0% found this document useful (0 votes)
468 views82 pages

Final Draft ERDMP-Rupnagar PDF

Uploaded by

tirth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
468 views82 pages

Final Draft ERDMP-Rupnagar PDF

Uploaded by

tirth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 82

BH

HARAT
T PETR
ROLEU
UM COR
RPORA
ATION LIMITE
ED

D
DISAST
TER/EM
MERGE ENCY MANAG
M GEMENNT PLA
AN
FOR
CNG FACILIITIES OF
O BPCCL AT RUPNA
AGAR

MECON LIM
MITED

(A
A Govt. off India Un
ndertakin
ng)
D
Delhi, India

MECON N P
Prepared b
by Ch
hecked by
Name
N
D
Designatio
on

Signature
S
BPCLL A
Approved b
by
N
Name
D
Designatio
on

S
Signature
26thh March, 20
018

 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

CONTE
ENTS
1.0 INT
TRODUCTION
2.0 DE
EFINITION
3.0 APPLICABILIT
TY
4.0 COPE AND INTENT OF
SC F ERDMP
5.0 CLA
ASSIFICAT
TION OF EM
MERGENCIES
‐ ON
N SITE EME
ERGENCY TEAM
T
‐ RE
ESPONSIBIL
LITIES & DUTIES OF DM KEY PE
ERSONNEL
‐ RE
ESPONSIBIL
LITIES & DUTIES OF OUTSIDE AGENCIES
A S
6.0 IMP
PLEMENTA
ATION SCH
HEDULE
7.0 CO
ONSEQUEN
NCE OF DE
EFAULT OR
R NON-COM
MPLIANCE
8.0 RE
EQUIREMEN
NTS UNDE
ER OTHER STATUTES
S
9.0 PR
RE-EMERGE
ENCY PLAN
NNING
10.0 RIS
SK ANALYS
SIS AND RISK ASSES
SSMENT
11.0 EM
MERGENCY
Y MITIGATION MEASU
URES
12.0 EM
MERGENCY
Y PREPARE
EDNESS
13.0 RE
ESPONSE PROCEDUR
P RES AND MEASURES
M S
14.0 EM
MERGENCY
Y ORGANIS
SATION AND RESPON
NSIBILITIES
S
15.0 INF
FRASTRUC
CTURE
16.0 DE
ECLARATIO
ON OF ONS
SITE AND OFFSITE
O EM
MERGENCY
Y
17.0 RE
ESOURCES
S FOR CON
NTROLLING
G EMERGENCY
18.0 DE
EMOGRAPH
HIC INFORM
MATION
19.0 ME
EDICAL FAC
CILITIES
20.0 EV
VACUATION
N
21.0 PUBLIC RELA
ATION AND
D INFORMA
ATION TO PUBLIC
P
22.0 OLES AND RESPONSI
RO R IBILITIES OF
O STAKE HOLDERS
H
23.0 RE
EPORTING OF INCIDE
ENT
24.0 AC
CTION AFTE
ER REPOR
RTING OF IN
NCIDENT
25.0 TERMINATION OF EMER
RGENCY
26.0 EM
MERGENCY
Y RECOVER
RY PROCE
EDURES
27.0 ER
RDMP FOR ROAD TRA
ANSPORTA
ATION
28.0 MIS
SCELLANE
EOUS

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 2 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Enclo
osure and
a An
nnexu
ure:
 MSDS of
o Natural Gas
G

 Layout of On-line CNG


C Station

 Layout of Mother CNG


C Station
n

 Layout of Daughte
er Booster CNG
C Station
n

 atic Gas Flo


Schema ow Diagram
m

 Typical NG installa
ation inside a domestic
c kitchen

 Health, Safety and


d Environme
ent

 Cold Work
W Permit (Annexure – I)

 Hot Wo
ork Permit (Annexure
( – II)

 Electriccal Isolation//Energisatio
on Permit (A
Annexure – III)

 Clearan
nce Renewa
al format

 Closing
g of Work Pe
ermit

 Emerge
ency Action Plan for CN
NG Station

 Emerge
ency Action Plan for PN
NG

 Emerge
ency Mutual Aid

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 3 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

1.0 INTRODU
UCTION

Emergenccy Responsse and Dissaster Man nagement Plan is esssential for oil & gass
installation
ns to ensuree that any eventual
e disaster is effe
ectively mannaged to minimise losss
of propertyy and life. M/s.
M Bhara at Petroleum Corpora ation Ltd. ((BPCL) is developing
d g
CNG & City
C Gas Distribution
D Infrastructure in the
e Geographical Area
as (GAs) of
o
Rupnagarr (Punjab) based on PNGRB au uthorization.

Bharat Petroleum
P Corporation Limited envissaged se et up forr creating g
prising of Steel Pip
infrastructture comp peline Nettwork (Priimary Nettwork), PEE
Pipeline Network (SSecondary Network) and GI Piping alongg with Coppper tubing
g
(Tertiary Network)
N in
n Rupnagar Geographical Areass (GAs) to o reach consumers of o
various se egments na amely Auto omobile, Ho ouseholds, Commercia al and Industrial. Thee
infrastructu NG stations of various types
ure shall alsso have CN t like M
Mother Statio
ons, On-line
e
Stations annd Daughte er Booster Stations
S to provide
p Com
mpressed N Natural gas (CNG).

This is alsso a pre-requirement for


f operatio
on of the in
nstallations to meet sttatutory and
d
regulatory requireme ents of the
e Governm
ment of Pu unjab and Government of India a
Ministries’ legislative.

In the even o the distribution systtem or on CNG


nt of a gas emergencyy occurring on C station
n,
a planned and practiical response must be e automaticcally activatted by the established
d
ERDMP procedure off the compa any so that personal sa
afety is pre
eserved and d damage too
private and
d system prroperty is minimised.
m

The proceedure outlinnes actionss to be tak ken by thee designate


ed key perssonnel in a
manner tha
at suits a diisaster situa
ation depen
nding upon its
i degree a
and gravity.

SCOPE of CGD Netw


work :
Each city gas distributtion networkk is primarily
y distributed e following major
d among the
categories:
 ate Station (CGS)
City Ga (
 Distribu
ution Pressu
ure regulatin
ng system (DPRS)
(
 Individu
ual Meter Regulating System
S (IPR
RS)
 Medium
m Industrial, Commercial & Domes
stic Metering System
 CNG Sttations.

City Gate Station


S (CG
GS):

BPCL shall receive Natural by ta apping from GAIL’s pipeline(Bawan na Nangal Pipeline) to
o
make the ciity grid netw
work for Rup
pnagar and adjacent
a are
ea in its GA..

CNG Statio
ons:

There are three


t catego
ories of CNG station:

a. Online CNG Statiions: On lin


ne stations are conneccted to the p
pipeline and
d have high
h
ession capacity. These stations su
compre upply CNG to
t vehicles.

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 4 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

b. Daughtter Stations: Daughter station dis spenses CN NG using m mobile casca ades. These e
mobile cascades ata daughter stations arre replaced when presssure falls an nd pressure
e
deplete
ed mobile cascades
c arre refilled at
a CNG mo other station or at CG GS. There iss
reductio
on in storag
ge pressure at daughte er station witth each succcessive filliing.

c. CNG mother
m station: On linee stations, connected to the pipe eline and ha
aving a high
h
compre ession faciliity. These stations su upply CNG G to both vvehicles annd daughter
stationss (through mobile
m casccades). Theese CNG stations com mprises of compressor
c r,
dispenssers, storag ge cascade es and fac cility for filling the mo
obile cascades. These e
stationss are also classified as Mother Staations.

nstallations
d. PNG in s:
District Regulatoryy Stations (DRS): Thhe gas preessure is reduced to distribution n
pressurre in DRS, for
f transmisssion and su
upply purpooses. The D
DRS is direcctly linked to
o
the main steel pip
peline. Fromm the DRS, takes off the
t Mediumm Density Polyethylene
P e
(MDPE) network. The
T MDPE network of pipes carrie es and distrributes PNG
G right up too
the customer’s pre
emises.

Meter Regulating
R S
Stations (MRS): It com
mprises of re
egulator andd meters for measuring
g
the gass supplied to
o the consuumers. The pressure re egulatory further reduc
ces the PNGG
peline to millibars.
pressurre in the pip

After MRS,
M the supply of natu ural gas is done to ind
dustrial, com
mmercial an
nd domesticc
customers. Pressu ure regulattors are insstalled to regulate thee pressure as per the
e
requirem
ment of cusstomers.

