QATAR ARMED FORCES
QATAR EMIRI CORPS OF ENGINEERS
PROJECTS & SITE SUPERVISION UNIT
Project: Camp: Army Camp
JOINT WARFARE TRAINING CENTER Supervising Wing: 4
APPROVAL OF MATERIALS
Ref: Submission: 1st 2nd 3rd 4th
Architectural Civil Mechanical Electrical Others
Submitted as: Spec. Alternative (If alternative state reasons on attachment)
Location : Spec. Ref :
Material : SOUND ATTENUATOR As per Project Doc’s AS PER PROJECT
B.O.Q. Ref : DOCUMENTS
Manufacture : GALLOWAY ACOUSTIC Data Sheet :
Agent : LEMINAR AIR CONDITIONING INDUSTRIES CO. QATAR W.L.L.
Country of Origin : UNITED KINGDOM
Sample : Literature : AS PER ATTACED DOCUMENTS
Contractor’s
Signature & Stamp: ______________ Date: 18/08/2019
Approved Approved with Comments Rejected
Comments:
Sr. Engr.: _____________________ Project Coordinator: ___________________
___________________
Wing Coordinator Date: ______________
Approved Approved with Comments Rejected
___________________
Wing Commander Date: ______________
Table of Content / Check List
PROJECT: QATAR JOINT WARFARE TRAINING CENTER AT AL DUHAILIYATH, QATAR
MATERIAL SUBMITTAL CHECK LIST:
No. Item Name Remarks
1
Cover Page
2
Table of Content / Check List
3
Company Profile
4
Valid Trade License
5
ISO (Quality) Certificate
6
List of Previous projects
7
Compliance Statement (QCS 2014)
8
Copy of BOQ
9
Material List (Material Description and Part Number)
10
Product Catalogue / Data Sheet
11
Drawings (if needed)
12
Previous Material Approvals
13
Test Certificates
Received By:
Received Date:
Company Profile
Valid Trade License
ISO (Quality) Certificate
List of Previous projects
Compliance Statement – QCS 2014
Material List (Material Description and Part
Number)
Product Catalogue / Data Sheet
Previous Material Approvals