.00
4 PCS 1'' UNION G.I SCH 40 800.00 3,200.00
10 PCS TEFLON TAPE 60.00 600.00
1 PCS 2'' UNION MECHANICAL/MECHANICAL 2,200.00 2,200.00
MATERIAL 20,000.00
B.LABOR
2 5 DAYS PLUMBER 428.00 4,280.00
2 5 DAYS LABORER 270.00 2,700.00
LABOR 6,980.00
IRINEO RAMOS
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
BARANGAY sn lorenzo
IRINEO RAMOS
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
BRGY. DADAOR
PROGRAM OF WORKS AND COST ESTIMATES FOR THE CLEANING OF BRGY. PLAZA
LOCATED AT BRGY. DADAOR, BANGUI, I.N.
AREA =
A. LABOR
TOTAL 9,720.00
Approved by:
BARANGAY manayon
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION AND PAINTING
OF SIGNAGES LOCATED AT BARANGAY MANAYON BANGUI,I.N.
A. MATERIALS
3 pcs # 26 Plain G.I. Sheet 0.50mm thk 495.00 1,485.00
2 gal Flat Latex (White) 610.00 1,220.00
2 gal Flat Latex (Blue) 610.00 1,220.00
2 gal QDE (White) 920.00 1,840.00
2 gal QDE (Blue) 920.00 1,840.00
4 pcs 3" Paint Brush 115.00 460.00
4 pcs 2" Paint Brush 70.00 280.00
2 pcs Roller Brush w/ Tray 190.00 380.00
1.5 kg 3" Common Nail 100.00 150.00
1.5 kg 2" Common Nail 100.00 150.00
27 bdft 8- 2"x2"x10' Tanguile 65.00 1,755.00
10,780.00
B. LABOR
1 3 days PAINTER 428.00 1,284.00
1 3 days CARPENTER 428.00 1,284.00
2 3 days HELPER 270.00 1,620.00
4,188.00
Prepared By:
GERRY A. GUIRA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
EDUARDO A. AGAG
Punong Barangay
MUNICIPALITY OF BANGUI
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
BARANGAY BANBAN
B.Labor
8 9 DAYS LABORER 270.00 19,440.00
B.Labor 19,440.00
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ARNEL S. SAGUCIO
RUBEN ALUPAY JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BANBAN
A. MATERIALS
8 PCS 1''X1''X3/16 ANGLE BAR 525.00 4,200.00
6 pcs 10 MM RSB 220.00 1,320.00
1 LTR EPOXY PRIMER W/ CATALYST 250.00 250.00
200 PCS BLIND RIVETS 3/16 1.50 300.00
2 KGS WELDING ROD 120.00 240.00
2 ROLL PLAIN G.I SHEET 550.00 1,100.00
MATERIAL COST 7,410.00
B.LABOR
1 4 DAYS WELDER 375.00 1,500.00
1 4 DAYS HELPER 270.00 1,080.00
LABOR COST 2,580.00
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
MUNICIPALITY OF BANGUI
I. MATERIALS
48 BD.FT 12-2''X2''X12' TNG 70.00 3,360.00
2 KGS ASSTD NAIL 90.00 180.00
1 PC ORDINARY PLYWOOD 465.00 465.00
1 KGS TIE WIRE 90.00 90.00
1 LOT FLOWERS/PLANTS 3,500.00 3,500.00
7,595.00
II. LABOR
1 3 2 DAYS CARPENTER 400.00 2,400.00
2,400.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY UTOL
A. MATERIALS
10 pcs 1/2 G.I. PIPE SCH 40 1,500.00 15,000.00
20 PCS 1 1/2 X 1 1/2 X 3/16 ANFLE BAR 520.00 10,400.00
5 KGS WELDING ROD 120.00 600.00
9 PCS 6' CORR. G.I 360.00 3,240.00
109 PCS TECKSCREW 3.00 327.00
3 ROLL PLASTIC CHICKEN WIRE 525.00 1,575.00
10 pcs 10 MM RSB 220.00 2,200.00
4 pcs 2'' PAINT BRUSH 165.00 660.00
2 LTR EPOXY PRIMER W/ CATALYST 240.00 480.00
3 BOTTLE LACQUER THINNER 60.00 180.00
MATERIAL COST 34,662.00
B. LABOR
1 9 days WELDER 428.00 3,852.00
2 9 days HELPER 270.00 4,860.00
LABOR COST 8,712.00
C. EQUIPMENT
1 9 days WELDING MACHI 350.00 3,150.00
1 9 days CUT OOF MACHIN 275.00 2,475.00
EQUIPMENT COST 5,625.00
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
BARANGAY dadaor
A. MATERIALS
15 pcs 1 1/2" G.I. Pipe, S40 1,710.00 25,650.00
10 pcs 1 1/2" Coupling 275.00 2,750.00
3 pcs G.I. Union 520.00 1,560.00
5 pcs Teflon Tape 45.00 225.00
MATERIAL COST 30,185.00
B. LABOR
1 5.5 days PLUMBER 428.00 2,354.00
3 5.5 days HELPER 270.00 4,455.00
LABOR COST 6,809.00
Prepared By:
ARNOLD AGUINALDO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
CHRISTOPHER MALAPIT
Punong Barangay
BARANGAY
I. PLUMBING WORKS:
A. MATERIALS
15 pcs 1 1/2" G.I. Pipe, S40 1,710.00 25,650.00
10 pcs 1 1/2" Coupling 275.00 2,750.00
3 pcs G.I. Union 520.00 1,560.00
5 pcs Teflon Tape 45.00 225.00
MATERIAL COST 30,185.00
B. LABOR
1 5.5 days PLUMBER 428.00 2,354.00
3 5.5 days HELPER 270.00 4,455.00
LABOR COST 6,809.00
Prepared By:
ARNOLD AGUINALDO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
CHRISTOPHER MALAPIT
Punong Barangay
BARANGAY UTOL
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION OF WATER SYSTEM
OF BRGY. HEALTH CENTER LOCATED AT BRGY. UTOL BANGUI,ILOCOS NORTE
B. LABOR
2 7 days PLUMBER 428.00 5,992.00
2 7 days HELPER 270.00 3,780.00
LABOR COST 9,772.00
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
BARANGAY UTOL
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION OF WATER SYSTEM
OF MULTI PURPOSE HALL LOCATED AT BRGY. UTOL BANGUI,ILOCOS NORTE
B. LABOR
2 7 days PLUMBER 428.00 5,992.00
2 7 days HELPER 270.00 3,780.00
LABOR COST 9,772.00
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
BARANGAY UTOL
B. LABOR
1 6 days ELECTRICIAN 428.00 2,568.00
2 6 days HELPER 270.00 3,240.00
LABOR COST 5,808.00
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY UTOL
PROGRAM OF WORKS AND COST ESTIMATES FOR THE IMPROVEMENT OF MULTI PURPOSE HALL
OF BRGY. UTOL,BANGUI ILOCOS NORTE
B. LABOR
2 8 days CARPENTER 428.00 6,848.00
2 8 days HELPER 270.00 4,320.00
LABOR COST 11,168.00
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
BARANGAY UTOL
Prepared By:
JERRY I ARZAGA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
REMIGIO G. CASTRO
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY NAGBALAGAN
Prepared By:
FLORIAN FERNANDEZ
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
CHRISTOPHER J. RESPECIO
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY NAGBALAGAN
PROGRAM OF WORKS AND COST ESTIMATES FOR THE CONSTRUCTION OF SLOPE PROTECTION
AT PUROK TAGUMPAU LOCATED AT BRGY NAGBALAGAN,BANGUI, ILOCOS NORTE
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 6.00 CU.M.
