PAGE
PT. Heat Exchangers Indonesia
PEARLOIL (SEBUKU) LTD.
Contract No. 001/POSL/TDR/RUBY-EPC/II/2010
PROJECT : RUBY FIELD DEVELOPMENT PROJECT
PO No. : 21165-PO-RUBY-MEP-000064
DOCUMENT TITLE : VENDOR DATA BOOK
DOCUMENT NO. : RB-HEI-PLT-QA-IX-2001
HEI DOC. NO. : MDRI-BO1205
EQUIPMENT TAG NO. : 213-V-03
PACKAGE NAME : SEAL GAS SCRUBBER
ORIGINATOR CHECKER APPROVER APPROVAL APPROVAL APPROVAL
REV DATE PURPOSE PT . Heat Exchangers Indonesia WPI MEI Company
NAME NAME NAME NAME NAME NAME DATE
10 26 July 2012 As Built Yogga Haris Bayu
DOCUMENT NO :
PEARLOIL (SEBUKU) LTD.
RB-HEI-PLT-QA-IX-2001
RUBY FIELD DEVELOPMENT PROJECT REVISION : 10
VENDOR DATA BOOK PAGE : 2 of 3
TABLE OF CONTENT
No. of Book
No. Document Number Rev Description
Sheets No.
1.0 Engineering & Fabrication Document
RB-HEI-PLT-MS-CL-2001 10 Design Calculation 210
1.1 1 of 2
RB-WPI-PR-DS-213-V-03 D Process Datasheet 16
1.2 RB-WPI-PLT-MS-SP-1001-0 0 User Design Specification 42 1 of 2
1.3 RB-HEI-PLT-MS-GA-2001 10 General Arrangement Drawings 1 1 of 2
RB-HEI-PLT-MS-DR-2001 10 Construction Detail 2
RB-HEI-PLT-MS-DR-2012 10 Nozzle Detail 2
1.4 RB-HEI-PLT-MS-DR-2023 10 Manhole Detail 1 1 of 2
RB-HEI-PLT-MS-DR-2034 10 Name Plate Detail 1
RB-HEI-PLT-MS-DR-2045 10 Lifting Arrangement 1
2.0 Manuals
2.1 - - Not Applicable - -
3.0 Manufacturing and Quality Documents
3.1 RB-HEI-PLT-QC-PR-2013 10 Welding Procedure Map 14 1 of 2
3.2 RB-HEI-PLT-QC-PR-2026 10 NDE Map and NDE Summary 3 1 of 2
List Welding Procedure Register 1
RB-HEI-PLT-QC-PR-2014 10 WPS-HEB-C004P1SMAW 10
RB-HEI-PLT-QC-PR-2015 10 WPS-HEB-C002P1GTSMAW 10
RB-HEI-PLT-QC-PR-2016 10 WPS-HEB-127P1SMSAW 8
RB-HEI-PLT-QC-PR-2017 10 WPS-HEB-C001P1GTSAW 10
RB-HEI-PLT-QC-PR-2018 10 WPS-HEB-226P1GMSAW 7
3.3 1 of 2
RB-HEI-PLT-QC-PR-2019 10 WPS-HEB-225GMFCAW 7
RB-HEI-PLT-QC-PR-2020 10 WPS-HEB-063100 10
RB-HEI-PLT-QC-PR-2021 10 WPS-HEB-109-P8GTSMAW 6
RB-HEI-PLT-QC-PR-2022 10 WPS-HEB-C005P8P1SMAW 6
RB-HEI-PLT-QC-PR-2023 10 WPS-HEB-105 7
RB-HEI-PLT-QC-PR-2025 10 Weld Repair Procedure 4
NDE Procedure
RB-HEI-PLT-QC-PR-2027 10 Radiography Test Procedure 24
3.4 RB-HEI-PLT-QC-PR-2028 10 Ultrasonic Test Procedure 28 1 of 2
RB-HEI-PLT-QC-PR-2029 10 Magnetic Particle Test Procedure 14
RB-HEI-PLT-QC-PR-2030 10 Liquid Penetrant Test Procedure 11
3.5 RB-HEI-PLT-QC-PR-2031 10 List of NDE Personnel 15 1 of 2
3.6 RB-HEI-PLT-QC-PR-2033 10 Hydrostatic Test Procedure 8 1 of 2
DOCUMENT NO :
PEARLOIL (SEBUKU) LTD.
RB-HEI-PLT-QA-IX-2001
RUBY FIELD DEVELOPMENT PROJECT REVISION : 10
VENDOR DATA BOOK PAGE : 3 of 3
No. of Book
No. Document Number Rev Description
Sheets No.
3.7 RB-HEI-PLT-QC-PR-2032 10 Heat Treatment Procedure 6 1 of 2
Surface Preparation & Painting
3.8 RB-HEI-PLT-QC-PR-2034 10 32 1 of 2
Procedure
4.0 Test & Inspection Reports/Certificates
4.1 RB-HEI-PLT-QC-PR-2001 10 Inspection and Test Plan 12 2 of 2
4.2 Inspection Release Notes 6 2 of 2
Code Certificate (MIGAS / ASME
4.3 3 2 of 2
Code form )
Welder and Welding Operator
4.4 2 2 of 2
Register
Welder and Welding Operator
4.5 35 2 of 2
MIGAS / ASME Certificates
4.6 Material Traceability with Certificates 118 2 of 2
4.7 Welding Traceability 8 2 of 2
4.8 NDE Reports 108 2 of 2
4.9 Dimensional Reports 4 2 of 2
Pressure Test Records & Calibration
4.10 16 2 of 2
Certificates
4.11 Name-plate Rubbing/ Photocopy 3 2 of 2
4.12 Heat Treatment Reports 9 2 of 2
4.13 Painting Reports 4 2 of 2
5.0 Spare Part List for Start-up/Commissioning/2 Years Operation
Spare part of commissioning & Two
5.1 RB-HEI-PLT-PG-LT-2003 2 2 of 2
Years Operation List