0% found this document useful (0 votes)
133 views64 pages

PB Kandang Ayam A.N Joni Paduraksa B2 33 Kva

Uploaded by

Fajar Pradana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views64 pages

PB Kandang Ayam A.N Joni Paduraksa B2 33 Kva

Uploaded by

Fajar Pradana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 64

HARGA SATUAN

NO. MATERIAL + SIZE GOL SAT

A ALAT PENGUKUR DAN PEMBATAS


1 KWH MPB; 1P;230V;5(60)A;1;2W MDU-KD Bh
2 KWH MPB; 3P; 4W; 230/400 V; 5(80) A; Class 1 HDW Bh
3 KWH Elektronik; 1P; 2W; 230 V; 5(40) A; kls 1 (combo); register drum MDU-KD Bh
4 KWH Elektronik; 1P; 2W; 230 V; 5(100) A; kls 1 termasuk modem 3G/4G MDU-KD Bh
5 KWH Elektronik; 3P; 4W; 57.7-100V/220-400V; 5 A; kls 0.2 (meter pembanding) MDU-KD Bh
6 KWH Elektronik; 3P; 4W; 220/380V; 5(80) A; kls 1 (Pengukuran Langsung) MDU-KD Bh
7 KWH Elektronik; 3P; 4W; 57.7-100V/220-400V; 5(10) A; kls 0.5 (Pengukuran Tidak Bh
Langsung) MDU-KD
8 KWH Elektronik; 3P; 4W; 220/380V; 5(10); kls 1 (Pengukuran Tidak Langsung) MDU-KD Bh
9 Modem 3G/4G HDW Unit
10 MCB 1 Fasa 2 A MDU-KD Bh
11 MCB 1 Fasa 4 A MDU-KD Bh
12 MCB 1 Fasa 6 A MDU-KD Bh
13 MCB 1 Fasa 10 A MDU-KD Bh
14 MCB 1 Fasa 16 A MDU-KD Bh
15 MCB 1 Fasa 20 A MDU-KD Bh
16 MCB 1 Fasa 25 A MDU-KD Bh
17 MCB 1 Fasa 35 A MDU-KD Bh
18 MCB 1 Fasa 50 A MDU-KD Bh
19 MCB 3 Fasa 10 A MDU-KD Bh
20 MCB 3 Fasa 16 A MDU-KD Bh
21 MCB 3 Fasa 20 A MDU-KD Bh
22 MCB 3 Fasa 25 A MDU-KD Bh
23 MCB 3 Fasa 35 A MDU-KD Bh
24 MCCB 1 Fasa 40 A HDW Bh
25 MCCB 1 Fasa 63 A HDW Bh
26 MCCB 1 Fasa 80 A HDW Bh
27 MCCB 1 Fasa 100 A HDW Bh
28 CT TR ; Burden 5 VA; 50/5 A - 300/5 A Class 0.5s HDW Bh
29 CT TR ; Burden 5 VA; 100/5 A Class 0.5s HDW Bh
30 CT TM Indoor Tipe Blok 10/5-5A MDU-KD Bh
31 CT TM Indoor Tipe Blok 15/5-5A MDU-KD Bh
32 CT TM Indoor Tipe Blok 20/5-5A MDU-KD Bh
33 CT TM Indoor Tipe Blok 30/5-5A MDU-KD Bh
34 CT TM Indoor Tipe Blok 40/5-5A MDU-KD Bh
35 CT TM Indoor Tipe Blok 50/5-5A MDU-KD Bh
36 CT TM Indoor Tipe Blok 60/5-5A MDU-KD Bh
37 CT TM Indoor Tipe Blok 75/5-5A MDU-KD Bh
38 CT TM Indoor Tipe Blok 80/5-5A MDU-KD Bh
39 CT TM Indoor Tipe Blok 100/5-5A MDU-KD Bh
40 CT TM Indoor Tipe Blok 150/5-5A MDU-KD Bh
41 CT TM Indoor Tipe Blok 200/5-5A MDU-KD Bh
42 CT TM Indoor Tipe Blok 250/5-5A MDU-KD Bh
43 CT TM Indoor Tipe Blok 300/5-5A MDU-KD Bh
44 CT TM Indoor Tipe Blok 400/5-5A MDU-KD Bh
45 CT TM Indoor Tipe Blok 500/5-5A MDU-KD Bh
46 CT TM Indoor Tipe Blok 600/5-5A MDU-KD Bh
47 CT TM Indoor Tipe Blok 750/5-5A MDU-KD Bh
48 CT TM Indoor Tipe Blok 800/5-5A MDU-KD Bh
49 CT TM Indoor Tipe Blok 1000/5-5A MDU-KD Bh
50 CT TM Indoor Tipe Ring 50/5-5A MDU-KD Bh
51 CT TM Indoor Tipe Ring 100/5-5A MDU-KD Bh
52 CT TM Outdoor (Burden 30 VA) 10/5 MDU-KD Bh
53 CT TM Outdoor (Burden 30 VA) 15/5 MDU-KD Bh
54 CT TM Outdoor (Burden 30 VA) 20/5 MDU-KD Bh
55 CT TM Outdoor (Burden 30 VA) 25/5 MDU-KD Bh
56 CT TM Outdoor (Burden 30 VA) 30/5 MDU-KD Bh
57 CT TM Outdoor (Burden 30 VA) 40/5 MDU-KD Bh
58 CT TM Outdoor (Burden 30 VA) 50/5 MDU-KD Bh
59 CT TM Outdoor (Burden 30 VA) 60/5 MDU-KD Bh
60 CT TM Outdoor (Burden 30 VA) 75/5 MDU-KD Bh
61 CT TM Outdoor (Burden 30 VA) 80/5 MDU-KD Bh
62 CT TM Outdoor (Burden 30 VA) 100/5 MDU-KD Bh
63 CT TM Outdoor (Burden 30 VA) 150/5 MDU-KD Bh
64 CT TM Outdoor (Burden 30 VA) 200/5 MDU-KD Bh
65 CT TM Outdoor (Burden 30 VA) 250/5 MDU-KD Bh
66 CT TM Outdoor (Burden 30 VA) 300/5 MDU-KD Bh
67 CT TM Outdoor (Burden 30 VA) 400/5 MDU-KD Bh
68 PT Indoor (ratio 20.000/v3 : 100/v3) Class 0.2s MDU-KD Bh
69 PT Outdoor (ratio 20.000/v3 : 100/v3) Class 0.2s MDU-KD Bh

B KOTAK APP
1 Smart Box Langsung Daya 3.9 kVA MCCB 6 A MDU-KD Unit
2 Smart Box Langsung Daya 6.6 kVA MCCB 10 A MDU-KD Unit
3 Smart Box Langsung Daya 10.6 kVA MCCB 16 A MDU-KD Unit

*) Harga KHS 2005 1


4 Smart Box Langsung Daya 13.2 kVA MCCB 20 A MDU-KD Unit
5 Smart Box Langsung Daya 16.5 kVA MCCB 25 A MDU-KD Unit
6 Smart Box Langsung Daya 23 kVA MCCB 35 A MDU-KD Unit
7 Smart Box Langsung Daya 33 kVA MCCB 50 A MDU-KD Unit
8 Smart Box Langsung Daya 41.5 kVA MCCB 63 A MDU-KD Unit
9 Smart Box Tidak Langsung Daya 53 kVA MCCB 80 A MDU-KD Unit
10 Smart Box Tidak Langsung Daya 66 kVA MCCB 100 A MDU-KD Unit
11 Smart Box Tidak Langsung Daya 82.5 kVA MCCB 125 A MDU-KD Unit
12 Smart Box Tidak Langsung Daya 105 kVA MCCB 160 A MDU-KD Unit
13 Smart Box Tidak Langsung Daya 131 kVA MCCB 200 A MDU-KD Unit
14 Smart Box Tidak Langsung Daya 147 kVA MCCB 225 A MDU-KD Unit
15 Smart Box Tidak Langsung Daya 164 kVA MCCB 250 A MDU-KD Unit
16 Smart Box Tidak Langsung Daya 197 kVA MCCB 300 A MDU-KD Unit
17 Smart Box Tidak Langsung Daya TM MDU-KD Unit
18 Kotak APP 1 Fasa OA KAS I HDW Set
19 Kotak APP 3 Fasa OA KAS III HDW Set
20 Kotak APP Type I Lipat,lengkap HDW Bh
21 Kotak APP Type III Lipat,lengkap HDW Bh
22 Kotak APP TR Type IV Tanpa Topi,lengkap HDW Bh
23 Kotak APP TR Type I A Single Tarif, lengkap HDW Bh
24 Kotak APP TR Double Tarif, lengkap HDW Bh
25 Kotak APP TM , lengkap HDW Bh

C LBS & KUBIKEL PELANGGAN


1 LBS Pelanggan TM HDW Unit
2 Air Insulated LBS Manual;24KV;630A;Min-16KA MDU-KD Cell
3 Air Insulated LBS Motorized;24KV;630A;Min-16KA MDU-KD Cell
4 Air Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA MDU-KD Cell
5 Fully Gas Insulated LBS Motorized;24KV;630A;Min-16KA MDU-KD Cell
6 Fully Gas Insulated CBOG Motorized+Metering;20KV;630A;Min-16KA MDU-KD Cell
7 Fully Gas Insulated LBS Manual;24KV;630A;Min-16KA MDU-KD Cell

D KUBIKEL GARDU INDUK


1 Metaclad;Outgoing;20kV;630A;25kA - GI MDU-KD Cell
2 Metaclad;Couple;20kV;2000A;25kA - GI MDU-KD Cell
3 Kubikel Interface 20 kV HDW Cell
4 Power Meter Digital HDW Unit
5 Rele Proteksi OC/EF HDW Set

E TRAFO DISTRIBUSI
1 Trafo 1 Fasa CSP 50 kVA MDU-KD Bh
2 Trafo 3 phasa 50 kVA YNyn0 MDU-KD Bh
3 Trafo 3 phasa 100 kVA YNyn0 MDU-KD Bh
4 Trafo 3 phasa 160 kVA YNyn0 MDU-KD Bh
5 Trafo 3 phasa 200 kVA YNyn0 MDU-KD Bh
6 Trafo 3 phasa 50 kVA Yzn5 MDU-KD Bh
7 Trafo 3 phasa 100 kVA Yzn5 MDU-KD Bh
8 Trafo 3 phasa 160 kVA Yzn5 MDU-KD Bh
9 Trafo 3 phasa 200 kVA Dyn5 MDU-KD Bh
10 LVCB 2 Jurusan 250 A MCCB MDU-KD Bh
11 LVCB 2 Jurusan 250 A LBS MDU-KD Bh
12 LVCB 2 Jurusan 400 A LBS MDU-KD Bh
13 LVCB 4 Jurusan 400 A LBS MDU-KD Bh

F PEMBATAS
1 FCO Polymer MDU-KD Bh
2 Fuse Link 2 A HDW Bh
3 Fuse Link 3 A HDW Bh
4 Fuse Link 4 A HDW Bh
5 Fuse Link 6 A HDW Bh
6 Fuse Link 8 A HDW Bh
7 Fuse Link 10 A HDW Bh
8 Fuse Link 12 A HDW Bh
9 Fuse Link 15 A HDW Bh
10 Fuse Link 20 A HDW Bh
11 Fuse Link 25 A HDW Bh
12 Fuse Link 30 A HDW Bh
13 Fuse Link 50 A HDW Bh
14 Fuse Link 60 A HDW Bh
18 NT Fuse 63 - 100 A Size 00, 25 - 160 A HDW Bh
19 NT Fuse 63 - 100 A Size 0, 50 - 160 A HDW Bh
20 NT Fuse 63 A Size 0 HDW Bh
21 NT Fuse 80 A Size 0 HDW Bh
22 NT Fuse 100 A Size 0 HDW Bh
23 NT Fuse 63 - 100 A Size 1, 63 - 250 A HDW Bh
24 NT Fuse 63 - 100 A Size 2, 250 - 400 A HDW Bh
25 NT Fuse 63 - 100 A Size 3, 425 - 630 A HDW Bh
26 NT Fuse 63 - 100 A Size 4, 800 - 1250 A HDW Bh
27 NH Fuse Holder Size 00, 25 - 160 A HDW Bh
28 NH Fuse Holder Size 0, 50 - 160 A HDW Bh
29 NH Fuse Holder Size 1, 63 - 250 A HDW Bh
30 NH Fuse Holder Size 2, 250 - 400 A HDW Bh
31 NH Fuse Holder Size 3, 425 - 630 A HDW Bh

*) Harga KHS 2005 2


32 NH Fuse Holder Size 4, 800 - 1250 A HDW Bh
33 NH Fuse Puller Size 00-4 HDW Bh

G SWITCH
1 ABSW 20 KV HDW Set
2 Load Break Switch MDU-KD Set
3 Recloser MDU-KD Set
4 Disconnecting Switch 20 KV HDW Set

H LIGHTNING ARESTER
1 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh
2 Lightning Arester (Polymer) 24 KV, 10 KA MDU-KD Bh
3 Disconnector Lightning Arester 5 KA HDW Bh
4 Disconnector Lightning Arester 10 KA HDW Bh
5 Multi Chamber Arrester HDW Bh

I KAPASITOR
1 Capasitor 3 x 300 KVAR komplit dengan kontrol HDW Set
2 Micro Capasitor Controller HDW Bh
3 Current Sensor HDW Bh

J TIANG BETON
1 Tiang Beton 9M-200 daN+E MDU-KD Btg
2 Tiang Beton 11M-200 daN+E MDU-KD Btg
3 Tiang Beton 12M-200 daN+E MDU-KD Btg
4 Tiang Beton 12M-350 daN+E MDU-KD Btg
5 Tiang Beton 13M-350 daN+E MDU-KD Btg
6 Tiang Beton 13M-500 daN+E MDU-KD Btg
7 Tiang Beton 14M-350 daN+E MDU-KD Btg
8 Tiang Beton 14M-500 daN+E MDU-KD Btg
9 Penomoran Tiang JASA Btg
10 Penghalang Panjat dan Papan Peringatan HDW Set

K ISOLATOR
1 Isolator Tumpu ( Line Post ) 20 KV MDU-KD Bh
2 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh
3 Isolator Tumpu ( Line Post ) 20 KV Polymer MDU-KD Bh
4 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 70-150 mm² MDU-KD Set
5 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp 150-240 mm² MDU-KD Set
6 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 70-150 mm² MDU-KD Set
7 Isolator Tarik ( Polymer ) 20 KV + Primary Dead End Clamp 150-240 mm² MDU-KD Set

L PENGHANTAR KAWAT
1 AAAC 70 mm² MDU-KD Mtr
2 AAAC 150 mm² MDU-KD Mtr
3 AAAC 240 mm² MDU-KD Mtr
4 AAAC/S 70 mm² MDU-KD Mtr
5 AAAC/S 150 mm² MDU-KD Mtr
6 AAAC/S 240 mm² MDU-KD Mtr

M PENGHANTAR KABEL
1 NFA2X-T 2 x 70 + N 50 mm² MDU-KD Mtr
2 NFA2X-T 3 x 35 + N 25 mm² MDU-KD Mtr
3 NFA2X-T 3 x 70 + N 50 mm² MDU-KD Mtr
4 NFA2X 2 x 10 mm² MDU-KD Mtr
5 NFA2X 2 x 16 mm² MDU-KD Mtr
6 NFA2X 2 x 25 mm² HDW Mtr
7 NFA2X 4 x 10 mm² HDW Mtr
8 NFA2X 4 x 16 mm² MDU-KD Mtr
9 NFA2X 4 x 25 mm² HDW Mtr
10 NFA2X 4 x 70 mm² MDU-KD Mtr
11 Kabel NYFGBY 4 x 16 mm² HDW Mtr
12 Kabel NYFGBY 4 x 70 mm² HDW Mtr
13 Kabel NYFGBY 4 x 95 mm² HDW Mtr
14 Kabel NYFGBY 4 x 150 mm² HDW Mtr
15 Kabel NYY 1 x 70 mm² MDU-KD Mtr
16 Kabel NYY 1 x 95 mm² MDU-KD Mtr
17 Kabel NYY 1 x 150 mm² MDU-KD Mtr
18 Kabel NYY 1 x 240 mm² MDU-KD Mtr
19 Kabel NYY 4 x 25 mm² HDW Mtr
20 Kabel NYY 4 x 35 mm² HDW Mtr
21 Kabel NYY 4 x 70 mm² MDU-KD Mtr
22 Kabel NYY 4 x 95 mm² HDW Mtr
23 Kabel NA2XSY 20 KV, 1 x 70 mm² HDW Mtr
24 Kabel NA2XSY 20 KV, 1 x 150 mm² HDW Mtr
25 Kabel NA2XSY 20 KV, 1 x 240 mm² HDW Mtr
26 Kabel NA2XSY 20 KV, 1 x 300 mm² HDW Mtr
27 Kabel NA2XS2Y 20 KV, 1 x 70 mm² HDW Mtr
28 Kabel NA2XS2Y 20 KV, 1 x 150 mm² HDW Mtr
29 Kabel NA2XS2Y 20 KV, 1 x 240 mm² HDW Mtr
30 Kabel NA2XS2Y 20 KV, 1 x 300 mm² HDW Mtr
31 Kabel NA2XSEYBY 20 KV, 3 x 150 mm² MDU-KD Mtr
32 Kabel NA2XSEYBY 20 KV, 3 x 240 mm² MDU-KD Mtr

*) Harga KHS 2005 3


33 Kabel NA2XSEYBY 20 KV, 3 x 300 mm² MDU-KD Mtr
34 Kabel NYA Fleksibel 2.5 mm² HDW Mtr
35 Kabel NYA Fleksibel 4 mm² HDW Mtr
36 Kabel NYA Fleksibel 6 mm² HDW Mtr
37 Kabel NYA Fleksibel 10 mm² HDW Mtr
38 Kabel NYA Fleksibel 16 mm² HDW Mtr
39 Kabel NYM 2 x 2.5 mm² HDW Mtr
40 Kabel NYM 3 x 2.5 mm² HDW Mtr
41 Kabel NYM 2 x 4 mm² HDW Mtr
42 Kabel NYM 3 x 4 mm² HDW Mtr
43 MVTIC 3 x 150 + N 95 mm² MDU-KD Mtr
44 MVTIC 3 x 240 + N 95 mm² MDU-KD Mtr

N SEPATU KABEL
1 Sepatu Kabel AL/CU Ring-35 mm² HDW Bh
2 Sepatu Kabel AL/CU Ring-50 mm² HDW Bh
3 Sepatu Kabel AL/CU Ring-70 mm² HDW Bh
4 Sepatu Kabel AL/CU Ring-95 mm² HDW Bh
5 Sepatu Kabel AL/CU Ring-120 mm² HDW Bh
6 Sepatu Kabel AL/CU Ring-150 mm² HDW Bh
7 Sepatu Kabel AL/CU Ring-185 mm² HDW Bh
8 Sepatu Kabel AL/CU Ring-240 mm² HDW Bh
9 Sepatu Kabel AL/CU Ring-300 mm² HDW Bh
10 Sepatu Kabel AL/CU Kepala-35 mm² HDW Bh
11 Sepatu Kabel AL/CU Kepala-50 mm² HDW Bh
12 Sepatu Kabel AL/CU Kepala-70 mm² HDW Bh
13 Sepatu Kabel AL/CU Kepala-95 mm² HDW Bh
14 Sepatu Kabel AL/CU Kepala-120 mm² HDW Bh
15 Sepatu Kabel AL/CU Kepala-150 mm² HDW Bh
16 Sepatu Kabel AL/CU Kepala-185 mm² HDW Bh
17 Sepatu Kabel AL/CU Kepala-240 mm² HDW Bh
18 Sepatu Kabel AL/CU 2 Lubang 150 mm² HDW Bh
19 Sepatu Kabel AL/CU 2 Lubang 240 mm² HDW Bh
20 Sepatu Kabel AL/AL-25 mm² HDW Bh
21 Sepatu Kabel AL/AL-35 mm² HDW Bh
22 Sepatu Kabel AL/AL-50 mm² HDW Bh
23 Sepatu Kabel AL/AL-70 mm² HDW Bh
24 Sepatu Kabel AL/AL-95 mm² HDW Bh
25 Sepatu Kabel AL/AL-120 mm² HDW Bh
26 Sepatu Kabel AL/AL-150 mm² HDW Bh
27 Sepatu Kabel AL/AL-185 mm² HDW Bh
28 Sepatu Kabel AL/AL-240 mm² HDW Bh
29 Sepatu Kabel CU/CU-25 mm² HDW Bh
30 Sepatu Kabel CU/CU-35 mm² HDW Bh
31 Sepatu Kabel CU/CU-50 mm² HDW Bh
32 Sepatu Kabel CU/CU-70 mm² HDW Bh
33 Sepatu Kabel CU/CU-95 mm² HDW Bh
34 Sepatu Kabel CU/CU-120 mm² HDW Bh
35 Sepatu Kabel CU/CU-150 mm² HDW Bh
36 Sepatu Kabel CU/CU-240 mm² HDW Bh