A. LABOR
1 3 days FOREMAN 428.00 1,284.00
2 3 days HELPER 270.00 1,620.00
LABOR COST 2,904.00
A. MATERIAL
11 CU.M BOULDERS 650.00 7,150.00
3 CU.M FINE SAND 450.00 1,350.00
40 BGS PORTLAND CEMENT 290.00 11,600.00
MATERIAL COST 20,100.00
B. LABOR
1 6 days FOREMAN 428.00 2,568.00
2 6 days HELPER 270.00 3,240.00
LABOR COST 5,808.00
SUB TOTAL 25,908.00
FROILAN FERNANDEZ
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
CHRISTOPHER J. RESPICIO
Punong Barangay
BARANGAY ABACA
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 6.00 CU.M.
A. LABOR
1 3 days FOREMAN 428.00 1,284.00
2 3 days HELPER 270.00 1,620.00
LABOR COST 2,904.00
A. MATERIAL
12 CU.M BOULDERS 650.00 7,800.00
3.5 CU.M FINE SAND 450.00 1,575.00
48 BGS PORTLAND CEMENT 290.00 13,920.00
MATERIAL COST 23,295.00
B. LABOR
1 8 days FOREMAN 428.00 3,424.00
2 8 days HELPER 270.00 4,320.00
LABOR COST 7,744.00
SUB TOTAL 31,039.00
IV.CONCRETE WORKS: 2.04 CU.M.
A. MATERIAL
2.04 CU.M AGREGATES 500.00 1,020.00
1.02 CU.M FINE SAND 250.00 255.00
19 BGS PORTLAND CEMENT 290.00 5,510.00
MATERIAL COST 6,785.00
B. LABOR
1 3 days FOREMAN 428.00 1,284.00
2 3 days HELPER 270.00 1,620.00
LABOR COST 2,904.00
SUB TOTAL 9,689.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY ABACA
B. LABOR
1 10 days ELECTRICIAN 428.00 4,280.00
2 10 days HELPER 270.00 5,400.00
LABOR COST 9,680.00
Prepared By:
JULIO ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
B. LABOR
1 10 days ELECTRICIAN 428.00 4,280.00
2 10 days HELPER 270.00 5,400.00
LABOR COST 9,680.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
B. LABOR
1 10 days ELECTRICIAN 428.00 4,280.00
2 10 days HELPER 270.00 5,400.00
LABOR COST 9,680.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 1.5 days FOREMAN 428.00 642.00