2.0 DEFINITIION

wing definitions have been


The follow b used in
n the reportt:

al terminolo
Essentia ogy / Definitions used
d in this do
ocument

In these regulations,
r , unless the
e context oth
herwise req
quires,-

(a) “Act” means


m the Petroleum
P a Naturall Gas Regullatory Board
and d Act, 2006;

(b) “Boardd” means th he Petroleum m and Natu ural Gas Re oard establlished under
egulatory Bo
sub-secction (1) of section
s 3 off the Act;

(c) “Boilin
ng liquid ex xpanding vapor
v explo
osion (BLE EVE)” mean ns the violennt rupture of
o
a presssure vessel containing saturated liiquid or vap por at a tem
mperature we ell above itss
atmosp pheric boiling point and d the resultin
ng flash eva
aporation o
of a large fra
action of the
e
superhe eated liquid
d which produces a larrge vapor cloudc which burns in th he form of a
large rissing fireballl due to igniition;

(d) “Chief incident controller” means


m the person who o assumes absolute co
ontrol of the
e
unit and
d determine ecessary to control the emergencyy;
es action ne

(e) “Codes s of practiice” meanss the code es of practiice for eme


ergency res
sponse and
d
disaster managemment plan no
otified by the
e Board;

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 5 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

(f) “Disasteer” means an


a occurren nce of suchh magnitude e as to crea
ate a situatiion in which
h
the norrmal pattern
ns of life within
wi area or
o industriall complex a are suddenly disrupted d
and in certain casses affectinng the neigghborhood seriously w with the res
sult that thee
people are plunge ed into helplplessness and sufferiing and ma ay need foood, shelterr,
clothing
g, medical attention
a pro
otection and
d other life sustaining
s rrequirementts;

(g) “Disastter manage ement plan““ means a well-coord dinated, commprehensivve responsee
plan to contain losss of life, property, environment and
a provide
e speedy and effective
e
recoverry by makiing the mo ost effective
e use of available
a re
esources in
n case of a
disaster;

(h) “Emerggency” mean ns a situatio


on or scena
ario which has
h the pottential to ca
ause seriouss
danger to personss, environm ment or dam mage to prooperty and which tend ds to cause
e
disruptiion inside or outside the premiises and may m require
e the help of outsidee
resourcces;

(i) “Emerge ency Respoonse Vehiccle (ERV)” means a vehicle v for handling emergencies
e s
having necessary equipment meant for rescue
r and relief opera
ations and ERV
E can be
e
put to use
u within in
nstallation, outside
o of in
nstallation in
ncluding roaad incident;;

(j) “Hazardd” means an n event rellated to the


e property of
o substancce or chemmicals with a
potentia
al for human injury, da
amage to prroperty, dam
mage to the
e environme
ent, or somee
combination thereoof;

(k) “Inciden
nt” means an
a unplanned or uninttended or in ntended evvent having potential to
o
cause damage
d to life,
l property
ty and envirronment;

(l) “Incident record reggister” mean ns a registe


er containin
ng complete e information
n pertaining g
to all in
ncidents covvering nearr miss, and all other inccidents lead
ding to Levvel-I, Level-III
and Levvel-III emerg
rgencies;

(m) “Installlation” mea


ans facilitie
es, namely, y, gaseous product piipeline, liqu uid Producct
pipeline
e, hydrocarrbons proce essing insttallation, oill and natural gas terrminals and d
comme ercial storag
ge and tra ransportation, hydroca arbons gass bottling Installationss
includin
ng CNG, cityy gas distribbution facilitties and rettail outlets;

(n) “Leak” means rellease or diischarge off a dangerrous chemiccals or sub


bstances or
materia
al into the en
nvironment;;

(o) “Level-II emergencyy” means an


n emergenc
cy as define
ed under su
ub regulation
n 6 (a);

(p) “Level-III emergenccy” means an


a emergen
ncy as defined under su
ub regulatio
on 6 (b);

(q) “Level-IIII emergenccy” means an


a emergen
ncy as defin
ned under ssub regulatio
on 6 (c);

(r) “Mutuall aid asso ociation” means an industrial


i m
mutual aid association in which h
particip
pating indusstries as a community
c shall
s assist each otherr in case of emergencyy.
Mutual aid associiations sup pplement a sites emergency con ntrol plan. Services of
o
membe er industriess shall be re
equested on he emergency threaten
nly when th ns to exceed
d
the cappability of ottherwise ava
ailable reso
ources.

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 6 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

(s) "Occup pier” of an installation


i means the
e person who
w has ultiimate contrrol over the
e
affairs of
o the installlation;

(t) “Off-site emergencyy” means an a emergen ncy that takees place in an installattion and the
e
effects of emergen ncy extendss beyond th he premisess or the eme ergency creeated due too
an inciddent, catastrophic inciidents, natu ural calamiti
ties, etc. It no longer remains
r the
e
concern n of the insstallation management
m t alone but also becom mes a conc cern for the
e
generall public livving outside e and to deal with such even ntualities sh
hall be thee
responssibilities of district
d adm
ministration

(u) “Off-sitee emergenccy plan” me eans a respponse plan to t control aand mitigate e the effectss
of cata astrophic incidents
i in
n above ground
g insstallation (AAGI) or underground
u d
installattions (UGI) or road tra
ansportationn. This plan n shall be pprepared by y the districct
adminisstration bassed on the data provid ded by the installation n(s), to mak ke the mosst
effectivve use of coombined ressources, i.e.. internal ass well as exxternal to minimize
m losss
of life, property,
p en
nvironment and to restoore facilitiess at the earlliest;

(v) “On site


e emergenccy” means ana emergen es place in an installattion and the
ncy that take e
effects are confine
ed to the Innstallation premises innvolving on nly the people working g
inside the plants and to de eal with suc ch eventuaalities is the
e responsib bility of the
e
occupieer and is ma
andatory. It may also reequire help of outside rresources;

(w) “On site


e emergenccy plan” means a respo onse plan too contain an
nd minimizee the effectss
due to emergencie es within th he installatio
ons which have
h a pote
ential to cau
use damage e
to peop
ple and facillities within the installattion premise
es;

(x) “Risk” means


m the chance of a specific undesired
u e
event occurrring within a specified
d
period or
o in specifi
fied circumsstances andd it may be either a frequency or a probabilityy
of a spe
ecific undessired event taking place
e;

(y) “Risk analysis” means


m the identificatiion of unddesired eve ents that lead
l to thee
materiaalization off a hazard
d, the anallysis of the mechaniisms by which w thesee
undesirred events could occur and, usua ally, the esttimation of the extent, magnitude
e,
elihood of any harmful effects;
and like

(z) “Risk assessment”” means the quantitatiive evaluati tion of the llikelihood of
o undesired
d
events and the like
elihood of harm or dammage being caused by tthem, togetther with the e
value ju
udgments made
m conceerning the siignificance of
o the resullts;

(aa) “Risk management” meanss the prog gram that embraces


e all adminisstrative andd
operatioonal progra
ams that are e designedd to reduce the risk of emergencie es involving
g
acutelyy hazardouss materials. Such progrrams includ de, but are n
not limited to, ensuring
g
the dessign safety of new an nd existing equipment, t, standard operating procedures
p s,
preventtive mainteenance, ope erator train
ning, incide
ent investigation proce edures, riskk
assessm ment for unit
u operatiions, emergrgency plannning, and internal an nd externa al
procedu ures to ensu
ure that the
ese programms are beingg executed as planned d;

(ab) “Site in
ncident con
ntroller” mea
ans the pers oes to the sccene of the emergencyy
son who go
and sup pervises the
e actions necessary too overcome
e the emerg gency at thee site of the
e
incident;

(ac) “Spill”” means an n unintendeed release or discharrge of hydrrocarbon orr any other
dangero ous liquid in
nto the enviironment;

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 7 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

(ad) “Transsport emerg rgency (TREEM) card” means a card


c contaiining details
s about thee
nature of hazardss, protective e devices, telephone numbers a and actions s related to
o
spillage a and other details of
e, fire, first aid a internattional (UN) numbers or
o national and
signagee which is common
c in India
I and ab
broad;

(ae) “ Unco onfined vap


por cloud exxplosion (U
UVCE)” mea ans the form
mation of vaapour cloud
d
due to release of significant quantity off liquefied hydrocarbon
h ns into the atmospheree
and itss explosion due to ignition whic ch may cau use high oover pressu ure and loww
pressurre that causse very heavvy damage..

3.0 APPLICA
ABILITY

These reg
gulations ap
pply to:-

(a) Pipeeline such as Natura al Gas, Pro opane, Buttane etc. a


and the hy
ydrocarbonss
prodduct which remains in gaseous sta ate at NTP
(b) Cityy or local na
atural gas distribution fa
acilities.
(c) Disppensing sta ations.
(d) Transportation of Petroleu um products s by Road

4.0 SCOPE AND


A INTEN
NT OF ERD
DMP

The ERD DMP has been


b prepared to enaable BPCL make nece
essary preparation for
handling a disaster with
w the follo
owing objec
ctives:

i) Immmediate con ntainment off the situatio on.


ii) Brin
nging the sittuation unde er control.
iii) Prompt rescue e, immediate medical assistance
a to casualtie
es and iden ntification of
o
deaad.
iv) Providing information to re elatives of casualties,
c g
govt. authorrities and media.
m
v) Protection of liffe, propertyy and enviro onment.
vi) Rehhabilitation of
o affected people.
vii) Resstoration of services.
viii) Preservation of o records and equip pment to help in iden ntification of
o cause of o
dent during subsequen
incid nt enquiry.

