Length (m): 20
Fault Rating
Correction Factors
Factor:
Ambient Temperature (deg C): 50.0 0.84
Total: 0.840
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 1 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar Section Section Fault Level Zs Earth Fault Volt Drop Section
inc. Cmin
From: To: Length at Tap Off (kA) (Total) at Tap Off Load
(exc. Cmin)
(m) Min Max ( W) (kA) (%) (A)
Swing Panel -1A SLVP-01A 20 24.35 28.77 0.0101 22.45 0.79 545.2
(23.63)
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 2 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Comments
Length (m): 20
Fault Rating
Correction Factors
Factor:
Ambient Temperature (deg C): 50.0 0.84
Total: 0.840
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 3 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar Section Section Fault Level Zs Earth Fault Volt Drop Section
inc. Cmin
From: To: Length at Tap Off (kA) (Total) at Tap Off Load
(exc. Cmin)
(m) Min Max ( W) (kA) (%) (A)
Swing Panel -1A SLVP-01B 20 24.35 28.77 0.0101 22.43 0.87 991.5
(23.61)
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 4 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar BTS-04B
Location Function
Comments
Fault Rating
Correction Factors
Factor:
Ambient Temperature (deg C): 50.0 0.84
Total: 0.840
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 5 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar Section Section Fault Level Zs Earth Fault Volt Drop Section
inc. Cmin
From: To: Length at Tap Off (kA) (Total) at Tap Off Load
(exc. Cmin)
(m) Min Max ( W) (kA) (%) (A)
SLVP-01B BTS-04B (1200A)_TAP-OFF 105 12.22 19.45 0.0197 11.54 2.27 617.5
(12.14)
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 6 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Location Function
Comments
Fault Rating
Correction Factors
Factor:
Ambient Temperature (deg C): 50.0 0.84
Total: 0.840
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 7 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar Section Section Fault Level Zs Earth Fault Volt Drop Section
inc. Cmin
From: To: Length at Tap Off (kA) (Total) at Tap Off Load
(exc. Cmin)
(m) Min Max ( W) (kA) (%) (A)
SLVP-01A BTS-05A ( TAP OFF ) 100 12.54 19.78 0.0191 11.90 1.25 216.0
(12.53)
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 8 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Location Function
Comments
Fault Rating
Correction Factors
Factor:
Ambient Temperature (deg C): 50.0 0.84
Total: 0.840
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 9 of 10 Printed on: 4/10/2020
Created using: v2018.0.0.661 BS 7671:2018 - Al Bidda Switchgear © 1996-2018 Trimble Inc.
Busbar Calculation Report
Busbar Section Section Fault Level Zs Earth Fault Volt Drop Section
inc. Cmin
From: To: Length at Tap Off (kA) (Total) at Tap Off Load
(exc. Cmin)
(m) Min Max ( W) (kA) (%) (A)
SLVP-01A BTS-05B ( TAP OFF ) 120 11.35 18.51 0.0202 11.28 0.79 0.0
(11.87)
Project: Hamad Building Construction -SLVP-01 & 02 - Rev. 2.p18x Page 10 of 10 Printed on: 4/10/2020