2 1.5 days HELPER 270.00 810.00
LABOR COST 1,452.00
A. MATERIAL
8 CU.M BOULDERS 650.00 5,200.00
2 CU.M FINE SAND 450.00 900.00
24 BGS PORTLAND CEMENT 290.00 6,960.00
MATERIAL COST 13,060.00
B. LABOR
1 4.5 days FOREMAN 428.00 1,926.00
2 4.5 days HELPER 270.00 2,430.00
LABOR COST 4,356.00
SUB TOTAL 17,416.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
A. LABOR
1 0.5 days MASON 428.00 214.00
2 0.5 days HELPER 270.00 270.00
LABOR COST 484.00
II. EXCAVATION WORKS: 1.00 CU.M.
A. LABOR
1 0.5 days MASON 428.00 214.00
2 0.5 days HELPER 270.00 270.00
LABOR COST 484.00
A. MATERIAL
202 PCS 5'' CHB 15.00 3,030.00
16 PCS 10MM RSB 190.00 3,040.00
6 CU.M MSG 450.00 2,700.00
22 BGS PORTLAND CEMENT 290.00 6,380.00
MATERIAL COST 15,150.00
B. LABOR
1 4 days MASON 428.00 1,712.00
2 4 days HELPER 270.00 2,160.00
LABOR COST 3,872.00
SUB TOTAL 19,022.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 1.5 days FOREMAN 428.00 642.00
2 1.5 days HELPER 270.00 810.00
LABOR COST 1,452.00
A. MATERIAL
8 CU.M BOULDERS 650.00 5,200.00
2 CU.M FINE SAND 450.00 900.00
24 BGS PORTLAND CEMENT 290.00 6,960.00
MATERIAL COST 13,060.00
B. LABOR
1 4.5 days FOREMAN 428.00 1,926.00
2 4.5 days HELPER 270.00 2,430.00
LABOR COST 4,356.00
SUB TOTAL 17,416.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
A. LABOR
1 3 days FOREMAN 428.00 1,284.00
2 3 days HELPER 270.00 1,620.00
LABOR COST 2,904.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 4 days FOREMAN 428.00 1,712.00
2 4 days HELPER 270.00 2,160.00
LABOR COST 3,872.00
A. MATERIAL
17 CU.M BOULDERS 650.00 11,050.00
6 CU.M FINE SAND 450.00 2,700.00
68 BGS PORTLAND CEMENT 290.00 19,720.00
MATERIAL COST 33,470.00
B. LABOR
1 9 days MASON 428.00 3,852.00
2 9 days HELPER 270.00 4,860.00
LABOR COST 8,712.00
SUB TOTAL 42,182.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
B. LABOR
1 6 days ELECTRICIAN 428.00 2,568.00
2 6 days HELPER 270.00 3,240.00
LABOR COST 5,808.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
B. LABOR
1 7 days ELECTRICIAN 428.00 2,996.00
2 7 days HELPER 270.00 3,780.00
LABOR COST 6,776.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
B. LABOR
1 5 days PLUMBER 428.00 2,140.00
2 5 days HELPER 270.00 2,700.00
LABOR COST 4,840.00
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
BARANGAY ABACA
Prepared By:
JULIO B. ALABA
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE STAGE AND DECORATIONS
FOR THE GWAPONG LOLO AT GANDANG LOLA
I. MATERIALS
1 GAL LATEX PAINT 585.00 585.00
1/4 LTR TOLUDINE RED 70.00 70.00
1/4 LTR THALO BLUE 70.00 70.00
1/4 LTR HANSA YELLOW 70.00 70.00
1/2 LTR THALO GREEN 80.00 80.00
1/4 LTR LAMP BLACK 70.00 70.00
1 LOT FLOWER/PLANTS 5,000.00 5,000.00
5,945.00
II. LABOR
2 4 DAYS PAINTER 437.50 3,500.00
. 3,500.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
MUNICIPALITY OF BANGUI
I. ELECTRICAL WORKS:
A. MATERIALS
1 PC 6 HOLES PANNEL BOX 2,070.00 2,070.00
6 PCS UTILITY BOX 44.00 264.00
2 PCS 40 AMP CB. BOLT ON 400.00 800.00
1 PCS 60 AMP CB. BOLT ON 450.00 450.00
3 PCS 2 GANG PLATE 60.00 180.00
10 PCS CONVENIENT OUTLET 65.00 650.00
40 MTRS 5.50 MM THHN WIRE 60.00 2,400.00
1 PC 1 1/4'' RSC PIPE 535.00 535.00
1 PC 1 1/4'' ENTRANCE CAP 80.00 80.00
2 PC NEMA 3R 540.00 1,080.00
2 PC 1'' LONG ELBOW 45.00 90.00
8 PC 1/2 PVC ORANGE 75.00 600.00
20 MTRS 38mm. THHN WIRE 390.00 7,800.00
16,999.00
II. LABOR
1 7 DAYS ELECTRICIAN 428.00 2,996.00
2 7 DAYS LABORER 270.00 3,780.00
. 6,776.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU JR
Municipal Mayor
BARANGAY BANBAN
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BANBAN
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
BARANGAY BANBAN
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
BARANGAY BANBAN
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
BARANGAY BANBAN
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 4 days FOREMAN 428.00 1,712.00
2 4 days HELPER 270.00 2,160.00
LABOR COST 3,872.00
A. MATERIAL
12 CU.M BOULDERS 650.00 7,800.00
4 CU.M FINE SAND 450.00 1,800.00
48 BGS PORTLAND CEMENT 290.00 13,920.00
MATERIAL COST 23,520.00
B. LABOR
1 8.5 days MASON 428.00 3,638.00
2 8.5 days HELPER 270.00 4,590.00
LABOR COST 8,228.00
SUB TOTAL 31,748.00
Prepared By:
RENATU V. RUAM
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 4 days FOREMAN 428.00 1,712.00
2 4 days HELPER 270.00 2,160.00
LABOR COST 3,872.00
A. MATERIAL
13 CU.M BOULDERS 650.00 8,450.00
4 CU.M FINE SAND 450.00 1,800.00
56 BGS PORTLAND CEMENT 290.00 16,240.00
MATERIAL COST 26,490.00
B. LABOR
1 8.5 days MASON 428.00 3,638.00
2 8.5 days HELPER 270.00 4,590.00
LABOR COST 8,228.00
SUB TOTAL 34,718.00
Prepared By:
RENATU V. RUAM
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
A. LABOR
1 1 days FOREMAN 428.00 428.00
2 1 days HELPER 270.00 540.00
LABOR COST 968.00
II. EXCAVATION WORKS: 4.00 CU.M.
A. LABOR
1 4 days FOREMAN 428.00 1,712.00
2 4 days HELPER 270.00 2,160.00
LABOR COST 3,872.00
A. MATERIAL
13 CU.M BOULDERS 650.00 8,450.00
4 CU.M FINE SAND 450.00 1,800.00
56 BGS PORTLAND CEMENT 290.00 16,240.00
MATERIAL COST 26,490.00
B. LABOR
1 8.5 days MASON 428.00 3,638.00
2 8.5 days HELPER 270.00 4,590.00
LABOR COST 8,228.00
SUB TOTAL 34,718.00
Prepared By:
RENATU V. RUAM
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
AVERAGE OUTPUT:
1.50 cu.m./Person/Day
A.LABOR
8 18.5 DAY LABORER 270.00 39,960.00
LABOR COST 39,960.00
SUB TOTAL 39,960.00
UNIT COST 180.00
Prepared by:
RENATU V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
I.A. MATERIALS:
7 PCS TRASH BIN 4,000.00 28,000.00
MATERIAL COST 28,000.00
Prepared by:
RENATU V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY BANBAN
A. MATERIALS
12 PCS 1" X 1" X 3/16" ANGLE BAR 400.00 4,800.00
3 PCS CHICKEN WIREMESH 3,000.00 9,000.00
36 PCS 10MMØ RSB 180.00 6,480.00
4 PCS PLAIN GI SHEET .5MM 270.00 1,080.00
6 KGS WELDING ROD 100.00 600.00
21,960.00
B. EQUIPMENT:
2 4.5 WELDING MACHINE 400 3,600.00
3,600.00
A. LABOR
1 4.5 DAYS WELDER 428.00 1,926.00
2 4.5 DAYS HELPER 270.00 2,430.00
LABOR COST 4,356.00
RENATU V. RUAM
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
SUB TOTAL -
UNIT COST #DIV/0!