ERDMP P outlines on
o site emerrgency plann to be deveeloped for oil & gas insttallations ass
per the
e requirements of Th he Factoriees Act 194 48 (Amendment 1987 7) and The e
Environ
nment (Protection) Act, 1986 to miinimise a ga
as emergen ncy incidentt.

The plaan ensures that the Company


C respond effecctively to a
an emergen ncy situation
n
with thheir own resources or in as ssociation with otherr agencies s like Civiil
Adminisstration, Firre Service, Medical
M Emmergency Seervice, Policce, Army an nd voluntaryy
organissations. Thee objective is
i to bring back
b normaalcy with thee restoration of service
e
at the earliest.
e

The ER
RDMP reporrt has been prepared to
o cover the proposed installations
s of BPCL.

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 8 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

5.0 CLASSIF
FICATION OF
O EMERG
GENCIES

Emergencies based on which Response


R Plans
P have
e to be adop pted are cla
assified into
o
following 3 levels depending on
o the serio
ousness off the incide
ents and their possible e
impacts.

Level 1

This leve
el of emerge ency arisess out of an incident, wh hich can be e safely and
d effectivelyy
contained
d by using field
f resourcces.
The incid
dent is restrricted within
n the installation and iss not likely to pose da
anger to life
e,
property and
a environ nment.

Level 2

Level 2 emergencie
e es may not be possiblle to contaiin using fie
eld resource
es and mayy
require exxternal help
p.

There is possibility of
o danger to
o life, prope
erty and envvironment b
both within and outside
e
the installation.

Level 3

Level 3 emergencie es escalate


e to a level where they
t adverssely affect public life
e,
companyy operation and
a reputattion.

The incid
dent will ha
ave implicattion on tech ects of the installation, public life
hnical aspe e,
personneel and mediaa

The incident may ha


ave one or combination
c n of the follo
owing situattions:

i) Losss of life or grave


g injuryy to employe ees and pubblic.
ii) Riskk of environnmental dam mage due to o extensive pollution.
iii) Dammage to company
c installations
s and pro operty both h within and
a outside
e
installation.

5.1 GENCY SCENARIOS


EMERG

Emerge
ency Scena
ario Threatss

Fatalityy, Serious in
njury or illne
ess
Medical
Cardiacc Problem

Fire an nd Explosion n
Structu ural failure
Operational Pipeline leakage o or rupture
Sabota age, pilfera age or terrorist
t
activityy

Flood
Natural Disaster Cyclone
Earthquake

 
© Copyright MECON Limited
d – All rights reserved
r Page
P 9 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Chemiccal/oil spill
Environme
ental Gas release
Atmosppheric emisssions

Bomb Threat
T
Security Sabota
age/terroristt activity
Kidnap
p & Ransom m

6.0 IMPLEME
ENTATION
N SCHEDUL
LE

Schedule entation of Code of Pra


e of Impleme actice for ERDMP
hedule of Im
Sch mplementa de of Practtice for ERDMP
ation of Cod
Sl. Activity
y Implemmentation Compliance Statu us
No. Time (from
m
notifica
ation Date)
1 On-site Emergencyy Plan 3 monthhs Shall bee complied with
w for the Pilot
Project within threee months fro
om
start of gas distribu
ution.
2 Off-site Emerge ency Pla
an 3 month
hs 3 month hs from the date of
(submisssion of infformation to
t availability of Naturral Gas in thhe
District Authority)
A City Nettwork from CGS
3 Resourcces in position 6 month
hs * O&M Te eam with ne ecessary tools
and tackkles including emergen ncy
Vehicle shall be ma ade availab ble at
the site of pilot projject.
4 Accreditted Thiird Partty 1 year from thee date of avvailability of
Certifica
ation of ERD
DMP Natural Gas in the City Network
from CG GS and submission of Final
ERDMP P to concern ned authoritties
5 Testing and Mock Drills
D (On- 6 month
hs To be done with O& &M Team at
a the
site) site of p
pilot project
6 Testing and Mock Drills
D (Off- ** To be done upon availability
a o
of
site) Natural Gas in the City Network
from CG GS

ong Deliveryy Items should be tied up with mutual aid organizations, in case of any
* Lo a delay,

T be coordiinated with district auth


** To horities by PNGRB.
P

 
© Copyright MECON Limited
d – All rights reserved
r Paage 10 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

7.0 CONSEQ
QUENCE OF DEFAUL
LT OR NON-COMPLIA
ANCE

i) There is a sysstem for ensuring compliancce to the provision of these e


regulattions throu
ugh a well defined ERDMP and conduction of moc ck drill and
d
safety audits durring the op
peration, as well as on o an on-g going basis
s. There iss
also a system of mock drillss for the vis
sitors befo
ore entering
g an establishment.
iii) The Board mon nitor the compliance
c e of ERDM MP, Techn nical Standards and d
Specifications inncluding Safety
S Staandards either direcctly or ind directly byy
accredited third party throuugh separate regula ations on third party conformityy
assesssment.

iii) In case
e of any de eviation or shortfall, in achievin
ng the reco
ommended d standardss
the enttities are liable to penal provisions underr the provissions of the technica
al
standaards, speciffications in
ncluding sa afety standards (T4S)).

ivv) Mutual Aid mem mbers not respondin ng to request for a assistance from site
e
inciden
nt controlle
er of the affected
a ins
stallation will
w attract penalty under these
e
regulattions.

v
v) For firsst default in response, the defa
aulting enttity shall ha
ave to sub
bmit written
n
explanation to afffected muttual aid meembers.

v
vi) For the
e second and
a successsive failurre, the deffaulting enttity shall have to payy
the double of thee billed am
mount of expenses in ncurred byy affected mutual aidd
membe ers in case
e of any evventuality occurs
o in the premisees of affeccted mutua
al
aid meembers.

8.0 REQUIRE
EMENTS UNDER
U OTH
HER STATU
UES

The follow
wing statuto
ory rules, re
egulations and
a Acts are
e compiled a
at the installlations:

• Thee Environmment (Protecction) Act, 1986 (ame ended 1991 1) and follo
owing Ruless
the
ere under:
• Thee Environment (Protecction) Rules,, 1986 (ame ended 20044).
• Thee Manufactture, Storag ge and Immport of Ha azardous C Chemicals Rules,
R 19899
(am
mended-199 94 and 2004 4).
• Thee Hazardou us Wastes (Managem ment and Handling)
H R
Rules, 1989 9 (amendedd
20000 and 2003 3).
• Thee Environment Impact Assessmen nt Notificatio
on, 2006.
• Thee Chemicall Accidentss (Emergen ncy Planning, Preparedness and Response))
Rulles, 1996.
• Bio
o-medical Wastes
W (Man a Handling) Rules. 1989.
nagement and
• Thee Factories Act, 1948 (amended
( 1987).
1
• Sta
ate Factory Rules.
• Thee Inflammab ble Substan nces Act, 19952.
• Thee Motor Veh hicles Act, 1988
1 (amen nded 2001)..
• Thee Central Motor
M Vehiclles Rules, 1989
1 (amended 2005).
• Thee Public Lia
ability Insura
ance Rules,, 1991 (ame ended 1992 2).
• Thee Public Lia
ability Insura
ance Rules,, 1991 (ame ended 1993 3).
• Thee Petroleumm Act, 1934.
• Thee Petroleumm Rules, 2002.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 11 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

• The
e Insecticid
de Rules, 19
968 (amend ded 2000).
• The
e Insecticid
de Rules, 19
971 (amend ded 1999).
• The
e National Environmen
E nt Tribunal Act,
A 1995.
• The
e Explosivees Act, 1884
4 (amended d till 1983).
• The
e Gas Cylinnder Rules, 2004.
• The
e Static andd Mobile Pre
essure Vessels (Unfire ed) Rules, 1
1981 (amended 2002).
• The
e Explosivees Rules, 19
983 (amend ded 2002).

9.0 PRE-EME
ERGENCY PLANNING
G

Hazard Ide
entification
n
1) The firsst step towa
ards ERDM
MP shall be to
t identify potential
p on
n-site & off-s
site hazardss
such as gas leakk, spills, fire
e, explosion n, transporrtation incid
dent, pipelin
ne rupturess,
equipm
ment failure, natural callamities, etcc. and the types
ty of dammage cause ed by them
m.
The hazzard identifi
fication shalll include,

a) Infformation to
o toxicologiccal, physicall and chemiical propertties of the substances
beiing handledd in the form
mat of MSDS S

b) ide
entification of
o potential impact on downwind
d a quality orr downstrea
air am water
quality from ann incidentall release an
nd possible danger to h
human, flora
a, fauna &
aniimal health;;

c) Ha
azards to thee installatio
on shall also
o include Na
atural perils such as flo
oods,
earrthquakes, cyclones orr landslides s etc.

d) Ch
heck points for hazard identificatio
i on are given
n at Check liist-1

The major hazard of installation is Natural Gas which


h is highly inflammable
e in nature
e.
These are the possiible causess for an accident
a in the installation, whic
ch leads too
emergencyy situation of
o

 Leakag
ge of Natura
al Gas
 Leakag
ge of odoran
nt
 Fire

Fire
The fire is a process of o burning that
t produc
ces heat, lig
ght and ofte
en smokes and flamess.
The effect of fire on the people e takes the
e form of skin burn du ue to the exposure
e to
o
thermal raddiation. Thee severity of the burns depends upon
u the inttensity of th
he heat andd
exposure time.
t In geeneral term ms, the skin
n withstand ds heat en nergy of 10 0 kw/m2 for
approximattely 5 seconds and that of 30 kw w/m2 for 0.44 seconds b before pain is felt. Fire
e
can take seeveral differrent form i.e
e.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 12 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

1 Flash Fiire:
1.

A flash fire
e occurs when
w a clou
ud of flammmable gas and air is ignited. Th he speed of
o
burning is function off the concentration of the flammaable compo onent in the
e cloud and
d
also the wind speed. Within
W a few
w second of ignition the flame sprreads both upwind and
d
downwind of the ignittion source es typical flame propaagation spe
eeds are the orders of
o
4m/sec. Thhe flame velocity and dispersion in
ncreases with wind speeed.

