0% found this document useful (0 votes)
101 views

Certificates of Reports PDF

This project report describes a project titled "PROJECT TITLE" completed by two students for their Bachelor of Engineering degree. It includes sections on project management, system requirements, system analysis and design, implementation planning, testing, screenshots, and conclusions. Certification is provided by the internal guide and head of the Information Technology Department of Alpha College of Engineering and Technology.

Uploaded by

Anubrata Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views

Certificates of Reports PDF

This project report describes a project titled "PROJECT TITLE" completed by two students for their Bachelor of Engineering degree. It includes sections on project management, system requirements, system analysis and design, implementation planning, testing, screenshots, and conclusions. Certification is provided by the internal guide and head of the Information Technology Department of Alpha College of Engineering and Technology.

Uploaded by

Anubrata Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

TITLE OF THE PROJECT

A PROJECT REPORT

Submitted by

NAME OF THE CANDIDATE (ENROLMENT NO)


NAME OF THE CANDIDATE (ENROLMENT NO)

In fulfillment for the award of the degree

of

BACHELOR OF ENGINEERING

in

Department of Information Technology

ALPHA COLLEGE OF ENGINEERING AND TECHNOLOGY,


GANDHINAGAR

Gujarat Technological University, Ahmedabad

2019 - 2020
Alpha College of Engineering and Technology, Gandhinagar
Department of Information Technology
2019 - 2020

CERTIFICATE
Date:

This is to certify that the Project entitled “PROJECT TITLE” has been carried out by

NAME OF THE STUDENT 1 under my guidance in fulfilment of the degree of Bachelor of

Engineering in Department of Information Technology 8th Semester of Gujarat

Technological University, Ahmedabad during the academic year 2019 - 2020.

Internal Guide
Prof. Amitkumar J. Patel
Department of Information Technology

Head of Department
Prof. Manojkumar B. Patel
Department of Information Technology
Alpha College of Engineering and Technology, Gandhinagar
Department of Information Technology
2019 - 2020

CERTIFICATE
Date:

This is to certify that the Project entitled “PROJECT TITLE” has been carried out by

NAME OF THE STUDENT 1 under my guidance in fulfilment of the degree of Bachelor of

Engineering in Department of Information Technology 8th Semester of Gujarat

Technological University, Ahmedabad during the academic year 2019 - 2020.

Internal Guide
Prof. Amitkumar J. Patel
Department of Information Technology

Head of Department
Prof. Manojkumar B. Patel
Department of Information Technology
This page is reserved for the Certificate generated by the PMMS Portal. They have to attach
PMMS Certificate in their project report at this position after certificate.
appendix i
ACKNOWLEDGEMENT

With Sincere Regards

Name of the Student 1

Name of the Student 2


appendix ii
ABSTRACT

Title of the Project


(Tagline if any)

Content must be in Times New Roman and Italic and size 12


appendix iii
LIST OF FIGURES

Figure No Figure Description Page No


2.1
4.5
appendix iv
LIST OF TABLES
Table No Table Description Page No
Table 2.1
Table 4.5
appendix v
LIST OF SYMBOLS
Symbol Symbol Description Page No
appendix vi
LIST OF ABBREVIATIONS
Abbreviations Description
appendix vii
TABLE OF CONTENT
Chapter No Chapter Title Page No
Acknowledgement i
Abstract ii
List of Figures iii
List of Tables iv
List of Symbol v
List of Abbreviations vi
Table of Contents vii

Chapter 1 Introduction
1.1 Project Summary
1.2 Purpose
1.3 Scope
1.4 Technology Review
1.4.1 Common Language Run-time
1.4.2 Introduction about Technology
1.4.2.1 Introduction about Software
1.4.3 Architecture used/followed

Chapter 2 Project Management


2.1 Project Planning & Schedule
2.1.1 Project Development Approach
2.1.2 Project Plan
2.1.3 Schedule Representation
2.2 Risk Management
2.2.1 Risk Identification
2.2.2 Risk Analysis
2.2.3 Risk Planning
2.3 Estimation
2.2.1 Effort Estimation
2.2.2 Duration Estimation

Chapter 3 System Requirement Study


3.1 User Characteristics
3.2 Hardware and Software characteristics
3.3 Constraints
3.3.1 Regulatory Policies
3.3.2 Reliability requirement
3.3.3 Criticality of the application
3.3.4 Safety & security consideration
Chapter 4 System Analysis and Designing
4.1 Study of current system
4.2 Problems & weakness of current system
4.3 Feasibility Study
4.4 Requirements Validation
4.5 Structural view
4.5.1 Class Diagram
4.6 Functional Modelling
4.6.1 Data Flow Diagram
4.6.2 Data Dictionary
4.6.3 Entity Relationship Diagram
4.7 Behavioral Modelling
4.7.1 Use-case Diagram
4.7.2 Sequence Diagram
4.7.3 Activity Diagram
4.8 Selection of hardware & software justification

Chapter 5 Implementation Planning


5.1 Implementation Environment
5.2 Coding Standards

Chapter 6 Testing
6.1 Testing Plan
6.2 Testing Strategy
6.3 Testing Cases

Chapter 7 Screen Shots & User Manuals

Chapter 8 Limitations and Enhancements

Chapter 9 Conclusion

Chapter 10 References

You might also like