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
AVERAGE OUTPUT:
1.50 cu.m./Person/Day
A.LABOR
8 13.5 DAY LABORER 270.00 29,160.00
LABOR COST 29,160.00
SUB TOTAL 29,160.00
UNIT COST 180.00
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
AVERAGE OUTPUT:
1.50 cu.m./Person/Day
A.LABOR
8 13.5 DAY LABORER 270.00 29,160.00
LABOR COST 29,160.00
SUB TOTAL 29,160.00
UNIT COST 180.00
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
AVERAGE OUTPUT:
1.50 cu.m./Person/Day
A.LABOR
8 9 DAY LABORER 270.00 19,440.00
LABOR COST 19,440.00
SUB TOTAL 19,440.00
UNIT COST 180.00
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY SN LORENZO
Prepared by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY PAYAC
A. MATERIALS
1 PC. 4'' HOLE CYCLONE WIRE 1,600.00 1,600.00
1 PCS 2''X2''X3/16 ANGLE BAR 750.00 750.00
1 KGS WELDING ROD 120.00 120.00
1 PCS 16MM PLAIN RSB 400.00 400.00
2,870.00
B. EQUIPMENT:
1 1 WELDING MACHINE 400 400.00
C. LABOR
1 1 DAYS WELDER 428.00 428.00
1 1 DAYS HELPER 270.00 270.00
LABOR COST 698.00
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
6 PC. 10' CORR. G.I ROOF G.0.50mm 500.00 3,000.00
3 kgs ASSTD NAIL 100.00 300.00
16 BD.FT 8-2''X2''X6' TNG 62.00 992.00
2 BGS PORTLAND CEMENT 290.00 580.00
2 PACK VULCA SEAL 150.00 300.00
1 CU.M. MSG 350.00 350.00
1 KGS TWISTED NAIL 120.00 120.00
28 BD.FT 8-2''X2''X10' TNG 62.00 1,736.00
7,378.00
A. LABOR
1 3.5 DAYS CARPENTER 428.00 1,498.00
1 3.5 DAYS HELPER 270.00 945.00
LABOR COST 2,443.00
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
8 PC. 10' CORR. G.I ROOF G.0.50mm 500.00 4,000.00
4 kgs ASSTD NAIL 100.00 400.00
20 BD.FT 10-2''X2''X6' TNG 62.00 1,240.00
3 BGS PORTLAND CEMENT 290.00 870.00
3 PACK VULCA SEAL 150.00 450.00
1.5 CU.M. MSG 350.00 525.00
4 KGS TWISTED NAIL 120.00 480.00
40 BD.FT 10-2''X2''X10' TNG 62.00 2,480.00
10,445.00
A. LABOR
1 5 DAYS CARPENTER 428.00 2,140.00
1 5 DAYS HELPER 270.00 1,350.00
LABOR COST 3,490.00
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. LABOR
1 0.5 DAYS MASON 428.00 214.00
1 0.5 DAYS HELPER 270.00 135.00
LABOR COST 349.00
A. LABOR
1 0.5 DAYS MASON 428.00 214.00
1 0.5 DAYS HELPER 270.00 135.00
LABOR COST 349.00
A. MATERIALS
6 CU.M. BOULDERS 600.00 3,600.00
24 BGS PORTLAND CEMENT 290.00 6,960.00
1.5 CU.M. MSG 350.00 525.00
11,085.00
A. LABOR
1 3 DAYS MASON 428.00 1,284.00
1 3 DAYS HELPER 270.00 810.00
LABOR COST 2,094.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
5 PC. 10' CORR. G.I ROOF G.0.50mm 500.00 2,500.00
1 kgs ASSTD NAIL 100.00 100.00
12 BD.FT 6-2''X2''X6' TNG 62.00 744.00
1 BGS PORTLAND CEMENT 290.00 290.00
1 PACK VULCA SEAL 150.00 150.00
1 PCS 2'' G.I PIPE 2,500.00 2,500.00
1 KGS TWISTED NAIL 120.00 120.00
24 BD.FT 6-2''X2''X10' TNG 62.00 1,488.00
7,892.00
A. LABOR
1 3 DAYS CARPENTER 428.00 1,284.00
1 3 DAYS HELPER 270.00 810.00
LABOR COST 2,094.00
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
6 ROLL 3/4 BLACK HOSE 2,325.00 13,950.00
13,950.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
6 ROLL 3/4 BLACK HOSE 2,325.00 13,950.00
13,950.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
4 ROLL 1 3/4 BLACK HOSE 3,500.00 14,000.00
14,000.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
6 PCS G.I PIPE 3/4 SCH 40 1,900.00 11,400.00
4 PCS TEFLON TAPE 50.00 200.00
2 PCS G.I PIPE COUPLING 3/4 SCH 40 300.00 600.00
6 PCS G.I PIPE UNION 3/4 SCH 40 300.00 1,800.00
14,000.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
6 PCS G.I PIPE 3/4 SCH 40 1,900.00 11,400.00
4 PCS TEFLON TAPE 50.00 200.00
2 PCS G.I PIPE COUPLING 3/4 SCH 40 300.00 600.00
6 PCS G.I PIPE UNION 3/4 SCH 40 300.00 1,800.00
14,000.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
11 PCS 10' CORRUGATED GI SHEET 0.50mm 500.00 5,500.00
72 BDFT 36-2"X2"X6' 65.00 4,680.00
140 BDFT 12-2"X7"X10' 65.00 9,100.00
3 KGS 3" CWN 100.00 300.00
2.5 KGS 4" CWN 100.00 250.00
10 LTR EPOXY PRIMER 250.00 2,500.00
2 PCS TWISTED NAIL 120.00 240.00
TOTAL MATERIAL COST 22,570.00
B. LABOR
1 6 DAYS CARPENTER 428.00 2,568.00
3 6 DAYS LABORER 270.00 4,860.00
7,428.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY PAYAC
A. MATERIALS
15 PCS 1/4 ORDINARY PLYWOOD 450.00 6,750.00
2.5 KGS 2" CWN 100.00 250.00
3 KGS 1" CWN 100.00 300.00
74 BDFT 22-2"X2"X10' 65.00 4,810.00
5 GAL LATEX FLAT 610.00 3,050.00
TOTAL MATERIAL COST 15,160.00
B. LABOR
1 5 DAYS PAINTER 428.00 2,140.00
2 5 DAYS LABORER 270.00 2,700.00
TOTAL LABOR COST 4,840.00
Prepared By:
REYSON LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
BARANGAY TAGUIPURO
B.Labor
6 9 DAYS LABORER 300.00 16,200.00
B.Labor 16,200.00
Prepared by:
ALMYN MOLINA
Committee on INFRA
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY
I.
