0% found this document useful (0 votes)
50 views5 pages

PARKING

The document provides a breakdown of space requirements and areas for different zones in a proposed railway station development project. It includes details of parking requirements for vehicles and transport, areas for administration zones like offices and housing, infrastructure areas, and retail space requirements. It also lists the specific space requirements for departure, entrance/ticketing, administration, and arrival areas of the station with functions like waiting areas, refreshment rooms, retail shops, booking offices, parcel offices, and staff facilities.

Uploaded by

S.P. Sai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views5 pages

PARKING

The document provides a breakdown of space requirements and areas for different zones in a proposed railway station development project. It includes details of parking requirements for vehicles and transport, areas for administration zones like offices and housing, infrastructure areas, and retail space requirements. It also lists the specific space requirements for departure, entrance/ticketing, administration, and arrival areas of the station with functions like waiting areas, refreshment rooms, retail shops, booking offices, parcel offices, and staff facilities.

Uploaded by

S.P. Sai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

F.

PARKING ZONE
1 2 WHEELERS 2800
2 4 WHEELERS 1400
3 TAXI 120
4 BUS 15
5 INTERMIDIATE TRASPORT (AUTO) 385
6 NON MOTORIZED TRANSPORT 50
S.NO. REQUIREMENTS NO. AREA

PARCEL 1

ADMINISTRATION ZONE 1500 SQ.M

1 OFFICE OF DRM 1 100SQ.M


2
OFFICE OF ENGINEERS (SR. DFE
(COORDINATION), GENERAL,
COACHING,TRACTION
DISTRIBUTION,ROLLING STOCK
OPERATION, OPERATION
MANAGER) 7 75SQ.M EACH
3
OFFICES OF SIGNAL ENGINEER,
MECHANICAL ENGINEER,
COMMERCIAL ENGINEER 75SQ.M EACH
4 SUPPORT STAFF 30 100SQ.M
5 TOILETS FOR 15 CAPACITY 40SQ.M
6 WAITING LOBBY

SECURITY OFFICE COMPLEX 6000 SQ.M

1 OFFICE OF CSO/DG 100SQ.M


2 OFFICE OF JOINT OFFICERS 10 75SQ.M EACH
3 OFFICE OF DEPUTY OFFICERS 10 75SQ.M EACH
4 SUPPORT STAFF 30 75SQ.M EACH
5 SECURITY AREA FOR CCTV 150SQ.M
6 DINING AREA/ CANTEEN 150SQ.M
7 TOILETS 100 PPL 300SQ.M
8 STORAGE 100SQ.M
9 RECREATION AREA 750SQ.M

HOUSING 35150 SQ.M

1 RAILWAY EMPLOYEES 11 250SQ.M EACH


30 150SQ.M EACH
2 RPF 1 300SQ.M
10 250SQ.M EACH
10 200SQ.M
30 150SQ.M

INFRASTRUCTURE 5000 SQ.M

1 OPEN SPACES
2 ROADS
3 PLAZAS 2 1500SQ.M EACH
4 SMALL POCKETS 2 1000SQ.M EACH
RETAIL SPACES 4,75,850 SQ.M
SL.NO REQUIREMENT AREA
REQUIREMENTS (DEPARTURE AREA-50%)
Waiting Areas
unreserved 3150sq mts
reserved 1260 sq mts
Waiting Halls 129(sleeper class)
16(handicapped)
53(upper class)
Retiring Rooms for Passengers 6(small)13(large)
Dispensary
Refreshment Rooms 24
Premium Restaurants & Bar
Tourism Office, Info Counter, May I Help you
booth
Bank / ATM , Post Office Outlet
Public Toilets 5
Retail shops
REQUIREMENTS (ENTRANCE & TICKETING-15%)
30 Bookings, 5 Enquiry,10 Kiosks 6 each
Room of Chief Booking Surveyor
Cloak Room 360
Parcel Office Luggage Billing 320
Office for Head Ticket Collector
Ticket Collection

Sorting Room
REQUIREMENTS (ADMINISTRATION AREA-15%)
Railway Police Force (RPF)
General RPF Changing Room ( 100
Jawans)
MCO Office and Rest Rooms
Rest Room for Ticket Collection Officers
Rest Room for Guards and Train Drivers
Office & Storage for Railway Mail Service
Rest room for Porters
Washroom/Toilets for Staffs
Trolley Storage
Bed Rolls Store
Telegraph Office and Enquiry
Electrician’s Room
Switch Room
Break Even Equipment
Main Store & Sub Store
Battery Room
REQUIREMENTS (ARRIVAL AREA-20%)

You might also like