1. PURPOSE The purpose of this Work Instruction regarding grounding and lightning
protection system is to simplify, clarify and guidance how to maintain and
inspect the condition is done properly, correctly and safely.
2. SCOPE This Work Instruction shall be applied for inspection and maintenance
of grounding and lightning protection system for all building at the TJB
Unit 5&6 Power Plant 2x1000MW.
3. REFERENCE 3.1. PR-2.1.03 for Maintenance Accuracy of Measurement.
3.2. PR-1.1.15 for Permit to Work (PTW).
3.3. WI-6.1.01.9 for Personal Protective Equipment.
3.4. NFPA-70B, 2006 for Recommended Practice for Electrical Equipment
Maintenance.
4. RESPONSIBILITIES 4.1. Electrical Manager shall be responsible for developing and
periodically reviewing and updating (if applicable) this Work
Instruction and ensure the proper implementation of this Work
Instruction by relevant Employees.
4.2. Electrical Leader is responsible for updating this work instruction and
making evaluation for improvement.
4.3. Electrical supervisor is responsible to ensure that the sub-ordinate
implementing this work instruction.
4.4. Electrical technician and contractor are responsible to carry out the
work base on the work instruction.
5. WORK This Work Instruction requires following actions to be taken:
INSTRUCTION 5.1. Safety Precaution.
1. Leader or Supervisor shall establish the General Safety, i.e. Safe
access to and from the work place, safe place of work, safe