Payback Period Chart

This document contains a payback period chart for an unnamed project. It shows that in year 0 the project will cost $140,000, in year 1 costs will be $37,200 while benefits will be $186,000, and it charts the cumulative costs and benefits over 3 years to calculate that the payback period for the project will be between years 2 and 3 when cumulative benefits exceed cumulative costs.

Uploaded by

Randa S Jowa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

Payback Period Chart

This document contains a payback period chart for an unnamed project. It shows that in year 0 the project will cost $140,000, in year 1 costs will be $37,200 while benefits will be $186,000, and it charts the cumulative costs and benefits over 3 years to calculate that the payback period for the project will be between years 2 and 3 when cumulative benefits exceed cumulative costs.

Uploaded by

Randa S Jowa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Payback Period Chart for Project Name

Created by: Date:


Note: Enter the discounted costs and benefits for your project below.
Add and delete rows as needed.

Year Costs Benefits Cum Costs Cum Benefits


0 140,000 0 140,000 0
1 37,200 186,000 177,200 186,000
2 34,400 172,000 211,600 358,000
3 31,600 158,000 243,200 516,000

Payback
600,000

500,000

400,000
Payback
300,000
$
200,000

100,000

0
0 1 2 3

Year

cumulative costs cumulative benefits