A. MATERIALS
2 PC 10mm RSB 185.00 370.00
18 BDFT 2 - 3"X6"X6' TANGUILE 75.00 1,350.00
2 PCS 2"Ø GI PIPE,SCH 40 2,280.00 4,560.00
1 BAG PORTLAND CEMENT 290.00 290.00
0.5 CU.M MSG 600.00 300.00
4 MTRS CHAIN 700.00 2,800.00
B. LABOR
1 3.5 DAYS CARPENTER 375.00 1,312.50
2 3.5 DAYS HELPER 270.00 1,890.00
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
A. MATERIALS
350 PCS 4"CHB 12.00 4,200.00
13 BAGS PORTLAND CEMENT 290.00 3,770.00
3 CU.M FINE SAND 800.00 2,400.00
2 CU.M MSG 700.00 1,400.00
20 PCS 10mm RSB 185.00 3,700.00
2 KG #16 TIE WIRE 100.00 200.00
15 BDFT 3-2"X 3" X 10' TANGUILE 70.00 1,050.00
14 BDFT 4-2"X 2"X 10' TANGUILE 70.00 980.00
162 LNFT CORRUGATED GI SHEET, 0.50mm 60.50 9,801.00
1 UNIT STAINLESS STEEL KITCHEN SINK 3,000.00 3,000.00
1 UNIT 0.70 X 2.1 PANEL DOOR W/ DOOR JAMB 3,000.00 3,000.00
2 SQ.M. STEEL GRILLS 2,800.00 5,600.00
39,101.00
B. LABOR
1 8 DAYS CARPENTER 375.00 3,000.00
4 8 DAYS HELPER 270.00 8,640.00
11,640.00
Prepared by:
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
A. MATERIALS
47 SQ.M. WINDOW SCREEN 250.00 11,750.00
11,750.00
B. LABOR
2 6 DAYS LABORER 270.00 3,240.00
3,240.00
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
A. MATERIALS
7.5 SQ.M. SLIDING WINDOW WITH SCREEN 4,000.00 30,000.00
TOTAL PROJECT COST 30,000.00
Prepared by:
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REHABILITATION OF SOLAR DRIER
AT BARANGAY TAGUIPORO, BANGUI, ILOCOS NORTE
A. MATERIALS
3 ROLLS 4"CYCLONE WIRE 2,250.00 6,750.00
3 ROLLS NYLON WIRE 100.00 300.00
27 BDFT 9-2"X 2"X9' 70.00 1,890.00
3 KGS CWN 100.00 300.00
9,240.00
B. LABOR
2 3 DAYS LABORER 270.00 1,620.00
1 3 DAYS CARPENTER 375.00 1,125.00
2,745.00
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
A. MATERIALS
200 PC 4" CHB 12.00 2,400.00
15 PC #10mm Ø RSB 185.00 2,775.00
3 CU.M. FINE SAND 800.00 2,400.00
2 CU.M. MSG 650.00 1,300.00
20 BAGS PORTLAND CEMENT 290.00 5,800.00
14,675.00
B. LABOR
2 5.5 DAYS LABORER 270.00 2,970.00
1 5.5 DAYS MASON 428.00 2,354.00
5,324.00
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY TAGUIPORO
SOURCE OF FUND:
A. MATERIALS
B. LABOR
1 6.5 DAYS CARPENTER 375.00 2,437.50
2 6.5 DAYS LABORER 270.00 3,510.00
5,947.50
ALMYN MOLINA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RICHARD ABALOS
Punong Barangay
BARANGAY UTOL
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REPAIR OF ELECTRICAL WIRING
OF BASKETBALL COURT OF BRGY UTOL BANGUI,ILOCOS NORTE
SOURCE OF FUND:
I. ELECTRICAL WORKS:
II.LABOR:
1 6 DAYS ELECTRICIAN 428.00 2,568.00
1 6 DAYS LABORER 270.00 1,620.00
4,188.00
Approved by:
REMIGIO G. CASTRO
Barangay Captain
SOURCE OF FUND:
I. ELECTRICAL WORKS:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
municipality of bangui
A. LABOR
1 4 days FOREMAN 500.00 2,000.00
2 4 days HELPER 350.00 2,800.00
LABOR COST 4,800.00
C.P. 720.00
O.C.M. 576.00
VAT 240.00
TOTAL 6,336.00
A. LABOR
2 5 days CARPENTER 500.00 5,000.00
2 5 days HELPER 350.00 3,500.00
LABOR COST 8,500.00
TOTAL 17,660.00
C.P. 2,649.00
O.C.M. 317.88
VAT 425.00
TOTAL 21,051.88
B. LABOR
1 5 days MASON 500.00 2,500.00
3 5 days HELPER 350.00 5,250.00
LABOR COST 7,750.00
B. LABOR
2 7 days MASON 500.00 7,000.00
3 7 days HELPER 350.00 7,350.00
LABOR COST 14,350.00
B. LABOR
1 3 days PAINTER 500.00 1,500.00
1 3 days HELPER 350.00 1,050.00
LABOR COST 2,550.00
PREPARED BY:
ARNEL S. SAGUCIO
Municipal Engineer
PREPARED BY:
BARANGAY PAYAC
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY PAYAC
