NO: T-25-2018-00-ME-TBE-1064
TECHNICAL BID EVALUATION SHEET REV. NO.: 0
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
A. GENERAL:
1) PUMP TYPE AXIALLY SPLIT HORIZONTAL CENTRIFUGAL PUMP Comply with Horizontal Split Case Type Complied - Closed
3) MANUFACTURER SIZE / MODEL VTA SFP 2000-29SM-2G Noted SFP 2000-29SM-2G Closed
4) DESIGN CODE API 610/ NFPA 20/ UL 1247 ANSI/UL 448 Noted - Closed
9) PERFORMANCE AND TESTING CODE VTA Comply With UL Testing Standards Noted Closed
1) PUMPED FLUID FIRE WATER (FRESH WATER/SALT WATER) Fresh Water Complied. Vendot to provide compliance for Sea water. Complied. Vendor to provide compliance for sea water.
4) SUCTION PRESSURE max / min kPa 362.75 / 88.23 Comply with 9 Bar Noted Noted
6) DIFF. HEAD. @ DUTY POINT m 120 9 bar (91.80 m head) Noted Noted
8) MIN, CONTINUOUS FLOW m3 /hr VTA Comply with 454 m³/hr Complied Closed
Not Clear for EOC with Water Point. Kindly advise for the Exact
12) DRIVER SIZED FOR EOC WITH WATER REQUIRED Vendor to size the driver for water -
Requirement.
14) SUCTION SPECIFIC SPEED LIMIT rpm VTA 2900 rpm Noted Noted
15) NPSH (1) NPSH available m 8.72 Noted Vendor to confirm compliance Vendor to confirm compliance
(2) NPSH required m VTA NPSH Required for Propose Pump 4.2mtr Noted Vendor to confirm compliance
17) NPSH @ EOC/150% flow < NPSH available m VTA Comply with 4.2mtr Noted Vendor to confirm compliance
19) MAX. / MIN. IMPELLER DIA. mm VTA 300/240 mm Vendor to provide performance curve for impeller diameter Vendor to provide performance curve for impeller diameter
20) MAX. HEAD @ RATED IMPELLER m VTA 11.24 bar @ 300mm dia Vendor to provide performance curve for impeller diameter Vendor to provide performance curve for impeller diameter
21) HEAD OF MAX. IMPELLER DIA. @ RATED FLOW m VTA 11.24 bar @ 300mm dia @ 2000GPM Vendor to provide performance curve for impeller diameter Vendor to provide performance curve for impeller diameter
DOC. NO: T-25-2018-00-ME-TBE-1064
TECHNICAL BID EVALUATION SHEET REV. NO.: 0
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
22) HEAD RISE TO SHUTOFF / SHUT OFF PRESSURE % VTA 9.35 bar Noted Noted
23) CAPACITY AT THE END OF CURVE m3 /hr VTA 4400 GPM Noted Noted
24) RATED FLOW AS PERCENTAGE OF B.E.P FLOW % VTA 239.52 HP Noted Noted
25) MAXIMUM ALLOWABLE WORKING PRESSURE kPa VTA 250PSI Noted 1723kPa Vendor to confirm compliance
26) EQUIPMENT SUITABLE FOR BLACK BULB TEMP. VTA Proposed Pump 50Deg. Ambient Temperature Noted Complied
33) POSITION OF DISCHARGE VALVE AT PUMP STARTING OPEN ( STANDBY PUMP IS IN PARALLEL POSITION) Comply Complied Closed
34) NPSH REQUIRED AT RUNOUT CONDITION mWC VTA 4.5mtr Noted Vendor to confirm compliance
35) PUMP SHAFT INPUT POWER AT RATED FLOW kw VTA 239.52 HP Noted Closed
C. CONSTRUCTION:
(2) MOUNTING FOOT MOUNTED Comply Complied Wall mounting Vendor to Confirm compliance for Foot mounting type
