CT & PT Sizing Calculation-UP

The document provides calculations for sizing current transformers (CTs) and potential transformers (PTs) for a 70 MW solar power plant in Saharanpur, Uttar Pradesh. It includes calculations for CT ratios, burdens for metering and protection, and selections of 200/1 and 400/1 CT ratings to measure currents of 168.4 A and 336.8 A respectively while allowing a 10% margin. PT burdens are also calculated with a selected margin of 10%. The sizing ensures accurate measurement for metering and protection within voltage and current ratings.

Uploaded by

Akhil Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (11 votes)
16K views5 pages

CT & PT Sizing Calculation-UP

The document provides calculations for sizing current transformers (CTs) and potential transformers (PTs) for a 70 MW solar power plant in Saharanpur, Uttar Pradesh. It includes calculations for CT ratios, burdens for metering and protection, and selections of 200/1 and 400/1 CT ratings to measure currents of 168.4 A and 336.8 A respectively while allowing a 10% margin. PT burdens are also calculated with a selected margin of 10%. The sizing ensures accurate measurement for metering and protection within voltage and current ratings.

Uploaded by

Akhil Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

70 MW (AC) SOLAR PLANT, CHHUTMALPUR, SAHARANPUR, AT UTTAR

PROJECT Title CT & PT SIZING CALCULATION


PRADESH
CLIENT FOURTH PARTNER ENERGY PVT. LTD. Rays Doc No RPIPL-UP-FP-SY-EE-DOC-SSC-001
OWNER'S
SGURR ENERGY INIDA PVT. LTD. Date 31-Jan-20
ENGINEER
EPC RAYS POWER INFRA PVT LTD
Current Transformer (CT)

CT RATIO

PrimaryCurrent rating required (Ir) for CT Rated kVA Vr = Rated voltage


a) =
(Amp)
1.732 x Vr

b) Considered 10% margin (Ict) = Ir x 1.1

c) CT secondary Current (Isec) Rating (Amp) = 1

d) Selected CT Rating = Ict / 1

CT BURDEN

a) VA Burden for connected Equipments = VA1

b) VA Burden for Lead Resistance VA2 = 2 x Lead Resistance( Rl) xLength of the cable x Safety Factor x Isec

c) Total Burden (VA) = VA1 + VA2

d) Selected Burden with 10% Margin = VA x 1.1


Knee Point Voltage Calculation for Differential Protection CT
knee point voltage (Vĸ) = ( Kx ) X (Rᴄᴛ + R∟+ Rrelay) x Isn As per IEC 60044 Part -1 ,
Where
(Kx) = ( Fault current / CT ratio )
a) Rᴄᴛ = Resistance of CT
R∟ = Cable Lead Resistance
Rrelay = Relay Resistance
Isn = Secondary current
Potential Transformer (PT)

PT BURDEN

a) VA Burden for connected Equipments = VA1

b) VA Burden for Lead Resistance VA2 = 2 x Lead Resistance x Safety Factor

c) Total Burden (VA) = VA1 + VA2

d) Selected Burden with 10% Margin = VA x 1.1

Note:
1 Number of core for Ct & PT will be as per requirement.

Application Class
Very accurate metering 0.1 – 0.2
Tariff (kWh) metering 0.5 – 0.5S – 0.2 – 0.2S
Instrument meters and control 1
Protection (P) 5P20 – 5P10 – 10P10
CURRENT TRANSFORMER CALCULATION

132kV Outgoing to Transformer feeders


Rating (Power Transfromer-1 &
Sr.No Parameter Rating (70MW OUTGOING CT)
Power Transformer -2)
1 Total load demand in KVA 35000 70000
2 Voltage Level (kV) 132 132
3 Rated current (Amps) = kVA/(√3 x Rated Volatge) 153.09 306.18
4 Considered 10% margin ( i.e 713.65 x 1.1) 168.40 336.80
5 Proposed Rating of Current Transformer 200/1-1-1-1-1 400/1-1-1-1-1

Burden calculations

I) Metering

1 CT details 200/1A 400/1A


2 Voltage Level 132kV 132kV
3 Load Connected Metering Load Metering Load
4 VA Burden of Ammeter ( i.e assumed ) 1 VA 1 VA
5 VA Burden of MFM ( i.e assumed ) 5 VA 5 VA
6 Cable lead resistance for 2.5 sq.mm cable (Rl ) 9.48 ohms/kM 9.48 ohms/kM
7 Total length of the cable 25 mtrs (considered) 25 mtrs (considered)
8 Lead resistance for 25mtr long 2.5 mm² copper cable (9.48/1000) x 25 = 0.237 (9.48/1000) x 25 = 0.237
9 Safety Factor (SF) 10 10
10 Lead VA burden 2 x Lead resistance(Rl) x SF x Irated 2 x Lead resistance(Rl) x SF x Irated
11 Lead VA burden 2x 0.237 x 10 x 1 = 4.74 VA 2x 0.237 x 10 x 1 = 4.74 VA
Total VA burden ( VA burden of ammter + VA burden of MFM+
12 1+5+4.74= 10.74 VA 1+5+4.74= 10.74 VA
Lead VA burden)
13 With 10% margin 10.74 x 1.10 = 11.814 VA 10.74 x 1.10 = 11.814 VA
Selected Burden 20 VA 20 VA
II) Protection

