Document Control Checklist
Document Control Checklist
2. Does the Auditee aware and have access to PEQP and other project
procedures.
Status Legend: S = Satisfied/Verified I = Inconsistent Practice – Observation (OBS) NV = Not Verified NA = Not Applicable U = Unsatisfied – Nonconformance (NCR)
Page 1 of 3
Project No:
Document Control Audit Checklist Project Title:
Audit Date:
Discipline Audited: Document Control
Ref Doc
No Requirements STATUS Findings / Comments
( As Applicable )
6. Verify that “Incoming” transmittal/documents:
“Client Documents” - Original / Copies filed by DCC
“Client Comments” - Original / Copies filed by DCC
Softcopy park in project folder
It shall be distributed by DCC to the intended recipients or as per PM’s
instruction.
7. Where client’s transmittals have been received, check these have been
filed
DOCUMENTS TO CLIENT
9. Verify that all design deliverables issued to the CLIENT registered and
issued undercover of transmittals
GENERAL
Status Legend: S = Satisfied/Verified I = Inconsistent Practice – Observation (OBS) NV = Not Verified NA = Not Applicable U = Unsatisfied – Nonconformance (NCR)
Page 2 of 3
Project No:
Document Control Audit Checklist Project Title:
Audit Date:
Discipline Audited: Document Control
Ref Doc
No Requirements STATUS Findings / Comments
( As Applicable )
12. Check client’s comment turnaround time
15. Randomly verify that initials are type on the DOCUMENTS prior to wet
signature
17. Randomly verify that initials are type on the DRAWINGS prior to wet
signature
Auditor notes
Status Legend: S = Satisfied/Verified I = Inconsistent Practice – Observation (OBS) NV = Not Verified NA = Not Applicable U = Unsatisfied – Nonconformance (NCR)
Page 3 of 3