O AKSESORIES APP
1 Kawat Segel HDW Roll
2 Timah Segel HDW Kg
3 Segel Plastik Tekan HDW Bh
4 Service Wedge Clamp 1 Fasa 6, 10, 16 mm² HDW Set
5 Service Wedge Clamp 3 Fasa 6, 10, 16, 25 mm² HDW Set
6 Strain Hook Clamp 1 ½" HDW Set
7 Strain Hook Ekor Babi HDW Set
8 Loden Manset 0.8 Kg HDW Bh
9 Protective Cup 1 ½" HDW Set
10 Protective Cup Plastik 1 ½" HDW Set
11 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² HDW Set
12 Tap Connector Kedap Air ( 35-70 / 35-70 ) mm² HDW Set
13 Tap Connector Kedap Air ( 6-25 / 35-70 ) mm² HDW Set
14 Tap Connector Berbadan Logam ( 6-25 / 6-25 ) mm² HDW Set
15 Tap Connector Berbadan Logam ( 35-70 / 35-70 ) mm² HDW Set
16 Tap Connector Berbadan Logam ( 6-25 / 35-70 ) mm² HDW Set
17 Connector Bimetal 16-6 mm² HDW Set
18 Connector Bimetal 16-10 mm² HDW Set
19 Connector Bimetal 16-16 mm² HDW Set
20 Connector Bimetal 50-50 mm² HDW Set
21 Connector Bimetal 70-35 mm² HDW Set
22 Connector Bimetal 50-70 mm² HDW Set
23 Connector Bimetal 70-70 mm² HDW Set
24 Connector Bimetal 95-70 mm² HDW Set
25 Connector Bimetal 70-50 mm² HDW Set
26 Connector Bimetal 70-95 mm² HDW Set
27 Connector Bimetal 120-70 mm² HDW Set
28 Connector Bimetal 70-120 mm² HDW Set
29 Connector Bimetal 120-120 mm² HDW Set
30 Pole Bracket Three Way 3"-4" HDW Set
31 Pole Bracket Three Way 8"-9" HDW Set

*) Harga KHS 2005 4


32 Pole Bracket Two Way 6"-7" HDW Set
33 Pole Bracket Two Way 8"-9" HDW Set
34 Pole Attachment Fitting / L bracket HDW Set
35 Fixing Collar HDW Set
36 Bimetalic Connector AL/AL 70-70 mm² HDW Set
37 Klem Bugel untuk tiang atap 1 ½" HDW Set
38 Gas Pipe 1 ½" x 6 Meter HDW Btg
39 Gas Pipe 1 ½" x 1.5 Meter HDW Btg

P AKSESORIES TM
1 Armour Rod # for 35 mm² HDW Set
2 Armour Rod # for 50 mm² HDW Set
3 Armour Rod # for 70 mm² HDW Set
4 Armour Rod # for 150 mm² HDW Set
5 Armour Rod # for 240 mm² HDW Set
6 Armour Tape ¼" wide HDW Mtr
7 Bimetalic Connector 35 - 240 mm² HDW Bh
8 Ball Clevis Socket Eyes HDW Bh
9 Bolt Double Arming ⅝ " x 16 - 24" HDW Bh
10 Bolt Double Arming ⅝" x 10" HDW Bh
11 Bolt Double Arming ⅝" x 12" HDW Bh
12 Bolt Double Arming ⅝" x 14" HDW Bh
13 Bolt Double Up Side ⅝" x (14 - 22") HDW Bh
14 Bolt Double Up Side ⅝" x 10" HDW Bh
15 Bolt Double Up Side ⅝" x 12" HDW Bh
16 Bolt Double Up Side ⅝" x 9" HDW Bh
17 Bolt Double Up Side ⅝" x 8" HDW Bh
18 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh
19 Bolt Machine ⅝" x (14 - 22") HDW Bh
20 Bolt Machine ⅝" x 10" HDW Bh
21 Bolt Machine ⅝" x 12" HDW Bh
22 Bolt Machine ⅝" x 8" HDW Bh
23 Bolt Machine ⅝" x 9" HDW Bh
24 Bolt Single Up Side ⅝" x 10" HDW Bh
25 Bolt Single Up Side ⅝" x 12" HDW Bh
26 Bolt Single Up Side ⅝" x 8" HDW Bh
27 Bolt Single Up Side ⅝" x 9" HDW Bh
28 Brace Steel 550 mm HDW Bh
29 Brace Steel 770 mm HDW Bh
30 Brace Steel 1.262 mm HDW Bh
31 Bracket Extension for cut out HDW Bh
32 Bracket Secondary / Bracket insulated HDW Bh
33 Bracket band segment,vertikal plat ( Hot dip galvanis ) HDW Bh
34 Bracket Transformer cluster and adapter HDW Bh
35 Center Bracket 6 KN HDW Bh
36 Center Bracket 12.5 KN HDW Bh
37 Clevis Swinging Secondary HDW Bh
38 Compresion Conector H type 150 mm² / 240 mm² HDW Bh
39 Compresion Conector H type 240 mm² / 240 mm² HDW Bh
40 Compresion Conector H type 50 mm² / 70 mm² HDW Bh
42 Compresion Conector H type 70 mm² / 70 mm² HDW Bh
41 Compresion Conector H type 70 mm² / 150 mm² HDW Bh
42 Compresion Conector H type 70 mm² / 240 mm² HDW Bh
43 Compresion Terminal Lug 35 mm² HDW Bh
44 Compresion Terminal Lug 50 mm² HDW Bh
45 Compresion Terminal Lug 70 mm² HDW Bh
46 Compresion Terminal Lug 150 mm² HDW Bh
47 Compresion Terminal Lug 240 mm² HDW Bh
48 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis HDW Bh
49 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh
50 Cross Arm Steel 3.000 mm ( UNSP 10 ) galvanis HDW Bh
51 Cross Arm Clevis HDW Bh
52 Dead End Assembly HDW Bh
53 Expanding Anchor 8.000 lbs HDW Bh
54 Expanding Anchor 10.000 lbs HDW Bh
55 Fixed Dead Assembly 25-35 mm² HDW Bh
56 Fixed Dead Assembly 50-70 mm² HDW Bh
57 Adjustable Dead End Assembly 25-35 mm² HDW Bh
58 Adjustable Dead End Assembly 50-70 mm² HDW Bh
59 Blundle protection Set 35-70 mm² HDW Bh
60 Compression Joint LVTC+ Heat Shrink 35 HDW Bh
61 Compression Joint LVTC+ Heat Shrink 50 HDW Bh
62 Compression Joint LVTC+ Heat Shrink 70 HDW Bh
63 Compression Joint LVTC+ Heat Shrink 150 HDW Bh
64 Compression Joint LVTC+ Heat Shrink 240 HDW Bh
65 Frefomed guy wire 22 mm² HDW Mtr
66 Frefomed guy wire 35 mm² HDW Mtr
67 Frefomed guy wire 70 mm² HDW Mtr
68 Ground rod & Washer HDW Bh
69 Ground rod ⅝" x 8" Copper Weld HDW Bh
70 Ground rod ⅝" x 8" Galvanis HDW Bh
71 Ground wire Cu 16 mm² HDW Mtr
72 Ground wire Cu 25 mm² HDW Mtr

*) Harga KHS 2005 5


73 Ground wire Cu 50 mm² HDW Mtr
74 Clamp Ground Rod ⅝" HDW Bh
75 Grounding Iron Plate Form Plat / Eart safety mats HDW Bh
76 Guy Attachment / Guy hok HDW Bh
77 Guy Wire 22 mm² HDW Mtr
78 Guy Wire 35 mm² HDW Mtr
79 Guy Wire 70 mm² HDW Mtr
80 Hot Line Clamp ( 35mm² s/d 70 mm² ) HDW Bh
81 Hot Line Clamp ( 150mm² s/d 240 mm² ) HDW Bh
82 Insulating Tape HDW Bh
83 Joint sleeve 35 mm² HDW Bh
84 Joint sleeve 50 mm² HDW Bh
85 Joint sleeve 70 mm² HDW Bh
86 Joint sleeve 150 mm² HDW Bh
87 Joint sleeve 240 mm² HDW Bh
88 Kawat Bendrad 6 mm² HDW Mtr
89 Kawat Las HDW Bh
90 Kousen HDW Bh
91 Large Angle Assembly 25-35 mm² HDW Bh
92 Large Angle Assembly 50-70 mm² HDW Bh
93 Lock Nut ⅝" HDW Bh
94 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh
95 Live Line Connector 240 mm² HDW Bh
96 Live Line Connector 150 mm² HDW Bh
97 Live Line Connector 70 mm² HDW Bh
98 Nut Timble eye ⅝" HDW Bh
99 Oval Eye Bolt ⅝" x 8" HDW Bh
100 Oval Eye Bolt ⅝" x 9" HDW Bh
101 Oval Eye Bolt ⅝" x ( 14" s/d 22" ) HDW Bh
102 Oval Eye Bolt ⅝" x 10" HDW Bh
103 Oval Eye Bolt ⅝" x 12" HDW Bh
104 Oval Eye Nut ⅝" HDW Bh
105 Parallel group clamp AL/AL 25-70 mm² HDW Bh
106 Parallel group clamp AL/AL 70-150 mm² HDW Bh
107 Parallel group clamp AL/AL 150-240 mm² HDW Bh
108 Pin adapter Insulator HDW Bh
109 Pipa Pralon 2 ½" HDW Bh
110 Pipa Pralon 3" HDW Bh
111 Knee Pipe 2 ½" HDW Bh
112 Knee Pipe 3" HDW Bh
113 Spiral Pralon 2 ½" HDW Bh
114 Spiral Pralon 3" HDW Bh
115 Pipe Cap Galvanis 2 ½" HDW Bh
116 Pipe Galvanis 2" 6' HDW Bh
117 Plastic Strap for Clamping HDW Bh
118 Plat Besi 4 mm x 4 cm x 8 cm HDW Bh
119 Pole Band Double Rack 3" atau 3 ½" HDW Bh
120 Pole Band Double Rack 4" atau 4 ½" HDW Bh
121 Pole Band Double Rack 5" atau 5 ½" HDW Bh
122 Pole Band Double Rack 6" atau 6 ½" HDW Bh
123 Pole Band Double Rack 7" atau 7 ½" HDW Bh
124 Pole Band Double Rack 8" atau 8 ½" HDW Bh
125 Pole Band Double Rack 9" atau 12" HDW Bh
126 Pole Band Double Up Side 3" atau 3 ½" HDW Bh
127 Pole Band Double Up Side 4" atau 4 ½" HDW Bh
128 Pole Band Double Up Side 5" atau 5 ½" HDW Bh
129 Pole Band Double Up Side 6" atau 6 ½" HDW Bh
130 Pole Band Double Up Side 7" atau 7 ½" HDW Bh
131 Pole Band Double Up Side 8" atau 8 ½" HDW Bh
132 Pole Band Double Up Side 9" atau 12" HDW Bh
133 Pole Band Single Rack 3" atau 3 ½" HDW Bh
134 Pole Band Single Rack 4" atau 4 ½" HDW Bh
135 Pole Band Single Rack 5" atau 5 ½" HDW Bh
136 Pole Band Single Rack 6" atau 6 ½" HDW Bh
137 Pole Band Single Rack 7" atau 7 ½" HDW Bh
138 Pole Band Single Rack 8" atau 8 ½" HDW Bh
139 Pole Band Single Rack 9" atau 12" HDW Bh
140 Pole Band Single Up Side 3" atau 3 ½" HDW Bh
141 Pole Band Single Up Side 4" atau 4 ½" HDW Bh
142 Pole Band Single Up Side 5" atau 5 ½" HDW Bh
143 Pole Band Single Up Side 6" atau 6 ½" HDW Bh
144 Pole Band Single Up Side 7" atau 7 ½" HDW Bh
145 Pole Band Single Up Side 8" atau 8 ½" HDW Bh
146 Pole Band Single Up Side 9" atau 12" HDW Bh
147 Primary Angle Clamp ( 35 s/d 70 ) mm² HDW Bh
148 Primary Angle Clamp ( 150 s/d 240 ) mm² HDW Bh
149 Primary Dead End Clamp ( 35 s/d 70 ) mm² HDW Bh
150 Primary Dead End Clamp ( 70 s/d 150 ) mm² HDW Bh
151 Primary Dead End Clamp ( 150 s/d 240 ) mm² HDW Bh
152 Rod Anchor ¾" x 8' HDW Bh
153 Rod Anchor ⅝" x 7' HDW Bh
154 Schackle Anchor ⅝" HDW Bh
155 Side Bracket HDW Bh

*) Harga KHS 2005 6


156 Split Plastic Sleve ( Tutup Kabel ) HDW Bh
157 Spool Insulator ANSI 53 - 2 HDW Bh
158 Spool Insulator ANSI 53 - 4 HDW Bh
159 Stainless Steel Strap 20 x 0.7 mm HDW Mtr
160 Steel L 70 x 70 x 7 x 780 mm galvanis HDW Bh
161 Steel L 70 x 70 x 7 x 1.000 mm galvanis HDW Bh
162 Steel L 70 x 70 x 7 x 1.250 mm galvanis HDW Bh
163 Steel L 70 x 70 x 7 x 1.682 mm galvanis HDW Bh
164 Steel L 70 x 70 x 7 x 3.000 mm galvanis HDW Bh
165 Steel Channel C NP 8 x 1.750 HDW Bh
166 Steel Channel C NP 8 x 1.250 HDW Bh
167 Steel Channel C NP 8 x 1.390 HDW Bh
168 Stopping Buckle / Yokes HDW Bh
169 Strain Clamp A3C, ACSR 25-70 mm² HDW Bh
170 Strain Clamp A3C, ACSR 70-150 mm² HDW Bh
171 Strain Clamp A3C, ACSR 150-240 mm² HDW Bh
172 Strain Clamp A3C, ACSR 240-400 mm² HDW Bh
173 Suspension / Small Angle Assembly HDW Bh
174 Suspension Clamp AL HDW Bh
175 Suspension Clamp Plastic HDW Bh
176 Suspension Clamp Bracket / Pole Bracket HDW Bh
177 Strain Clamp Wedge 25-70 mm² HDW Bh
178 Strain Clamp Wedge 70-150 mm² HDW Bh
179 Tap connector ( 35 s/d 70 ) mm² HDW Bh
180 Tap connector ( 35 s/d 150 ) mm² HDW Bh
181 Tap connector ( 70 s/d 150 ) mm² HDW Bh
182 Tap connector ( 70 s/d 240 ) mm² HDW Bh
183 Tension Bracket HDW Bh
184 Link HDW Bh
185 Plastic Strap / Cable Ties HDW Bh
186 Three Bolt Clamp HDW Bh
187 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr
188 U Bolt Connector HDW Bh
189 Washer Round ⅜" HDW Bh
190 Washer Square 2 ¼" HDW Bh

Q AKSESORIES KABEL TANAH


1 Terminating kabel 1 x 70 mm² ID HDW Set
2 Terminating kabel 1 x 70 mm² OD HDW Set
3 Terminating kabel 1 x 95 mm² ID HDW Set
4 Terminating kabel 1 x 95 mm² OD HDW Set
5 Terminating kabel 1 x 240 mm² ID HDW Set
6 Terminating kabel 1 x 240 mm² OD HDW Set
7 Terminating kabel 1 x 300 mm² ID HDW Set
8 Terminating kabel 1 x 300 mm² OD HDW Set
9 Terminating kabel 3 x 70 mm² ID HDW Set
10 Terminating kabel 3 x 70 mm² OD HDW Set
11 Terminating kabel 3 x 95 mm² ID HDW Set
12 Terminating kabel 3 x 95 mm² OD HDW Set
13 Terminating kabel 3 x 150 mm² ID HDW Set
14 Terminating kabel 3 x 150 mm² OD HDW Set
15 Terminating kabel 3 x 240 mm² ID HDW Set
16 Terminating kabel 3 x 240 mm² OD HDW Set
17 Terminating kabel 3 x 300 mm² ID HDW Set
18 Terminating kabel 3 x 300 mm² OD HDW Set
19 Jointing Raychem 24 KV 3 x 300 mm² (Armoured) OD HDW Set
20 Jointing Raychem 24 kV 3 x 300 mm² (Unarmoured) ID HDW Set
21 Jointing Raychem 24 kV 3 x 240 mm² (Armoured) OD HDW Set
22 Jointing Raychem 24 kV 3 x 240 mm² (Unarmoured) ID HDW Set
23 Jointing Raychem 24 kV 3 x 95 mm² (Armoured) OD HDW Set
24 Jointing Raychem 24 kV 3 x 95 mm² (Unarmoured) ID HDW Set
25 Suplement kit XLPE-PILC 3 x 150-240 mm² HDW Set
26 Suplement kit XLPE-PILC 3 x 300-400 mm² HDW Set
27 Suplement kit XLPE-PILC 3 x 150-240 mm² (IJKA) HDW Set
28 Klem beugel bevesteging 8 x 6" HDW Bh
29 Klem beugel ⅞" HDW Bh
30 Pipa PVC ½" HDW Bh
31 Pipa PVC ¾" panjang 4 meter HDW Bh
32 Pipa PVC 3" panjang 4 meter HDW Bh
33 Pipa PVC 6" panjang 4 meter HDW Bh
34 Pipa Besi Galvanis 3" Tebal 4 mm Panjang 6 Meter HDW Bh
35 Pipa shock PVC HDW Bh
36 Tanda urutan Fasa untuk kabel HDW Bh
37 Stainless steel strap HDW Bh
38 Tanda Kabel TM HDW Bh

R MATERIAL SCADA DAN TELEKOMUNIKASI


1 Antena 9 dBi HDW Bh
2 Battery 12 V/120 Ah HDW Bh
3 Battery 12 V/17 Ah HDW Bh
4 Battery 12 V/12 Ah HDW Bh
5 Battery 12 V/ 7 Ah HDW Bh
6 Kabel komunikasi RS485 HDW Unit

