Pressure Transducer at Pump Delivery Pipe

The document describes a scenario where a pump was initially running steadily and then the outlet valve was suddenly closed. This caused the pressure measured by a transducer at the outlet valve to spike to 2.1 bar, matching experimental results. The setup included a pump, delivery pipe, outlet valve, and pressure transducers both upstream and at the outlet valve.

Uploaded by

Abhijit Haval
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Pressure Transducer at Pump Delivery Pipe

The document describes a scenario where a pump was initially running steadily and then the outlet valve was suddenly closed. This caused the pressure measured by a transducer at the outlet valve to spike to 2.1 bar, matching experimental results. The setup included a pump, delivery pipe, outlet valve, and pressure transducers both upstream and at the outlet valve.

Uploaded by

Abhijit Haval
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Pressure transducer at

pump delivery pipe

Pump START/ TRIP


e transducer at
elivery pipe In this scenario, initially pump set to run in steady state, and then suddenly outlet valve is clos
en suddenly outlet valve is closed in fraction of a second. As its can be seen from analysis results, the pressure at outlet valve is 2.1 bar (21
e at outlet valve is 2.1 bar (21 m) due to sudden valve closure which is exactly matches with experimental results.
Year 2019
September October November
1st half 2nd half 1st half 2nd half 1st half 2nd half

Software Learning

Data Collection & study

KYPIPE Model

Stage 1 Report

Physical model & testing

Standard table for SAV

Stage 3 Report
Year 2020
December January February March April
1st half 2nd half 1st half 2nd half 1st half 2nd half 1st half 2nd half 1st half
April May
2nd half 1st half 2nd half
•Software Learning Sept to Oct 2019
•Data Collection & study Sept to Nov 2019
•KYPIPE Model Nov 2019 to Dec 2019
•Stage 1 Report Dec 2019
•Physical model & testing Jan to March 2020
•Standard table for SAV Feb to March 2020
•Stage 3 Report April to May 2020
Tank re-filling Manual valve

Pressure transducer

Water tank Inlet


pipe

Pump

Check valve
e transducer
Pressure transducer at
pump delivery pipe

Pump ON
e transducer at
elivery pipe
Valve closed
suddenly

Pressure transducer at
U/S of valve
e transducer at
alve

You might also like