2 Jet Fire:
2.

A jet fire occurs


o wheen a flamm mable liquidd or gas iss ignited affter its release from a
pressurizedd, punctured vessel orr pipe. The pressure of release ge enerated a long flame e,
which is sttable underr most cond dition. A fla
ash flame may
m take the form of jet flame on n
reaching thhe spill poin
nt. The dura
ation of the jet
j fire is de
etermined b by the relea
ase rate and
d
the capacity of the souurce. Flamee length incrreased direcctly with flow
w rate.

3. Pool Firre:
3
A pool fire occurs on ignition of an
a accumulation of liqu uid as a pool on the ground or on n
water or otther liquid. A steadily burning fire is rapidlyy achieved as the flam
me vapor to o
sustain thee fire is prrovided by evaporatio on of liquidd by heat from the flames.
f The e
maximum burning
b rate
e is function
n of the net heat of com
mbustion and heat reqquired for itss
vaporization.

Fire damage occurs more freq quently than n losses byb explosion but the damage iss
generally le es are less dangerous to human life that flas
ess extensivve. Pool fire shes fire bu
ut
their longer duration’ss results in greater strructural dam
mages. The e jet fires mainly
m affecct
the mechanical prope erties of thee structuress. Material of construcction loses mechanica al
strengths when
w exposed to high temperature
t es.

Explosion

An explosio on is the prrocess invo


olving the prroduction of a pressurre discontinuity or blasst
wave resulting from a rapid relea ase of energgy. A pressure disturbaance is gen nerated in too
the surrounnding mediu um. Air becomes heate ed due to itss compresssibility and this
t leads to
o
an increase e in the ve
elocity of so
ound, causing the fron nt of disturb
bance to stteepen as it i
travels thro
ough air.

The explossion mainly occurs duee to the rapid combusstion of a fflammable material
m but
can be bro ought abouut the chem
mical reactions other than comb bustion, pro
ovided theyy
release large amount of energy. Examples of these reactions arre polymerizations, the e
decomposition of unstable substa
ances and exothermic
e interactionss of many kiinds.

Vapor Clou
ud Explosion:

An accidenntal escapee of flamma able materiaal leads to subsequen nt rapid com


mbustion on n
encounterin
ng a source e of ignition and may reesult in to fireball on im
mmediate ignition. But if
i
elay in the ignition, it may result in to eithe
there is de er flash fire
e or in to Vapor
V Cloudd
i turbulence inducting feature are
Explosion if e present. A VCE is a an extremelyy damaging g
outcome from the rele ease of flammmable material. A larrge amountt of flammable materia al
can accummulate in thee cloud form m and subssequently re elease its energy on encountering g
some local ignition sou
urce in the form
f of over pressure explosion.
e

 
© Copyright MECON Limited
d – All rights reserved
r Paage 13 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Natural gass is a mixturre of hydroccarbon gase


es having very
v low boiling point. Methane
M the
e
first memb
ber of parafffin series makes up for approxximately 80% of the natural n gass.
Ethane, Proopane, Buta ane and hig gher hydrocarbons up to
t Heptaness are also present.
p

Natural gass has no disstinct odor. It’s important propertie


es are as un
nder

Calorific value
v 86 m3
600 KCal/Nm
Molecular weight 16
6.3
Explosivee Range 5.3
3 to 14%
Auto-ignittion Temperature 53
35 Deg.C
3
TLV 3 Mg/m
M

The degree
e of fire and
d explosion hazards off natural ga
as is high, m
mainly for th
he following
g
reasons:

 Extremeely low boiling point.


 Poor visibility of ig
gnitable mixxture and high
h burning
g velocity th hat can inju
ure instantlyy
anyonee coming intto contact with
w it on acc count of higgh calorific vvalue.
 Highly inflammable
i e.
 Under atmospheriic pressure e and low concentration, natura al gas is not toxic for
3
human being. Its TLV is 3 Mg/M M . Howwever, at high
h concentrations, hydrocarbon
h n
gases displace
d Oxxygen causing asphyxia a.
 In case
e of inhalation if conceentration is high, it willl displace ooxygen in air.
a Too little e
Oxygenn can incrrease brea athing and pulse ratiio, disturb muscle coordination
c n,
emotionnal aspect, fatigue, nau usea, vomitting, respira
atory collapsse, even deeath.

Odorizing Unit

1. ant Leakage
Odora e from flang
ges valves etc.
e

Ethyl Mercaptan is used as odorant in the natural gas. It is highly flamm


mable and in
n
case of leakage of odoran nt and if it finds any source of ignition, th here will be
e
explossion.

2. Malfun
nction of system leadin
ng to non-injection.

Potentiaal on-site ha
azard of CG
GD network k include occcasional lea aks, and ex
xplosions. In n
case off non-injectiion of odora
ant the leak
kage of nattural gas will not be de etected and d
vapor cloud
c may beb formed leading
l to explosion
e iff it finds any source off ignition. In
n
the indiividual housses and smmall businessses, intern
nal leaks may cause lo ow intensityy
explosioons with so ome damag ge to the structures
s a
and minor to moderatee injuries to o
people inside. De eadly explossions may occur if siignificant amount of gas g collectss
inside.

Natural gas heatinng systemss are known n to cause carbon mo onoxide deaths. Whenn
such syystem malfu
unctions, it produces carbon monooxide. With no fumes or
o smoke too
give a warning, people
p insid phyxiated. Carbon Mo
de get asp onoxide de
etectors can
n
preventt such occurrences.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 14 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Usuallyy gas dissipa


ates readilyy outdoors being
b lighter than air. S
Sometimes, however, it
may co ollect in dangerous
d quantities if weatherr conditions are righ ht for suchh
accumu ulation.

The acccidental damage


d ca
aused by third
t partie
es excavatiing in the vicinity of
o
undergrround gas facilities.
f

Materia
al Safety Data
D Sheett for natura d Odorant have been prepared
al gas and d
Annexuure-1.

Identifiication of Possible
P Em
mergency Situations
S

Possible emergenccy situation ns can broad dly be classsified into n


natural gas release, fire
e
or exploosion. While
e doing so, it is stresse
ed that thesse results arre only for the modeled d
scenarios and, tha at the distances as we ell as damaages can ch hange depe ending upon n
the acttual develoopment of a scenario o. Additionaal emergen ncy situatioons can be e
develop ped on the basis of au udit / HAZIDD (Hazard Identification) or other proceduress
prior to commence ement of operations.

Therefo
ore lookingg to the hazard pote ential associated with
h the insta
allation and
d
complying with reg
gulatory obliigations, HA
AZOP studyy has been conducted.

P (Hazard & Operabiliity) Method


HAZOP dology:

A HAZO OP study is a well-strucctured qualitative technnique basedd on “guide words” and d


is carrie
ed out by a multi-discip plinary team
m (HAZOP team) durin ng a set of meetings. It
is a structured an nd systema atic examin nation of a planned o or existing process or
operatioon in order to identify hazards
h andd evaluate problems
p th
hat may rep present riskss
to perssonnel or equipment,
e or prevent efficient operation.
o Itt evaluates
s the safetyy
featuress and givess recommen ndations wh herever neceessary.

The con ncept involvves investig


gating how the plant parameters
p might devia
ate from the
e
design intent. If, in the process of iden ntifying problems durinng a HAZO OP study, a
solution
n becomes apparent, itt is recorded as part off the HAZOP result. HAAZOP studyy
is based on the prrinciple that several ex
xperts with different
d backgrounds can interacct
and ideentify more problems
p w
when working together than
t when wworking sep
parately.

The HA
AZOP studyy for the insttallations un
nder Pilot Project
P Decompression Facilityy
i.e. D
& Daug
ghter Booste
er CNG Sta ation has be een carried out.
o

0
10.0 RISK ANALYSIS
A A
AND RISK ASSESSM
MENT

The seecond step of the ERRDMP proce ess is to determine


d tthe risk of an inciden
nt
associaated with each hazard
d. The basic procedurre in a riskk analysis shall be ass
follows::-

(a) Identify pottential failurres or accid


dents (includ
ding frequen
ncy)

(b) Calculate the quantitty of materrial that may


m be rele
eased in each
e failure
e,
estimate th
he probabilitty of such occurrences
o s.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 15 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

(c) Evaluate th
he consequences of suuch occurre
ences based
d on scenarrios such ass
most probaable and wo
orst case ev
vents.

(d) The combinnation of co


onsequence es and prob bability will a
allow the ha
azards to bee
ranked in a logical fa
ashion to in ndicate the zones of iimportant risk.
r Criteria
a
should the
en be estab blished by which the quantified level of riisk may be e
considered
d acceptablee to all partiies concern
ned.

(e) After assesssing the rissk, the "Maaximum Tollerable Crite erion" mustt be defined
d
and above which the risk shall be b regarded d as intolerrable. Whattever be thee
benefit leve
el must be reduced
r bellow this leve
el.

(f) The risk shhould also be


b made "A As Low as Reasonably
R y Practicablle" (ALARP)
P)
and least impacting
i th
he neighborhood. Whiile conductiing the risk k analysis, a
quantitative
e determina
ation of risk involves thrree major ssteps.

Note- a rissk of 10 pe
er million pe 1 -5 /Year, effectively
er year, or 10 e m
means that any person n
standing at
a a point off this risk would
w have a 1 I 10000 00 chance o of being fattality injured
d
per year.

10.1
1 PHASES OF DISAS
STER

er has distinct 5 phasess, which can


A disaste n be classified into:

Warning Phase

Warning signals are e generatedd wheneverr there is an


a abnorma ality in the system like
e
gas/vapour leakage, increase in pressure e/temperatu
ure etc. The
e warning phase
p givess
sufficient time to respond to the
e situation and
a avert a disaster.
d

 
© Copyright MECON Limited
d – All rights reserved
r Paage 16 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Occurren
nce Phase

A disasteer strikes suddenly and gives no opportunity to


t react. Ge
enerally an explosion
e or
a fire followed by exxplosion occcurs during
g this phasee and may last a few seconds to o
several days.

Search and Rescue Phase

Search and Rescue Phase is a very impoortant phasee after occu


urrence of a disaster. A
systematic approacch can minnimise loss
s of life, property
p an
nd further damage to o
environm
ment. Promp
pt rescue an
nd evacuatio
on are the need
n during
g this period
d.

Relief Phase

Relief Ph
hase is meaant to put in
n place relief operation with or w
without external agencyy
dependinng upon the magnitude of disasterr.

Rehabilita
ation Phase
e

Post disaaster and relief opera ation this the


t longestt phase invvolving com mpensation
n,
reconstruuction of pro
operty, med
dical aid etc. Govt. and Statutory A
Authorities are
a involvedd
during thiis phase

10.2
2 CAUSES
S OF DISAS
STER

BPCL has set up On n-line CNG Stations and Daughte


er Booster S
Stations to cater to the
e
requireme
ent of transsport vehicle
es in Rupna
agar.

In additio
on to CNG Stations, BPCL
B havee also laid network off pipelines to transporrt
piped nattural gas (P
PNG) to dom
mestic and industrial co
onsumers.

CNG is available
a om the Cityy Gate Stattion of GAIL (India) Limited located at NFL
fro L.
BPCL dra aws gas fro om the abo ove stations (after me
etering and custody trransfer) and
d
transporte
ed to variouus CNG Sta
ations and PNG
P networrk through C
CS pipelines
s.

The posssible accideent scenarios on acc count of gaas leakage and explo
osion during
g
ation and dispensing of
transporta o gas are id
dentified as::

 Leaakage of gaas and acccumulation ini a confine ed place, w


which may pose
p health
h
hazzard due to suffocation
n.
 Leaakage of gaas and sub bsequent firre resulting in casualtyy, damage to propertyy
andd environmeent
 Leaakage of Gas
G and Exxplosion res
sulting in caasualty, da
amage to property and d
envvironment
 Leaakage of Gas
G and snaking of hose due to mechan nical damaage of highh
pre
essure hosee or nozzle, which may lead to acccident.

The posssible causess of gas lea


akage are: -

 Damage in the e pipeline


 Equuipment Failure
 Thiird party fau
ult (in Bus, Auto
A and Ca
ar)

 
© Copyright MECON Limited
d – All rights reserved
r Paage 17 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

Due to stringent qu
uality requirrements in the
t design, procureme ent (of key equipment
e &
accessoories) and construction it is ensu ured that noo failure takke place unnder normaal
ng condition. It is repo
operatin orted that frequency
f o leakage o
of of gas is very minimaal
unless caused by accidental
a d
digging, fau
ulty maintenance and in nappropriatee operation.

10.3
3 POSSIB
BLE DISAS
STERS DUE
E TO GAS LEAKAGE
L

i) Gass Leakage in CNG Stattion :-CNG Station is one


o area wh here minor gas
g leakage e
is common
c due to leakkage from compresso or piping, d
dispenser nozzle and d
cascade pipingg / tubing etc. The affected
a ea is confined within the station
are n
bouundary.

ii) Gass leakage during


d fuellin
ng of vehicle :- Vehicle
e fuelling syystem is als
so a source
e
of gas
g leak. The
T leakage e is, howeever, negligible due to o small borre piping of
o
vehicle and does not posee any seriou
us hazard too the CNG iinstallation.

If, howe
ever, safetyy disc gets ruptured
r atches fire it may caus
and vehicle ca se extensive
e
fire com
mpletely burrning the ve
ehicle and damaging eq quipment w within the sta
ation.
City gaas pipe piiping netwo ork leading
g to dome estic, comm mercial and d industria
al
consum mers mostlyy consist of PE Pipes and
a has the e risk of third party daamage. Gass
leakagee caused du ue to such damages
d m result into gas fire.
may

Gas leaakage in the


e domestic gas supplyy line is low w pressure of the order
w due to low
of 30 - 50 mbar foor domesticc user and 300 - 500 mbar for co ommercial. Leakage inn
domesttic consume er premise remains co onfined within the affeected house
e and doess
not posse hazard as such leakage is easily
e deteccted due too pungent smell
s of the
e
leaked gas.

Howeve er gas leakkage in commmercial insstallation may


m pose a hazard to commercia
al
unit due
e to higher pressure
p off gas and also may affe
ect nearby h
house/prem
mise.

10.4
4 CONSE
EQUENCES
S

The con nsequencess of an accident


a arre fire exp plosion, fa
ast spreadiing flamess,
deflagratiion and blast
b wave es resultin ng in burrns, fatalitiies and damaged to
o
buildings//property. Depending
D u
upon the magnitude
m o the accide
of ent, the fire
e either getss
confined within the premises
p orr spill off outtside the pre
emises.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 18 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

CO
ONSEQUENCE ANA
ALYSIS TYPICAL TE
EMPLATE RESULTS
S

(In
n the initia
al Phase, Conseque
C ence Analy
ysis, only
y For Dome estic Connection -
Loow Pressure & that for
f CNG Station
S shaall remain relevant)

Hig
gh Pressu
ure Line Section- La
arge Leak
High pressurre line section leakage –Large Leak

Vertical Sectio
on through Origin
40

35
He
eat Flux

30

4.5 kW/m2
25 12.5 kW/m2 
37.4 kW/m2 
20 Unused
Unused
15 Unused
FLAME
10

5
Dow
wn Wind

0 3 m/s
-20 -15 -10 -5  0 5 10 15 20

 
© Copyright MECON Limited
d – All rights reserved
r Paage 19 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

H
High Pressu
ure Line Se
ection – Sm
mall Leak

High pressure
e line section leakage –Smalll Leak

V
Vertical Section
n through Origiin
40

35
Heat Flux

30

4
4.5 kW/m2
25 12.5 kW/m2 
1
37.4 kW/m2 
3
20 U
Unused
U
Unused
15 U
Unused
F
FLAME
10

5
Down Wind

0 3m
m/s
-20 -1
15 -10 -5  0 5 10
0 15 20

Lo
ow Pressure Line Se
ection – Small Leak
k

lo
ow pressure lin
ne section leak
kage –Small Le
eak

V
Vertical Section
n through Origiin
20

18
Heat Flux
16

14
4
4.5 kW/m2
12 12.5 kW/m2 
1
37.4 kW/m2 
3
10 U
Unused
U
Unused
8
U
Unused
6 F
FLAME

2 Down Wind

0 3m
m/s
-10 -8 -6 -4 -2 0 2 4 6 8 10

 
© Copyright MECON Limited
d – All rights reserved
r Paage 20 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

11.0
0 EMERGE
ENCY MITIG
GATION ME
EASURES

After dete
ermining th
he risk leve
el, the follow
wing actions shall be taken for mitigation
m o
of
emergenccy:-

11.1
1 BASIC REQUIREME
ENT OF ER
RDMP

Basic reqquirement for


f ERDMP P has been
n assessed
d for develo
opment of ERDMP ass
detailed below
b (Sche
edule-III of ERDMP act).

i) Locattion Plan off the Installa ation indica


ating sitting of the instaallation at neighbouring
g
(detaiils up to a distance
d of 2 kms from the installation in each h direction).
ii) Site plan
p of the installation showing a layout of th he installatio
on indicatin
ng boundaryy
walls,, exit & entrry gates and d location off various facilities
iii) Layouut of Fire Fig ghting Equiipment.
iv) Materrial Safety Data
D Sheet (MSDS) forr Natural Ga as (NG)
v) Intern
nal and Extternal Emerrgency contact numbe ers and add dresses of Police, Firee
Statio
on, Hospita als, Factoryy Inspectorr, PNGRB, State Pollution Con ntrol Board,
PESO O, etc.
vi) Pipeline route mapm and de etails of va
arious facilitties such a as sectionalising Valvee
(SV) across
a pipe
eline route.

11.2
2 RESOUR
RCE MOBIL
LISATION

Resourcee mobilisatio
on shall incclude manpower requirrement, fire e fighting apppliances or
equipmennt, safety equipment,
e communic port, list of emergencyy
cation facilitties, transp
drugs and
d appliancees, etc. (Sch
hedule-IV).

11.3
3 THE INCIDENT PRE
EVENTION MEASURE
ES AND PR
ROCEDURE
ES

Incident preventing
p dures at insstallation or locations include the
measures and proced e
following::-

i) Safetyy, Health an
nd Environm ment Policy y
ii) Propeer layout and inter facility distance
es.
iii) Safetyy Committeees.
iv) Safetyy Audits and Inspections.
v) Work permit systtem.
vi) Fire protection
p and HSE Ma anagement system in place.
p

0 EMERGE
12.0 ENCY PREP
PAREDNES
SS

11.1
1 EMERGE
ENCY SKIL
LL TRAININ
NG

Emergency Skill Tra aining shall be imparted d to all the staff at the time of the
eir induction
n.
Periodic refresher’s
r courses, wo orkshops sh hall be orgaanised to keeep them ab breast of thee
entire sysstem from th
heir techniccalities, operation, mainntenance an nd hazards involved.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 21 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

These tra
aining coursses shall cover:
 Cha aracteristicss of CNG, highlighting hazard
h invo olved in han ndling the medium.
m
 Ope erational proocedures & practices including fam miliarisation
n of the equ
uipment.
 All types
t of maaintenance activities
a of the facilities
 Eme ergency situ uations, the eir implicatio
ons and shu utdown requ uirement.
 Detection of CN NG leak and need for immediate
i a effectivve isolation.
and
 Acccounting of product
p to detect
d leakaage or pilferrage.
 Han nds on expe erience on operation
o off equipmentt
 Safeety regulatio ons and acccident preve ention
 Fire
e fighting faccilities, methods of fire fighting an nd their maiintenance.
 Evaacuation and d safe egress of the ve ehicles
 Safeety in transportation off CNG throu ugh Cascad des.
 Maintenance of o medical aida facility
 Hou usekeeping, maintenan nce of signa age, area illumination e etc.
 Eme ergency pla an

nally BPCL employee must be tra


Addition ained annua
ally in emerrgency proc
cedures tha
at
include but are nott limited to:

 Upddate of the emergency


e plan
 Revview of empployee respo onsibilities in
i an emerg gency
 Revview of loca
ation and usse of emerge ency equipm ment.
 Revview the pro
operties of natural
n gas.
 Revview the loocations of Systems map, m Main records, S Service records, Valve e
reco
ords and Re egulator sta
ation schem matics
 Takke a hypothetical emerrgency situa ation and coonduct a sttep-by-step review with h
empployees on the action to be taken g contact with public officials,
n, including o Fire
e
Deppartment, Rupnagar
R Po
olice, GAIL and ONGC CL, etc.
 Reccord keeping
 ephone reports
Tele
 Reccords shall be
b kept on file
f of attend dance and items discu ussed.
 Liaison with ap
ppropriate fire, police and other pu ublic officialss.

ency drills and


Emerge a Mock drrills

 To eva aluate the thhoroughnesss and effe ectiveness of


o an ERDM MP, it is necessary to o
conducct periodic taable top exe nnounced and unannou
ercises full scale or an unced drillss.
Each siite should hold
h drills on
n the night shifts,
s changge shifts ass well as du
uring the dayy
as man ndated unde er regulationn 12.1 (e).
 Drills sh
hould be prresent a varriety of eme ergency sceenarios and d designed tot challenge e
each se egment of the
t organiza ation. Limiteed scale driills are usefful and should be used d
by Chie ef of each support
s serrvices to tra
ain his ownn team. Pla ans should be made to o
have pe eriodic masss causalityy exercise. These exercises shou uld attempt to simulate e
as closely as posssible a fire, explosion, oro toxic ageent release and compa arison of thee
prescribbed time lines and the actual rece eived.
 The wa arning systtem, first aid, evacuattion proced dure and th he definitive
e treatmen nt
procedu ure should all
a be tested d periodicallly.
 Some of the drillls should also a includ
de the partticipation o of outside groups
g andd
agencie es such as a police, fire comp panies, am mbulance sservice, civ vil defense e
organizzations and mutual aid groups.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 22 of 822
 
  DISASTER/EMERGENCY MANAGEMENT PLAN FOR 
BPCL AT RUPNAGAR 

DOC. NO. MEC/23T1/ERDMP


MECON LTD.
 
 Testing and mock drills for onsite emergency plan shall be carried once in three
months and for offsite emergency plan twelve months.
 For other installations, the mock drill shall be carried out once a year. However, for
locations having more than one industry members, the annual mock drill can be
carried out by one industry members in turn, thus ensuring one mock drill in every
year at the location.
 These mock drills will enable the unit/location to assess the capability of the
individual and performance as a group. The frequent discussions and drills will help
in eliminating the confusion and shortcomings if any.
 Each mock drill should be recorded with observations and deficiencies to be rectified
within 24 hrs.
 
11.2 REVIEW OF EMERGENCY PLAN
 
Emergency Plan is reviewed after every mock emergency exercises and actual
emergency. The plan should be updated on the following issues, which may come up
during review:
 
 Any problem or hindrance observed during an emergency situation.
 
 Problem due to changes in organisation structure.
 
 Problem due to introduction of new emergency equipment.
 
 Problem due to changes/modifications in operating facilities.
 
 Communication problem due to equipment deficiency, human factor or
shortcoming in organisation structure.
 
11.3 EDUCATIONAL PROGRAMS
 
Entities operating CGD Networks shall undertake a comprehensive public awareness
program for consumers and general public. The educational material shall be
prepared in local language, Hindi and English language.
 
Public nearby the installations is to be made aware about the gas pipeline. Concerted
efforts should be made by BPCL to educate the citizens about the gas pipeline, its
benefits, hazards, accident preventive measures, whom and how to communicate in an
emergency. Incentives and awards may be instituted for prompt communication of an
emergency to the authorities. For awareness of the public letters and pamphlets will
be distributed by BPCL in addition to public education programe in regular interval.
The program material should include, but not be limited to:
 
 Information about gas properties
 Recognition of gas odors
 What to do and not do when there is a strong gas odor
 Notification of the BPCL prior to making excavation related activities.
 Telephone numbers for persons in the BPCL to report gas leaks or odors or other
information during both business and non-business hours.
 
This information may be conveyed by BPCL through a number of means :
 
 Radio and television

  © Copyright MECON Limited – All rights reserved Page 23 of 82


  DISASTER/EMERGENCY MANAGEMENT PLAN FOR 
BPCL AT RUPNAGAR 

DOC. NO. MEC/23T1/ERDMP


MECON LTD.
 
 Newspaper
 Meetings
 Bill stuffers
 Mailings
 Hand-outs
 Posted on bulletin boards
 Employee newsletters
 Campus websites
 Apartment Handbooks
 New-employee orientation
 
BPCL will maintain records of the public information programme and related
activities.
 
FOR GENERAL PUBLIC SIMPLE DO’S AND DON’T FOR HOME AND BUSINESS
USES OF NATURAL GAS ARE LISTED AS AN ILLUSTRATION.
 
DO’S
 
 Have all gas appliances, furnaces, vents, flues, chimneys and gas lines in your
home and/or business inspected every year or two by qualified industry
professionals.
 

 Keep the areas around all gas appliances and equipment clean and unblocked to
permit proper airflow.
     

 Follow manufacturer instructions for the care and use of gas appliances and
equipment.
 

 Look for the blue flame. If pilot lights and burners have a steady, blue flame, they
are operating correctly. (Decorative gas fire logs are the only exception; their
flame is usually yellow.)      
       
 Make sure there is at least one multipurpose fire extinguisher in your home.
Business owners should follow local fire code regulations.
 
 Review natural gas safety regularly with ALL family members and/or employees.
 
 Include your natural gas company's emergency contact information on your list of
important phone numbers (e.g. fire, police, physicians, etc.) and/or in your
company manual.
 
 
DON'TS
 
 Ever let children play with or near natural gas appliances or pipes, even the
knobs on the oven or stovetop.
 
 Use your stove or oven for anything other than cooking (for instance, to heat your
home), under any circumstances.
   

 Move or install a gas appliance or change the connector in any way without
professional assistance.
 

 Use a space heater UNTIL you are sure it has been vented properly. If using a
vent-free heater, make sure the automatic cut-off switch is operational.

  © Copyright MECON Limited – All rights reserved Page 24 of 82


  DISASTER/EMERGENCY MANAGEMENT PLAN FOR 
BPCL AT RUPNAGAR 

DOC. NO. MEC/23T1/ERDMP


MECON LTD.
 
 Install a gas appliance yourself, unless you are a qualified contractor. Instead,
you should always seek professional assistance.
 

 Ever store household chemicals or combustible materials near gas appliances.


 
 
11.4 CALL BEFORE YOU DIG
 
Unauthorized digging is one the leading causes of natural gas leaks. You must call
the BPCL, at least two working days before digging for any landscape or construction
project on your property. Keep in mind that lines have been hit digging fence post
 
holes, anchoring supports for decks and swing sets, planting trees, removing tree
roots and driving landscaping stakes into the ground. By not calling, you are risking
injury to yourself, your family and your fellow community members.
 
If you ever suspect unauthorized digging, contact BPCL.
 
11.5 MIND YOUR METER
 
Before natural gas enters your home or business, it passes through a gas meter
(located just outside your home or business).
 
To assure uninterrupted service, check the meter on a regular basis.
 
11.6 WHEN YOU'RE OUT AND ABOUT...BE AWARE
 
Even when you're strolling around town, it's helpful to remember the following signs
of a natural gas leak:
 
SMELL — To help you SMELL a leak from a gas line or appliance, a familiar odour
like rotten eggs is often added to natural gas.
 
SEE — Near a gas leak, you might SEE blowing dirt, bubbling water or an unusual
area of dead vegetation.
 
HEAR — A leaking pipeline might make a hissing sound you can HEAR.
 
If you recognize even one of the above signs, walk away, right away. Don't try to stop
or repair the leak yourself or use anything that might create a spark, such as a cell
phone. When you're clear of the area, call your BPCL for emergency response.
 
13.0 RESPONSE PROCEDURE AND MEASURES
 
13.1 FOR CNG STATIONS
 
The Emergency Response Plan for the following CNG Stations are described in the
following chapters. The Incident Controller shall be responsible for evaluating the
Emergency Response Plan through mock emergency drill, which shall be carried out
at a predetermined interval, at least once in a year. Any deficiency in the plan for it’s
effectiveness shall be noted and the plan should be updated.
 
Possible emergencies that may create at the CNG stations are elaborated below:

  © Copyright MECON Limited – All rights reserved Page 25 of 82


  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

In case of
o gas leakage following
g procedure
e shall be fo
ollowed:

 Stop Dispensing at all Dispe ensers


 Stop all
a compresssors
 Isolatte Gas sup pply - Close all suctio on valves, Isolate stoorage casca ade, Isolate
e
mobile cascade
 Cut off power supply
 Remo ove all vehiicles out off station by
y manual pu ush only annd restrict the
t entry of
o
unautthorized perrsons and vehicles
v at station
s
 Repair/Replace damaged
d E
Equipment
 Do noot start the station
s unle
ess clearancce is obtaine
ed from the
e Control Rooom.

If Gas Su
upply can no
ot be stoppe
ed

on to the acttions taken above, the following measures


In additio m arre taken:

 Inform
m Area conttrol room an nd Area Marketing Officer
 Inform
m (Fire & Sa afety) In-chaarge
 Inform
m Rupnagarr Fire Servicce, Rupnag gar Police and Ambulan nce (in case
e of injury).
 Placee “DANGER R” board and d barricade the area.
 Assist Rupnagarr Fire Servicce & Rupna agar Police.
 Put poositive Isola
ation after closing
c the valve
v and taag on the eq
quipment.
 Arrange for repair & Mainten nance of thee Equipmen nt.
 Carryy out Leak check.
c
 Do noot start the station
s unleess clearancce is obtaine
ed from the
e Control Rooom.
 Submmit Accident Report to fire
f & safety y departmen nt.

In case of
o Fire/Explo
osion
 Stop Dispensing at all Dispe ensers
 Stop all
a compresssors.
 Isolatte gas suppply - Close suction va alve, Isolatee storage ca
ascade, Iso
olate mobile
e
cascaade.
 Cut off power supply.
 Use appropriate
a extinguisheer to extingu
uish fire.
 Inform
m Area conttrol room an nd Marketinng Officer.
 Inform
m (Fire & Saafety) In-chaarge
 Simulltaneously inform - Rupnagar
R Fire
F Servicee, Rupnaga ar Police & Rupnagar
Ambu ulance (in ca
ase of injuryy)
 Remo ove all vehhicles out ofo station and
a restrict entry of u
unauthorize
ed/unwantedd
persoons and vehhicles at stattion.
 Placee "DANGER R” board" an nd barricade
e the area.
 Assist Rupnagarr Fire Service & Police e and otherr external a
agencies responding at
a
the site.
 Ensurre fire is exttinguished
 Put poositive Isola
ation after closing
c the valve
v and put tag on th
he equipmennt
 Arrange for repair & mainten nance of the
e equipmen nt
 Carryy out leak chheck
 Do noot start the station
s unle
ess clearancce is obtaine
ed from the
e Control Ro
oom
 Submmit accident report to firre & safety department
d t

 
© Copyright MECON Limited
d – All rights reserved
r Paage 26 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

In case of
o Gas Leakage from Vehicle at CN
NG Station
 Stop dispensing
d at all the pooints
 If thee leakage is from the e Bus, imm mediately operate
o DCCP under BusB system
m
installed at the dispenser po oint or opera ate DCP exxtinguisher
 Try too stop gas leeakage by closing
c he cylinder valves
all th
 Do no ot start the engine,
e kee
ep ignition off
o
 Remo ove all vehiccles out of station
s by manual
m pushhing only
 Push leaking veh hicle to a plaace outside e the station
n
 Informm Area conttrol room an nd Marketin ng Officer
 Informm (Fire & Sa afety) In-cha arge
 Informm (if required) - Rupnagar Firre Service, Rupnagarr Police & Rupnagar
Ambu ulance (in caase of injuryy)
 Ensurre no smoking / no flam me /no sparrk near leakking vehicle
 Placee "DANGER R” board" an nd barricade e the area
 Keep public awa ay from the e leaking vehicle
v andd place DC CP fire extin
nguisher ass
stand by at a saffe distance on upwind direction fro om the vehicle
 If stop
ppage of ga as is not po ossible then n allow the release of the same in controlledd
and safe
s mannerr in atmosphere
 Assist Rupnagarr Fire Servicce
 Do no ot start the station
s unle
ess clearanc ce is obtaineed from the
e Control Ro
oom
 Subm mit accident report to Fiire & Safety y Departmen nt

In case of
o Fire in Vehicle at CNG Station

 Stop dispensing
d all dispenseers
 Stop all
a compresssors
 Exting guish fire byy using DCP P extinguishher & DCP under bus ssystem
 Informm Area conttrol room an nd Marketin ng Officer
 Informm (Fire & Sa afety) In-cha arge
 Informm Fire Serviice, Rupnag gar Police and
a Ambula ance (in case of injury)
 Remo ove all vehiicles out off station and restrict th he entry of unauthoriz zed personss
and vehicles
v at station
s
 If posssible, push the vehicle e out of statiion.
 Keep public awa ay from the vehicle
v
 Place e "DANGER R” board" an nd barricade e the area
 Assist Rupnagarr Fire Servicce & Police
 Ensurre fire is exttinguished
 Do no ot start the station
s unle
ess clearancce is obtaineed from the
e Control Ro oom
 Subm mit accident report to Fiire & Safety y departmen nt

In case of
o Accident in Cascade Mounted Light
L Commercial Vehiccle (LCV):

 Stop the
t vehicle to roadside e away fromm fire sourcee and switch
h off ignition
n.
 If gass is leaking close
c all iso
olation valve
es.
 Use fire extinguissher to extinnguish the fire.
f
 Informm transporte er supervisoor/ area conntrol room.
 Do no ot allow the public to coome near th he vehicle/ leaking
l gas.