*) Harga KHS 2005 7


7 Converter RS 485 to RS 232 HDW Bh

S SKUTM / SKTM
1 Strap For Clamping, Type Insulator HDW Bh
2 Suspension Clamp HDW Bh
3 U-Bolt HDW Bh
4 Fixation Device HDW Bh
5 Yoke HDW Bh
6 Shackle HDW Bh
7 Parralel Groove Clamp HDW Bh
8 Strain Clamp Bolted Type HDW Bh
9 Turn Buckle HDW Bh
10 Strain Hinge HDW Bh
11 H Type Connector 50/50 mm² Cu HDW Bh
12 Cooper Strip 50 mm² Insulated Ground Colour HDW Mtr
13 PVC Pipe 150 mm² HDW Mtr
14 Protective Plastic HDW Bh
15 Link 50 x 25 mm HDW Bh
16 Strapping Buckle HDW Bh
17 Stainless Steel Strap 20mm x 0.7 mm HDW Mtr
18 Terminal Lug For 50 mm² CU Conductor HDW Bh
19 Stainless Steel Bolt 12 x 45 HDW Bh
20 Set Of Cable Terminator For 3x150aac+90 st HDW Bh
21 Terminal Lug For 150 mm² CU conductor HDW Bh
22 H Type Connector HDW Bh
23 Three Pole Outdoor Terminator For 3x240 mm² AL XLPE U/G CABLE HDW Bh
24 Support Assembly For TIC Terminator HDW Bh
25 Single Support On Single Pole 2000mm HDW Bh

T PEMBUATAN SALURAN KABEL GI


a PEMBUATAN SALURAN KABEL Outdoor
1 Persiapan Pekerjaan JASA ls
2 Pemasangan Bouwplank JASA m2
3 Galian Tanah JASA m3
4 Pembuangan Tanah JASA m3
5 Urugan Pasir Padat HDW m3
6 Pembuatan Lantai Kerja HDW m3
7 Pembuatan Beton Bertulang K225 HDW m3
8 Pembuatan Tutup Beton Bertulang K225 HDW m3
9 Besi Siku 70 untuk Tray Kabel Power HDW pcs

b PEMBUATAN GALIAN TANAH


1 Galian Tanah keras sedalam 1 meter JASA Mtr
2 Urugan Pasir Dipadatkan JASA m3
3 Urugan Tanah Dipadatkan JASA m3
4 Pembuangan sisa tanah JASA Mtr
5 Pekerjaan Aspal JASA Mtr

c Mur Baut Ring Plat Ring Per Stainless Steel Ukuran 19 mm HDW Bh

U UPAH PASANG
- KONSTRUKSI JTR
1 Upah Pasang Konst. JTR J2 JASA Unit
2 Upah Pasang Konst. JTR J3 JASA Unit
3 Upah Pasang Konst. JTR J4 JASA Unit
4 Upah Pasang Konst. JTR J4-A JASA Unit
5 Upah Pasang Konst. JTR J5 JASA Unit
6 Upah Pasang Konst. JTR J6 JASA Unit
7 Upah Pasang Konst. JTR J6-X JASA Unit
8 Upah Pasang Konst. JTR J7 JASA Unit
9 Upah Pasang Konst. JTR J8 JASA Unit
10 Upah Pasang Konst. JTR J10 JASA Unit
11 Upah Pasang Konst. JTR J5-T JASA Unit
12 Upah Pasang Konst. JTR J6-T JASA Unit
13 Upah Pasang Konst. JTR J7-T JASA Unit
14 Upah Pasang Konst. JTR MJ6-T JASA Unit
15 Upah Pasang Konst. JTR B13-B JASA Unit
16 Upah Pasang Konst. JTR B13-D JASA Unit
17 Upah Pasang Konst. JTR B15-B JASA Unit
18 Upah Pasang Konst. JTR B15-D JASA Unit
19 Upah Pasang Konst. JTR B16-B JASA Unit
20 Upah Pasang Konst. JTR B16-D JASA Unit
21 Upah Pasang Konst. JTR B71-B JASA Unit

- KONSTRUKSI JTM 1 FASA


1 Upah Pasang Konst. JTM 1 Fasa A1 JASA Unit
2 Upah Pasang Konst. JTM 1 Fasa A1-N JASA Unit
3 Upah Pasang Konst. JTM 1 Fasa A1-PN JASA Unit
4 Upah Pasang Konst. JTM 1 Fasa A1-P JASA Unit
5 Upah Pasang Konst. JTM 1 Fasa A1' JASA Unit
7 Upah Pasang Konst. JTM 1 Fasa A2 JASA Unit
8 Upah Pasang Konst. JTM 1 Fasa A2-N JASA Unit
9 Upah Pasang Konst. JTM 1 Fasa A2' JASA Unit

*) Harga KHS 2005 8


10 Upah Pasang Konst. JTM 1 Fasa A3 JASA Unit
11 Upah Pasang Konst. JTM 1 Fasa A3-N JASA Unit
12 Upah Pasang Konst. JTM 1 Fasa A3' JASA Unit
13 Upah Pasang Konst. JTM 1 Fasa A4 JASA Unit
14 Upah Pasang Konst. JTM 1 Fasa A4-N JASA Unit
15 Upah Pasang Konst. JTM 1 Fasa A4' JASA Unit
16 Upah Pasang Konst. JTM 1 Fasa A5 JASA Unit
17 Upah Pasang Konst. JTM 1 Fasa A5-N JASA Unit
18 Upah Pasang Konst. JTM 1 Fasa A5-1 JASA Unit
19 Upah Pasang Konst. JTM 1 Fasa A5-2 JASA Unit
20 Upah Pasang Konst. JTM 1 Fasa A5-3 JASA Unit
21 Upah Pasang Konst. JTM 1 Fasa A5-4 JASA Unit
22 Upah Pasang Konst. JTM 1 Fasa A5' JASA Unit
23 Upah Pasang Konst. JTM 1 Fasa A5-1' JASA Unit
24 Upah Pasang Konst. JTM 1 Fasa A5-2' JASA Unit
25 Upah Pasang Konst. JTM 1 Fasa A5-3' JASA Unit
26 Upah Pasang Konst. JTM 1 Fasa A5-4' JASA Unit
27 Upah Pasang Konst. JTM 1 Fasa A6 JASA Unit
28 Upah Pasang Konst. JTM 1 Fasa A6-N JASA Unit
29 Upah Pasang Konst. JTM 1 Fasa A6' JASA Unit
30 Upah Pasang Konst. JTM 1 Fasa A7 JASA Unit
31 Upah Pasang Konst. JTM 1 Fasa A7-A JASA Unit
32 Upah Pasang Konst. JTM 1 Fasa A8 JASA Unit
33 Upah Pasang Konst. JTM 1 Fasa A8-A JASA Unit
34 Upah Pasang Konst. JTM 1 Fasa A9 JASA Unit
35 Upah Pasang Konst. JTM 1 Fasa A9-N JASA Unit

- KONSTRUKSI JTM 1 FASA MENJADI 3 FASA


1 Upah Pasang Konst. JTM 1-3 Fasa B1 JASA Unit
2 Upah Pasang Konst. JTM 1-3 Fasa B1-A JASA Unit
3 Upah Pasang Konst. JTM 1-3 Fasa B2 JASA Unit
4 Upah Pasang Konst. JTM 1-3 Fasa B3 JASA Unit
5 Upah Pasang Konst. JTM 1-3 Fasa B4 JASA Unit
6 Upah Pasang Konst. JTM 1-3 Fasa B5 JASA Unit

- KONSTRUKSI JTM 3 FASA


1 Upah Pasang Konst. JTM 3 Fasa C1 JASA Unit
2 Upah Pasang Konst. JTM 3 Fasa C1-N JASA Unit
3 Upah Pasang Konst. JTM 3 Fasa C1-1 JASA Unit
4 Upah Pasang Konst. JTM 3 Fasa C1-1N JASA Unit
5 Upah Pasang Konst. JTM 3 Fasa C1-A JASA Unit
6 Upah Pasang Konst. JTM 3 Fasa C1' JASA Unit
7 Upah Pasang Konst. JTM 3 Fasa C1-1' JASA Unit
8 Upah Pasang Konst. JTM 3 Fasa C1-A' JASA Unit
9 Upah Pasang Konst. JTM 3 Fasa C2 JASA Unit
10 Upah Pasang Konst. JTM 3 Fasa C2-1 JASA Unit
11 Upah Pasang Konst. JTM 3 Fasa C2-A JASA Unit
12 Upah Pasang Konst. JTM 3 Fasa C2-N JASA Unit
13 Upah Pasang Konst. JTM 3 Fasa C2' JASA Unit
14 Upah Pasang Konst. JTM 3 Fasa C2-1' JASA Unit
15 Upah Pasang Konst. JTM 3 Fasa C2-A' JASA Unit
16 Upah Pasang Konst. JTM 3 Fasa C3 JASA Unit
17 Upah Pasang Konst. JTM 3 Fasa C3-VN JASA Unit
18 Upah Pasang Konst. JTM 3 Fasa C3' JASA Unit
19 Upah Pasang Konst. JTM 3 Fasa C4-1 JASA Unit
20 Upah Pasang Konst. JTM 3 Fasa C5-1 JASA Unit
21 Upah Pasang Konst. JTM 3 Fasa C7 JASA Unit
22 Upah Pasang Konst. JTM 3 Fasa C7-1 JASA Unit
23 Upah Pasang Konst. JTM 3 Fasa C7-N JASA Unit
24 Upah Pasang Konst. JTM 3 Fasa C7' JASA Unit
25 Upah Pasang Konst. JTM 3 Fasa C7-1' JASA Unit
26 Upah Pasang Konst. JTM 3 Fasa C8 JASA Unit
27 Upah Pasang Konst. JTM 3 Fasa C8-A JASA Unit
28 Upah Pasang Konst. JTM 3 Fasa C8-AN JASA Unit
29 Upah Pasang Konst. JTM 3 Fasa C8' JASA Unit
30 Upah Pasang Konst. JTM 3 Fasa C8-A' JASA Unit
31 Upah Pasang Konst. JTM 3 Fasa C9 JASA Unit
32 Upah Pasang Konst. JTM 3 Fasa C9-N JASA Unit
33 Upah Pasang Konst. JTM 3 Fasa C9' JASA Unit
34 Upah Pasang Konst. JTM 3 Fasa C10 JASA Unit
35 Upah Pasang Konst. JTM 3 Fasa C10-N JASA Unit
36 Upah Pasang Konst. JTM 3 Fasa C10' JASA Unit
37 Upah Pasang Konst. JTM 3 Fasa C11 JASA Unit
38 Upah Pasang Konst. JTM 3 Fasa C11-N JASA Unit
39 Upah Pasang Konst. JTM 3 Fasa C11' JASA Unit

- KONSTRUKSI JTM DOUBLE CIRCUIT


1 Upah Pasang Konst. JTM Double Circuit DC-C1V JASA Unit
2 Upah Pasang Konst. JTM Double Circuit DC-C1-1V JASA Unit
3 Upah Pasang Konst. JTM Double Circuit DC-C1-1H JASA Unit
4 Upah Pasang Konst. JTM Double Circuit DC-C1-AHN JASA Unit
5 Upah Pasang Konst. JTM Double Circuit DC-C2-1V JASA Unit
6 Upah Pasang Konst. JTM Double Circuit DC-C2-AH JASA Unit

*) Harga KHS 2005 9


7 Upah Pasang Konst. JTM Double Circuit DC-C2-AHN JASA Unit
8 Upah Pasang Konst. JTM Double Circuit DC-C2-1BN JASA Unit
9 Upah Pasang Konst. JTM Double Circuit DC-C4-N JASA Unit
10 Upah Pasang Konst. JTM Double Circuit DC-C7-N JASA Unit
11 Upah Pasang Konst. JTM Double Circuit DC-C8 JASA Unit
12 Upah Pasang Konst. JTM Double Circuit DC-C8-N JASA Unit

- SKUTM / SKTM
1 Upah Pasang Konst. SKUTM DB01 (Suspension Assembly) JASA Unit
2 Upah Pasang Konst. SKUTM DB02 (Small Angle Assembly) JASA Unit
3 Upah Pasang Konst. SKUTM DB03 (Medium Angle Assembly) JASA Unit
4 Upah Pasang Konst. SKUTM DB04 (Large Angle Assembly) JASA Unit
5 Upah Pasang Konst. SKUTM DB05 (Adjustable Dead End Assembly) JASA Unit
6 Upah Pasang Konst. SKUTM DB06 (Fixed Dead End Assembly)) JASA Unit
7 Upah Pasang Konst. SKUTM DB08 JASA Unit
8 Upah Pasang Konst. SKUTM DB09 JASA Unit

- AKSESORIES JARINGAN
1 Upah Pasang Acc.Jar M2-11 JASA Unit
2 Upah Pasang Acc.Jar M2-11M JASA Unit
3 Upah Pasang Acc.Jar M2-12 JASA Unit
4 Upah Pasang Acc.Jar M2-12A JASA Unit
5 Upah Pasang Acc.Jar M2-15 JASA Unit
6 Upah Pasang Acc.Jar M3-16 JASA Unit
7 Upah Pasang Acc.Jar M5-2 JASA Unit
8 Upah Pasang Acc.Jar M5-3 JASA Unit
9 Upah Pasang Acc.Jar M5-4 JASA Unit
10 Upah Pasang Acc.Jar M5-5 JASA Unit
11 Upah Pasang Acc.Jar M5-6 JASA Unit
12 Upah Pasang Acc.Jar M5-8 JASA Unit
13 Upah Pasang Acc.Jar M5-9 JASA Unit
14 Upah Pasang Acc.Jar M5-10 JASA Unit
15 Upah Pasang Acc.Jar M5-12 JASA Unit
16 Upah Pasang Acc.Jar M5-13 JASA Unit
17 Upah Pasang Acc.Jar M5-16 JASA Unit
18 Upah Pasang Acc.Jar M5-20 JASA Unit
19 Upah Pasang Acc.Jar M5-24 JASA Unit
20 Upah Pasang Acc.Jar P12C-1 JASA Unit
21 Upah Pasang Acc.Jar P12C-2 JASA Unit
22 Upah Pasang Acc.Jar P12S-1 JASA Unit
23 Upah Pasang Acc.Jar P12S-2 JASA Unit
24 Upah Pasang Acc.Jar E1-1 JASA Unit
25 Upah Pasang Acc.Jar E1-2 JASA Unit
26 Upah Pasang Acc.Jar E1-3 JASA Unit
27 Upah Pasang Acc.Jar E2-1 JASA Unit
28 Upah Pasang Acc.Jar E2-2 JASA Unit
29 Upah Pasang Acc.Jar E2-3 JASA Unit
30 Upah Pasang Acc.Jar E5-1 JASA Unit
31 Upah Pasang Acc.Jar E5-2 JASA Unit
32 Upah Pasang Acc.Jar E6-1 JASA Unit
33 Upah Pasang Acc.Jar F1-2 JASA Unit
34 Upah Pasang Acc.Jar F1-3 JASA Unit
35 Upah Pasang Acc.Jar FDG JASA Unit
36 Upah Pasang Acc.Jar Penghalang Panjat JASA Unit
38 Upah Pasang Acc.Jar LVCB 2 Jurusan (M8-A1, M8-A2) JASA Unit
39 Upah Pasang Acc.Jar LVCB 4 Jurusan (M8-B1, M8-B2) JASA Unit
41 Upah Pasang Acc.Jar Konstruksi Vangnet JASA Unit
42 Upah Pembuatan & Pasang Acc.Jar Jaring Vangnet JASA Per 1 m

- SWITCHING
1 Upah Pasang Air Break Switch (ABSW) JASA Unit
2 Upah Pasang Load Break Switch (LBS) JASA Unit
3 Upah Pasang Recloser JASA Unit
4 Upah Pasang Disconecting Switch (DS) JASA Unit

- PENGHANTAR TM
1 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² JASA Per 50 m
2 Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² JASA Per 50 m
3 Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² JASA Per 50 m
4 Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² JASA Per 50 m
5 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² JASA Per 50 m
6 Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² JASA Per 50 m
7 Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² JASA Per 50 m
8 Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² JASA Per 50 m
9 Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² JASA Per 50 m
10 Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² JASA Per 50 m
11 Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² JASA Per 50 m
12 Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² JASA Per 50 m
13 Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² JASA Per 50 m
14 Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² JASA Per 50 m
15 Upah Pasang Penghantar TM A3C 3x240mm² JASA Per 50 m
16 Upah Pasang Penghantar TM A3C 3x150mm² JASA Per 50 m
17 Upah Pasang Penghantar TM A3C 3x70mm² JASA Per 50 m

*) Harga KHS 2005 10


18 Upah Pasang Penghantar TM A3C 3x35mm² JASA Per 50 m
19 Upah Pasang Penghantar TM A3C 2x240mm² JASA Per 50 m
20 Upah Pasang Penghantar TM A3C 2x150mm² JASA Per 50 m
21 Upah Pasang Penghantar TM A3C 2x70mm² JASA Per 50 m
22 Upah Pasang Penghantar TM A3C 2x35mm² JASA Per 50 m
23 Upah Pasang Penghantar TM A3C 1x240mm² JASA Per 50 m
24 Upah Pasang Penghantar TM A3C 1x150mm² JASA Per 50 m
25 Upah Pasang Penghantar TM A3C 1x70mm² JASA Per 50 m
26 Upah Pasang Penghantar TM A3C 1x50mm² JASA Per 50 m
27 Upah Pasang Penghantar TM A3C 1x35mm² JASA Per 50 m
28 Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² JASA Per 50 m
29 Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² JASA Per 50 m
30 Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² JASA Per 50 m
31 Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² JASA Per 50 m
32 Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² JASA Per 50 m
33 Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² JASA Per 50 m
34 Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² JASA Per 50 m
35 Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² JASA Per 50 m
36 Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² JASA Per 50 m
37 Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² JASA Per 50 m
38 Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² JASA Per 50 m
39 Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² JASA Per 50 m
40 Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² JASA Per 50 m
41 Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² JASA Per 50 m
42 Upah Pasang Penghantar TM A3CS 3x240mm² JASA Per 50 m
43 Upah Pasang Penghantar TM A3CS 3x150mm² JASA Per 50 m
44 Upah Pasang Penghantar TM A3CS 3x70mm² JASA Per 50 m
45 Upah Pasang Penghantar TM A3CS 3x35mm² JASA Per 50 m
46 Upah Pasang Penghantar TM A3CS 2x240mm² JASA Per 50 m
47 Upah Pasang Penghantar TM A3CS 2x150mm² JASA Per 50 m
48 Upah Pasang Penghantar TM A3CS 2x70mm² JASA Per 50 m
49 Upah Pasang Penghantar TM A3CS 2x35mm² JASA Per 50 m
50 Upah Pasang Penghantar TM A3CS 1x240mm² JASA Per 50 m
51 Upah Pasang Penghantar TM A3CS 1x150mm² JASA Per 50 m
52 Upah Pasang Penghantar TM A3CS 1x70mm² JASA Per 50 m
53 Upah Pasang Penghantar TM A3CS 1x50mm² JASA Per 50 m
54 Upah Pasang Penghantar TM A3CS 1x35mm² JASA Per 50 m
55 Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² JASA Per 50 m

- PENGHANTAR TR
1 Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² JASA Per 50 m
2 Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² JASA Per 50 m
3 Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² JASA Per 50 m
4 Upah Pasang Penghantar TR A3C 2x70mm² JASA Per 50 m
5 Upah Pasang Penghantar TR A3C 2x35mm² JASA Per 50 m
6 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² JASA Per 50 m
7 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² JASA Per 50 m

