Appendix A: No Description Remark I Calculation Delivery Time (Week)

The document outlines the requirements for documentation related to the fabrication of a pressure vessel. It includes 12 sections that detail the required calculations, drawings, quality control procedures, welding and inspection documentation, fabrication procedures, equipment calibration documentation, and reports that must be provided. The goal is to provide all necessary documentation to ensure the pressure vessel meets design specifications and regulatory requirements for safety.

Uploaded by

SonNguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
218 views

Appendix A: No Description Remark I Calculation Delivery Time (Week)

The document outlines the requirements for documentation related to the fabrication of a pressure vessel. It includes 12 sections that detail the required calculations, drawings, quality control procedures, welding and inspection documentation, fabrication procedures, equipment calibration documentation, and reports that must be provided. The goal is to provide all necessary documentation to ensure the pressure vessel meets design specifications and regulatory requirements for safety.

Uploaded by

SonNguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

APPENDIX A

Delivery
No Description Remark
Time (Week)
I Calculation
1 Pressure Vessel calculation. Including calculation as follows but not limitted.
2 Shell, head, nozzle minimum wall thickness calculation.
3 Allowable nozzle load calculation.
Detailed Lifting and Tailing calculations including local load stresses in shell/ Skirt, and shell bending stresses in
4
vertical.
5 Calculations of slinging stresses in vessel shell, during lifting operations with vessel in vertical position.
6 Local load analysis to WRC-107. (the external load shall be calculated according to WRC 107 & WRC 297).

II Drawing & Datasheet


1 Vessel datasheet
2 General Arrangement drawings.
3 Detail construction drawings for pressure vessel.
4 Skirt support detail drawing.
5 Name plate detaill drawing.

III Organization
1 Organization chart.
2 Factory lay-out.
3 C/Q or guarantee certificates.

IV Control of main materials


1 Material requisition form.
2 Purchase order specification.
3 Material receiving inspection report.
5 Mill Certificates type 3.1 & 2.2 according to EN10474/ 10204 for non-critical items and non-pressurized Parts.
6 Material request.
7 Coded marking control log.
8 Storage & Handling of filler metal.

V Control of welding materials


1 Welding material purchase requisition.
2 Welding material receiving inspection report.
3 Certificates of welding material.
4 Consumable request.
5 Baking and holding log for electrodes/flux.
6 Consumable issue log.

VI Control of welder
1 Qualified welder & welding operator register list.
2 Certificates of welder.

VII Welding procedure specification


1 Qualified WPSI PQR register list.
2 Welding procedure specification no.
3 Welding repair procedure.

VIII NDE procedures


1 Magnetic particle inspection procedure.
2 Dye penetrant procedure.
APPENDIX A
Delivery
No Description Remark
Time (Week)
3 Ultrasonic testing procedure.
4 Radiographic testing procedure.
5 Positive material indentification (PMI) procudure.
6 List of NDE personnel.
7 Certificates of NDE personnel.

VIII Fabrication Construction Procedures


1 Cutting plan.
2 Coded marking control procedure.
3 General welding control procedure.
4 Forming control procedure.
5 Dimension control procedure.
6 Post weld heat treatment procedure.
7 Surface preparation & painting procedure
8 Leakage test procedure.
9 Hydrostatic test procedure.
10 Blasting & Painting procedure.
11 Acid pickling and passivation procedure.
12 Repair procedure.

IX Control of construction equipments


1 List of calibration equipment.
2 Verification certificates of equipment.

X Control of Fabrication Reports


1 Inspection & Test Plan.
2 Weld map.
3 Dish end inspection report.
4 Dimension Inspection report.
5 Post weld heat treatment report.
6 Visual test report.
7 Magnetic particle inspection report.
8 Radiographic test report.
9 Ultrasonic test report.
10 Positive material indentification (PMI) test report.
11 Repair report.
12 Hydrostatic test report.
13 Leakage test report.
14 Blasting & Painting report.
15 Acid pickling and passivation report.
16 Dimesional & Tolerance records.

XI Non conformance record


XII Third Party Inspection Report