6 Pile Design
6 Pile Design
Transverse Design:
Side face reinforcement required 0.05% of c/s area 750 mm2 /m per one side
Side face reinforcement provided 4 Nos 16 Y 804 mm2 /m per one side
Top reinforcement
As per MOM Dated 17.04.2017, top reinforcement in pile cap shall be for temperature
& shrinkage or 0.05% of c/s area whichever is higher.
0.05% of c/s area = 0.05 X 10800 X 1500 = 8100 mm2 total width
100
= 750 mm2 per metre
Temperature & Shrinkage Reinforcement Cl. No. 15.9.9, IRS:CBC 2014
As = kr ( Ac - 0.5 Acor)
Critical section for shear lies at deff/2 from the face of the pier
deff/2 = 696.5 mm
Shear dispersion line cut the the pile at a distance of 500mmk from inside edgeas shown below.
av
0.90 Critical Section for Shear
2.25
6.3
2.25
0.90
4.5 4.5
10.8
τv < 1.29
(2d/av)svc
Hence shear reinforcement need not be provided
Cl. 15.5.4.1.3
v< svc, Asv = 0.4bsv/ 0.87 fyv Table 14, IRS:CBC
v > svc, Asv = bsv(v+0.4-svc)/0.87fyv
Longitudinal Design:
0.05% of c/s area = 0.05 X 6300.0 X 1500 = 4725 mm2 per total width
100
= 750 mm2 per metre
As = kr ( Ac - 0.5 Acor)
0.90
2.25 av
6.3
2.25 Critical Section for Shear
0.90
4.5 4.5
10.8
4.7035
Cl. 15.5.4.1.3
v< svc, Asv = 0.4bsv/ 0.87 fyv Table 14, IRS:CBC
v > svc, Asv = bsv(v+0.4-svc)/0.87fyv
0.90 av
2.25
6.3 Critical Section for Shear
2.25
0.90
4.5 4.5
10.8
Transverse Design:
Moment @ the face of the pier due to pile MAX(P1+P3 or P2+P4)
= 3855.5 x 3.5 OR 3856 x 3.5
= 13494.25 KN-m
dreqd =( M )0.5
Qxb
=( 13494.3 x 1000000 )0.5= 487.8 mm
5.250 x 10800
dprov = 1500 - 75 - 12 - 20.0
= 1393 mm
sst = M
Ast x j x d
= 13494.3 x 1000000
33912.0 x 0.950 x 1393
= 301 n/mm2 OK
0
0
per one side
er one side
0
0
Sabarmathi Rly.station station - Design of pile cap ( PC1,PC10,PC21,PC30) -ULS CASE
NORMAL SEISMIC CASE CRITICAL LOAD COMBINATION 3041 GOVERNING PC30
P 15298 KN
ML 13414.4 KN-M
MT 8620.52 KN-M
due to ecc moment along transverse direction
mte 0 KN-M
MT+Mte 0 KN-M
NORMAL NON SEISMIC CASE CRITICAL LOAD COMBINATION 1003
P 0 KN
ML 0 KN-M
MT 0 KN-M
due to ecc moment along transverse direction
mte 0 KN-M
MT+Mte 0 KN-M
0.9
Chart Title
P3 2.5
2
2.25
6.3 2
1.5
1.25
1
0.5
0
-5 -4 -3 -2 -1 0 1 2
2.25
-0.5
-1
0.9 P1 P2
-1.5
Y1 -2.25 m X1 -4.5 m
Y2 -2.25 m X2 0m
Y3 -2.25 m X3 4.5 m
Y4 2.25 m X4 -4.5 m
Y5 2.25 m X5 0m
Y6 2.25 m X6 4.5 m
Y7 0m X7 0m
Y8 0m X8 0m
SESIMIC CASE
no of piles 6 P/N MT ML PMAX T
P1 1804 KN 2550 -639 -745 117
P2 2550 KN 2550 -639 0 191
P3 3295 KN 2550 -639 745 266
P4 1804 KN 2550 639 -745 244
P5 2550 KN 2550 639 0 319
P6 3295 KN 2550 639 745 393
P7 0 KN 0 0 0 0
P8 0 KN 0 0 0 0
P MAX
e
P4
1 2 3 4 5
0.9
NON SEISMIC CASE
P/N MT ML PMAX(T)
P1 0 KN 0 0 0 0
P2 0 KN 0 0 0 0
P3 0 KN 0 0 0 0
P4 0 KN 0 0 0 0
P5 0 KN 0 0 0 0
P6 0 KN 0 0 0 0
P7 0 KN 0 0 0 0
P8 0 KN 0 0 0 0
0.75
P3
1.5
4.5 2
1.25
1.5
0.75 P1 P2
Y1 -1.5 m X1 -1.5 m
Y2 1.5 m X2 -1.5 m