- PENGHANTAR TM
1 Upah Pasang Penghantar TM A3C 3x240 + 1x150mm² Per Kms JASA Per Kms
2 Upah Pasang Penghantar TM A3C 3x240 + 1x120mm² Per Kms JASA Per Kms
3 Upah Pasang Penghantar TM A3C 3x150 + 1x150mm² Per Kms JASA Per Kms
4 Upah Pasang Penghantar TM A3C 3x150 + 1x70mm² Per Kms JASA Per Kms
5 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² Per Kms JASA Per Kms
6 Upah Pasang Penghantar TM A3C 3x70 + 1x50mm² Per Kms JASA Per Kms
7 Upah Pasang Penghantar TM A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
8 Upah Pasang Penghantar TM A3C 3x35 + 1x35mm² Per Kms JASA Per Kms
9 Upah Pasang Penghantar TM A3C 1x150 + 1x70mm² Per Kms JASA Per Kms
10 Upah Pasang Penghantar TM A3C 1x120 + 1x70mm² Per Kms JASA Per Kms
11 Upah Pasang Penghantar TM A3C 1x70 + 1x70mm² Per Kms JASA Per Kms
12 Upah Pasang Penghantar TM A3C 1x70 + 1x50mm² Per Kms JASA Per Kms
13 Upah Pasang Penghantar TM A3C 1x70 + 1x35mm² Per Kms JASA Per Kms
14 Upah Pasang Penghantar TM A3C 1x35 + 1x35mm² Per Kms JASA Per Kms
15 Upah Pasang Penghantar TM A3C 3x240mm² Per Kms JASA Per Kms
16 Upah Pasang Penghantar TM A3C 3x150mm² Per Kms JASA Per Kms
17 Upah Pasang Penghantar TM A3C 3x70mm² Per Kms JASA Per Kms
18 Upah Pasang Penghantar TM A3C 3x35mm² Per Kms JASA Per Kms
19 Upah Pasang Penghantar TM A3C 2x240mm² Per Kms JASA Per Kms
20 Upah Pasang Penghantar TM A3C 2x150mm² Per Kms JASA Per Kms
21 Upah Pasang Penghantar TM A3C 2x70mm² Per Kms JASA Per Kms
22 Upah Pasang Penghantar TM A3C 2x35mm² Per Kms JASA Per Kms
23 Upah Pasang Penghantar TM A3C 1x240mm² Per Kms JASA Per Kms
24 Upah Pasang Penghantar TM A3C 1x150mm² Per Kms JASA Per Kms
25 Upah Pasang Penghantar TM A3C 1x70mm² Per Kms JASA Per Kms
26 Upah Pasang Penghantar TM A3C 1x50mm² Per Kms JASA Per Kms
27 Upah Pasang Penghantar TM A3C 1x35mm² Per Kms JASA Per Kms
28 Upah Pasang Penghantar TM A3CS 3x240 + 1x150mm² Per Kms JASA Per Kms
29 Upah Pasang Penghantar TM A3CS 3x240 + 1x120mm² Per Kms JASA Per Kms
30 Upah Pasang Penghantar TM A3CS 3x150 + 1x150mm² Per Kms JASA Per Kms
31 Upah Pasang Penghantar TM A3CS 3x150 + 1x70mm² Per Kms JASA Per Kms
32 Upah Pasang Penghantar TM A3CS 3x70 + 1x70mm² Per Kms JASA Per Kms
33 Upah Pasang Penghantar TM A3CS 3x70 + 1x50mm² Per Kms JASA Per Kms
34 Upah Pasang Penghantar TM A3CS 3x70 + 1x35mm² Per Kms JASA Per Kms

*) Harga KHS 2005 11


35 Upah Pasang Penghantar TM A3CS 3x35 + 1x35mm² Per Kms JASA Per Kms
36 Upah Pasang Penghantar TM A3CS 1x150 + 1x70mm² Per Kms JASA Per Kms
37 Upah Pasang Penghantar TM A3CS 1x120 + 1x70mm² Per Kms JASA Per Kms
38 Upah Pasang Penghantar TM A3CS 1x70 + 1x70mm² Per Kms JASA Per Kms
39 Upah Pasang Penghantar TM A3CS 1x70 + 1x50mm² Per Kms JASA Per Kms
40 Upah Pasang Penghantar TM A3CS 1x70 + 1x35mm² Per Kms JASA Per Kms
41 Upah Pasang Penghantar TM A3CS 1x35 + 1x35mm² Per Kms JASA Per Kms
42 Upah Pasang Penghantar TM A3CS 3x240mm² Per Kms JASA Per Kms
43 Upah Pasang Penghantar TM A3CS 3x150mm² Per Kms JASA Per Kms
44 Upah Pasang Penghantar TM A3CS 3x70mm² Per Kms JASA Per Kms
45 Upah Pasang Penghantar TM A3CS 3x35mm² Per Kms JASA Per Kms
46 Upah Pasang Penghantar TM A3CS 2x240mm² Per Kms JASA Per Kms
47 Upah Pasang Penghantar TM A3CS 2x150mm² Per Kms JASA Per Kms
48 Upah Pasang Penghantar TM A3CS 2x70mm² Per Kms JASA Per Kms
49 Upah Pasang Penghantar TM A3CS 2x35mm² Per Kms JASA Per Kms
50 Upah Pasang Penghantar TM A3CS 1x240mm² Per Kms JASA Per Kms
51 Upah Pasang Penghantar TM A3CS 1x150mm² Per Kms JASA Per Kms
52 Upah Pasang Penghantar TM A3CS 1x70mm² Per Kms JASA Per Kms
53 Upah Pasang Penghantar TM A3CS 1x50mm² Per Kms JASA Per Kms
54 Upah Pasang Penghantar TM A3CS 1x35mm² Per Kms JASA Per Kms
55 Upah Pasang Kabel MVTIC 3 x 240 + N 95 mm² Per Kms JASA Per Kms

- PENGHANTAR TR
1 Upah Pasang Penghantar TR A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
2 Upah Pasang Penghantar TR A3C 2x70 + 1x70mm² Per Kms JASA Per Kms
3 Upah Pasang Penghantar TR A3C 2x70 + 1x35mm² Per Kms JASA Per Kms
4 Upah Pasang Penghantar TR A3C 2x70mm² Per Kms JASA Per Kms
5 Upah Pasang Penghantar TR A3C 2x35mm² Per Kms JASA Per Kms
6 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² Per Kms JASA Per Kms
7 Upah Pasang Penghantar TR LVTC 2x70 + 1x50mm² Per Kms JASA Per Kms

- TRAFO DISTRIBUSI
1 Upah Pasang Trafo 1 Fasa 25 KVA + Bracket JASA Unit
2 Upah Pasang Trafo 1 Fasa 50 KVA + Bracket JASA Unit
3 Upah Pasang Trafo 1 Fasa 50 KVA 1 Tiang JASA Unit
4 Upah Pasang Trafo 3 Fasa 50 KVA 1 Tiang JASA Unit
5 Upah Pasang Trafo 3 Fasa 100 KVA 1 Tiang JASA Unit
6 Upah Pasang Trafo 3 Fasa 50 KVA 2 Tiang JASA Unit
7 Upah Pasang Trafo 3 Fasa 100 KVA 2 Tiang JASA Unit
8 Upah Pasang Trafo 3 Fasa 160 KVA 2 Tiang JASA Unit
9 Upah Pasang Trafo 3 Fasa 200 KVA 2 Tiang JASA Unit

- TIANG
1 Upah Pasang Tiang Beton 7M-100 daN JASA Btg
2 Upah Pasang Tiang Beton 7M-100 daN+E JASA Btg
3 Upah Pasang Tiang Beton 9M-100 daN JASA Btg
4 Upah Pasang Tiang Beton 9M-100 daN+E JASA Btg
5 Upah Pasang Tiang Beton 9M-200 daN JASA Btg
6 Upah Pasang Tiang Beton 9M-200 daN+E JASA Btg
7 Upah Pasang Tiang Beton 9M-350 daN JASA Btg
8 Upah Pasang Tiang Beton 9M-350 daN+E JASA Btg
9 Upah Pasang Tiang Beton 11M-200 daN JASA Btg
10 Upah Pasang Tiang Beton 11M-200 daN+E JASA Btg
11 Upah Pasang Tiang Beton 11M-350 daN JASA Btg
12 Upah Pasang Tiang Beton 11M-350 daN+E JASA Btg
13 Upah Pasang Tiang Beton 12M-200 daN JASA Btg
14 Upah Pasang Tiang Beton 12M-200 daN+E JASA Btg
15 Upah Pasang Tiang Beton 12M-350 daN JASA Btg
16 Upah Pasang Tiang Beton 12M-350 daN+E JASA Btg
17 Upah Pasang Tiang Beton 12M-500 daN JASA Btg
18 Upah Pasang Tiang Beton 12M-500 daN+E JASA Btg
19 Upah Pasang Tiang Beton 13M-350 daN JASA Btg
20 Upah Pasang Tiang Beton 13M-350 daN+E JASA Btg
21 Upah Pasang Tiang Beton 13M-500 daN JASA Btg
22 Upah Pasang Tiang Beton 13M-500 daN+E JASA Btg
23 Upah Pasang Tiang Beton 14M-350 daN JASA Btg
24 Upah Pasang Tiang Beton 14M-350 daN+E JASA Btg
25 Upah Pasang Tiang Beton 14M-500 daN JASA Btg
26 Upah Pasang Tiang Beton 14M-500 daN+E JASA Btg

- KABEL TANAH
1 Upah Pasang Terminating Kabel 1 x 70 mm² OD JASA Unit
2 Upah Pasang Terminating Kabel 3 x 70 mm² ID JASA Unit
3 Upah Pasang Terminating Kabel 3 x 70 mm² OD JASA Unit
4 Upah Pasang Terminating Kabel 3 x 95 mm² ID JASA Unit
5 Upah Pasang Terminating Kabel 3 x 95 mm² OD JASA Unit
6 Upah Pasang Terminating Kabel 3 x 150 mm² ID JASA Unit
7 Upah Pasang Terminating Kabel 3 x 150 mm² OD JASA Unit
8 Upah Pasang Terminating Kabel 3 x 240 mm² ID JASA Unit
9 Upah Pasang Terminating Kabel 3 x 240 mm² OD JASA Unit
10 Upah Pasang Terminating Kabel 3 x 300 mm² ID JASA Unit
11 Upah Pasang Terminating Kabel 3 x 300 mm² OD JASA Unit
12 Upah Pasang Sepatu kabel bimetal 240 - 300 mm² (2 lubang) JASA Unit

*) Harga KHS 2005 12


13 Upah Pasang Sepatu kabel bimetal 150 mm² (2 lubang) JASA Unit
14 Upah Pasang Kabel Tanah XLPE 3 x 300 mm² (three core) JASA Per 50 m
15 Upah Pasang Kabel Tanah XLPE 3 x 240 mm² (three core) JASA Per 50 m
16 Upah Pasang Kabel NYY 1 x 70 mm² JASA Per 1 m
17 Upah Pasang Kabel NYY 1 x 150 mm² JASA Per 1 m
18 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 150 mm² JASA Per 1 m
19 Upah Pasang Kabel NA2XS2Y 20 KV 3 x 70 mm² JASA Per 1 m
20 Upah Pasang Kabel NA2XS2Y 20 KV 1 x 70 mm² JASA Per 1 m
21 Galian Kabel - m³ JASA Per m³

- SAMBUNGAN RUMAH
1 Upah Pasang Sambungan Rumah 1 Fasa JASA Unit
2 Upah Pasang Sambungan Rumah 3 Fasa JASA Unit
3 Upah Pasang SR + APP 1 Fasa JASA Unit
4 Upah Pasang SR + APP 3 Fasa JASA Unit
5 Upah Pasang APP TM + Wiring JASA Unit
6 Upah Pasang Cubicle Pelanggan JASA Unit

V UPAH BONGKAR
- KONSTRUKSI JTR
1 Upah Bongkar Konst. JTR J2 JASA Unit
2 Upah Bongkar Konst. JTR J3 JASA Unit
3 Upah Bongkar Konst. JTR J4 JASA Unit
4 Upah Bongkar Konst. JTR J4-A JASA Unit
5 Upah Bongkar Konst. JTR J5 JASA Unit
6 Upah Bongkar Konst. JTR J6 JASA Unit
7 Upah Bongkar Konst. JTR J6-X JASA Unit
8 Upah Bongkar Konst. JTR J7 JASA Unit
9 Upah Bongkar Konst. JTR J8 JASA Unit
10 Upah Bongkar Konst. JTR J10 JASA Unit
11 Upah Bongkar Konst. JTR J5-T JASA Unit
12 Upah Bongkar Konst. JTR J6-T JASA Unit
13 Upah Bongkar Konst. JTR J7-T JASA Unit
14 Upah Bongkar Konst. JTR MJ6-T JASA Unit
15 Upah Bongkar Konst. JTR B13-B JASA Unit
16 Upah Bongkar Konst. JTR B13-D JASA Unit
17 Upah Bongkar Konst. JTR B15-B JASA Unit
18 Upah Bongkar Konst. JTR B15-D JASA Unit
19 Upah Bongkar Konst. JTR B16-B JASA Unit
20 Upah Bongkar Konst. JTR B16-D JASA Unit
21 Upah Bongkar Konst. JTR B71-B JASA Unit

- KONSTRUKSI JTM 1 FASA


1 Upah Bongkar Konst. JTM 1 Fasa A1 JASA Unit
2 Upah Bongkar Konst. JTM 1 Fasa A1-N JASA Unit
3 Upah Bongkar Konst. JTM 1 Fasa A1-PN JASA Unit
4 Upah Bongkar Konst. JTM 1 Fasa A1-P JASA Unit
5 Upah Bongkar Konst. JTM 1 Fasa A1' JASA Unit
7 Upah Bongkar Konst. JTM 1 Fasa A2 JASA Unit
8 Upah Bongkar Konst. JTM 1 Fasa A2-N JASA Unit
9 Upah Bongkar Konst. JTM 1 Fasa A2' JASA Unit
10 Upah Bongkar Konst. JTM 1 Fasa A3 JASA Unit
11 Upah Bongkar Konst. JTM 1 Fasa A3-N JASA Unit
12 Upah Bongkar Konst. JTM 1 Fasa A3' JASA Unit
13 Upah Bongkar Konst. JTM 1 Fasa A4 JASA Unit
14 Upah Bongkar Konst. JTM 1 Fasa A4-N JASA Unit
15 Upah Bongkar Konst. JTM 1 Fasa A4' JASA Unit
16 Upah Bongkar Konst. JTM 1 Fasa A5 JASA Unit
17 Upah Bongkar Konst. JTM 1 Fasa A5-N JASA Unit
18 Upah Bongkar Konst. JTM 1 Fasa A5-1 JASA Unit
19 Upah Bongkar Konst. JTM 1 Fasa A5-2 JASA Unit
20 Upah Bongkar Konst. JTM 1 Fasa A5-3 JASA Unit
21 Upah Bongkar Konst. JTM 1 Fasa A5-4 JASA Unit
22 Upah Bongkar Konst. JTM 1 Fasa A5' JASA Unit
23 Upah Bongkar Konst. JTM 1 Fasa A5-1' JASA Unit
24 Upah Bongkar Konst. JTM 1 Fasa A5-2' JASA Unit
25 Upah Bongkar Konst. JTM 1 Fasa A5-3' JASA Unit
26 Upah Bongkar Konst. JTM 1 Fasa A5-4' JASA Unit
27 Upah Bongkar Konst. JTM 1 Fasa A6 JASA Unit
28 Upah Bongkar Konst. JTM 1 Fasa A6-N JASA Unit
29 Upah Bongkar Konst. JTM 1 Fasa A6' JASA Unit
30 Upah Bongkar Konst. JTM 1 Fasa A7 JASA Unit
31 Upah Bongkar Konst. JTM 1 Fasa A7-A JASA Unit
32 Upah Bongkar Konst. JTM 1 Fasa A8 JASA Unit
33 Upah Bongkar Konst. JTM 1 Fasa A8-A JASA Unit
34 Upah Bongkar Konst. JTM 1 Fasa A9 JASA Unit
35 Upah Bongkar Konst. JTM 1 Fasa A9-N JASA Unit

- KONSTRUKSI JTM 1 FASA MENJADI 3 FASA


1 Upah Bongkar Konst. JTM 1-3 Fasa B1 JASA Unit
2 Upah Bongkar Konst. JTM 1-3 Fasa B1-A JASA Unit
3 Upah Bongkar Konst. JTM 1-3 Fasa B2 JASA Unit
4 Upah Bongkar Konst. JTM 1-3 Fasa B3 JASA Unit

*) Harga KHS 2005 13


5 Upah Bongkar Konst. JTM 1-3 Fasa B4 JASA Unit
6 Upah Bongkar Konst. JTM 1-3 Fasa B5 JASA Unit

- KONSTRUKSI JTM 3 FASA


1 Upah Bongkar Konst. JTM 3 Fasa C1 JASA Unit
2 Upah Bongkar Konst. JTM 3 Fasa C1-N JASA Unit
3 Upah Bongkar Konst. JTM 3 Fasa C1-1 JASA Unit
4 Upah Bongkar Konst. JTM 3 Fasa C1-1N JASA Unit
5 Upah Bongkar Konst. JTM 3 Fasa C1-A JASA Unit
6 Upah Bongkar Konst. JTM 3 Fasa C1' JASA Unit
7 Upah Bongkar Konst. JTM 3 Fasa C1-1' JASA Unit
8 Upah Bongkar Konst. JTM 3 Fasa C1-A' JASA Unit
9 Upah Bongkar Konst. JTM 3 Fasa C2 JASA Unit
10 Upah Bongkar Konst. JTM 3 Fasa C2-1 JASA Unit
11 Upah Bongkar Konst. JTM 3 Fasa C2-A JASA Unit
12 Upah Bongkar Konst. JTM 3 Fasa C2-N JASA Unit
13 Upah Bongkar Konst. JTM 3 Fasa C2' JASA Unit
14 Upah Bongkar Konst. JTM 3 Fasa C2-1' JASA Unit
15 Upah Bongkar Konst. JTM 3 Fasa C2-A' JASA Unit
16 Upah Bongkar Konst. JTM 3 Fasa C3 JASA Unit
17 Upah Bongkar Konst. JTM 3 Fasa C3-VN JASA Unit
18 Upah Bongkar Konst. JTM 3 Fasa C3' JASA Unit
19 Upah Bongkar Konst. JTM 3 Fasa C4-1 JASA Unit
20 Upah Bongkar Konst. JTM 3 Fasa C5-1 JASA Unit
21 Upah Bongkar Konst. JTM 3 Fasa C7 JASA Unit
22 Upah Bongkar Konst. JTM 3 Fasa C7-1 JASA Unit
23 Upah Bongkar Konst. JTM 3 Fasa C7-N JASA Unit
24 Upah Bongkar Konst. JTM 3 Fasa C7' JASA Unit
25 Upah Bongkar Konst. JTM 3 Fasa C7-1' JASA Unit
26 Upah Bongkar Konst. JTM 3 Fasa C8 JASA Unit
27 Upah Bongkar Konst. JTM 3 Fasa C8-A JASA Unit
28 Upah Bongkar Konst. JTM 3 Fasa C8-AN JASA Unit
29 Upah Bongkar Konst. JTM 3 Fasa C8' JASA Unit
30 Upah Bongkar Konst. JTM 3 Fasa C8-A' JASA Unit
31 Upah Bongkar Konst. JTM 3 Fasa C9 JASA Unit
32 Upah Bongkar Konst. JTM 3 Fasa C9-N JASA Unit
33 Upah Bongkar Konst. JTM 3 Fasa C9' JASA Unit
34 Upah Bongkar Konst. JTM 3 Fasa C10 JASA Unit
35 Upah Bongkar Konst. JTM 3 Fasa C10-N JASA Unit
36 Upah Bongkar Konst. JTM 3 Fasa C10' JASA Unit
37 Upah Bongkar Konst. JTM 3 Fasa C11 JASA Unit
38 Upah Bongkar Konst. JTM 3 Fasa C11-N JASA Unit
39 Upah Bongkar Konst. JTM 3 Fasa C11' JASA Unit

