0% found this document useful (0 votes)
75 views

Tasks

This document is a laboratory task list for an Aircraft Maintenance Technology course covering fasteners and sheet metal practices. It outlines 25 laboratory activities, such as surface patch repair, rivet installation, and drawing plates for bolts, nuts, and rivets. The activities are categorized as routine and reference the FAA General Handbook. Students must check available references before each activity and use proper equipment. Any tasks not performed must be reported to the Head of Training. The list was prepared by Reuel De Castro and revised in February 2020.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

Tasks

This document is a laboratory task list for an Aircraft Maintenance Technology course covering fasteners and sheet metal practices. It outlines 25 laboratory activities, such as surface patch repair, rivet installation, and drawing plates for bolts, nuts, and rivets. The activities are categorized as routine and reference the FAA General Handbook. Students must check available references before each activity and use proper equipment. Any tasks not performed must be reported to the Head of Training. The list was prepared by Reuel De Castro and revised in February 2020.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DPR – Philippine Academy in Technology & Sciences

Aircraft Maintenance Technology Department


DPR-PATS Hangar, Plaridel Airport, Lumangbayan, Plaridel, Bulacan
3004 Philippines.
LABORATORY TASK LIST
Prepared by: Reuel De Castro Revised: February, 2020 AMT Department

I. Subject Information
Subject Code :
Subject Description : Fasteners and Sheet Metal Practices
SME :
II. List of Laboratory Activities
No. Description / Title Reference Category
1 MS20470 Surface Patch Repair FAA General Handbook Routine
2 MS20426 Flush Patch Repair FAA General Handbook Routine
3 MS20425 Dimple Patch Skin Repair FAA General Handbook Routine
4 Double Countersunk Flush rivet installation method FAA General Handbook Routine
5 Rivnut removal practices FAA General Handbook Routine
6 Rivnut Installation procedures FAA General Handbook Routine
7 Rivet squeezer handling practices FAA General Handbook Routine
8 Torque tightening and safety wiring practices FAA General Handbook Routine
9 Fasteners Thread count inspection FAA General Handbook Routine
10 Screw Tapping Procedures for Aluminium FAA General Handbook Routine
11 Solid Shank Thread forming FAA General Handbook Routine
12 Installation of MS Type Anchor Nuts FAA General Handbook Routine
13 Cotter Pin Installation FAA General Handbook Routine
14 Stud Bolt Removal and Installation Procedures FAA General Handbook Routine
15 Identification and Coding of AN Standard Bolts and Nuts FAA General Handbook Routine
16 Installation of composite structure fasteners FAA General Handbook Routine
17 Drawing of Laboratory Plates: Aircraft Bolts FAA General Handbook Routine
18 Drawing of Laboratory Plates: Aircraft Nuts FAA General Handbook Routine
19 Drawing of Laboratory Plates: Hydraulic Fittings FAA General Handbook Routine
20 Drawing of Laboratory Plates: Safety Fasteners and special locks FAA General Handbook Routine
21 Drawing of Laboratory Plates: Rivets FAA General Handbook Routine
22 Drawing of Laboratory Plates: Layout work FAA General Handbook Routine
23 Drawing of Laboratory Plates: Stringer patch repair layout work FAA General Handbook Routine
24 Documentation: overall activity Log for propeller related practices Aircraft Logbook and Manuals Routine
25 Tool Keeping and general management of Materials and Parts Tool Keeping and Materials Audit Routine

Important Notes:

Due to the current conditions and maintenance work on the aircrafts, all the activities that are listed above will be
effective only for this particular semester module. Always check all available references before handling any of the laboratory
practices listed on the above table. Do not modify procedures. Make sure to use the correct measuring equipment for various
activities. Failure to perform a particular task in the list must reported immediately to the Head of training.

Prepared by:

Received by: Approved by:

_________________________________________ _____________________________________
Mrs. Anna Marie M. Rivera Mr. Christian Daniel B. Rivera
DPR-PATS Quality Manager DPR-PATS Accountable Manager

You might also like