MSP-0009-TCO-RFI-HVAC-XX-XX-XXX-001 Damper Installation

1) PT. Mega Synergy Powerindo notifies the construction manager and other parties that it is ready for inspection of 10 damper installations. 2) The supplier declares that the items are available and have passed in-house inspections, with material certificates and applicable third party inspections. 3) Attachment 1 provides further details on the 10 damper installations that are ready for inspection, including their tag numbers, descriptions, locations, and service.

Uploaded by

gali vidyasagar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
214 views3 pages

MSP-0009-TCO-RFI-HVAC-XX-XX-XXX-001 Damper Installation

1) PT. Mega Synergy Powerindo notifies the construction manager and other parties that it is ready for inspection of 10 damper installations. 2) The supplier declares that the items are available and have passed in-house inspections, with material certificates and applicable third party inspections. 3) Attachment 1 provides further details on the 10 damper installations that are ready for inspection, including their tag numbers, descriptions, locations, and service.

Uploaded by

gali vidyasagar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

PT.

MEGA SYNERGY POWERINDO

MSP-0009-TCO-RFI-
NOTIFICATION OF READINESS FOR INSPECTION
NO: HVAC-XX-XX-
(NORFI)
XXX-001
Project: TENGIZCHEVROIL PO No. 0009
FGP / AREA 7SS
Contract: FR8000235

Date: No. of Pages incl. cover:


To: Construction Manager

Copy to: Purchasing Manager


Copy to: QA/QC Leader
Copy to: Project Manager
Copy to: Technical Leader
Copy to Engineering Integration Leader
Copy to Senior Inspection Engineer
Client Representative
Copy to
Copy to Package SQS representative

Suppliers Name: MSP Sub-Supplier Name: N/A


Contact Name: Contact Name: N/A
Email: Email: N/A
Phone: Phone: N/A

Location / Address: Date & Time:21 MARCH 20XX

Time: 10.15 AM - Finish

Form No:
Page 1 of 3
PT. MEGA SYNERGY POWERINDO

The proposed location & date has been confirmed with:


* Shop Inspector / *3rd Party Inspector (*delete as applicable).

For the Inspection & Test Plan activities identified below.

Item / Tag Activit Code


ITP No. Description of Activity / Inspection / Test to be performed
No. y No. R/W/H
051-0005- R/W Damper Installation Inspection
HHH-ITP-
1 000-SQF-
00001-
00_K01

Any other information:

To avoid unnecessary visits, Supplier herewith declares that:- (Please tick the boxes below)

YES NO N/A
All above-mentioned items are available.
All above mentioned items passed successfully in-house inspection.
Material and / or test-certificates for above mentioned items are available,
checked and approved by Supplier
Applicable 3rd party inspection has taken place / will take place at the same
date*. *(delete as appropriate)
All relevant documents have been processed/reviewed Code 1 or Code 2.
All flange facings are in accordance with the project / order specifications.
All equipment / material is in compliance with the project / order
specifications.

COMPLETED BY MSP ACCEPTED BY ACCEPTED BY


SIGNATURE

PRINT NAME
DATE

Form No:
Page 2 of 3
PT. MEGA SYNERGY POWERINDO

ATTACHMENT 1

ITR Tag Equipment


S/N ITR Tag Number Location Service
Description Description
Damper
1 XX-FD-3301-6
Installation
Damper
2 XXVCD-3301-12
Installation
Damper
3 XX-VCD-3301-8
Installation
Damper
4 XX-FD-3301-7
Installation
Damper
5 XX-VCD-3301-13
Installation
Damper
6 XX-VCD-3301-16
Installation
Damper
7 XX-VCD-3301-17
Installation
Damper
8 XX-VCD-3301-18
Installation
Damper
9 XX-FD-3301-8
Installation
Damper
10 XX-FD-3301-9
Installation

Form No:
Page 3 of 3