1. The document provides notes and details for the construction of a toilet block for laborers at an EHV class sub station, including opening schedules, materials, and general notes. 2. Dimensions and quantities of doors, jalis, and other elements are specified, along with requirements for construction drawings, foundations, and masonry. 3. Special notes indicate flexibility in design based on soil conditions, codes, and the final decisions of GETCO.

Uploaded by

Amarjit Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views1 page

Toilet Block

1. The document provides notes and details for the construction of a toilet block for laborers at an EHV class sub station, including opening schedules, materials, and general notes. 2. Dimensions and quantities of doors, jalis, and other elements are specified, along with requirements for construction drawings, foundations, and masonry. 3. Special notes indicate flexibility in design based on soil conditions, codes, and the final decisions of GETCO.

Uploaded by

Amarjit Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8 7 6 5 4 3 2 1

GENERAL NOTES:-

OPENING SCHEDULE 1. CERTAIN MINIMUM


F F
REQUIREMENTS ARE INDICATED
NAME DETAIL SIZE NOS.
IN THIS DRAWING FOR
D1 PVC DOOR 800MM X 2100MM 10 GUIDANCE PURPOSE ONLY.
V1 PRECAST CC JALI 450MM X 600MM 12 HOWEVER, BIDDER SHALL
QUOTE THE RATES ACCORDING
TO THE COMPLETE SYSTEM.
2. BIDDER HAS TO ADJUST TOILET
E E
BLOCK AS PER SITE CONDITION
AND SITE REQUIREMENT IN
LAYOUT OF SUB STATION
3. BIDDER HAS TO DEVELOP
REQUIRED CONSTRUCTION AND
STRUCTURAL DRAWING ON THE
V1 V1 V1 V1 V1 V1 V1 V1 V1 V1
BASIS OF THIS DRAWING, SBC
D D
REPORT, TECHNICAL
SPECIFICATION AND SITE
REQUIREMENT.
D1 D1 D1 D1 D1 D1 D1 D1 D1 D1
4. BRICK / BLOCK MASONRY MAY
BE USED AS PER AVAILABILITY IN
WATER WATER
V1 TANK TANK V1 THE AREA.
· SPECIAL NOTE
C C
5. TYPE OF FOUNDATION SHALL BE
ADOPTED ON THE BASIS OF SOIL
INVESTIGATION REPORT, SITE
CONDITION. ELECTRICAL LAYOUT,
RELEVANT STANDARDS & CODES.
HOWEVER DECISION OF GETCO
WILL BE FINAL.
B B

TENDER PURPOSE
G
E
GUJARAT ENERGY TRANSMISSION CORPN.LTD.
T S.P.VIDYUT BHAVAN, RACE COURSE,
C VADODARA - 390 007
O

STANDARD PLAN & SECTION OF TOILET BLOCK


FOR LABORS AT EHV CLASS SUB STATION
DRAWN: CHECKED: APPD:
A A
SIZE:
JE (CIVIL) DE (CIVIL) EE (ENGG.) EE (CIVIL) SE (ENGG.) SE (CIVIL) CE (ENGG.) A3
SCALE: DATE: DRG. NO: SHEET: REV:
1 R0 FIRST PREPARATION
GETCO / C /
31.05.16 1 OF 1 R0
SR NO. REFERENCE REV: DESCRIPTION N.T.S TB / ARCH. PLAN

8 7 6 5 4 3 2 1