This document is a design verification plan and report (DVP&R) for aeration diffusers. It contains 3 sections: [1] a system description identifying the subsystem and assembly being tested, [2] a planned product testing section outlining tests, acceptance criteria, responsibilities, and timing, and [3] a verification report authorization section to review and approve the test results. The DVP&R allows verification that the diffuser membranes meet requirements before production.

Uploaded by

narmadha rajesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

DVPR Template

This document is a design verification plan and report (DVP&R) for aeration diffusers. It contains 3 sections: [1] a system description identifying the subsystem and assembly being tested, [2] a planned product testing section outlining tests, acceptance criteria, responsibilities, and timing, and [3] a verification report authorization section to review and approve the test results. The DVP&R allows verification that the diffuser membranes meet requirements before production.

Uploaded by

narmadha rajesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DESIGN VERIFICATION PLAN AND REPORT Copies must be verified for current revision

DVP&R No: Rev: Date:


System Description: Aeration Supplier Name: Environmental Dynamics Internation

Subsystem Description: Diffusers Supplier Code: Affected Program(s): Metro, NZ Team:

Assembly Description: Part Number Rev Design Engineer Supplier Design Engineer (Key Contact)
Supplier
Address:
Name: Name:

City: Zip / Postal Code:


Component Description: Part Number Rev
Title: Title:
Diffuser Membranes
State: Country:
Email: Email:

Test Stage ED = Engineering Development Test, DV = Design Verification Test, PV = Production Verification Test, CCT = Continued Compliance Testing Phone: Phone:
Target Requirements. State required probability and confidence of meeting criteria, e.g. R90, C90 or all must pass.
Sample Level A = Prototype (No tooling), B = Prototype (Soft Tooled), C = Production Tooling (Not Process), D = Production Tooling & Process Cell: Cell:

Planned Product Testing Reporting of Results Planned Test Timing & Sample information Actual Timing & Sample Information
Compliance / Scheduled Timing Actual Timing
Test Results Test Test Location / Verification Sample Size Report or Doc.
Test #

Regulatory / Specification / Test Name Method or Procedure Duration Acceptance Criteria Test Results / Findings Pass / Fail Test Completed by Notes Stage Target Requirement Resp. Source of Requirement Sample Level or Batch # Number Sample Level Sample ID Sample Size Tested
SC/CC/KPC
Start End Start End

Verification Report Authorization Design Engineer Review / Approval


I affirm that the samples used for verification testing are representative of our parts, and I authorize the use of this data.

Authorized Signature Date Authorized Signature Date