I. MATERIALS:
Prepared By:
REYSON B. LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
OFFICE OF THE MUNICIPAL ENGINEER
SOURCE OF FUND:
I. LABOR
1 1 DAY CARPENETER 500.00 500.00
1 1 DAY CARPENETER 500.00 500.00
1,000.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY TAGUIPORO
PROGRAM OF WORKS AND COST ESTIMATES FOR THE CONSTRUCTION OF PERIMETER FENCE
AT TAGUIPORO ELEM. SCHOOL , BRGY. TAGUIPORO, BANGUI, ILOCOS NORTE
SOURCE OF FUND:
A. LABOR
1 3 days FOREMAN 500.00 1,500.00
2 3 days HELPER 350.00 2,100.00
LABOR COST 3,600.00
C.P. 540.00
O.C.M. 432.00
VAT 180.00
TOTAL 4,752.00
B. LABOR
1 6 days MASON 500.00 3,000.00
3 6 days HELPER 350.00 6,300.00
LABOR COST 9,300.00
B. LABOR
1 5 days MASON 500.00 2,500.00
3 5 days HELPER 350.00 5,250.00
LABOR COST 7,750.00
V. PLASTERING WORKS:
A. MATERIALS
1 CU.M FINE SAND 800.00 800.00
14 BGS PORTLAND CEMENT 290.00 4,060.00
MATERIAL COST 4,860.00
B.LABOR
1 5 DAYS MASON 500.00 2,500.00
1 5 DAYS LABORER 350.00 1,750.00
LABOR 4,250.00
B. LABOR
1 3 days PAINTER 500.00 1,500.00
2 3 days HELPER 350.00 2,100.00
LABOR COST 3,600.00
TOTAL COST 10,595.00
C.P. 1,589.25
O.C.M. 1,271.40
VAT 180.00
TOTAL 13,635.65
Approved by:
RICHARD ABALOS
Barangay Captain
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
OFFICE OF THE MUNICIPAL ENGINEER
I. MATERIALS: CU.M.
Prepared By:
REYSON B. LAZARO
Committee on INFRA Checked and Verified By:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
MICHAEL B. SALLUTAL
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY TAGUIPORO
PROGRAM OF WORKS AND COST ESTIMATES FOR THE CONSTRUCTION OF PERIMETER FENCE
AT TAGUIPORO ELEM. SCHOOL , BRGY. TAGUIPORO, BANGUI, ILOCOS NORTE
SOURCE OF FUND:
A. LABOR
1 1 days FOREMAN 500.00 500.00
2 1 days HELPER 350.00 700.00
LABOR COST 1,200.00
C.P. 180.00
O.C.M. 120.00
VAT 120.00
TOTAL 1,620.00
B. LABOR
1 3 days MASON 500.00 1,500.00
3 3 days HELPER 350.00 3,150.00
LABOR COST 4,650.00
TOTAL COST 16,804.10
C.P. 2,520.62
O.C.M. 1,680.41
VAT 232.50
TOTAL 21,237.63
B. LABOR
1 1.5 days MASON 500.00 750.00
2 1.5 days HELPER 350.00 1,050.00
LABOR COST 1,800.00
Approved by:
RICHARD ABALOS
Barangay Captain
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY ABACA
I. FORM WORKS:
A. MATERIALS
4 pcs 2"x6" C-Purlins 870.00 3,480.00
1 pc 10mm RSB 200.00 200.00
3,680.00
Approved by:
JOSEPH SUMUGAT
Barangay Captain
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY ABACA
AVERAGE OUTPUT:
1.50 cu.m./Person/Day
A.LABOR
10 10 DAY LABORER 250.00 25,000.00
LABOR COST 25,000.00
SUB TOTAL 25,000.00
UNIT COST
Prepared by:
JULIO B. ALABA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY ABACA
A.MATERIALS
2.50 cu.m. Fine Sand
5.00 cu.m. Coarse Aggregates
45.00 bags Portland cement
35.00 bags Sahara Water Proofing
65.00 pcs Sahara Water Proofing
18.00 kgs
8.00 kgs
Prepared by:
JULIO B. ALABA
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
JOSEPH SUMUGAT
Punong Barangay
PROGRAM OF WORKS AND COST ESTIMATE FOR THE FABRICATION AND INSTALLATION OF
BILBOARDS AND SIGNAGES ALONG NATIONAL HIGHWAY, BANGUI, ILOCOS NORTE
I. MATERIALS
6 pcs 1"X1"X3/16 Angle Bar 450.00 2,700.00
6 pcs 1.5" G.I. Pipe Sch 40 1,750.00 10,500.00
660 pcs Blind Rivets 1.00 660.00
8 pcs 1.2 x 2.4 Plain GI Sheet 0.50mm 850.00 6,800.00
3 pcs 10mm RSB 165.00 495.00
4 bags Portland Cement 290.00 1,160.00
0.5 cu.m MSG 350.00 175.00
23 kgs Welding Rod 100.00 2,300.00
8 pcs Paint Brush 2" 100.00 800.00
