0% found this document useful (0 votes)
134 views5 pages

PP Trans Code

This document provides an overview of the menu nodes and transaction codes for Material Requirement Planning (MRP), production planning, and material and work center management in SAP. It includes sections on master data, planning runs, evaluations, planned orders, long-term planning, production control, capacity planning, material master data, bills of material, work centers, and routing.

Uploaded by

RajaRam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views5 pages

PP Trans Code

This document provides an overview of the menu nodes and transaction codes for Material Requirement Planning (MRP), production planning, and material and work center management in SAP. It includes sections on master data, planning runs, evaluations, planned orders, long-term planning, production control, capacity planning, material master data, bills of material, work centers, and routing.

Uploaded by

RajaRam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 5

Material Requirement Planning

Menu Nodes TransactionActivity

Master Data MD25 Create planning calendar


MD26 Change planning calendar
MD27 Display planning calendar
MDSA Display BOM explosion number
MDSP Edit BOM explosion number
MEQ1 Maintain quota file
OPPP Explode BOM by date
MDUS Display project assignment
MDUP Process project assignment
MDL1 Create production lot
MDL2 Change production lot
MDL3 Display production lot

Planning MD20 Create planning file entry


MD21 Display planning file entry
MDAB Set up planning file entry in background
MDRE Check planning file entry
MD01 Total planning online
MDBT Total planning in background
MD03 Single-item, single-level planning
MD02 Single-item, multi-level planning
MD43 Interactive single-item planning
MD50 Multi-level, make-to-order planning
MD51 Multi-level project planning
MF52 Display planning table
MF50 Change planning table
MF57 Planning table by MRP lists
MF51 Planning table by production list

Evaluations MD04 Stock/requirements list


MD07 Collective access of stock/requirements lis
MD05 MRP list
MD06 Collective access of MRP lists
MDLD Print MRP list
MD45 Planning result
MD46 Collective access of planning result
MD44 Planning situation for a material
MD47 Planning situation for a product group
MD48 Cross-plant planning situation
MD4C Order report
MD09 Pegged requirements
CO46 Order progress

Planned Order MD11 Create planned order


MD12 Change planned order
MD13 Individual access of planned order
MD16 Collective access of planned orders
MD14 Individual conversion of planned order into
MD15 Collective conversion of planned orders int
MDUM Convert planned order into purchase requisi
CO40 Convert individual planned order into produ
CO41 Collective conversion of planned orders int
CO48 Partial conversion of planned order into pr
COR7 Individual conversion of planned order into
COR7_PC Collective conversion of planned orders int
COR8 Partial conversion of planned order into pr
MDVP Collective availability check
MDAC Execute action for planned order

LONG TERM PLANNING


PALNNING SCENARIO MS31 CREATE
MS32 CHANGE
MS33 DISPLAY
PLANNING RUN MS01 ON LINE
MSBT SA BACKGROUND JOB
MS02 SINGLE ITEM - MULTI LEVEL
MS03 SINGLE ITEM - SINGLE LEVEL
MS50 SINGLE ITEM - SALES ORDER
MS51 SINGLE ITEM PLANNING, PROJECT
MFSO PLANNING TABLE

EVALUTIONS MS05 MRP LIST MATERIAL


MS06 MRP LIST COLLECTIVE DISPLAY
MSLD PRINT MRP LIST
MS04 STOCK/REQUIREMENTS LIST
MS07 STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
MS44 PLANNING SITUATION MATERIAL
MS47 SITUATION PRODUCT GROUP

MPS-MASTER SCHEDULE ITEMS


TOTAL PLANNING MD40 ON LINE
MDBS SA BACKGROUND JOB
MD41 SINGLE ITEM - MULTI LEVEL
MD42 SINGLE ITEM - SINGLE LEVEL
MD43 SINGLE ITEM - INTERACTIVE
MD50 SINGLE ITEM - SALES ORDER
MD51 SINGLE ITEM PLANNING, PROJECT

*** EVALUTION IS SIMILAR TO MRP


PRODUCTION CONTROL
ORDER - CREATE CO01 WITH MATERIAL
CO07 WITHOUT MATERIAL
CO40 FROM PLANNED ORDER
CO41 COLLECTIVE CONVERTION OF PLANNED ORDER
CO08 FOR SALES ORDER
CO10 FOR PROJECT
CO02 CHANGE
CO03 DISPLAY

CONTROL MD04 STOCK/REQUIREMENTS LIST


COHV MASS PROCESSING
COMAC COLLECTIVE AVAILABILITY CHECK
CO05N COLLECTIVE RELEASE
CO04N PRINT
CO09 AVAILABILITY OVER VIEW