1 CT details 200/1A 400/1A


2 Voltage Level 132kV 132kV
3 Load Connected Relay Load Relay Load
4 VA Burden of Relay ( Assumed ) 5 VA 5 VA
5 Cable lead resistance for 2.5 sq.mm cable (Rl ) 9.48 ohms/kM 9.48 ohms/kM
6 Total length of the cable 25 mtrs (considered) 25 mtrs (considered)
7 Lead resistance for 25mtr long 2.5 mm² copper cable (9.48/1000) x 25 = 0.237 (9.48/1000) x 25 = 0.237
8 Safety Factor (SF) 10 10
9 Lead VA burden 2 x Lead resistance(Rl) x SF x Irated 2 x Lead resistance(Rl) x SF x Irated
10 Lead VA burden 2x 0.237 x 10 x 1 = 4.74 VA 2x 0.237 x 10 x 1 = 4.74 VA

11 Total VA burden ( VA burden of Relay + Lead VA burden ) 4.74 + 5 = 9.74 VA 4.74 + 5 = 9.74 VA
12 With 10% margin 9.74 x 1.10 = 10.714 VA 9.74 x 1.10 = 10.714 VA
Selected Burden 20 VA 20 VA
CURRENT TRANSFORMER SIZING CALCULATION

Total load CT Rating Selected CT


S.No Feeder Voltage in kV Full load current Margin @ 10% CT Ratio
in kVA required rating

HT Panel
11 35000 33 612.36 1.1 673.60 1000 1000/1-1-1-1A
O/G-1
HT Panel
12 35000 33 612.36 1.1 673.60 1000 1000/1-1-1-1A
O/G-2
Powe
13 35000 132 153.09 1.1 168.40 200 200/1-1-1-1-1A
Transformer-1
Powe
14 35000 132 153.09 1.1 168.40 200 200/1-1-1-1-1A
Transformer-2
70 MW
15 70000 132 306.18 1.1 336.80 400 400/1-1-1-1-1A
Outgoing
CURRENT TRANSFORMER CALCULATION

KNEE POINT VOLTAGE CALCULATIONS AT 132kV SIDE FOR 35000 KVA TRANSFORMER FEEDER

Sr.No Parameter Rating Units

1 Transformer (kVA) 35000 KVA


2 Voltage Level (kV) 132 kV
3 Rated current (Amps) = kVA/(√3 x Rated Volatge) 153.09 Amps
4 Proposed Rating of Current Transformer 200 /1 Amps Amps

KNEE POINT VOLTAGE CALCULATIONS

5 Transformer 132 kV Side CT

6 As per IEC 60044 Part -1 , knee point voltage Vĸ = ( Kx ) X (Rᴄᴛ + R∟+ Rrelay) x Isn

Where

(Kx) = ( Fault current / CT ratio )

Rᴄᴛ = Resistance of CT

R∟ = Cable Lead Resistance

Rrelay = Relay Resistance

Isn = Secondary current

7 Fault Level Current 4.8 kA

8 percentage of imepdance for 35MVA transformer 12.5


Hence fault current is full load current/ % of imedance
9 1225 Amps
Fl)
10 CT Ratio 200/1 Amps

11 Rᴄᴛ = Resistance of CT

12 R∟ = Cable Lead Resistance

13 Cable Size Used - 4C X 2.5 Sq.mm

14 Length of cable 25 Mtrs ( Assumed )

15 Resistance of the cable 9.48 Ω / kM

16 Cable lead resistance for 25 meter cable (R∟) 2*(9.48/1000)*25 Ω

0.474

17 Rrelay = 5Ω (Assumed)

Vĸ = (1225 / 300 ) X (5 + 0.474 + 1.0) *1

Required knee point voltage : Vĸ = 6.123* (5 +1.474 ) =39.644V


132kV POTENTIAL TRANSFORMER CALCULATION FOR HT PANEL

Burden calculations
I) Metering
Sr.No Parameter Rating
1 PT Core No. 132kV PT

2 Load Connected Metering Load

3 VA Burden of Voltmeter ( i.e assumed ) 5 VA


4 VA Burden to MFM ( i.e assumed ) 5 VA
5 Cable lead resistance for 2.5 sq.mm cable (Rl ) 9.48 ohms/kM
6 Total length of the cable 25 mtrs (considered)
7 Lead resistance for 25mtr long 2.5 mm² copper cable (9.48/1000) x 25 = 0.237
8 Safety Factor (SF) 10
9 Lead VA burden 2 x Lead resistance(Rl) x SF
10 Lead VA burden 2x 0.237 x 10 = 4.74 VA
Total VA burden ( VA burden of voltmeter + VA burden to MFM + Lead VA
11 5+5+4.74 = 14.74 VA
burden )
12 With 10% margin 14.74 x 1.10 = 16.214 VA

Selected Burden 50 VA

II) Protection
Sr.No Parameter Rating

1 PT Core No. 132kV PT

2 Load Connected Relay load


3 VA Burden to Relay ( i.e assumed ) 5 VA
4 Cable lead resistance for 2.5 sq.mm cable (Rl ) 9.48 ohms/kM
5 Total length of the cable 25 mtrs (considered)
6 Lead resistance for 25mtr long 2.5 mm² copper cable (9.48/1000) x 25 = 0.237
7 Safety Factor (SF) 10
8 Lead VA burden 2 x Lead resistance(Rl) x SF
9 Lead VA burden 2x 0.237 x 10 = 4.74 VA

10 Total VA burden ( VA burden of relay + Lead VA burden ) 5+4.74 = 9.74 VA

11 With 10% margin 9.74 x 1.10 = 10.714 VA

Selected Burden 50 VA