- KONSTRUKSI JTM DOUBLE CIRCUIT


1 Upah Bongkar Konst. JTM Double Circuit DC-C1V JASA Unit
2 Upah Bongkar Konst. JTM Double Circuit DC-C1-1V JASA Unit
3 Upah Bongkar Konst. JTM Double Circuit DC-C1-1H JASA Unit
4 Upah Bongkar Konst. JTM Double Circuit DC-C1-AHN JASA Unit
5 Upah Bongkar Konst. JTM Double Circuit DC-C2-1V JASA Unit
6 Upah Bongkar Konst. JTM Double Circuit DC-C2-AH JASA Unit
7 Upah Bongkar Konst. JTM Double Circuit DC-C2-AHN JASA Unit
8 Upah Bongkar Konst. JTM Double Circuit DC-C2-1BN JASA Unit
9 Upah Bongkar Konst. JTM Double Circuit DC-C4-N JASA Unit
10 Upah Bongkar Konst. JTM Double Circuit DC-C7-N JASA Unit
11 Upah Bongkar Konst. JTM Double Circuit DC-C8 JASA Unit
12 Upah Bongkar Konst. JTM Double Circuit DC-C8-N JASA Unit

- SKUTM / SKTM
1 Upah Bongkar Konst. SKUTM DB01 (Suspension Assembly) JASA Unit
2 Upah Bongkar Konst. SKUTM DB02 (Small Angle Assembly) JASA Unit
3 Upah Bongkar Konst. SKUTM DB03 (Medium Angle Assembly) JASA Unit
4 Upah Bongkar Konst. SKUTM DB04 (Large Angle Assembly) JASA Unit
5 Upah Bongkar Konst. SKUTM DB05 (Adjustable Dead End Assembly) JASA Unit
6 Upah Bongkar Konst. SKUTM DB06 (Fixed Dead End Assembly)) JASA Unit
7 Upah Bongkar Konst. SKUTM DB08 JASA Unit
8 Upah Bongkar Konst. SKUTM DB09 JASA Unit

- AKSESORIES JARINGAN
1 Upah Bongkar Acc.Jar M2-11 JASA Unit
2 Upah Bongkar Acc.Jar M2-11M JASA Unit
3 Upah Bongkar Acc.Jar M2-12 JASA Unit
4 Upah Bongkar Acc.Jar M2-12A JASA Unit
5 Upah Bongkar Acc.Jar M2-15 JASA Unit
6 Upah Bongkar Acc.Jar M3-16 JASA Unit
7 Upah Bongkar Acc.Jar M5-2 JASA Unit
8 Upah Bongkar Acc.Jar M5-3 JASA Unit
9 Upah Bongkar Acc.Jar M5-4 JASA Unit
10 Upah Bongkar Acc.Jar M5-5 JASA Unit
11 Upah Bongkar Acc.Jar M5-6 JASA Unit
12 Upah Bongkar Acc.Jar M5-8 JASA Unit
13 Upah Bongkar Acc.Jar M5-9 JASA Unit
14 Upah Bongkar Acc.Jar M5-10 JASA Unit

*) Harga KHS 2005 14


15 Upah Bongkar Acc.Jar M5-12 JASA Unit
16 Upah Bongkar Acc.Jar M5-13 JASA Unit
17 Upah Bongkar Acc.Jar M5-16 JASA Unit
18 Upah Bongkar Acc.Jar M5-20 JASA Unit
19 Upah Bongkar Acc.Jar M5-24 JASA Unit
20 Upah Bongkar Acc.Jar P12C-1 JASA Unit
21 Upah Bongkar Acc.Jar P12C-2 JASA Unit
22 Upah Bongkar Acc.Jar P12S-1 JASA Unit
23 Upah Bongkar Acc.Jar P12S-2 JASA Unit
24 Upah Bongkar Acc.Jar E1-1 JASA Unit
25 Upah Bongkar Acc.Jar E1-2 JASA Unit
26 Upah Bongkar Acc.Jar E1-3 JASA Unit
27 Upah Bongkar Acc.Jar E2-1 JASA Unit
28 Upah Bongkar Acc.Jar E2-2 JASA Unit
29 Upah Bongkar Acc.Jar E2-3 JASA Unit
30 Upah Bongkar Acc.Jar E5-1 JASA Unit
31 Upah Bongkar Acc.Jar E5-2 JASA Unit
32 Upah Bongkar Acc.Jar E6-1 JASA Unit
33 Upah Bongkar Acc.Jar F1-2 JASA Unit
34 Upah Bongkar Acc.Jar F1-3 JASA Unit
35 Upah Bongkar Acc.Jar FDG JASA Unit
36 Upah Bongkar Acc.Jar Penghalang Panjat JASA Unit
38 Upah Bongkar Acc.Jar LVCB 2 Jurusan (M8-A1, M8-A2) JASA Unit
39 Upah Bongkar Acc.Jar LVCB 4 Jurusan (M8-B1, M8-B2) JASA Unit
41 Upah Bongkar Acc.Jar Konstruksi Vangnet JASA Unit
42 Upah Pembuatan & Bongkar Acc.Jar Jaring Vangnet JASA Per 1 m

- SWITCHING
1 Upah Bongkar Air Break Switch (ABSW) JASA Unit
2 Upah Bongkar Load Break Switch (LBS) JASA Unit
3 Upah Bongkar Recloser JASA Unit
4 Upah Bongkar Disconecting Switch (DS) JASA Unit

- PENGHANTAR TM
1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² JASA Per 50 m
2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² JASA Per 50 m
3 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² JASA Per 50 m
4 Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² JASA Per 50 m
5 Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² JASA Per 50 m
6 Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² JASA Per 50 m
7 Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² JASA Per 50 m
8 Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² JASA Per 50 m
9 Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² JASA Per 50 m
10 Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² JASA Per 50 m
11 Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² JASA Per 50 m
12 Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² JASA Per 50 m
13 Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² JASA Per 50 m
14 Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² JASA Per 50 m
15 Upah Bongkar Penghantar TM A3C 3x240mm² JASA Per 50 m
16 Upah Bongkar Penghantar TM A3C 3x150mm² JASA Per 50 m
17 Upah Bongkar Penghantar TM A3C 3x70mm² JASA Per 50 m
18 Upah Bongkar Penghantar TM A3C 3x35mm² JASA Per 50 m
19 Upah Bongkar Penghantar TM A3C 2x240mm² JASA Per 50 m
20 Upah Bongkar Penghantar TM A3C 2x150mm² JASA Per 50 m
21 Upah Bongkar Penghantar TM A3C 2x70mm² JASA Per 50 m
22 Upah Bongkar Penghantar TM A3C 2x35mm² JASA Per 50 m
23 Upah Bongkar Penghantar TM A3C 1x240mm² JASA Per 50 m
24 Upah Bongkar Penghantar TM A3C 1x150mm² JASA Per 50 m
25 Upah Bongkar Penghantar TM A3C 1x70mm² JASA Per 50 m
26 Upah Bongkar Penghantar TM A3C 1x50mm² JASA Per 50 m
27 Upah Bongkar Penghantar TM A3C 1x35mm² JASA Per 50 m
28 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² JASA Per 50 m
29 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² JASA Per 50 m
30 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² JASA Per 50 m
31 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² JASA Per 50 m
32 Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² JASA Per 50 m
33 Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² JASA Per 50 m
34 Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² JASA Per 50 m
35 Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² JASA Per 50 m
36 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² JASA Per 50 m
37 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² JASA Per 50 m
38 Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² JASA Per 50 m
39 Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² JASA Per 50 m
40 Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² JASA Per 50 m
41 Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² JASA Per 50 m
42 Upah Bongkar Penghantar TM A3CS 3x240mm² JASA Per 50 m
43 Upah Bongkar Penghantar TM A3CS 3x150mm² JASA Per 50 m
44 Upah Bongkar Penghantar TM A3CS 3x70mm² JASA Per 50 m
45 Upah Bongkar Penghantar TM A3CS 3x35mm² JASA Per 50 m
46 Upah Bongkar Penghantar TM A3CS 2x240mm² JASA Per 50 m
47 Upah Bongkar Penghantar TM A3CS 2x150mm² JASA Per 50 m
48 Upah Bongkar Penghantar TM A3CS 2x70mm² JASA Per 50 m
49 Upah Bongkar Penghantar TM A3CS 2x35mm² JASA Per 50 m

*) Harga KHS 2005 15


50 Upah Bongkar Penghantar TM A3CS 1x240mm² JASA Per 50 m
51 Upah Bongkar Penghantar TM A3CS 1x150mm² JASA Per 50 m
52 Upah Bongkar Penghantar TM A3CS 1x70mm² JASA Per 50 m
53 Upah Bongkar Penghantar TM A3CS 1x50mm² JASA Per 50 m
54 Upah Bongkar Penghantar TM A3CS 1x35mm² JASA Per 50 m
55 Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² JASA Per 50 m

- PENGHANTAR TR
1 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² JASA Per 50 m
2 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² JASA Per 50 m
3 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² JASA Per 50 m
4 Upah Bongkar Penghantar TR A3C 2x70mm² JASA Per 50 m
5 Upah Bongkar Penghantar TR A3C 2x35mm² JASA Per 50 m
6 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² JASA Per 50 m
7 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² JASA Per 50 m

- PENGHANTAR TM
1 Upah Bongkar Penghantar TM A3C 3x240 + 1x150mm² Per Kms JASA Per Kms
2 Upah Bongkar Penghantar TM A3C 3x240 + 1x120mm² Per Kms JASA Per Kms
3 Upah Bongkar Penghantar TM A3C 3x150 + 1x150mm² Per Kms JASA Per Kms
4 Upah Bongkar Penghantar TM A3C 3x150 + 1x70mm² Per Kms JASA Per Kms
5 Upah Bongkar Penghantar TM A3C 3x70 + 1x70mm² Per Kms JASA Per Kms
6 Upah Bongkar Penghantar TM A3C 3x70 + 1x50mm² Per Kms JASA Per Kms
7 Upah Bongkar Penghantar TM A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
8 Upah Bongkar Penghantar TM A3C 3x35 + 1x35mm² Per Kms JASA Per Kms
9 Upah Bongkar Penghantar TM A3C 1x150 + 1x70mm² Per Kms JASA Per Kms
10 Upah Bongkar Penghantar TM A3C 1x120 + 1x70mm² Per Kms JASA Per Kms
11 Upah Bongkar Penghantar TM A3C 1x70 + 1x70mm² Per Kms JASA Per Kms
12 Upah Bongkar Penghantar TM A3C 1x70 + 1x50mm² Per Kms JASA Per Kms
13 Upah Bongkar Penghantar TM A3C 1x70 + 1x35mm² Per Kms JASA Per Kms
14 Upah Bongkar Penghantar TM A3C 1x35 + 1x35mm² Per Kms JASA Per Kms
15 Upah Bongkar Penghantar TM A3C 3x240mm² Per Kms JASA Per Kms
16 Upah Bongkar Penghantar TM A3C 3x150mm² Per Kms JASA Per Kms
17 Upah Bongkar Penghantar TM A3C 3x70mm² Per Kms JASA Per Kms
18 Upah Bongkar Penghantar TM A3C 3x35mm² Per Kms JASA Per Kms
19 Upah Bongkar Penghantar TM A3C 2x240mm² Per Kms JASA Per Kms
20 Upah Bongkar Penghantar TM A3C 2x150mm² Per Kms JASA Per Kms
21 Upah Bongkar Penghantar TM A3C 2x70mm² Per Kms JASA Per Kms
22 Upah Bongkar Penghantar TM A3C 2x35mm² Per Kms JASA Per Kms
23 Upah Bongkar Penghantar TM A3C 1x240mm² Per Kms JASA Per Kms
24 Upah Bongkar Penghantar TM A3C 1x150mm² Per Kms JASA Per Kms
25 Upah Bongkar Penghantar TM A3C 1x70mm² Per Kms JASA Per Kms
26 Upah Bongkar Penghantar TM A3C 1x50mm² Per Kms JASA Per Kms
27 Upah Bongkar Penghantar TM A3C 1x35mm² Per Kms JASA Per Kms
28 Upah Bongkar Penghantar TM A3CS 3x240 + 1x150mm² Per Kms JASA Per Kms
29 Upah Bongkar Penghantar TM A3CS 3x240 + 1x120mm² Per Kms JASA Per Kms
30 Upah Bongkar Penghantar TM A3CS 3x150 + 1x150mm² Per Kms JASA Per Kms
31 Upah Bongkar Penghantar TM A3CS 3x150 + 1x70mm² Per Kms JASA Per Kms
32 Upah Bongkar Penghantar TM A3CS 3x70 + 1x70mm² Per Kms JASA Per Kms
33 Upah Bongkar Penghantar TM A3CS 3x70 + 1x50mm² Per Kms JASA Per Kms
34 Upah Bongkar Penghantar TM A3CS 3x70 + 1x35mm² Per Kms JASA Per Kms
35 Upah Bongkar Penghantar TM A3CS 3x35 + 1x35mm² Per Kms JASA Per Kms
36 Upah Bongkar Penghantar TM A3CS 1x150 + 1x70mm² Per Kms JASA Per Kms
37 Upah Bongkar Penghantar TM A3CS 1x120 + 1x70mm² Per Kms JASA Per Kms
38 Upah Bongkar Penghantar TM A3CS 1x70 + 1x70mm² Per Kms JASA Per Kms
39 Upah Bongkar Penghantar TM A3CS 1x70 + 1x50mm² Per Kms JASA Per Kms
40 Upah Bongkar Penghantar TM A3CS 1x70 + 1x35mm² Per Kms JASA Per Kms
41 Upah Bongkar Penghantar TM A3CS 1x35 + 1x35mm² Per Kms JASA Per Kms
42 Upah Bongkar Penghantar TM A3CS 3x240mm² Per Kms JASA Per Kms
43 Upah Bongkar Penghantar TM A3CS 3x150mm² Per Kms JASA Per Kms
44 Upah Bongkar Penghantar TM A3CS 3x70mm² Per Kms JASA Per Kms
45 Upah Bongkar Penghantar TM A3CS 3x35mm² Per Kms JASA Per Kms
46 Upah Bongkar Penghantar TM A3CS 2x240mm² Per Kms JASA Per Kms
47 Upah Bongkar Penghantar TM A3CS 2x150mm² Per Kms JASA Per Kms
48 Upah Bongkar Penghantar TM A3CS 2x70mm² Per Kms JASA Per Kms
49 Upah Bongkar Penghantar TM A3CS 2x35mm² Per Kms JASA Per Kms
50 Upah Bongkar Penghantar TM A3CS 1x240mm² Per Kms JASA Per Kms
51 Upah Bongkar Penghantar TM A3CS 1x150mm² Per Kms JASA Per Kms
52 Upah Bongkar Penghantar TM A3CS 1x70mm² Per Kms JASA Per Kms
53 Upah Bongkar Penghantar TM A3CS 1x50mm² Per Kms JASA Per Kms
54 Upah Bongkar Penghantar TM A3CS 1x35mm² Per Kms JASA Per Kms
55 Upah Bongkar Kabel MVTIC 3 x 240 + N 95 mm² Per Kms JASA Per Kms

- PENGHANTAR TR
1 Upah Bongkar Penghantar TR A3C 3x70 + 1x35mm² Per Kms JASA Per Kms
2 Upah Bongkar Penghantar TR A3C 2x70 + 1x70mm² Per Kms JASA Per Kms
3 Upah Bongkar Penghantar TR A3C 2x70 + 1x35mm² Per Kms JASA Per Kms
4 Upah Bongkar Penghantar TR A3C 2x70mm² Per Kms JASA Per Kms
5 Upah Bongkar Penghantar TR A3C 2x35mm² Per Kms JASA Per Kms
6 Upah Bongkar Penghantar TR LVTC 3x70 + 1x50mm² Per Kms JASA Per Kms
7 Upah Bongkar Penghantar TR LVTC 2x70 + 1x50mm² Per Kms JASA Per Kms

- TRAFO DISTRIBUSI

*) Harga KHS 2005 16


1 Upah Bongkar Trafo 1 Fasa 25 KVA + Bracket JASA Unit
2 Upah Bongkar Trafo 1 Fasa 50 KVA + Bracket JASA Unit
3 Upah Bongkar Trafo 1 Fasa 50 KVA 1 Tiang JASA Unit
4 Upah Bongkar Trafo 3 Fasa 50 KVA 1 Tiang JASA Unit
5 Upah Bongkar Trafo 3 Fasa 100 KVA 1 Tiang JASA Unit
6 Upah Bongkar Trafo 3 Fasa 50 KVA 2 Tiang JASA Unit
7 Upah Bongkar Trafo 3 Fasa 100 KVA 2 Tiang JASA Unit
8 Upah Bongkar Trafo 3 Fasa 160 KVA 2 Tiang JASA Unit
9 Upah Bongkar Trafo 3 Fasa 200 KVA 2 Tiang JASA Unit

- TIANG
1 Upah Bongkar Tiang Beton 7M-100 daN JASA Btg
2 Upah Bongkar Tiang Beton 7M-100 daN+E JASA Btg
3 Upah Bongkar Tiang Beton 9M-100 daN JASA Btg
4 Upah Bongkar Tiang Beton 9M-100 daN+E JASA Btg
5 Upah Bongkar Tiang Beton 9M-200 daN JASA Btg
6 Upah Bongkar Tiang Beton 9M-200 daN+E JASA Btg
7 Upah Bongkar Tiang Beton 9M-350 daN JASA Btg
8 Upah Bongkar Tiang Beton 9M-350 daN+E JASA Btg
9 Upah Bongkar Tiang Beton 11M-200 daN JASA Btg
10 Upah Bongkar Tiang Beton 11M-200 daN+E JASA Btg
11 Upah Bongkar Tiang Beton 11M-350 daN JASA Btg
12 Upah Bongkar Tiang Beton 11M-350 daN+E JASA Btg
13 Upah Bongkar Tiang Beton 12M-200 daN JASA Btg
14 Upah Bongkar Tiang Beton 12M-200 daN+E JASA Btg
15 Upah Bongkar Tiang Beton 12M-350 daN JASA Btg
16 Upah Bongkar Tiang Beton 12M-350 daN+E JASA Btg
17 Upah Bongkar Tiang Beton 12M-500 daN JASA Btg
18 Upah Bongkar Tiang Beton 12M-500 daN+E JASA Btg
19 Upah Bongkar Tiang Beton 13M-350 daN JASA Btg
20 Upah Bongkar Tiang Beton 13M-350 daN+E JASA Btg
21 Upah Bongkar Tiang Beton 13M-500 daN JASA Btg
22 Upah Bongkar Tiang Beton 13M-500 daN+E JASA Btg
23 Upah Bongkar Tiang Beton 14M-350 daN JASA Btg
24 Upah Bongkar Tiang Beton 14M-350 daN+E JASA Btg
25 Upah Bongkar Tiang Beton 14M-500 daN JASA Btg
26 Upah Bongkar Tiang Beton 14M-500 daN+E JASA Btg

- KABEL TANAH
1 Upah Bongkar Terminating Kabel 1 x 70 mm² OD JASA Unit
2 Upah Bongkar Terminating Kabel 3 x 70 mm² ID JASA Unit
3 Upah Bongkar Terminating Kabel 3 x 70 mm² OD JASA Unit
4 Upah Bongkar Terminating Kabel 3 x 95 mm² ID JASA Unit
5 Upah Bongkar Terminating Kabel 3 x 95 mm² OD JASA Unit
6 Upah Bongkar Terminating Kabel 3 x 150 mm² ID JASA Unit
7 Upah Bongkar Terminating Kabel 3 x 150 mm² OD JASA Unit
8 Upah Bongkar Terminating Kabel 3 x 240 mm² ID JASA Unit
9 Upah Bongkar Terminating Kabel 3 x 240 mm² OD JASA Unit
10 Upah Bongkar Terminating Kabel 3 x 300 mm² ID JASA Unit
11 Upah Bongkar Terminating Kabel 3 x 300 mm² OD JASA Unit
12 Upah Bongkar Sepatu kabel bimetal 240 - 300 mm² (2 lubang) JASA Unit
13 Upah Bongkar Sepatu kabel bimetal 150 mm² (2 lubang) JASA Unit
14 Upah Bongkar Kabel Tanah XLPE 3 x 300 mm² (three core) JASA Per 50 m
15 Upah Bongkar Kabel Tanah XLPE 3 x 240 mm² (three core) JASA Per 50 m
16 Upah Bongkar Kabel NYY 1 x 70 mm² JASA Per 1 m
17 Upah Bongkar Kabel NYY 1 x 150 mm² JASA Per 1 m
18 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 150 mm² JASA Per 1 m
19 Upah Bongkar Kabel NA2XS2Y 20 KV 3 x 70 mm² JASA Per 1 m
20 Upah Bongkar Kabel NA2XS2Y 20 KV 1 x 70 mm² JASA Per 1 m