Y3 1.5 m X3 1.5 m
Y4 -1.5 m X4 1.5 m
Y5 0m X5 0m
Y6 0m X6 0m
Y7 0m X7 0m
Y8 0m X8 0m
SESIMIC CASE
no of piles 4 P/N MT ML PMAX T
P1 931 KN 1710 -52 -727 93
P2 1034 KN 1710 52 -727 103
P3 2489 KN 1710 52 727 249
P4 2386 KN 1710 -52 727 239
P5 0 KN 0 0 0 0
P6 0 KN 0 0 0 0
P7 0 KN 0 0 0 0
P8 0 KN 0 0 0 0
P MAX
P4
0.75
NON SEISMIC CASE
P/N MT ML PMAX(T)
P1 1629 KN 1928 -33 -266 163
P2 1694 KN 1928 33 -266 169
P3 2226 KN 1928 33 266 223
P4 2161 KN 1928 -33 266 216
P5 0 KN 0 0 0 0
P6 0 KN 0 0 0 0
P7 0 KN 0 0 0 0
P8 0 KN 0 0 0 0
DL CL 3406
PL 3119
TL 1709
8234 KN
SIDL
CL 2267
PL 1792
SIDL 681
4740 KN
SIDL VAR TL 207 23965
LL CL 1743
PL 1352
TL 2402
5497 KN
PIER CAP CL 2691 0.229376
1966
4657 KN
PIER 1926
PILE CAP 3471
SOIL LOAD 937 6334 KN
29462 KN
LL
1448 1208
ULS SLS
DL 1.25 1
SIDL FIX 1.25 1
SIDL VAR 2 1.2
LL 1.75 1.1
DL 24031 19225
SIDL FIX 5925 4740
SIDL VAR 414 248
LL 9620 6047
39990 30260
5043.35
Gurkul Road station - LOADS ON PLIE -(C8-C10)
NORMAL SEISMIC CASE CRITICAL LOAD COMBINATION 106
P 23375 KN
ML -20171 KN-M
MT -23445 KN-M
due to ecc moment along transverse direction
mte 19868.75 KN-M
MT+Mte -3576.25 KN-M
NORMAL NON SEISMIC CASE CRITICAL LOAD COMBINATION 102
P 23067 KN
ML -5973 KN-M
MT -18680 KN-M
due to ecc moment along transverse direction
mte 19606.95 KN-M
MT+Mte 926.95 KN-M
0.85
P6 P7
2.4
8.11 2.4
2.2
3.16
0.85 P1 P2 P3
Y1 -3.16 m X1 -3.6 m
Y2 -3.16 m X2 0m
Y3 -3.16 m X3 3.6 m
Y4 0.41 m X4 -1.83 m
Y5 0.41 m X5 1.83 m
Y6 3.25 m X6 -3.6 m
Y7 3.25 m X7 0m
Y8 3.25 m X8 3.6 m
SESIMIC CASE
no of piles 8 P/N MT ML PMAX T
P1 4345 KN 2922 182 1240 443
P2 3104 KN 2922 182 0 317
P3 1864 KN 2922 182 -1240 190
P4 3529 KN 2922 -24 631 360
P5 2268 KN 2922 -24 -631 231
P6 3975 KN 2922 -188 1240 406
P7 2734 KN 2922 -188 0 279
P8 1494 KN 2922 -188 -1240 152
P MAX
Pcapacity
P8
0.85
NON SEISMIC CASE
P/N MT ML PMAX(T)
P1 3203 KN 2883 -47 367 327
P2 2836 KN 2883 -47 0 289
P3 2469 KN 2883 -47 -367 252
P4 3076 KN 2883 6 187 314
P5 2703 KN 2883 6 -187 276
P6 3299 KN 2883 49 367 337
P7 2932 KN 2883 49 0 299
P8 2565 KN 2883 49 -367 262
0.85
P6 P7
2.4
8.11 2.4
2.2
3.16
0.85 P1 P2 P3
Y1 -3.16 m X1 -3.6 m
Y2 -3.16 m X2 0m
Y3 -3.16 m X3 3.6 m
Y4 0.41 m X4 -1.83 m
Y5 0.41 m X5 1.83 m
Y6 3.25 m X6 -3.6 m
Y7 3.25 m X7 0m
Y8 3.25 m X8 3.6 m
SESIMIC CASE
no of piles 8 P/N MT ML PMAX T
P1 6664 KN 4547 394 1723 680
P2 4941 KN 4547 394 0 504
P3 3218 KN 4547 394 -1723 328
P4 5372 KN 4547 -51 876 548
P5 3620 KN 4547 -51 -876 369
P6 5865 KN 4547 -405 1723 598
P7 4142 KN 4547 -405 0 423
P8 2419 KN 4547 -405 -1723 247
P8
0.85
16 4 64
16 4 64
11 2 22
150
NON SEISMIC CASE
P/N MT ML PMAX(T)
P1 5889 KN 4726 445 718 601
P2 5171 KN 4726 445 0 528
P3 4453 KN 4726 445 -718 454
P4 5033 KN 4726 -58 365 514
P5 4303 KN 4726 -58 -365 439
P6 4987 KN 4726 -458 718 509
P7 4268 KN 4726 -458 0 436
P8 3550 KN 4726 -458 -718 362