Q/HS
Corporate Standard of China Oilfield Services Limited
Q/HS YF 218.1-2013
Specifications for cementing design
Part 1: Inner string cementing
Date issued: 09/13/2016 Date effective: 11/13/2016
Issued by China Oilfield Services LimitedCONTENTS
FOREWORD... ones ss
Specifications for cementing design Part 1: Inner string cementing.
1 Scope...
2 Normative references,
3. Terms and definitions
4 Design principle
5. Design basis
5.1 General
5.2. Information for the design
6 String assembly.
Casing accessories...
8 Slurry design
8.1 Slumy system selection and requirements...
82 Density
8.3. Thickening time......
8.4 Compressive strength
85. Testing method
9 Preflushes
10 Top of cement
11 Excess slurry volume...
42. Displacement design
13 Wait-on-cement.
14. Job execution parameters...
45. Cementing proposal
QUHS YF 218.1-2013
anor a a ee RR wD DEEN EHDHEDEE
‘Annex A (normative) Calculations of the pressure differential between inside and outside of the
conductor.
6
‘Annex B (normative) Calculation of the upward counterforce on the Inner string 7QUHS YF 218.1-2013
FOREWORD
QIHS YF 218 Specifications for Cementing Design is divided into eight parts:
—Part 1: Inner string cementing,
—Part 2: Primary cementing,
—Part 3: Two-stage cementing,
—Part 4: Liner cementing,
—Part 5: Balanced cement plugging,
—Part 6: Squeeze cementing,
—Part 7: Deep-water cementing,
—Part 8: Special cementing
This part is the Part 1 of Q/HS YF 218.
This part was drafted in accordance with the rules specified in GB/T 1.1-2009.
‘Attention is drown to the possibilty that some of the elements of this document may be the subject
of patent rights. The issuance body of this document shall not be held responsible for identifying
any or all such patent rights.
This part was proposed by and is under the jurisdiction of Technical Committee on Standardization
of China Oilfield Services Limited.
This part was drafted by Oilfield Chemicals of China Oilfield Services Limited
The primary drafters of
Wuchang and Xue Lei
part are: Zhang Jingtao, Luo Donghui, Qi ying, Duan Zhiwei, Ai
The primary reviewer of this part are: Wang Yongsong and Zhao Hu.QUHS YF 218.1-2013
Specifications for cementing design
Part 1: Inner string cementing
1 Scope
This part specifies the technical requirements on inner string cementing design for oll and gas wells.
Itis applicable to the inner string cementing design for conventional well cementing and provide a
reference for the inner string cementing design for unconventional well cementing such as shallow
{gas and thermal recovery wells.
2. Normative references
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (Including any amendments) applies.
GB/T 19139 Testing of well cements
3. Terms and definitions
For the purpose of this document, the following terms and definitions apply.
34
stab-in stinger
Advice for inner string cementing, whose upper part is connected with the drill pipe and, the lower
part is a sealing adaptor for engaging with the float shoe or float collar.
3.2
inner string
A string is made up of a stab-in stinger at the bottom and drill pipe upward on a fixed drilling rig,
while for a floating drilling rig is made up of dril pipe and casing running tools
3.3
drill pipe centralizer
A device for centralizing the drill pipe so that the stab-in stinger sealing adaptor can engage with
float shoe and collarQUHS YF 218.1-2013
4 Design principle
The design shall meet the requirements of exploration, development and drilling engineering with
the objective of preventing lost circulation and over displacement while isolating the formations.
5 Design basis
5.1 General
The cementing design shall be based on the well geological and drilling engineering design, actual
drilling data and data of offset wells.
5.2 Information for the design
5.2.1 Table 1 shall be used as a checklist for collecting the basic information for the design.
Table 1. Basic information for cementing design
No. Item Description
1 | General Block name, well name, well type, rig model, rig name.
2 | Geological _|Lithology, formation fracturing pressure gradient of offset wells (top of cement)
Hole size; conductoricasing steel grade, size, wall thickness, thread type, mechanical
3 | Casing design sees Se
Properties, setting depth; top of cement, casing accessories’ location
Water depth, borehole conditions, dling parameters, dling fuid properties and
4 | Actual driting = spe ‘gme prop
placement of viscous pills.
Bottom hole temperature; name and concentration of additives; class, grade and
Miscellaneous | quantity of cement; well head tools and accessories; shallow geological hazard,
shallow gas presence ete.
5.2.2 Table 2 shall be used as a checklist for collection the data about cementing tools.
Table 2 Data on cementing tools
No. Item Description
1 | Stab-in stinger | Type, size and compatibility with float shoe or float collar.
2 | Drit pipettwoP | Type, size and inner capacity
Dri pipe
3 Oe Type and size.
5.2.3 Table 3 shall be used as checklist for collecting the cementing-related equipment dataQUHS YF 218.1-2013
Table 3 Cementing-related equipment data
No. tem Description
‘Model, liner diameter and volume per stroke, maximum working pressure,
1 | Rig pumps
delivery capacity and pump efficiency.
‘Cement surface
2 1, Dimension, maximum working pressure, pressure test records
3__[Cementing unit | Model, maximum working pressure and displacement rate.
‘Slurry mixin
4 TY INNS | Model, mixing capacity
system
Volume, maximum working pressure, maximum dry cement feeding rate and
5 | Cement silos oP ~ $
dry cement line condition.
Pneumatic
6 Working pressure, compressed air supply rate,
system
6 String assembly
6.1 Inner string assembly for fixed drilling rig is: stab-in stinger + drill pipe/HWDP.
6.2 Inner string assembly for floating drilling rig is: drill pipe + running tools + HWDP. The open
‘ended drill pipe shall be at least 15 m above the float shoe.
6.3 Fixed drilling rig conductor (casing) string assembly is:
a) Stab-in float shoe + conductor (casing), and
b) Float shoe + casing + stab-in float collar + casing.
6.4 Conductor/casing string assembly for floating rig is: float shoe + casing.
7 Casing accessories
7A The steel grade and thread type of casing accessories shall match with those of the casing,
The top of the stab-in float shoe/ collar shall be tapered.
7.2 The outside diameter of the drill pipe centralizer shall match with the inner diameter of the
‘conductor/casing, There is a rule of thumb to be met, that is: inner diameter of conductor/casing <
outside diameter of drill pipe centralizer_