5 gal Epoxy Primer w/ catalyst ( Gray) 800.00 4,000.00
5 gal QDE White 800.00 4,000.00
4 ltrs Assorted Tinting Color 260.00 1,040.00
4 gal Lacquer Thinner 200.00 800.00
4 gal Paint Thinner 200.00 800.00
TOTAL MATERIAL COST 36,230.00
II. LABOR:
1 10 DAYS LABORER 270.00 2,700.00
1 10 DAYS PAINTER 428.00 4,280.00
1 10 DAYS WELDER/TINSMITH 428.00 4,280.00
TOTAL LABORL COST 11,260.00
III. EQUIPMENT:
1 10 DAYS WELDING MACHINE 250.00 2,500.00
TOTAL EQUIPMENT COST 2,500.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
PROGRAM OF WORKS AND COST ESTIMATE FOR THE REPAIR AND MAINTENANCE OF
EVACUATION CENTER, BANGUI, ILOCOS NORTE
I.PAINTING WORKS
A. MATERIALS
5 gal QDE Paint (White) 800.00 4,000.00
40 gal Latex Paint (Ready Mix) 800.00 32,000.00
1 gal Masonry Putty 600.00 600.00
6 sets Roller Brush w/ Tray 200.00 1,200.00
6 pcs Paint Brush 2" 120.00 720.00
6 pcs Paint Brush 1" 80.00 480.00
10 pcs Sand Paper #120 25.00 250.00
3 sets Pallete 100.00 300.00
3 gal Paint Thinner 235.00 705.00
TOTAL MATERIAL COST 40,255.00
B. LABOR
10 7 days Painter 428.00 29,960.00
TOTAL LABOR COST 29,960.00
III. PLUMBING
A. MATERIALS
2 pcs 3/4 Marine Plywood 1,365.00 2,730.00
1 pcs 1"x1"x3/16 Angle Bar 425.00 425.00
12 pcs 10mm Expansion Bolt 50.00 600.00
3 pcs 1' length Flexible Hose for Urinal 450.00 1,350.00
2 pcs 1' length Flexible Hose for Lavatory 150.00 300.00
1 pcs Teflon Tape 50.00 50.00
12 pcs 10mm Bolt and Nut 20.00 240.00
TOTAL MATERIAL COST 5,695.00
B. LABOR
1 3 days Carpenter 428.00 1,284.00
1 3 days Laborer 270.00 810.00
TOTAL LABOR COST 2,094.00
IV. ACCESSORIES
A. MATERIALS
4 pcs 1/2" dia GI Pipe Sch 40 450.00 1,800.00
1 pcs 1"x1"x1/8 Flat Bar 250.00 250.00
TOTAL MATERIAL COST 2,050.00
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
I.TINSMITRY WORKS
A. MATERIALS
40 pcs 3/16 x 1 1/2 Angle Bar 545.00 21,800.00
20 pcs 1" Flat Bar 250.00 5,000.00
40 pcs 4'x8' Steel Matting 765.00 30,600.00
1 pcs Cutting Disc 420.00 420.00
2 gal Epoxy Primer w/ Catalyst 890.00 1,780.00
2 gal Criystal Green QDE 800.00 1,600.00
1 gal Paint Thinner 350.00 350.00
1 gal Lacquer Thinner 350.00 350.00
5 kgs Welding Rod 100.00 500.00
4 pcs Paint Brush 115.00 460.00
60 m Plastic Chicken Wire 190.00 11,400.00
10 pcs Padlock 330.00 3,300.00
2 pcs Plain G.I. 4x8 730.00 1,460.00
1 box Rivet 1/8 290.00 290.00
TOTAL MATERIAL COST 79,310.00
B. LABOR
1 12 days Welder 450.00 5,400.00
3 12 days Laborer 380.00 13,680.00
TOTAL LABOR COST 19,080.00
C. EQUIPMENT
1 6 Welding Machine 250.00 1,500.00
1,500.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
B. LABOR
1 12 days Welder 450.00 5,400.00
3 12 days Laborer 380.00 13,680.00
TOTAL LABOR COST 19,080.00
C. EQUIPMENT
1 6 Welding Machine 250.00 1,500.00
1,500.00
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
I.
A. MATERIALS
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
FIDEL A. CIMATU, JR.
Municipal Mayor
I. TINSMITRY WORKS:
A. MATERIALS
7 pcs Marine Plywood 495.00 3,465.00
8 pcs Flushing Gutter, 0.60 485.00 3,880.00
2 pcs 12' Corrugated GI Roofing, 0.60 870.00 1,740.00
6 pcs Hardiflex 1x10x8 485.00 2,910.00
4 pcs S-Gutter 485.00 1,940.00
13,935.00
B. LABOR
1 5 day Welder 450.00 2,250.00
2 5 day Laborer 380.00 3,800.00
6,050.00
Approved by:
FREDDIE J. BALBAG
Barangay Captain
A. MATERIALS
8 pcs Switch Wide Series 115.00 920.00
50 pcs Omni Lights, 12W 190.00 9,500.00
350 mtrs PDX #14 55.00 19,250.00
5 pcs Electrical Tape 65.00 325.00
29,995.00
Approved by:
FREDDIE J. BALBAG
Barangay Captain
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
B. LABOR: (LGU-COUNTERPART)
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
PROGRAM OF WORKS AND COST ESTIMATE FOR THE HAULING OF GARDEN SOIL FROM
LANAO FOR THE ESTABLISHMENT OF BEACH FOREST TREES PLANTATION AT
BRGY. BARUYEN, BANGUI, ILOCOS NORTE
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
PROGRAM OF WORKS AND COST ESTIMATE FOR THE HAULING OF GARDEN SOIL FROM
LANAO FOR THE ESTABLISHMENT OF BEACH FOREST TREES PLANTATION AT
BRGY. BARUYEN, BANGUI, ILOCOS NORTE
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
IRINEO RAMOS
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
ELMER FAYLOGNA
I. PAINTING WORKS:
A. MATERIALS
2 LTRS.
1 LTRS.
3 LTRS.
16 SETS
2 GALS
193.60
1.5
1.5
1.5
1.5
0
1200
3.8 4.433333
10869
12680.5
1 10 270 2,700.00
1 10 428 4,280.00
1 10 428 4,280.00
1 10 250 2,500.00
13,760.00 13,770.00
50,000.00
50,000.00
f
456
3800
4256
210
1428.57142857143
ACRYLIC COLOR(BURNT SIENNA) 240.00 480.00
ACRYLIC COLOR(RAW SIENNA) 240.00 240.00
ACRYLIC COLOR(THALOU BLUE) 240.00 720.00
ROLLER BRUSH W/ TRAY 150.00 2,400.00
ACRYLIC EMULSION 850.00 1,700.00
MATERIAL COST5,540.00
TOTAL PROJECT5,540.00
COST
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BANBAN
1.00 LOT
A.MATERIALS:
-
-
-
-
-
-
-
MATERIAL COST -
B.LABOR
1 11 DAY PAINTER 428.00 4,708.00
1 11 DAY LABORER 270.00 2,970.00
LABOR COST 7,678.00
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BANBAN
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BANBAN
PROGRAM OF WORKS AND COST ESTIMATES FOR THE ROOFING AND CEILING
AT BRGY. HALL BANBAN, BANGUI, ILOCOS NORTE
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
BARANGAY BANBAN
B.LABOR
1 4 DAY ELECTRICIAN 450.00 1,800.00
1 4 DAY LABORER 380.00 1,520.00
LABOR COST 3,320.00
Prepared by:
RENATO V. RUAM
Committee on INFRA
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
RUBEN ALUPAY JR
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
PROGRAM OF WORKS AND COST ESTIMATES FOR DESILTING THE CANAL LINING OF
SANJERA DAY AS, SAN LORENZO, LIPSOC, UTOL, UPPER BAGUNSANAY, CADAGASAN,
AMALIA AND SANJERA DANAO
SOURCE OF FUND:
I. DESILTING:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
1 set
I. DREDGING WORKS:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY. ABACA
SOURCE OF FUND:
B. LABOR
1 2 days CARPENTER 450.00 900.00
1 2 days Helper 380.00 760.00
LABOR COST 1,660.00
IV. ACESSORIES WORKS: 1 LOT
A. MATERIALS
1 PC WATER CLOSET 7,000.00 7,000.00
1 PC LAVATORY 5,000.00 5,000.00
1 PC ANGLE VALVE 400.00 400.00
1 PC FAUCET SPECIAL 600.00 600.00
MATERIAL COST 13,000.00
B. LABOR
1 4 days CARPENTER 450.00 1,800.00
1 4 days Helper 380.00 1,520.00
LABOR COST 3,320.00
Approved by:
BRGY. ABACA
SOURCE OF FUND:
B. LABOR
1 1.5 days CARPENTER 450.00 675.00
1 1.5 days Helper 380.00 570.00
LABOR COST 1,245.00
B. EQUIPMENT
1 2 days AEGER 200.00 400.00
LABOR COST 400.00
B. LABOR
1 2 days PLUMBER 450.00 900.00
1 2 days Helper 380.00 760.00
LABOR COST 1,660.00
Approved by:
BRGY. ABACA
SOURCE OF FUND:
Approved by:
I. LABOR:
Approved by:
ELMER C. FAYLOGNA
Punong Barangay
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
PROGRAM OF WORKS AND COST ESTIMATES FOR THE REPAIR OF IRRIGATION CANAL
DAMAGED BY TYPHOON INENG AT BRGY. MALASIN
SOURCE OF FUND:
I.
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY MALASIN
B. Labor
No. No. of days Description Rate per Day Total Cost
1 3 Carpenter 450.00 1,350.00
2 3 Helper 380.00 2,280.00
3,630.00
B. Labor
No. No. of days Description Rate per Day Total Cost
1 3 Carpenter 450.00 1,350.00
1 3 Helper 380.00 1,140.00
2,490.00
Approved by:
ERNESTO TOMAS
Barangay Chairman
BARANGAY MALASIN
B. Labor
No. No. of days Description Rate per Day Total Cost
1 2 Carpenter 450.00 900.00
1 2 Helper 380.00 760.00
1,660.00
B. Labor
No. No. of days Description Rate per Day Total Cost
1 2 Carpenter 450.00 900.00
1 2 Helper 380.00 760.00
1,660.00
ERNESTO TOMAS
Barangay Chairman
BARANGAY MALASIN
I. Declogging Works
Average Output:
1.50 cu.m. / Person / Day
A. Labor
8 5 days Laborer 250.00 10,000.00
10,000.00
Approved by:
ERNESTO TOMAS
Barangay Chairman
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
BARANGAY BARUYEN
Prepared by:
Verified by:
FERDINAND MACAGANDA
Chairman, Comm. On Infra ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BRGY. UTOL
SOURCE OF FUND:
I. ROOFING WORKS
Approved by:
REMIGIO G. CASTRO
Barangay Captain
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION OF WATER SYSTEM
AT DAYCARE CENTER
SOURCE OF FUND:
I. PLUMBING WORKS:
III. LABOR:
Approved by:
REMIGIO G. CASTRO
Barangay Captain
BRGY. UTOL
PROGRAM OF WORKS AND COST ESTIMATES FOR THE INSTALLATION OF STREET LIGHTS
SOURCE OF FUND:
I. MATERIALS
4 ROLLS 3.5mm THHN. WIRE 3700
4 PCS SALACOT 1500
4 PCS 3'' G.I PIPE SCH. 40 3,245.00 12,980.00
4 PCS BULB 100.00
2 PCS RUBBER TAPE 300.00
2 PCS ELECTRIC TAPE 75.00 150.00
-
150.00
I. MASONRY WORKS
2 PCS 12mm RSB 465
2 BAGS PORTLAND CEMENT 285
2 CUBIC MIX AGGREGATES 600
II. LABOR:
Approved by:
REMIGIO G. CASTRO
Barangay Captain
Republic of the Philippines
Province of Ilocos Norte
MUNICIPALITY OF BANGUI
SOURCE OF FUND:
I. DESILTING
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
SOURCE OF FUND:
I. DESILTING
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
SOURCE OF FUND:
I.
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
BARANGAY TAGUIPORO
PROGRAM OF WORKS AND COST ESTIMATES FOR THE DREDGING OF COMPOST PIT
FOR WASTE MATERIAL AND RE-GRAVELLING OF BARANGAY ROADS
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by:
SOURCE OF FUND:
Prepared by:
ARNEL S. SAGUCIO
Municipal Engineer
Approved by: