Substation S07
Substation S07
DETAILS
ALONG SHORT SPAN ALONG LONG SPAN
TOP BAR BOTTOM BAR TOP BAR BOTTOM BAR
SLAB THK, t
Ø DISCONTINUOUS CONTINUOUS DISCONTINUOUS CONTINUOUS DISCONTINUOUS CONTINUOUS DISCONTINUOUS CONTINUOUS REMARKS
LABEL (mm) BAR (mm) BAR (mm) BAR (mm) BAR (mm) BAR (mm) BAR (mm) BAR (mm) BAR (mm)
S-01 230 12 190 80 190 80 190 190 190 190 2W
S-02 230 12 190 160 190 160 190 190 190 190 2W
S-03 230 12 190 150 190 150 190 190 190 190 2W
S-04 230 12 190 120 190 120 190 190 190 190 2W
S-05 230 12 270 120 270 120 270 120 270 120 1W
S-06 230 12 270 130 270 130 270 130 270 130 1W
S-07 230 12 270 250 270 250 270 250 270 250 1W
S-08 230 12 270 270 270 270 270 270 270 270 1W
1 SLAB SCHEDULE
S-07 SCALE: NTS
1 SLAB SCHEDULE
S-07 SCALE: NTS
PREPARED BY: NOTES: SHEET SHEET NO.
1). ALL DIMENSIONS ARE IN MILLIMETERS CONTENT:
2). CONCRETE STRENGTH USED (Fc') = 28 Mpa (FOR NON-PRECAST ELEMENTS)
Ronald C. Balbuena, CEng MICE M.ASCE M.IABSE
STEEL STRENGTH USED: Fy = 414 Mpa; Fys = 276 Mpa
3). PROVIDE LEAN CONCRETE WITH 75MM THK. AT MONTALBAN SUBSTATION PREMIUM MEGASTRUCTURES INC. DATE: SCALE:
CHARTERED STRUCTURAL ENGINEER Fc'= 10.5 Mpa OR 1500 Psi OWN ER
4). ALL DIMENSIONS SHALL BE VERIFIED AT SITE CADD BY: REVISION:
PRC NO.: 0113662 DESIGNED BY: DATE: DESCRIPTION
TIN NO.: 287-671-321
PTR NO. 0743752: IAPOA NO.:
LOCATION : MONTALBAN, BULACAN ADDRESS: 1423 The Mondrian Building. P. Ocampo St., Brgy. San Antonio Village, Makati City CHECKED BY:
D/P: 00/00/00 OR NO./DATE: 04-15-2019