Drive Test Plan and Requirements
Drive Test Plan and Requirements
REQUIREMENTS
1) Provide site database with the following information
a) 3G
Site ID
CI
Cluster
Region
Sub-Region
SITE NAME
Technology
LAC
RNC
Y-LATITUDE
X-LONGITUDE
Antenna Type
Antenna height
Azimuth
Tilt Mechanical
Tilt-Electrical
SITE TYPE(tower/rooftop)
PSC
dlURFCN
ulURFCN
Average monthly traffic latest
b) 2G
Site id
Cell id
BSC
Cluster
Region
Sub-Region
Site name
Cell Name
Antenna Type
LAC
Y-LATITUDE
X-LONGITUDE
SITE TYPE(tower/rooftop)
Band
Antenna height
AZIMUTH
Mechanical-tilt
Electrical tilt
No. of TRX's
BCCH
BSIC
Hopping Mode
CU2
CU3
CU4
CU5
CU6
CU7
CU8
CU9
CU10
CU11
CU12
MA List
Average monthly traffic latest
2) Collect engineering parameters from site (RF site audit) to update site database
requirements: access to the site
3) Divide network area into clusters and designate clusters
4) Perform cluster drivetest and do post processing analysis Provide recommendations to
improve the network performance. requirements: drivetest kit, and post processing tool
a) Preparation of the Pre-drive test report
5) Extract KPIs and prepare pre-performance report for sites in each cluster corresponding
to the drive test area
6) Perform Physical and parameter optimization based on the recommendations of the
Pre-Drive test report
7) Perform Post-Drive test and prepare a post-Drive test report and a Post-performance
report for the sites in that corresponding cluster highlighting any improvements on the
network performance
8) Update network data base for any changes made during the optimization process
9) Perform a neighbor audit to identify which neighbors are missing and should be defined
and also which ones should be deleted
Drive test scenarios