- SAMBUNGAN RUMAH
1 Upah Bongkar Sambungan Rumah 1 Fasa JASA Unit
2 Upah Bongkar Sambungan Rumah 3 Fasa JASA Unit
3 Upah Bongkar SR + APP 1 Fasa JASA Unit
4 Upah Bongkar SR + APP 3 Fasa JASA Unit
5 Upah Bongkar APP TM + Wiring JASA Unit
6 Upah Bongkar Cubicle Pelanggan JASA Unit

W LAIN-LAIN
1 Sertifikasi Laik Operasi JASA Lot
2 Transportasi JASA Rit
3 Rabas-Rabas Pohon JASA Kms
4 Tebang Pohon JASA Pohon
5 Potong Pohon JASA Pohon
6 Pengepresan CCO JASA Bh
7 Pengepresan Joint Sleve JASA Bh
8 Penegakan Tiang Miring JASA Bh
9 Pengeboran Jalan JASA Ls
10 Pemasangan Alpijar JASA Bh
11 Pemasangan Tutup Busing Trafo JASA Unit
12 Pemasangan Ijuk JASA Bh
13 Pemasangan Braket A JASA Bh
14 Pembetonan Tiang JASA Ls

*) Harga KHS 2005 17


*) Harga KHS 2005 18
*) Harga KHS 2005 19
*) Harga KHS 2005 20
PT. PLN ( PERSERO )
UP3 TEGAL

ANALISA KETENTUAN PB-PD

NAMA PEKERJAAN : PEMASANGAN JTM 3 FASA & TRAFO


NAMA : JONI
ALAMAT : PADURAKSA
KEPERLUAN : KANDANG AYAM
PERIHAL : PASANG BARU
TARIF / DAYA : B2 33000 VA
LOKASI UNIT : ULP PEMALANG - ULP PEMALANG

A. DETAIL PERMOHONAN PENYAMBUNGAN

BIAYA PENYAMBUNGAN
NO JENIS PELAYANAN KETENTUNAN PEMBANGUNAN JARINGAN DAYA LAMA DAYA BARU
UNIT TARIP RP/VA JUMLAH
(VA) (VA)

Layanan TR Dengan Perluasan SUTM / SUTR dan trafo baru Maksimum 5 gawang SUTM 1 Fasa, 5 gawang
1 Daya 19.5 KVA s.d 40 KVA* SUTR dan 1 buah trafo 50 KVA 33,000 1 969.00 Rp 31,977,000 - ###

2 0.00 Rp - ###

3 0.00 Rp - ###

4 0.00 Rp - ###

TOTAL SELISIH DAYA 33,000 1 Rp 31,977,000 -

B. ANALISA KETENTUAN PEMBANGUNAN JARINGAN

Sesuai Surat dari PT. PLN (Persero) Disjateng & DIY Nomer : 0236/AGA.01.01/DJTY/2018 tanggal 19 Juli 2018 tentang Penyempurnaan Ketentuan Percepatan dan Kemudahan Penyambungan Jaringan Listrik Untuk PB/PD J
u
m
l
KETENTUNAN PEMBANGUNAN JARINGAN DIISI KEBUTUHAN PEMBANGUNAN JARINGAN a
h
NO Jumlah Gawang Jumlah Gawang KESIMPULAN
Jumlah
KVA Trafo Kms Tiang
Jumlah
KVA Trafo Kms Tiang SG
SUTM / Trafo SUTM / Trafo aU
SUTM SUTR SUTM SUTR
SUTR SUTR Tw
a
M
n
3 1 5 5 0 1 50 0 0 5 5 1 50 Memenuhi ### g

0 2 0 0 0 0 0 0 0 0 ###

0 3 0 0 0 0 0 0 0 0 ###

0 4 0 0 0 0 0 0 0 0 ###

TOTAL 5 5 0 1 50 0 0 Memenuhi ###

KESIMPULAN Memenuhi

C. PERMINTAAN PASANG BARU / PERUBAHAN DAYA DENGAN JARINGAN TIDAK STANDAR ( BILA ADA )

BP RAB = ( RAB Tidak Standar - RAB Standar ) + BP

Biaya Penyambungan : Rp 31,977,000 -

RAB Tidak Standar : Rp -

RAB Standar : Rp 177,602,867 -

Selisih RAB : Hanya Membayar Biaya Penyambungan

Tegal, ………………………………

Mengetahui, Dibuat,
Manager ULP Supervisor Teknik

………………………………………….. …………………………………………..

Copyright @ 11 November 2018


Perencanaan UP3 Tegal - [email protected]
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
HILANGKAN CENTANG
PADA "HAPUS" DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA
SATUAN MDU HARDWARE JASA JUMLAH

1 A PB KANDANG AYAM DANASARI 0 0 0 0 0


1 I PEMASANGAN TIANG 0 0 0 0 0
1 1 Tiang Beton 12M-200 daN+E MDU-KD Btg 4 5,600,000 22,400,000 0 0 22,400,000
1 2 Tiang Beton 12M-350 daN+E MDU-KD Btg 1 6,125,000 6,125,000 0 0 6,125,000
1 3 Tiang Beton 9M-200 daN+E MDU-KD Btg 5 3,155,000 15,775,000 0 0 15,775,000
1 4 Penomoran Tiang JASA Btg 10 10,404 0 0 104,040 104,040
1 0 0 0 0 0
1 II PEMASANGAN KONSTRUKSI 0 0 0 0 0
1 + CJ5-T Unit 3 0 0 0 0 0
1 Plastic Strap for Clamping HDW Bh 3 2,705 0 8,115 0 8,115
2 Stainless Steel Strap 20 x 0.7 mm HDW Mtr 3 15,606 0 46,818 0 46,818
3 Stopping Buckle / Yokes HDW Bh 3 2,393 0 7,179 0 7,179
4 Suspension / Small Angle Assembly HDW Bh 3 73,868 0 221,605 0 221,605
5 Upah Pasang Konst. JTR J5-T JASA Unit 3 20,808 0 0 62,424 62,424
0 0 0 0 0
+ CJ6-T Unit 2 0 0 0 0 0
1 Dead End Assembly HDW Bh 2 81,671 0 163,343 0 163,343
2 Plastic Strap for Clamping HDW Bh 2 2,705 0 5,410 0 5,410
3 Stainless Steel Strap 20 x 0.7 mm HDW Mtr 2 15,606 0 31,212 0 31,212
4 Stopping Buckle / Yokes HDW Bh 2 2,393 0 4,786 0 4,786
5 Upah Pasang Konst. JTR J6-T JASA Unit 2 29,235 0 0 58,470 58,470
1 0 0 0 0 0
1 + CJ7-T Unit 2 0 0 0 0 0
1 1 Large Angle Assembly 50-70 mm² HDW Bh 2 121,519 0 243,037 0 243,037
1 2 Plastic Strap for Clamping HDW Bh 2 2,705 0 5,410 0 5,410
1 3 Stainless Steel Strap 20 x 0.7 mm HDW Mtr 2 15,606 0 31,212 0 31,212
1 4 Stopping Buckle / Yokes HDW Bh 2 2,393 0 4,786 0 4,786
1 5 Upah Pasang Konst. JTR J7-T JASA Unit 2 21,848 0 0 43,697 43,697
1 0 0 0 0 0
+ CC1-A Unit 2 0 0 0 0 0
1 Isolator Tumpu ( Line Post ) 20 KV MDU-KD Bh 2 221,000 442,000 0 0 442,000
2 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh 4 221,000 884,000 0 0 884,000
3 Bolt Machine ⅝" x 10" HDW Bh 6 18,415 0 110,490 0 110,490
4 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 4 5,098 0 20,392 0 20,392
5 Bolt Single Up Side ⅝" x 10" HDW Bh 2 34,957 0 69,915 0 69,915
6 Brace Steel 770 mm HDW Bh 4 43,177 0 172,706 0 172,706
7 Center Bracket 12.5 KN HDW Bh 2 93,844 0 187,688 0 187,688
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 2 405,548 0 811,096 0 811,096
9 Lock Nut ⅝" HDW Bh 8 11,861 0 94,884 0 94,884
10 Pole Band Single Rack 7" atau 7 ½" HDW Bh 2 36,102 0 72,204 0 72,204
11 Spool Insulator ANSI 53 - 2 HDW Bh 2 17,687 0 35,374 0 35,374
12 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 12.4 5,306 0 65,795 0 65,795
13 Washer Square 2 ¼" HDW Bh 10 1,561 0 15,606 0 15,606
14 Upah Pasang Konst. JTM 3 Fasa C1-A JASA Unit 2 75,013 0 0 150,026 150,026
1 0 0 0 0 0
1 + CC2-A Unit 1 0 0 0 0 0
1 1 Isolator Tumpu ( Line Post ) 20 KV MDU-KD Bh 2 221,000 442,000 0 0 442,000
1 2 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh 4 221,000 884,000 0 0 884,000
1 3 Bolt Double Arming ⅝" x 14" HDW Bh 2 36,206 0 72,412 0 72,412
1 4 Bolt Machine ⅝" x 10" HDW Bh 4 18,415 0 73,660 0 73,660
1 5 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 4 5,098 0 20,392 0 20,392
1 6 Brace Steel 770 mm HDW Bh 4 43,177 0 172,706 0 172,706
1 7 Bracket Secondary / Bracket insulated HDW Bh 1 13,629 0 13,629 0 13,629
1 8 Center Bracket 12.5 KN HDW Bh 2 93,844 0 187,688 0 187,688
1 9 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 2 405,548 0 811,096 0 811,096
1 10 Lock Nut ⅝" HDW Bh 8 11,861 0 94,884 0 94,884
1 11 Pole Band Double Rack 7" atau 7 ½" HDW Bh 1 51,292 0 51,292 0 51,292
1 12 Spool Insulator ANSI 53 - 2 HDW Bh 1 17,687 0 17,687 0 17,687
1 13 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 11.6 5,306 0 61,550 0 61,550
1 14 Washer Square 2 ¼" HDW Bh 13 1,561 0 20,288 0 20,288
1 15 Upah Pasang Konst. JTM 3 Fasa C2-A JASA Unit 1 87,602 0 0 87,602 87,602
1 0 0 0 0 0
1 + CC8 Unit 1 0 0 0 0 0
1 1 Isolator Tumpu ( Line Post ) 20 KV MDU-KD Bh 1 221,000 221,000 0 0 221,000
1 2 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh 2 221,000 442,000 0 0 442,000

3 Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End MDU-KD Set 6 400,600 2,403,600 0 0 2,403,600
1 Clamp 150-240 mm²
1 4 Armour Tape ¼" wide HDW Mtr 2 7,075 0 14,149 0 14,149
1 5 Bolt Double Arming ⅝" x 14" HDW Bh 2 36,206 0 72,412 0 72,412
1 6 Bolt Machine ⅝" x 10" HDW Bh 3 18,415 0 55,245 0 55,245
1 7 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 4 5,098 0 20,392 0 20,392
1 8 Brace Steel 770 mm HDW Bh 4 43,177 0 172,706 0 172,706
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
HILANGKAN CENTANG
PADA "HAPUS" DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA
SATUAN MDU HARDWARE JASA JUMLAH

1 9 Center Bracket 12.5 KN HDW Bh 1 93,844 0 93,844 0 93,844


1 10 Clevis Swinging Secondary HDW Bh 2 16,126 0 32,252 0 32,252
1 11 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 4 46,818 0 187,272 0 187,272
1 12 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 2 405,548 0 811,096 0 811,096
1 13 Lock Nut ⅝" HDW Bh 3 11,861 0 35,582 0 35,582
1 14 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 4 30,796 0 123,183 0 123,183
1 15 Oval Eye Bolt ⅝" x 10" HDW Bh 3 19,976 0 59,927 0 59,927
1 16 Oval Eye Nut ⅝" HDW Bh 9 21,848 0 196,636 0 196,636
1 17 Pole Band Double Rack 7" atau 7 ½" HDW Bh 1 51,292 0 51,292 0 51,292
1 18 Schackle Anchor ⅝" HDW Bh 8 16,646 0 133,171 0 133,171
1 19 Spool Insulator ANSI 53 - 4 HDW Bh 2 27,467 0 54,933 0 54,933
1 20 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 5.4 5,306 0 28,653 0 28,653
1 21 Washer Square 2 ¼" HDW Bh 13 1,561 0 20,288 0 20,288
1 22 Upah Pasang Konst. JTM 3 Fasa C8 JASA Unit 1 176,036 0 0 176,036 176,036
1 0 0 0 0 0
1 + CC7 Unit 2 0 0 0 0 0
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End
1 MDU-KD Set 6 400,600 2,403,600 0 0 2,403,600
1 Clamp 150-240 mm²
1 2 Armour Tape ¼" wide HDW Mtr 2 7,075 0 14,149 0 14,149
1 3 Bolt Double Arming ⅝" x 14" HDW Bh 4 36,206 0 144,824 0 144,824
4 Bolt Machine ⅝" x 10" HDW Bh 2 18,415 0 36,830 0 36,830
5 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 8 5,098 0 40,784 0 40,784
6 Brace Steel 770 mm HDW Bh 8 43,177 0 345,413 0 345,413
7 Clevis Swinging Secondary HDW Bh 2 16,126 0 32,252 0 32,252
8 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 4 405,548 0 1,622,192 0 1,622,192
1 9 Lock Nut ⅝" HDW Bh 8 11,861 0 94,884 0 94,884
1 10 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 4 30,796 0 123,183 0 123,183
1 11 Oval Eye Bolt ⅝" x 10" HDW Bh 2 19,976 0 39,951 0 39,951
1 12 Oval Eye Nut ⅝" HDW Bh 6 21,848 0 131,090 0 131,090
1 13 Pole Band Double Rack 7" atau 7 ½" HDW Bh 2 51,292 0 102,583 0 102,583
1 14 Pole Band Single Rack 7" atau 7 ½" HDW Bh 2 36,102 0 72,204 0 72,204
1 15 Schackle Anchor ⅝" HDW Bh 6 16,646 0 99,878 0 99,878
1 16 Spool Insulator ANSI 53 - 4 HDW Bh 2 27,467 0 54,933 0 54,933
1 17 Washer Square 2 ¼" HDW Bh 22 1,561 0 34,333 0 34,333
1 18 Upah Pasang Konst. JTM 3 Fasa C7 JASA Unit 2 87,498 0 0 174,995 174,995
1 0 0 0 0 0
1 + CM5-5 Unit 2 0 0 0 0 0
1 1 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh 2 221,000 442,000 0 0 442,000
1 2 Washer Square 2 ¼" HDW Bh 4 1,561 0 6,242 0 6,242
1 3 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 3.6 5,306 0 19,102 0 19,102
1 4 Upah Pasang Acc.Jar M5-5 JASA Unit 2 24,553 0 0 49,107 49,107
1 0 0 0 0 0
1 + CE1-2 Unit 11 0 0 0 0 0
1 1 Bolt Machine ⅝" x 10" HDW Bh 11 18,415 0 202,566 0 202,566
2 Guy Attachment / Guy hok HDW Bh 11 9,988 0 109,866 0 109,866
3 Guy Wire 35 mm² HDW Mtr 132 15,606 0 2,059,992 0 2,059,992
4 Three Bolt Clamp HDW Bh 22 41,304 0 908,685 0 908,685
5 Washer Square 2 ¼" HDW Bh 11 1,561 0 17,167 0 17,167
6 Upah Pasang Acc.Jar E1-2 JASA Unit 11 32,460 0 0 357,065 357,065
0 0 0 0 0
+ F1-2 Unit 7 0 0 0 0 0
1 Rod Anchor ⅝" x 7' HDW Bh 7 108,410 0 758,868 0 758,868
2 Expanding Anchor 8.000 lbs HDW Bh 7 124,848 0 873,936 0 873,936
4 Kousen HDW Bh 7 4,682 0 32,773 0 32,773
3 Upah Pasang Acc.Jar F1-2 JASA Unit 7 36,418 0 0 254,926 254,926
0 0 0 0 0
+ CM2-12 Unit 10 0 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 10 48,483 0 484,826 0 484,826
2 Ground wire Cu 16 mm² HDW Mtr 8 24,970 0 199,757 0 199,757
3 Ground rod & Washer HDW Bh 10 9,884 0 98,838 0 98,838
4 Upah Pasang Acc.Jar M2-12 JASA Unit 10 12,693 0 0 126,929 126,929
0 0 0 0 0
+ CM2-12A Unit 4 0 0 0 0 0
1 Bimetalic Connector 35 - 240 mm² HDW Bh 4 48,483 0 193,931 0 193,931
2 Ground wire Cu 16 mm² HDW Mtr 4 24,970 0 99,878 0 99,878
3 Ground rod & Washer HDW Bh 4 9,884 0 39,535 0 39,535
4 Upah Pasang Acc.Jar M2-12A JASA Unit 4 16,646 0 0 66,586 66,586
0 0 0 0 0
III PEMASANGAN TRAFO 0 0 0 0 0
+ Trafo 3 Fasa 50 KVA 1 Tiang (G312-A) Unit 1 0 0 0 0 0
1 Trafo 3 phasa 50 kVA YNyn0 MDU-KD Bh 1 21,646,500 21,646,500 0 0 21,646,500
2 Jumper Wire : 0 0 0 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
HILANGKAN CENTANG
PADA "HAPUS" DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA
SATUAN MDU HARDWARE JASA JUMLAH

AAAC 70 mm² MDU-KD Mtr 9 10,611 95,499 0 0 95,499


NFA2X-T 3 x 70 + N 50 mm² MDU-KD Mtr 3 39,900 119,700 0 0 119,700
3 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh 3 607,750 1,823,250 0 0 1,823,250
4 FCO Polymer MDU-KD Bh 3 810,000 2,430,000 0 0 2,430,000
5 Fuse Link 4 A HDW Bh 3 17,500 0 52,500 0 52,500
6 Sepatu Kabel AL/CU Ring-70 mm² HDW Bh 13 48,379 0 628,922 0 628,922
7 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 22 5,098 0 112,155 0 112,155