2) SUCTION NOZZLE (1) SIZE VTA Comply with 8 Inch Dia Noted Noted
(2) RATING : VTA ANSI B16.1 Class 250 Vendor to provide ASME B16.5 Vendor to confirm complaince for ASME B16.5
3) DISCHARGE NOZZLE (1) SIZE : VTA Comply with 6 inch Dia Noted Noted
(2) RATING : VTA ANSI B16.1 Class 250 Vendor to provide ASME B16.5 Vendor to confirm complaince for ASME B16.5
4) CASING DRAIN SIZE & RATING VTA 3/4inch dia Noted Noted
8) COUPLING (1) TYPE FLEXIBLE METALLIC DISC SPACER COUPLING Comply Complied Closed
(2) MFR. VTA Comply with Rigid Flexible Coupling Complied Vendor to clarify the type of coupling for efficient operation
(3) SERVICE FACTOR 1.5 1.15 Vendor to provide a service factor of 1.5 Vendor to provide a service factor of 1.5
10) TYPE OF IMPELLER ENCLOSED IMPELLER (CAST IN ONE PIECE) Closed impellar Type Noted Closed
12) FLANGE DRILLING (SUCTION & DISCHARGE) ASME B 16.5 ANSI B 16.1 Vendor to provide ASME B 16.5 Vendor to confirm complaince for ASME B 16.5
DOC. NO: T-25-2018-00-ME-TBE-1064
TECHNICAL BID EVALUATION SHEET REV. NO.: 0
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
14) SIZE OF BASE PLATE VTA Will be provide After Fire Pump Assembled Noted Noted
17) GASKET VTA Comply Vendor to provide gasket Vendor to include gasket in their scope of supply
D. MATERIAL:
3) SHAFT SS Alloy Steel Vendor to provide shaft material as SS Vendor to confirm compliance for shaft material as SS
E.DIESEL ENGINE
2)APPLICABLE STANDARDS NFPA 20/ UL 1247 NFPA20 & UL1247 Complied Closed
4.) ENGINE NET POWER (RATED CONTINOUS OUTPUT) VTA 240HP Noted Closed
5) ENGINE OVERLOAD CAPACITY( OUTPUT) FOR ONE HOUR VTA 256HP Noted Closed
7)FAULTS LEADING TO AUTOMATIC DIESEL ENGINE SHUTDOWN VTA Comply Complied Closed
9)SILENCER WITH EXHAUST REQUIRED Noted With Installation Contractor Scope of Work Complied Closed
10) AIR FILTER 2 STAGE FILTER AND SILENCER Comply Complied Closed
11) DAY TANK FOR 6 Hrs CAPACITY VTA Comply with 8hrs asper NFPA20 Requirement Complied Closed
12) DAY TANK MATERIAL VTA Comply with Carbon Steel Noted Noted
13)MAIN OIL STORAGE TANK TO BE WITH MAGNETIC OIL GAUGE VTA Comply with Fuel Level Indicator vendor to confirm complaince for magnetic oil gauge Vendor to Confirm compliance of Magnetic Oil gauge
16)LUBRICATION OIL CONSUMPTION(Maximum) VTA 37.5Gallon Consumption per Hour Noted Noted
17)FUEL CONSUMPTION UNDER N.T.P VTA 37.5Gallon Consumption per Hour Noted Noted
18) 100% LOAD VTA 300 Gallon per 8 Hours Noted Noted
DOC. NO: T-25-2018-00-ME-TBE-1064
TECHNICAL BID EVALUATION SHEET REV. NO.: 0
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
21) METHOD OF ENGINE COOLING JACKET WATER-COOLING (RADIATOR) Comply with Heat Exchanger Type Noted Noted
22)EXHAUST OUTLET DIAMETER VTA Noted With Installation Contractor Scope of Work Noted Noted
26)INSULATION WITH CLADDING VTA Noted With Installation Contractor Scope of Work Noted Complied
30)BASE FRAME SKID MOUNTED (PUMP & ENGINE) Will be provide After Fire Pump Assembled Noted Noted
F. STARTING BATTERY
4)NUMBER OF PERMISSIBLE START PER HOUR OF DIESEL ENGINE VTA 24Volts/7HRS Noted Noted
G. BATTERY CHARGER
1)POWER REQUIRMENTS (APPROX) VTA Comply with 150% Rated power Noted Closed
3)FUEL OIL TRANSFER PUMP( IF APPLICABLE) VTA Bosch in-line “P” type Noted NOted
7)LOCAL CONTROL CUBICLES VTA Noted With Installation Contractor Scope of Work Noted Closed
8)TYPE AND DESIGN VTA internmal Combustion Engine With UL1247 Design Noted Noted
11)DEGREE OF PROTECTION FOR ENCLOSURE VTA IP23-NEMA2 Enclosure Vendor to provide IP65 Vendor to confirm complaince for IP65
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
13)THICKNESS mm VTA
(3)INDICATIONS VTA
Comply & Factory Test Report will be provide on Pump Delivery Time
5) PERFORMANCE TEST (complete unit w/Job Mtr) WITNESS Noted Noted
Period
J. OTHER REQUIREMENTS:
1) INSTRUMENTATION FOR PUMP SKID VTA Will be provide after Assubmbly Noted Noted
2) HAZARDOUS AREA CLASSIFICATION FOR INSTRUMENTS(IF ZONE 2, IIB, T4 Noted With Installation Contractor Scope of work Noted Noted
3) MATERIAL CERTIFICATON 3.1B [CASING, IMPELLER, SHAFT,SEAL , SHAFT SLEEVE, SEAL HOUSING] Kindly refer the submittal Noted Noted
4) NOISE LEVEL AT 1 m DISTANCE FOR MOTOR / PUM dB(A) LESS THAN 85 Comply with 85db Complied Closed
5) SURFACE PREPARATION & PAINTING REQ'T T-25-2018-00-ME-SPC-1077 Compl with RAL3000 Vendor to provide painting as per specification provided Vendor to provide painting as per specification provided
6) SPARE PARTS (1) START UP & COMMISSIONING VTA Comply Complied Closed
(2) TWO(2) YEAR OPERATION PROVIDED BY VENDOR Comply with 1 year. More than 1 year additional Cost Vendor to provide 2 years operation Vendor to provide complaince for 2 years operation with no additional cost.
9) PROVISION FOR VIBRATION MEASUREMENT (FLAT SURFAC VTA Will be provide after Assembly Noted Noted
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C) REQ'N N: T-25-2018-00-ME-REQ-1053
BIDDER BIDDER
DESCRIPTION REQ'N REQUIREMENT CLARIFICATIONS VENDOR TO FILL IN & ATTACH WITH TECHNICAL QUERY - 2
VENDOR TO FILL IN & ATTACH WITH OFFER
OFFER
TECHNICAL ACCEPTANCE
COMMENTS
LEGEND: V : IN ACCORDANCE WITH REQUIREMENT VTA: MFR'S RECOMMENDATION N.S: NOT SPECIFIED IN QUOTATION
TECHNICAL BID EVALUATION SHEET
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C)
BIDDER
DESCRIPTION REQ'N REQUIREMENT
VENDOR TO FILL IN & ATTACH WITH OFFER
A. GENERAL:
1) PUMP TYPE AXIALLY SPLIT HORIZONTAL CENTRIFUGAL PUMP Comply with Horizontal Split Case Type
4) SUCTION PRESSURE max / min kPa 362.75 / 88.23 Comply with 9 Bar
Not Clear for EOC with Water Point. Kindly advise for the Exact
12) DRIVER SIZED FOR EOC WITH WATER REQUIRED
Requirement.
(2) NPSH required m VTA NPSH Required for Propose Pump 4.2mtr
17) NPSH @ EOC/150% flow < NPSH available m VTA Comply with 4.2mtr
20) MAX. HEAD @ RATED IMPELLER m VTA 11.24 bar @ 300mm dia
21) HEAD OF MAX. IMPELLER DIA. @ RATED FLOW m VTA 11.24 bar @ 300mm dia @ 2000GPM
TECHNICAL BID EVALUATION SHEET
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C)
BIDDER
DESCRIPTION REQ'N REQUIREMENT
VENDOR TO FILL IN & ATTACH WITH OFFER
22) HEAD RISE TO SHUTOFF / SHUT OFF PRESSURE % VTA 9.35 bar
26) EQUIPMENT SUITABLE FOR BLACK BULB TEMP. VTA Proposed Pump 50Deg. Ambient Temperature
33) POSITION OF DISCHARGE VALVE AT PUMP STARTING OPEN ( STANDBY PUMP IS IN PARALLEL POSITION) Comply
C. CONSTRUCTION:
7) BEARING TYPE (1) RADIAL BEARING VTA Comply with Roller Bearing
10) TYPE OF IMPELLER ENCLOSED IMPELLER (CAST IN ONE PIECE) Closed impellar Type
12) FLANGE DRILLING (SUCTION & DISCHARGE) ASME B 16.5 ANSI B 16.1
TECHNICAL BID EVALUATION SHEET
MAIN FIRE WATER PUMPS( DIESEL ENGINE DRIVEN PUMP) (P-7003A/7003B/7003C)
BIDDER
DESCRIPTION REQ'N REQUIREMENT
VENDOR TO FILL IN & ATTACH WITH OFFER
14) SIZE OF BASE PLATE VTA Will be provide After Fire Pump Assembled
D. MATERIAL:
2) IMPELLER SS Bronze
E.DIESEL ENGINE
9)SILENCER WITH EXHAUST REQUIRED Noted With Installation Contractor Scope of Work
11) DAY TANK FOR 6 Hrs CAPACITY VTA Comply with 8hrs asper NFPA20 Requirement
13)MAIN OIL STORAGE TANK TO BE WITH MAGNETIC OIL GAUGE VTA Comply with Fuel Level Indicator
BIDDER
DESCRIPTION REQ'N REQUIREMENT
VENDOR TO FILL IN & ATTACH WITH OFFER
21) METHOD OF ENGINE COOLING JACKET WATER-COOLING (RADIATOR) Comply with Heat Exchanger Type
22)EXHAUST OUTLET DIAMETER VTA Noted With Installation Contractor Scope of Work
25) EXHAUST PIPE VTA Min. 6" dia (We considered 10mtr pipe lenth & 3nos 90Deg.Elbow)
26)INSULATION WITH CLADDING VTA Noted With Installation Contractor Scope of Work
30)BASE FRAME SKID MOUNTED (PUMP & ENGINE) Will be provide After Fire Pump Assembled
F. STARTING BATTERY
G. BATTERY CHARGER
3)FUEL OIL TRANSFER PUMP( IF APPLICABLE) VTA Bosch in-line “P” type
7)LOCAL CONTROL CUBICLES VTA Noted With Installation Contractor Scope of Work
8)TYPE AND DESIGN VTA internmal Combustion Engine With UL1247 Design
BIDDER
DESCRIPTION REQ'N REQUIREMENT
VENDOR TO FILL IN & ATTACH WITH OFFER
13)THICKNESS mm VTA
(2)ANNUCIATIONS VTA Kindly refer the submitted submittal Controller Data Sheets
(3)INDICATIONS VTA
Comply & Factory Test Report will be provide on Pump Delivery Time
5) PERFORMANCE TEST (complete unit w/Job Mtr) WITNESS
Period
J. OTHER REQUIREMENTS:
2) HAZARDOUS AREA CLASSIFICATION FOR INSTRUMENTS(IF ZONE 2, IIB, T4 Noted With Installation Contractor Scope of work
3) MATERIAL CERTIFICATON 3.1B [CASING, IMPELLER, SHAFT,SEAL , SHAFT SLEEVE, SEAL HOUSING] Kindly refer the submittal
4) NOISE LEVEL AT 1 m DISTANCE FOR MOTOR / PUM dB(A) LESS THAN 85 Comply with 85db
(2) TWO(2) YEAR OPERATION PROVIDED BY VENDOR Comply with 1 year. More than 1 year additional Cost
9) PROVISION FOR VIBRATION MEASUREMENT (FLAT SURFAC VTA Will be provide after Assembly