GOODS MOVEMENT MF65 STOCK TRANSFER FOR RESERVATION

MATERIAL STAGING MF68 LOG


MB1A GOODS ISSUE
MB31 GOODS RECEIPT
COWBPACK PACK MATERIAL

CONFIRMATION CO1V TIME TICKET


FOR OPERATION CO14 DISPLAY
CO13 CANCEL
CO1L REQUESTED CONFIRMATIONS
CO1P PREDEFINED PROCESSES

TOOLS-ARCHIVING CO78 ORDER


KOAA SETTELMENT DOCUMENTS

CAPACITY PLANNING
EVALUTION CM01 LOAD

WORK CENTER VIEW CM02 ORDERS


CM03 POOL
CM04 BACKLOG
CM05 OVERLOAD
CM07 VARIABLE
EXTENDED EVALUTION CM50 WORK CENTER VIEW
CM51 INDIVIDUAL CAPACITY VIEW
CM52 ORDER VIEW
LEVELLING CM21 PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW CM22 PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY VCM27 PLANNING TABLE (GRAPHICAL)
CM28 PLANNING TABLE (TABULAR)
ORDER VIEW CM31 PLANNING TABLE (GRAPHICAL)
CM32 PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY CR12 CHANGE
CAPACITY CR13 DISPLAY
OP4A SHIFT SEQUENCE
OP43 FACTORY CALENDER

----------------------
MATERIAL
CREATE-GENERAL MM01 IMMEDIETELY
MM11 SCHEDULE
CHANGE MM02 IMMEDIETELY
MM12 SCHEDULE
MM13 ACTIVATE
FLAG FOR DELETION MM06 IMMEDIETELY
MM16 SCHEDULE
DISPLAY MM03 DISPLAY CURRENT
MM19 DISPLAY AT KEY DATE
DISPLAY CHANGES MM04 ACTIVE CHANGES
MM14 SCHEDULE CHANGES
MM17 MASS MAINTENANCE
MMAM CHANGE MATERIAL TYPE
OTHER MMBE STOCK OVERVIEW
MMPV CLOSE PERIOD
MMRV ALLOW POSTING TO
PREVIOUS PERIOD
MM50 INSTANT MATERIAL VIEW
MMSC ENTER STORAGE LOCATIONS
MM60 MATERIAL LIST
ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETE
MM72 DISPLAY ARCHIVE

BILL OF MATERIAL (MATERIAL BOM)


CS01 CREATE
CS02 CHANGE
CS03 DISPLAY
EXTRAS CS28 ARCHIVING
CS20 MASS CHANGES
EVALUATION/BOM CS11 BOM MULTILEVEL
EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL
BOM CS13 SUMMURISED BOM

WORK CENTRES
CR01 CREATE
CR02 CHANGE
CR03 DISPLAY
CA85 REPLACE
CAPACITY CR11 CREATE
CR12 CHANGE
CR13 DISPLAY
HIERARCHY CR21 CREATE
CR22 CHANGE
CR23 DISPLAY
LINE HIERARCHY LDB1 CREATE
LDB2 CHANGE
LDB3 DISPLAY
REPORTING CR60 W/C INFORMATION SYSTEM
CR05 W/C LIST
CR06 COST CENTRE ASSIGNMENT
CR07 W/C CAPACITIES
CR08 W/C HIERARCHY
WHERE USED CA80 WORK CENTRE
CR15 CAPACITY
CR10 CHANGE DOCUMENTS
EXTRAS CR09 STD. TEXTS TASK LIST
CR41 ARCHIVING

ROUTING
STAD. ROUTING CA01 CREATE
CA02 CHANGE
CA03 DISPLAY
REF. OPERATION SETS CA11 CREATE
CA12 CHANGE
CA13 DISPLAY
RATE ROUTING CA21 CREATE
CA22 CHANGE
CA23 DISPLAY
REF. RATE ROUTING CA31 CREATE
CA32 CHANGE
CA33 DISPLAY
EXTRAS CA85 REPLACE W/C
MASS CHANGES CA95 REPLACE REF. OP. SET
CA75 REPLACE PRT
DELETE TASK LIST CA99 WITH ARCHIVING
CA98 W/O ARCHIVING
REPORTING CA80 WORK CENTRE
WHERE USED LIST CA90 REF. OP. SETS
CA70 PRODUCTION RESORCE TOOLS

COST CENTRE
OKKP MAINTAIN CONTROLLING AREA
KS01 CREATE COST CENTRE
KZS2 CREATE COSTING SHEET
KA01 CREATE PRI. COST ELEMENT
KA06 CREATE SEC. COST ELEMENT
KL01 CREATE ACTIVITY TYPE
KP26 ACTIVITY TYPE/PRICE PLANNING

You might also like