8 Bracket band segment,vertikal plat ( Hot dip galvanis ) HDW Bh 1 420,946 0 420,946 0 420,946

9 Compresion Conector H type 70 mm² / 70 mm² HDW Bh 3 30,796 0 92,388 0 92,388


10 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis HDW Bh 5 315,033 0 1,575,166 0 1,575,166
11 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 4 405,548 0 1,622,192 0 1,622,192
12 Hot Line Clamp ( 150mm² s/d 240 mm² ) HDW Bh 3 161,366 0 484,098 0 484,098
1 13 Pole Band Single Rack 7" atau 7 ½" HDW Bh 1 36,102 0 36,102 0 36,102
1 14 Pole Band Double Rack 8" atau 8 ½" HDW Bh 2 55,141 0 110,282 0 110,282
1 15 Steel L 70 x 70 x 7 x 780 mm galvanis HDW Bh 2 133,587 0 267,175 0 267,175
1 16 Steel L 70 x 70 x 7 x 1.682 mm galvanis HDW Bh 4 255,314 0 1,021,257 0 1,021,257
17 Upah Pasang Trafo 3 Fasa 50 KVA 1 Tiang JASA Unit 1 1,218,308 0 0 1,218,308 1,218,308
1 0 0 0 0 0
1 + LVCB 2 Jurusan Untuk 1 Tiang (M8-A1) Unit 1 0 0 0 0 0
1 LVCB 2 Jurusan 250 A LBS MDU-KD Bh 1 9,379,100 9,379,100 0 0 9,379,100
2 Kabel NYY 1 x 70 mm² MDU-KD Mtr 68 79,000 5,372,000 0 0 5,372,000
3 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 4 5,098 0 20,392 0 20,392
4 Bolt Machine ⅝" x 8" HDW Bh 10 17,791 0 177,908 0 177,908
5 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis HDW Bh 1 315,033 0 315,033 0 315,033
6 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 1 405,548 0 405,548 0 405,548
7 Pole Band Double Rack 3" atau 3 ½" HDW Bh 9 31,524 0 283,717 0 283,717
8 Pole Band Double Rack 7" atau 7 ½" HDW Bh 1 51,292 0 51,292 0 51,292
9 Pole Band Double Rack 8" atau 8 ½" HDW Bh 2 55,141 0 110,282 0 110,282
10 Pipa Pralon 2 ½" HDW Bh 2 82,250 0 164,500 0 164,500
11 Pipa Pralon 3" HDW Bh 1 85,296 0 85,296 0 85,296
12 Knee Pipe 2 ½" HDW Bh 2 7,616 0 15,231 0 15,231
13 Knee Pipe 3" HDW Bh 1 9,139 0 9,139 0 9,139
14 Spiral Pralon 2 ½" HDW Bh 3 54,833 0 164,500 0 164,500
15 Spiral Pralon 3" HDW Bh 1.5 70,065 0 105,097 0 105,097
16 Sepatu Kabel CU/CU-70 mm² HDW Bh 16 51,716 0 827,456 0 827,456
1 17 Compresion Conector H type 70 mm² / 70 mm² HDW Bh 8 30,796 0 246,367 0 246,367

18 Upah Pasang Acc.Jar LVCB 2 Jurusan (M8-A1, M8-A2) JASA Unit 1 626,113 0 0 626,113 626,113
1
1 0 0 0 0 0
1 + CM2-11M Unit 2 0 0 0 0 0
1 1 Ground rod ⅝" x 8" Copper Weld HDW Bh 2 216,923 0 433,847 0 433,847
1 2 Bimetalic Connector 35 - 240 mm² HDW Bh 2 48,483 0 96,965 0 96,965
1 3 Clamp Ground Rod ⅝" HDW Bh 2 5,077 0 10,154 0 10,154
1 4 Ground wire Cu 16 mm² HDW Mtr 20 24,970 0 499,392 0 499,392
1 5 Ground rod & Washer HDW Bh 4 9,884 0 39,535 0 39,535
1 6 Pipa PVC ½" HDW Bh 11 6,346 0 69,811 0 69,811
1 7 Stopping Buckle / Yokes HDW Bh 12 2,393 0 28,715 0 28,715
1 8 Stainless Steel Strap 20 X 0.7 mm HDW Mtr 9.6 15,606 0 149,818 0 149,818
1 9 Upah Pasang Acc.Jar M2-11M JASA Unit 2 68,042 0 0 136,084 136,084
1 0 0 0 0 0
1 IV PENARIKAN KONDUKTOR 0 0 0 0 0
1 1 Upah Pasang Penghantar TM A3C 3x70 + 1x70mm² JASA Per 50 m 4.9 303,381 0 0 1,486,565 1,486,565

2 Upah Pasang Penghantar TR LVTC 3x70 + 1x50mm² JASA Per 50 m 4.7 225,143 0 0 1,058,170 1,058,170
1
1 3 AAAC 70 mm² MDU-KD Mtr 980 10,611 10,398,780 0 0 10,398,780
1 4 NFA2X-T 3 x 70 + N 50 mm² MDU-KD Mtr 235 39,900 9,376,500 0 0 9,376,500
1 0 0 0 0 0
1 V PEMASANGAN APP 0 0 0 0 0
1 + Pemasangan APP 3 Fasa Di Bangunan Unit 1 0 0 0 0 0
1 1 Strain Hook Clamp 1 ½" HDW Set 1 11,465 0 11,465 0 11,465
1 2 Klem Bugel untuk tiang atap 1 ½" HDW Set 1 6,050 0 6,050 0 6,050
1 3 Gas Pipe 1 ½" x 1.5 Meter HDW Btg 1 47,646 0 47,646 0 47,646
1 4 Protective Cup Plastik 1 ½" HDW Set 1 5,014 0 5,014 0 5,014
1 5 Loden Manset 0.8 Kg HDW Bh 1 59,967 0 59,967 0 59,967
1 6 Service Wedge Clamp 3 Fasa 6, 10, 16, 25 mm² HDW Set 2 3,033 0 6,066 0 6,066
1 7 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² HDW Set 4 8,560 0 34,240 0 34,240
1 0 0 0 0 0
1 + Daya 33.000 VA Unit 1 0 0 0 0 0
KWH Elektronik; 3P; 4W; 220/380V; 5(80) A; kls 1
1 MDU-KD Bh 1 1,282,430 1,282,430 0 0 1,282,430
1 (Pengukuran Langsung)
1 2 Smart Box Langsung Daya 33 kVA MCCB 50 A MDU-KD Unit 1 2,184,000 2,184,000 0 0 2,184,000
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
HILANGKAN CENTANG
PADA "HAPUS" DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


NO URAIAN GOL SAT VOL HARGA
SATUAN MDU HARDWARE JASA JUMLAH

1 3 Modem 3G/4G HDW Unit 1 1,338,267 0 1,338,267 0 1,338,267


1 4 Kabel NYY 4 x 35 mm² HDW Mtr 35 171,544 0 6,004,050 0 6,004,050
1 5 Upah Pasang SR + APP 3 Fasa JASA Unit 1 104,040 0 0 104,040 104,040
1 0 0 0 0 0
1 VI LAIN - LAIN 0 0 0 0 0
1 1 Transportasi JASA Rit 1 520,200 0 0 520,200 520,200
1 0 0 0 0 0
1
1 Sertifikasi laik Operasi JASA Lot 1 2.6% 4,093,041 4,093,041

1
Jumlah MDU - Hardware - Jasa : 116,971,959 33,530,769 10,954,423 161,457,152
PPN 10% : 11,697,196 3,353,077 1,095,442 16,145,715
Jumlah Total : 128,669,155 36,883,846 12,049,866 177,602,867
Terbilang : ( Seratus Tujuh Puluh Tujuh Juta Enam Ratus Dua Ribu Delapan Ratus Enam Puluh Tujuh Rupiah )

Harga yang dipakai adalah KHS PB/PD 2018

Tegal, ………………………………
Mengetahui,
Manager ULP

…………………………………………..
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) TIDAK STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


HARGA
NO URAIAN SAT VOL
SATUAN MDU HARDWARE JASA JUMLAH

HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) TIDAK STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


HARGA
NO URAIAN SAT VOL
SATUAN MDU HARDWARE JASA JUMLAH

HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) TIDAK STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


HARGA
NO URAIAN SAT VOL
SATUAN MDU HARDWARE JASA JUMLAH

HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0
HAPUS 0 0 0 0 0

1
Jumlah MDU - Hardware - Jasa : 0 0 0 0
PPN 10% : 0 0 0 0
Jumlah Total : 0 0 0 0
Terbilang : ( Nol Rupiah )
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

RENCANA ANGGARAN BIAYA (RAB) TIDAK STANDAR


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA
DI WILAYAH ULP PEMALANG

BIAYA YANG DIPERLUKAN ( Rp )


HARGA
NO URAIAN SAT VOL
SATUAN MDU HARDWARE JASA JUMLAH
Terbilang : ( Nol Rupiah )

Harga yang dipakai adalah KHS PB/PD 2018

Tegal, ………………………………
Mengetahui,
Manager ULP

…………………………………………..
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

+ REKAP MATERIAL
KWH Elektronik; 3P; 4W; 220/380V; 5(80) A; kls 1 (Pengukuran
1 MDU-KD Bh 1 0
1 Langsung)
2 2 Smart Box Langsung Daya 33 kVA MCCB 50 A MDU-KD Unit 1 0
3 3 Trafo 3 phasa 50 kVA YNyn0 MDU-KD Bh 1 0
4 4 LVCB 2 Jurusan 250 A LBS MDU-KD Bh 1 0
5 5 FCO Polymer MDU-KD Bh 3 0
6 6 Lightning Arester (Polymer) 21 KV, 10 KA MDU-KD Bh 3 0
7 7 Tiang Beton 9M-200 daN+E MDU-KD Btg 5 0
8 8 Tiang Beton 12M-200 daN+E MDU-KD Btg 4 0
9 9 Tiang Beton 12M-350 daN+E MDU-KD Btg 1 0
10 10 Isolator Tumpu ( Line Post ) 20 KV MDU-KD Bh 5 0
11 11 Isolator Tumpu ( Pin Post ) 20 KV MDU-KD Bh 12 0
Isolator Tarik ( Porcelain ) 20 KV + Primary Dead End Clamp
12 MDU-KD Set 12 0
12 150-240 mm²
13 13 AAAC 70 mm² MDU-KD Mtr 989 0
14 14 NFA2X-T 3 x 70 + N 50 mm² MDU-KD Mtr 238 0
15 15 Kabel NYY 1 x 70 mm² MDU-KD Mtr 68 0
16 16 Modem 3G/4G HDW Unit 1 0
17 17 Fuse Link 4 A HDW Bh 3 0
18 18 Kabel NYY 4 x 35 mm² HDW Mtr 35 0
19 19 Sepatu Kabel AL/CU Ring-70 mm² HDW Bh 13 0
20 20 Sepatu Kabel CU/CU-70 mm² HDW Bh 16 0
21 21 Service Wedge Clamp 3 Fasa 6, 10, 16, 25 mm² HDW Set 2 0
22 22 Strain Hook Clamp 1 ½" HDW Set 1 0
23 23 Loden Manset 0.8 Kg HDW Bh 1 0
24 24 Protective Cup Plastik 1 ½" HDW Set 1 0
25 25 Tap Connector Kedap Air ( 6-25 / 6-25 ) mm² HDW Set 4 0
26 26 Klem Bugel untuk tiang atap 1 ½" HDW Set 1 0
27 27 Gas Pipe 1 ½" x 1.5 Meter HDW Btg 1 0
28 28 Armour Tape ¼" wide HDW Mtr 4 0
29 29 Bimetalic Connector 35 - 240 mm² HDW Bh 16 0
30 30 Bolt Double Arming ⅝" x 14" HDW Bh 8 0
31 31 Bolt Machine / Bolt cariage ½" x ¾" HDW Bh 46 0
32 32 Bolt Machine ⅝" x 10" HDW Bh 26 0
33 33 Bolt Machine ⅝" x 8" HDW Bh 10 0
34 34 Bolt Single Up Side ⅝" x 10" HDW Bh 2 0
35 35 Brace Steel 770 mm HDW Bh 20 0
36 36 Bracket Secondary / Bracket insulated HDW Bh 1 0
37 37 Bracket band segment,vertikal plat ( Hot dip galvanis ) HDW Bh 1 0
38 38 Center Bracket 12.5 KN HDW Bh 5 0
39 39 Clevis Swinging Secondary HDW Bh 4 0
40 40 Compresion Conector H type 240 mm² / 240 mm² HDW Bh 4 0
41 41 Compresion Conector H type 70 mm² / 70 mm² HDW Bh 11 0
42 42 Cross Arm Steel 1.500 mm ( UNSP 10 ) galvanis HDW Bh 6 0
43 43 Cross Arm Steel 2.000 mm ( UNSP 10 ) galvanis HDW Bh 15 0
44 44 Dead End Assembly HDW Bh 2 0
45 45 Expanding Anchor 8.000 lbs HDW Bh 7 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

46 46 Ground rod & Washer HDW Bh 18 0


47 47 Ground rod ⅝" x 8" Copper Weld HDW Bh 2 0
48 48 Ground wire Cu 16 mm² HDW Mtr 32 0
49 49 Clamp Ground Rod ⅝" HDW Bh 2 0
50 50 Guy Attachment / Guy hok HDW Bh 11 0
51 51 Guy Wire 35 mm² HDW Mtr 132 0
52 52 Hot Line Clamp ( 150mm² s/d 240 mm² ) HDW Bh 3 0
53 53 Kousen HDW Bh 7 0
54 54 Large Angle Assembly 50-70 mm² HDW Bh 2 0
55 55 Lock Nut ⅝" HDW Bh 27 0
56 56 Loop Dead End Clamp / LC ( 35 s/d 240 ) mm² HDW Bh 8 0
57 57 Oval Eye Bolt ⅝" x 10" HDW Bh 5 0
58 58 Oval Eye Nut ⅝" HDW Bh 15 0
59 59 Pipa Pralon 2 ½" HDW Bh 2 0
60 60 Pipa Pralon 3" HDW Bh 1 0
61 61 Knee Pipe 2 ½" HDW Bh 2 0
62 62 Knee Pipe 3" HDW Bh 1 0
63 63 Spiral Pralon 2 ½" HDW Bh 3 0
64 64 Spiral Pralon 3" HDW Bh 2 0
65 65 Plastic Strap for Clamping HDW Bh 7 0
66 66 Pole Band Double Rack 3" atau 3 ½" HDW Bh 9 0
67 67 Pole Band Double Rack 7" atau 7 ½" HDW Bh 5 0
68 68 Pole Band Double Rack 8" atau 8 ½" HDW Bh 4 0
69 69 Pole Band Single Rack 7" atau 7 ½" HDW Bh 5 0
70 70 Rod Anchor ⅝" x 7' HDW Bh 7 0
71 71 Schackle Anchor ⅝" HDW Bh 14 0
72 72 Spool Insulator ANSI 53 - 2 HDW Bh 3 0
73 73 Spool Insulator ANSI 53 - 4 HDW Bh 4 0
74 74 Stainless Steel Strap 20 x 0.7 mm HDW Mtr 17 0
75 75 Steel L 70 x 70 x 7 x 780 mm galvanis HDW Bh 2 0
76 76 Steel L 70 x 70 x 7 x 1.682 mm galvanis HDW Bh 4 0
77 77 Stopping Buckle / Yokes HDW Bh 19 0
78 78 Suspension / Small Angle Assembly HDW Bh 3 0
79 79 Three Bolt Clamp HDW Bh 22 0
80 80 Tie Wire # 4 / Alluminium bonding wire # 20 HDW Mtr 33 0
81 81 Washer Square 2 ¼" HDW Bh 73 0
82 82 Pipa PVC ½" HDW Bh 11 0
83 0 0
84 0 0
85 0 0
86 0 0
87 0 0
88 0 0
89 0 0
90 0 0
91 0 0
92 0 0
93 0 0
94 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

95 0 0
96 0 0
97 0 0
98 0 0
99 0 0
100 0 0
101 0 0
102 0 0
103 0 0
104 0 0
105 0 0
106 0 0
107 0 0
108 0 0
109 0 0
110 0 0
111 0 0
112 0 0
113 0 0
114 0 0
115 0 0
116 0 0
117 0 0
118 0 0
119 0 0
120 0 0
121 0 0
122 0 0
123 0 0
124 0 0
125 0 0
126 0 0
127 0 0
128 0 0
129 0 0
130 0 0
131 0 0
132 0 0
133 0 0
134 0 0
135 0 0
136 0 0
137 0 0
138 0 0
139 0 0
140 0 0
141 0 0
142 0 0
143 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

144 0 0
145 0 0
146 0 0
147 0 0
148 0 0
149 0 0
150 0 0
151 0 0
152 0 0
153 0 0
154 0 0
155 0 0
156 0 0
157 0 0
158 0 0
159 0 0
160 0 0
161 0 0
162 0 0
163 0 0
164 0 0
165 0 0
166 0 0
167 0 0
168 0 0
169 0 0
170 0 0
171 0 0
172 0 0
173 0 0
174 0 0
175 0 0
176 0 0
177 0 0
178 0 0
179 0 0
180 0 0
181 0 0
182 0 0
183 0 0
184 0 0
185 0 0
186 0 0
187 0 0
188 0 0
189 0 0
190 0 0
191 0 0
192 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

193 0 0
194 0 0
195 0 0
196 0 0
197 0 0
198 0 0
199 0 0
200 0 0
201 0 0
202 0 0
203 0 0
204 0 0
205 0 0
206 0 0
207 0 0
208 0 0
209 0 0
210 0 0
211 0 0
212 0 0
213 0 0
214 0 0
215 0 0
216 0 0
217 0 0
218 0 0
219 0 0
220 0 0
221 0 0
222 0 0
223 0 0
224 0 0
225 0 0
226 0 0
227 0 0
228 0 0
229 0 0
230 0 0
231 0 0
232 0 0
233 0 0
234 0 0
235 0 0
236 0 0
237 0 0
238 0 0
239 0 0
240 0 0
241 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

242 0 0
243 0 0
244 0 0
245 0 0
246 0 0
247 0 0
248 0 0
249 0 0
250 0 0
251 0 0
252 0 0
253 0 0
254 0 0
255 0 0
256 0 0
257 0 0
258 0 0
259 0 0
260 0 0
261 0 0
262 0 0
263 0 0
264 0 0
265 0 0
266 0 0
267 0 0
268 0 0
269 0 0
270 0 0
271 0 0
272 0 0
273 0 0
274 0 0
275 0 0
276 0 0
277 0 0
278 0 0
279 0 0
280 0 0
281 0 0
282 0 0
283 0 0
284 0 0
285 0 0
286 0 0
287 0 0
288 0 0
289 0 0
290 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

291 0 0
292 0 0
293 0 0
294 0 0
295 0 0
296 0 0
297 0 0
298 0 0
299 0 0
300 0 0
301 0 0
302 0 0
303 0 0
304 0 0
305 0 0
306 0 0
307 0 0
308 0 0
309 0 0
310 0 0
311 0 0
312 0 0
313 0 0
314 0 0
315 0 0
316 0 0
317 0 0
318 0 0
319 0 0
320 0 0
321 0 0
322 0 0
323 0 0
324 0 0
325 0 0
326 0 0
327 0 0
328 0 0
329 0 0
330 0 0
331 0 0
332 0 0
333 0 0
334 0 0
335 0 0
336 0 0
337 0 0
338 0 0
339 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

340 0 0
341 0 0
342 0 0
343 0 0
344 0 0
345 0 0
346 0 0
347 0 0
348 0 0
349 0 0
350 0 0
351 0 0
352 0 0
353 0 0
354 0 0
355 0 0
356 0 0
357 0 0
358 0 0
359 0 0
360 0 0
361 0 0
362 0 0
363 0 0
364 0 0
365 0 0
366 0 0
367 0 0
368 0 0
369 0 0
370 0 0
371 0 0
372 0 0
373 0 0
374 0 0
375 0 0
376 0 0
377 0 0
378 0 0
379 0 0
380 0 0
381 0 0
382 0 0
383 0 0
384 0 0
385 0 0
386 0 0
387 0 0
388 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

389 0 0
390 0 0
391 0 0
392 0 0
393 0 0
394 0 0
395 0 0
396 0 0
397 0 0
398 0 0
399 0 0
400 0 0
401 0 0
402 0 0
403 0 0
404 0 0
405 0 0
406 0 0
407 0 0
408 0 0
409 0 0
410 0 0
411 0 0
412 0 0
413 0 0
414 0 0
415 0 0
416 0 0
417 0 0
418 0 0
419 0 0
420 0 0
421 0 0
422 0 0
423 0 0
424 0 0
425 0 0
426 0 0
427 0 0
428 0 0
429 0 0
430 0 0
431 0 0
432 0 0
433 0 0
434 0 0
435 0 0
436 0 0
437 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

