0% found this document useful (0 votes)
74 views

Yasir CV

Syed Yasir Baqar has over 3 years of experience as an Electrical Engineer, including roles as a Project Engineer and Electrical Supervisor where he planned and managed electrical projects, maintenance, and troubleshooting. He holds an MS in Electrical Engineering and has experience working on projects for hospitals, banks, and other commercial and residential buildings. Baqar is skilled in electrical systems installation, programming, and repair with a focus on lighting control, sound systems, and access control.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views

Yasir CV

Syed Yasir Baqar has over 3 years of experience as an Electrical Engineer, including roles as a Project Engineer and Electrical Supervisor where he planned and managed electrical projects, maintenance, and troubleshooting. He holds an MS in Electrical Engineering and has experience working on projects for hospitals, banks, and other commercial and residential buildings. Baqar is skilled in electrical systems installation, programming, and repair with a focus on lighting control, sound systems, and access control.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CAREER PROFILE

Having 3+ Years of work experience in Electrical project & Maintenance.


Good understanding of Electrical diagrams, planning of Projects, Erection & Maintenance.
Both practical as well as theoretical knowledge of different electrical instruments.

EXPERIENCE
RESPONSIBILITIES:
PROJECT ENGINEER
• Lead and supervised electrical team.
SYED YASIR BAQAR CLEVTRON LIFESTYLE
• Provided technical guidance to the team on installation,
(ELECTRONICS ENGINEER) DEC 2016 TO PRESENT
maintenance, and repair of electrical systems
• EMAIL: [email protected] • Planned and scheduled electrical maintenance work
• Estimated required time, cost, and labor for project and
• CONTACT: 03312539114
provided reports to clients
• RESIDENT: House#R855, Sector
• Contacted vendors and negotiated on price of electrical
7D3, Shadman Town North Karachi. devices
QUALIFICATION • Maintained records of electrical operations, timesheets,
and payrolls
• MS in ELECTRICAL ENGINEERING
FROM BAHRIA UNIVERSITY • Participated in the budget planning meetings
KARACHI, 2019 (2.9 CGPA). • Managed troubleshooting, diagnosing, repairing and
• BS in ELECTRONICS ENGINEERING maintenance of plant electrical distribution.
from SIR SYED UNIVERSITY OF • Determined priorities and completed assignments timely.
ENGINEERING & TECHNOLOGY • Assisted in maintaining spare parts and support operations.
KARACHI, 2016 (3.04 CGPA). • Provided immediate feedback to crew and production
personnel.
CERTIFICATIONS • Installation of Phillips Dynalite Programming, lightning
• INDUSTRIAL ENGINEERING 1 year control and Nuvo Sound System, Crestron Switcher Wiring.
from IEIPC.
• CCTV and Fire Security System 4 RESPONSILIBLITES:
Months from STEVTA. ELECTRICAL • Design, implementation& installation of residential &
• POWER DISTRIBUTION & SUPERVISOR commercial buildings system include: Single and three phase
DESIGN 2 Months From SDC. JAMMY TECH PVT LTD wiring lighting system [Normal & Emergency], Power system
• HIGH RISE BUILDING 2 Months from
SDC. [Normal & UPS], CCTV system, and public address system
DEC 2015 TO DEC 2016 , Nurse call system, Access control systems, fire alarm, IT
• HVAC 2 Months from SDC.
Infrastructure [Voice & Data], DB and Rack.
PROJECTS • Preparation of Project Documentations, BOQ, Shop
• Aga Khan hospital Karachi Diagrams, Submittals, and Purchasing.
• Civil Hospital Karachi. • Meeting with Clients.
• National bank regional office Khi
• Kuwait medical center, Skurdu LEARN ABOUT:
• Misc residential and commercials INTERNEE • Procedure of cement making
LUCKY CEMENT • Machine overhauling and diagram reading.
PERSONAL DATA
• Working of plc, hardware connections and basic
• FATHER NAME: Syed Baqar
2 MONTHS 2015 programming.
• DATE Of BIRTH: July 23rd ,1993
• Star/ delta control and power circuit
• PEC Regis.# : ELECTRO/25212 • Different sensors and its working prameters
• NATIONALITY: Pakistani • Pneumatic system Controlling and Synchronization system
• MARITAL: Married of Generators
• Working of burner with the help of current transformer,
PERSONAL QUALITIES soleniod valve, water level detector and pt- 100 &
temperature controller, proximity and pressure sensors.
• Excellent Communication, Listening
and motivating Skills LEARN ABOUT:
• Proficiency in MS Office INTERNEE • Introduction of BMS software its working .
• Good Understanding of Internet Tools. AGA KHAN HOSPITAL • Working of variable frequency drive , PLC controllers and its
• Ability to learn quickly is my forte that parameters
helped me successfully manage 2 MONTHS 2014 • Working of HVAC systems, chillers and boilers, Switchgears
various jobs given. include contactors,relay,timers,and overloads. PFI panels
• Ability to work with a team of and its need.
dedicated professionals for achieving LEARN ABOUT:
the deadlines for execution of work. INTERNEE
• Working of Audio and video switcher, wiring termination of
PAKISTAN TELEVISION
REFERENCES camera, mic, cordless headphones to the switcher.
• Procedure of Transmission system and Lighting Control
• Will be provided on request 2 MONTHS 2013
systems, live telecast etc. Synchronization systems.

You might also like