438 0 0
439 0 0
440 0 0
441 0 0
442 0 0
443 0 0
444 0 0
445 0 0
446 0 0
447 0 0
448 0 0
449 0 0
450 0 0
451 0 0
452 0 0
453 0 0
454 0 0
455 0 0
456 0 0
457 0 0
458 0 0
459 0 0
460 0 0
461 0 0
462 0 0
463 0 0
464 0 0
465 0 0
466 0 0
467 0 0
468 0 0
469 0 0
470 0 0
471 0 0
472 0 0
473 0 0
474 0 0
475 0 0
476 0 0
477 0 0
478 0 0
479 0 0
480 0 0
481 0 0
482 0 0
483 0 0
484 0 0
485 0 0
486 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

487 0 0
488 0 0
489 0 0
490 0 0
491 0 0
492 0 0
493 0 0
494 0 0
495 0 0
496 0 0
497 0 0
498 0 0
499 0 0
500 0 0
501 0 0
502 0 0
503 0 0
504 0 0
505 0 0
506 0 0
507 0 0
508 0 0
509 0 0
510 0 0
511 0 0
512 0 0
513 0 0
514 0 0
515 0 0
516 0 0
517 0 0
518 0 0
519 0 0
520 0 0
521 0 0
522 0 0
523 0 0
524 0 0
525 0 0
526 0 0
527 0 0
528 0 0
529 0 0
530 0 0
531 0 0
532 0 0
533 0 0
534 0 0
535 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

536 0 0
537 0 0
538 0 0
539 0 0
540 0 0
541 0 0
542 0 0
543 0 0
544 0 0
545 0 0
546 0 0
547 0 0
548 0 0
549 0 0
550 0 0
551 0 0
552 0 0
553 0 0
554 0 0
555 0 0
556 0 0
557 0 0
558 0 0
559 0 0
560 0 0
561 0 0
562 0 0
563 0 0
564 0 0
565 0 0
566 0 0
567 0 0
568 0 0
569 0 0
570 0 0
571 0 0
572 0 0
573 0 0
574 0 0
575 0 0
576 0 0
577 0 0
578 0 0
579 0 0
580 0 0
581 0 0
582 0 0
583 0 0
584 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

585 0 0
586 0 0
587 0 0
588 0 0
589 0 0
590 0 0
591 0 0
592 0 0
593 0 0
594 0 0
595 0 0
596 0 0
597 0 0
598 0 0
599 0 0
600 0 0
601 0 0
602 0 0
603 0 0
604 0 0
605 0 0
606 0 0
607 0 0
608 0 0
609 0 0
610 0 0
611 0 0
612 0 0
613 0 0
614 0 0
615 0 0
616 0 0
617 0 0
618 0 0
619 0 0
620 0 0
621 0 0
622 0 0
623 0 0
624 0 0
625 0 0
626 0 0
627 0 0
628 0 0
629 0 0
630 0 0
631 0 0
632 0 0
633 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

634 0 0
635 0 0
636 0 0
637 0 0
638 0 0
639 0 0
640 0 0
641 0 0
642 0 0
643 0 0
644 0 0
645 0 0
646 0 0
647 0 0
648 0 0
649 0 0
650 0 0
651 0 0
652 0 0
653 0 0
654 0 0
655 0 0
656 0 0
657 0 0
658 0 0
659 0 0
660 0 0
661 0 0
662 0 0
663 0 0
664 0 0
665 0 0
666 0 0
667 0 0
668 0 0
669 0 0
670 0 0
671 0 0
672 0 0
673 0 0
674 0 0
675 0 0
676 0 0
677 0 0
678 0 0
679 0 0
680 0 0
681 0 0
682 0 0
PT. PLN ( PERSERO )
UP3 TEGAL - ULP PEMALANG

REKAP KEBUTUHAN MATERIAL


PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG BARU
ATAS NAMA JONI DAYA B2 33000 VA

RAB TIDAK
NO URAIAN GOL SAT RAB STANDAR
STANDAR

683 0 0
684 0 0
685 0 0
686 0 0
687 0 0
688 0 0
689 0 0
690 0 0
691 0 0
692 0 0
693 0 0
694 0 0
695 0 0
696 0 0
697 0 0
698 0 0
699 0 0
700 0 0
PT. PLN ( PERSERO ) ULP PEMALANG
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
9 Fuse Cut Out s s
P13-57/4
1C12-200 10 ABSW
1CC2-A 11 Vang Net
1CM2-12 P13-57/1
1CM2-12A 1C12-200 12 Schoor
2CE1-2 1CC-8 13
1F1-2 P13-57/3 1CM2-12
1C12-200 2CM2-12A
1CC1-A P13-57/2 4CE1-2
A 1CM2-12 1C12-200 2F1-2
Bongkar Pasang Konstruksi :
1CC1-A Pasang Bongkar
50 m 1CM2-12
45 m 45 m 45 m 50 m C12-200 4 Btg
45 m C12-350 1 Btg
50 m
P13-57/8
1C9-200 P13-57/7 P13-57/6 P13-57/5 50 m C9-200 5 Btg
1CJ5-T 1C9-200 1C9-200 1C12-350 45 m CC1-A 2 Unit
1CM2-12 1CJ5-T 1CJ5-T 1CC-7
1CM2-12 1CM2-12 1CG312-A CC2-A 1 Unit
1CJ6-T CC-7 2 Unit
2CM2-11M
1CM2-12 CC-8 1 Unit
1CM2-12A P13-57 CG312-A 1 Unit
2CE1-2 1C14-350
1F1-2 1CC1-A CM2-12 10 Unit
LVCB 1CM2-12 CM2-11M 2 Unit
1CC-7
2CM5-5 CM2-12A 4 Unit
CE1-2 11 Unit
F1-2 7 Unit
TM A3C 3x70 + 1x70mm²245 Mtr
P13-57/10
1C9-200 CJ5-T 3 Unit
TR LVTC 3x70 + 1x50mm²
235 Mtr
1CJ7-T CJ6-T 2 Unit CM5-5 2 Unit
1CM2-12
1CE1-2 CJ7-T 2 Unit LVCB 1 Unit
1F1-2 Keterangan Tambahan:
APP 10 m 1CJ6-T

45 m
Golongan
No. Gambar 1 Lembar dr
Gambar dari Skala
P13-57/9
A Perihal:
1C9-200
1CJ7-T PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG
1CM2-12 BARU
2CE1-2 ATAS NAMA JONI DAYA B2 33000 VA
2F1-2
Digambar FADILAH
Diperiksa AZMI NUR FAUZAN
Diketahui AZMI NUR FAUZAN
Disetujui KHOIRON JUSUF
PT. PLN ( PERSERO ) ULP PEMALANG
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
9 Fuse Cut Out s s
10 ABSW
11 Vang Net
12 Schoor
13

Bongkar Pasang Konstruksi :


Pasang Bongkar

Keterangan Tambahan:

Golongan
No. Gambar 2 Lembar dr
Gambar dari Skala
Perihal:
PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG
BARU
ATAS NAMA JONI DAYA B2 33000 VA
Digambar FADILAH
Diperiksa AZMI NUR FAUZAN
Diketahui AZMI NUR FAUZAN
Disetujui KHOIRON JUSUF
PT. PLN ( PERSERO ) ULP PEMALANG
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
9 Fuse Cut Out s s
10 ABSW
11 Vang Net
12 Schoor
13

Bongkar Pasang Konstruksi :


Pasang Bongkar

Keterangan Tambahan:

Golongan
No. Gambar 3 Lembar dr
Gambar dari Skala
Perihal:
PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG
BARU
ATAS NAMA JONI DAYA B2 33000 VA
Digambar FADILAH
Diperiksa AZMI NUR FAUZAN
Diketahui AZMI NUR FAUZAN
Disetujui KHOIRON JUSUF
PT. PLN ( PERSERO ) ULP PEMALANG
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
9 Fuse Cut Out s s
10 ABSW
11 Vang Net
12 Schoor
13

Bongkar Pasang Konstruksi :


Pasang Bongkar

Keterangan Tambahan:

Golongan
No. Gambar 4 Lembar dr
Gambar dari Skala
Perihal:
PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG
BARU
ATAS NAMA JONI DAYA B2 33000 VA
Digambar FADILAH
Diperiksa AZMI NUR FAUZAN
Diketahui AZMI NUR FAUZAN
Disetujui KHOIRON JUSUF
PT. PLN ( PERSERO ) ULP PEMALANG
Keterangan Gambar :
No Nama Material Baru Eksisting
1 Tiang Beton
2 Tiang Besi
3 JTM 3 Fasa
4 JTM 1 Fasa
5 JTR 1 Fasa Only / UB
6 JTR 3 Fasa Only / UB
7 Trafo 1 Fasa
8 Trafo 3 Fasa
9 Fuse Cut Out s s
10 ABSW
11 Vang Net
12 Schoor
13

Bongkar Pasang Konstruksi :


Pasang Bongkar

Keterangan Tambahan:

Golongan
No. Gambar 5 Lembar dr
Gambar dari Skala
Perihal:
PEMASANGAN JTM 3 FASA & TRAFO UNTUK MELAYANI PASANG
BARU
ATAS NAMA JONI DAYA B2 33000 VA
Digambar FADILAH
Diperiksa AZMI NUR FAUZAN
Diketahui AZMI NUR FAUZAN
Disetujui KHOIRON JUSUF
REKAP KONSTRUKSI

KELOMPOK KONSTRUKSI SATUAN

CA1 Unit
CA1' Unit
CA1-N Unit
CA1-PN Unit
CA1-P Unit
CA1-P' Unit
CA2 Unit
CA2' Unit
CA2-N Unit
CA3 Unit
CA3' Unit
CA3-N Unit
CA4 Unit
CA4' Unit
CA4-N Unit
CA5 Unit
CA5' Unit
KONSTRUKSI JTM 1 FASA PADA CA5-N Unit
TIANG BETON
CA5-1 Unit
CA5-1' Unit
CA5-2 Unit
CA5-2' Unit
CA5-3 Unit
CA5-3' Unit
CA5-4 Unit
CA5-4' Unit
CA6 Unit
CA6' Unit
CA6-N Unit
CA7 Unit
CA7-A Unit
CA8 Unit
CA8-A Unit
CA9 Unit
CA9-N Unit

SA1 Unit
SA1' Unit
SA1-N Unit
SA1-PN Unit
SA1-P Unit
SA1-P' Unit
SA2 Unit
SA2' Unit
SA2-N Unit
SA3 Unit
SA3' Unit
SA3-N Unit
SA4 Unit
SA4-N Unit
SA5 Unit
SA5' Unit
KONSTRUKSI JTM 1 FASA PADA SA5-N Unit
TIANG BESI SA5-1 Unit
SA5-1' Unit
SA5-2 Unit
SA5-2' Unit
SA5-3 Unit
SA5-3' Unit
SA5-4 Unit
SA5-4' Unit
SA6 Unit
SA6' Unit
SA-N Unit
SA7 Unit
SA7-A Unit
SA8 Unit
SA8-A Unit
SA9 Unit
SA9-N Unit

CB-1 Unit
CB1-A Unit
KONSTRUKSI JTM 1-3 FASA PADA CB-2 Unit
TIANG BETON CB-3 Unit
CB-4 Unit
CB-5 Unit

SB-1 Unit
SB1-A Unit
KONSTRUKSI JTM 1-3 FASA PADA SB-2 Unit
TIANG BESI SB-3 Unit
SB-4 Unit
SB-5 Unit

CC1 Unit
CC1' Unit
CC1-N Unit
CC1-1 Unit
CC1-1' Unit
CC1-1N Unit
CC1-A Unit
CC1-A' Unit
CC2 Unit
CC2' Unit
CC2-N Unit
CC2-1 Unit
CC2-1' Unit
CC2-1N Unit
CC2-A Unit
CC2-A' Unit
CC3 Unit
CC3' Unit
CC3-VN Unit
CC4-1 Unit
KONSTRUKSI JTM 3 FASA PADA CC5-1 Unit
TIANG BETON
CC7 Unit
CC7' Unit
CC7-1 Unit
CC7-1' Unit
CC7-N Unit
CC8 Unit
CC8' Unit
CC8-N Unit
CC8-A Unit
CC8-A' Unit
CC8-AN Unit
CC9 Unit
CC9' Unit
CC9-N Unit
CC10 Unit
CC10' Unit
CC10-N Unit
CC11 Unit
CC11' Unit
CC11-N Unit

SC1 Unit
SC1' Unit
SC1-N Unit
SC1-1 Unit
SC1-1' Unit
SC1-1N Unit
SC1-A Unit
SC1-A' Unit
SC2 Unit
SC2' Unit
SC2-N Unit
SC2-1 Unit
SC2-1' Unit
SC2-1N Unit
SC2-A Unit
SC2-A' Unit
SC3 Unit
SC3' Unit
SC3-VN Unit

KONSTRUKSI JTM 3 FASA PADA


TIANG BESI
SC4-1 Unit
KONSTRUKSI JTM 3 FASA PADA
TIANG BESI SC5-1 Unit
SC7 Unit
SC7' Unit
SC7-1 Unit
SC7-1' Unit
SC7-N Unit
SC8 Unit
SC8' Unit
SC8-N Unit
SC8-A Unit
SC8-A' Unit
SC8-AN Unit
SC9 Unit
SC9' Unit
SC9-N Unit
SC10 Unit
SC10' Unit
SC10-N Unit
SC11 Unit
SC11' Unit
SC11-N Unit

DC-C1V Unit
DC-C1-1V Unit
DC-C1-1VN Unit
DC-C1-1H Unit
DC-C1-AHN Unit
KONSTRUKSI JTM 3 FASA DOUBLE DC-C2-1V Unit
CIRCUIT PADA TIANG DC-C2-AH Unit
BETON/BESI DC-C2-AHN Unit
DC-C2-1BN Unit
DC-C4-N Unit
DC-C7-N Unit
DC-C8 Unit
DC-C8N Unit

DB01 Unit
DB02 Unit
DB03 Unit
DB04 Unit
KONSTRUKSI SKUTM
DB05 Unit
DB06 Unit
DB08 Unit
DB09 Unit

CE1-1 Unit
CE1-2 Unit
CE1-3 Unit

UNIT KONSTRUKSI GAWAT TARIK


(GUY) PADA TIANG BETON
CE2-1 Unit
UNIT KONSTRUKSI GAWAT TARIK
(GUY) PADA TIANG BETON CE2-2 Unit
CE2-3 Unit
CE5-1 Unit
CE5-2 Unit
CE6-1 Unit

SE1-1 Unit
SE1-2 Unit
SE1-3 Unit
SE2-1 Unit
UNIT KONSTRUKSI GAWAT TARIK SE2-2 Unit
(GUY) PADA TIANG BESI
SE2-3 Unit
SE5-1 Unit
SE5-2 Unit
SE6-1 Unit

F1-2 Unit
UNIT KONSTRUKSI GANCHOR
ASSEMBLIES & DRAG SCHOOR F1-3 Unit
FDG Unit

Trafo 1 Fasa CSP 50 KVA (G105, G106, G136) Unit


Trafo 1 Fasa 50 KVA Dengan Srandang (G107) Unit
Trafo 3 Fasa 50 KVA 1 Tiang (G312-A) Unit
KONSTRUKSI PEMASANGAN Trafo 3 Fasa 100 KVA 1 Tiang (G312-A) Unit
TRAFO PADA TIANG BETON/BESI
Trafo 3 Fasa 100 KVA 2 Tiang (G313) Unit
Trafo 3 Fasa 160 KVA 2 Tiang (G313) Unit
Trafo 3 Fasa 200 KVA 2 Tiang (G313) Unit

CJ5 Unit
CJ6 Unit
CJ6X Unit
CJ7 Unit
KONSTRUKSI JTR PADA TIANG CJ8 Unit
BETON CJ10 Unit
CJ5-T Unit
CJ6-T Unit
CJ7-T Unit
MJ6-T Unit

SJ5 Unit
SJ6 Unit
SJ6X Unit
SJ7 Unit
KONSTRUKSI JTR PADA TIANG SJ8 Unit
BESI SJ10 Unit
SJ5-T Unit
KONSTRUKSI JTR PADA TIANG
BESI

SJ6-T Unit
SJ7-T Unit
MJ6-T Unit

CM2-11 Unit
CM2-11M Unit
CM2-12 Unit
CM2-12.A Unit
CM2-15 Unit
CM5-2 Unit
CM5-3 Unit
AKSESORIS JARINGAN PADA CM5-4 Unit
TIANG BETON CM5-5 Unit
CM5-6 Unit
CM5-8 Unit
CM5-9 Unit
CM5-12 Unit
CM5-13 Unit
CM5-16 Unit
CM5-20 Unit

SM2-11 Unit
SM2-11M Unit
SM2-12 Unit
SM2-12.A Unit
SM2-15 Unit
SM5-2 Unit
SM5-3 Unit
AKSESORIS JARINGAN PADA SM5-4 Unit
TIANG BESI SM5-5 Unit
SM5-6 Unit
SM5-8 Unit
SM5-9 Unit
SM5-12 Unit
SM5-13 Unit
SM5-16 Unit
SM5-20 Unit

P12C-1 Unit
KONSTRUKSI P12 (UNTUK P12S-1 Unit
MENAMBAH KETINGGIAN TIANG) P12C-2 Unit
P12S-2 Unit

KONSTRUKSI VANGNET (UNTUK


PENGAMAN JARINGAN DI ATAS KONSTRUKSI VANGNET Meter
JALAN)

Pemasangan Load Break Switch Unit


PEMUTUS/PEMISAH PADA TIANG
BETON/BESI Pemasangan ABSW Unit
PEMUTUS/PEMISAH PADA TIANG
BETON/BESI
Pemasangan Recloser Unit

Tiang Beton 9M-200 daN+E Batang


Tiang Beton 12M-200 daN+E Batang
Tiang Beton 12M-350 daN+E Batang
PEMASANGAN TIANG Tiang Beton 13M-200 daN+E Batang
Tiang Beton 13M-350 daN+E Batang
Tiang Beton 14M-350 daN+E Batang
Tiang Beton 14M-500 daN+E Batang

A3C 3x240 + 1x150 mm Kms


A3C 3x240 mm Kms
A3C 3x70 + 1x70 mm Kms
A3C 3x70 mm Kms
PEMASANGAN PENGHANTAR A3C 1x70 + 1x70 mm Kms
A3C 1x70 mm Kms

LVTC 2x70 + N50 mm Kms


LVTC 3x70 + N50 mm Kms

Disesuaikan Hasil Survey Unit


Unit
Unit
Unit
PEMBONGKARAN KONSTRUKSI & Unit
PENGHANTAR
Unit

Disesuaikan Hasil Survey Kms


Kms
EKAP KONSTRUKSI

Gambar 1 Gambar 2 Gambar 3 Gambar 4 Gambar 5 Total


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PT. PLN (PERSERO)
DISTRIBUSI JATENG DAN DI YOGYAKARTA
UP3 TEGAL - ULP PEMALANG

JUSTIFIKASI PERLUASAN JARINGAN

1. Nama Pekerjaan : PEMASANGAN JTR UNTUK MELAYANI PASANG BARU ATAS NAMA TPU WANARATA

2. Lokasi : ULP PEMALANG

3. Potensi Pelanggan : Terdapat potensi pelanggan sejumlah ……. Daya …… VA (contoh)

4. Jumlah Anggaran : Rp 177,602,867 ,-

RAB & Gambar Terlampir

5. Latar Belakang : 1. Terdapat Permintaan PB atas nama TPU WANARATA Daya 900 VA
2. Jarak jaringan listrik eksisting ke calon pelanggan 0,129 kms
3. Pelanggan disekitar lokasi terdapat SR deret
4. dst ……………

6. Manfaat Perluasan Jaringan : 1. Melayani Permintaan PB/PD atas nama TPU WANARATA Daya 900 VA
2. Perbaikan Tegangan
3. Perbaikan SR deret di lokasi pembangunan jaringan
4. dst ……………

Tegal, ………………………………
PT. PLN ( PERSERO ) ULP PEMALANG

Mengetahui, Dibuat,
Manager ULP Supervisor Teknik

………………………………………….. …………………………………………..

You might also like