 
© Copyright MECON Limited
d – All rights reserved
r Paage 27 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

13.2
2 POSSIBL
LE FAILURE
ES AND TH
HEIR REAS
SONS

Failure typ
pes ns for Failure
Reason
Human Faiilure Inapprop
priate opera
ation of Com
mpressor, D
Dispensers & valves;
Changinng Operating Conditionns, Shutdow
wn, Preparation for
maintenance

Equipment Failures Technicaal reasons like thermal expansion,


e Internal/exte
ernal
corrosion
n, Bad weld ds, materiall failure due
e to fatigue/b
brittleness,
Structura
al Failure, poor
p constru
uction, Presssure Boostter Failure

System Pro
ocedural Inspectio
on, Operation Start-up / shutdown n, Communication,
Failures Maintenance, Leak k detection, Emergencyy temporary repair,
Material, Specificattion and tessting, Modiffications

Failure due
e to Externa
al Caving in of earth due
d to excesssive rain/flo
ood, Earthq quake effecct,
Factors Lighting, external Fire,
F Vandalism/ sabotaage/terroristt activity

 
© Copyright MECON Limited
d – All rights reserved
r Paage 28 of 822
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

EM
MERGENCY
Y ACTION PLAN
P FOR CNG STAT
TION

Chief Inccident 
Controller//Incident 
Contro oller  
Areea Control Room/Marketing  Inform  ‐in‐Ch
harge  (Operattions)/ 
Officer/ Fire & Safety   S
Station Operato
or /Technician Sr.Manager(Project)/MD  

Rush too Site, Control  Inform
Incident, EEnsure Station &&  Inform
m MD 
Rush To Site & Take 
Public Safety, Assist & 
Chargge, Bring  
Guidee Fire/Police  Statio
on To  
Rup
pnagar  Ambulanc Operaation Inform  
F
Fire CCOE & Cif (As Per Law
w)  

Rupnagar Police 
Ro
oll # 3, 4, 5  
Sto
op Refilling; Take Out Nozzless From 
Roll ##  2   Veehicles, Close Diispenser Valve. 
Roll # 1 
Push  Esd,  Main  Switch,  Ups  Opperate  DCP  Sys/Extinguishe
S er  till 
Guide  Dsm  And  Seecurity  Staff, 
Switcch,  Cascadess  Isolation  Veehicle is Safe. 
Evacuatte  Vehicle  Safely,  Inform 
Fire  Service,  Police  And 
A Control  Valvees.  ush Vehicle to a Safe Location.
Pu
Room.  Arrange  To  Push 
P Vehicle  Assistt  In  Operrating  Fire 
Away Saafely.  Extingguishers From Station. 
Assistt  To  Push  Away  Sick 
Vehiccle.

Instant Common Ro ole 
 
Dsm:: Stop Refilling, Take Out   No ozzles From  Roll # 7 (Lcv Driver) 
Roll # 6 (Security Guard)  Stop  Reffilling.  Discoonnect 
Vehiccles                                                                       
Shout  “Not  To  Start  Vehicle”,  Stop
p  Refilling Hosse. 
                                                                           . 
Vehicles Entry.  Push Out LC CV Safely, If, Clo
ose To 
Securrity Guard:  Sho out ‘’ Not To Staart  
Evacuate V Vehicle From Sttation.  Sick Vehicle..   
Vehiccle’’ In Gas Leakk. Stop Entry Off                       
Arrange Fiire Extinguisherrs. 
Vehiccles.                                                                      
Assist Out Sick Vehicle. 
                                                                                     
Techn nician:  Rush  To  T Push  Esd.  Switch  Off 
Poweer  Supply,  Clo ose  Cascade      Isolation   
Valvee.          
                                                                           

 
© Copyright MECON Limiited – All rightss reserved Page 29 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

13
3.3 FOR CN
NG/PNG PIPELINE
P N
NETWORK & SYSTEM
M

The Em
mergency Response Plan has bee
en described
d for the en
nvisaged pip
pelines :

 steel pipeline
 PE Netw work

Possible emergen
ncies that may
m create at the abo
ove pipeline
e network are
a elabora
ated
below:

Buried or above ground pip pelines aree laid for trransportatio


on of CNG G over a lo ong
distance to reach various
v con
nsumers. Th he pipeline originates ffrom a Distrrict Regulatting
Station (DRS) andd is provide
ed with Secctionalising / Isolation Valves, reliief valves, Pig
Launchhers / Receivers, cased
d protection
n sleeves unnder Road & Rail Cros ssings, Control
& Comm munication System and d Cathodic Protection System.

Thus, pipeline
p failu
ures can in
nvolve more e than just pipe failure es. Table 133-1 presentts a
d listing of potential incidents for a pipeline system. While these incidents ha
detailed ave
been grrouped into human errrors, equipm ment failuress, failure off systems annd procedures
and exxternal even nts, these categories
c do not neccessarily co orrespond to the wayy in
which faailure rate data
d are collected. Ratther, they re
efer to geneeral categorries to haza
ards
that willl be consid dered for Qualitative
Q hazard
h iden
ntification aand as furthher input to
o a
Quantittative study and Emerg gency plann ning.

13
3.4 POSSIB
BLE FAILURE MODES
S OF PIPEL
LINE

Human Errors Pigging op perations, Hot


H tapping, Slug opera ation, Repair
/replaceme ent of a seection of line
e Start up, C
Changing Op perating
Conditionss, Shutdown, Preparattion for main ntenance, Valve
V
operation
Equipment Thermal expansion, In nternal/External corrosio on, Bad weld
ds, Fatigue,
ures
Failu Failure of cathodic
c pro
otection (CP P), Internal e
erosion, Con
nstruction
defects, Overpressur
O re Plugging / Fouling
Systeem Inspection, Operation Start up/ shutdown, Communication n
Procedural Maintenan nce Leak de etection, Emmergency te emporary repair, Material
Failu
ures specificatiion and testting, Modificcations
Exterrnal Accidental excavation n, Earthquake after effeect, Flood/s scouring,
Even
nts Lightning, Fire, Vanda alism/sabota
age/terroristt activity, Pilferage, Rail/
road crosssing (pipe brridge or slee
eved casing g)

In case
e of emergency such as leak etc. in the City Gas
G system
m PNG follo
owing activitties
are required to be taken by O & M In-Cha
arge:

i) Implementatio on of compa any (BPCL) emergencyy plan,


ii) Evacuating prremises,
iii) Co
ordoning off the area,
iv) Reerouting of traffic,
v) Eliminating soources of ign nition,
vi) Sa o gas from the area,
afe venting of
vii) Sto
opping the flow
f of gas by closing valves
v or otther measurres,

 
© Copyright MECON Limiited – All rightss reserved Page 30 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

viii) No
otifying policce and fire departments
d s

To achiieve above in-charge im


mmediately
y takes care
e of the follo
owing:

 Ruush to the siite.


 Take over thee charge of emergency
e handling inn City Gas a
and Steel ne
etwork.
 Moobilize resou
urces for ne
ecessary repairs.
 Exxecute necessary repairs to controol the emerggency.
 Coonduct nece essary tests and take safety cleara
ance.
 Coommission the
t pipeline as per the start up proocedure.

13.5
5 EMERGE N & PROCEDURE ES
ENCY PLAN STABLISHE
ED BY BPCL
L IN PRACT
TICE

Plan and Procedu ure - Prep paration off an full proofp emerrgency han ndling plan in
consultation with ad djoining esta
ablishments s and locall authoritiess e.g. fire brigade,
b police
and otherr District em
mergency Au uthorities ettc., for the following
f cirrcumstance
es:-

a) Shhut down orr interruptio


on to the PN
NG supply due
d to leaka age or failure
e of pipeline
e.
c) Major failure of CNG fittiings / acces
M ssories.
d) Acccidents or other emerrgencies, which can afffect the CNG refueling, station.
e) Civil emergenncies.

f) Emmergency plan as prrepared shall be dissseminated / circulated d amongst all


oncern stafffs and make them und
co derstand the
eir roles & rresponsibilitties during the
evvent of any emergencyy.

g) Concern officcials of the station mu


ust have clo
ose liaison with Fire service, Poliice,
AM
MC & all othher related to CNG faccility.

h) Im
mportant tellephone numbers rela ated to eme ergency han ndling shalll be displayyed
prrominently, so as to ma
ake it acces
ssible to all the staffs.

i) M
Means of com
mmunication shall be always
a available at the station on 24 hrs. bassis.

The fo ns may indiccate a natural gas pipe


ollowing sign eline leak orr failure:-

 A hissing, roa aring or blow


wing sound d
 Dirt being bloown into thee air
 W
Water t air at a pond, river or creek
being blown into the
 Continuous bubbling
b in wet,
w flooded d areas
 Fiire at or nea
ar exposed piping
 Fllames appa arently eman nating from the ground
d
 Dead or brow wn vegetatio herwise moist or green field
on in an oth

13
3.6 DEALIN
NG WITH GAS
G ESCAP
PE & ACTIO
ON CRITER
REA

Inform BPCL Conttrol room to


o report a leak or othe
er natural g
gas emerge
ency by callling
the emeergency num
mbers of co
ontrol center.

 Turn machinerry and vehiicles and prevent


p othe
er sources of ignition such as op pen
flam
mes and the
e operation of
o electricall switches or hones nearr by the site.
o cellular ph
 
© Copyright MECON Limiited – All rightss reserved Page 31 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

 Do not attemp pt to extinguish any firre & also avoid


a to ma
ake any rep
pair or operrate
anyy pipeline va
alve.

Not all gas


g leaks or
o line breakks result in flame. Natural gas haas an explos sive zone of 5
to 15% gas to air mixture & will
w ignite with
w source of ignition w with intensity 900 deg. F.
Source may be Static electricity, a car ignition, orr rocks strikking togethher generatting
spark

Inform local
l emerg
gency respo
onse agency
y such as fire department or police etc.

If a gass leakage does


d o a flame, the flame can
lead to c be bettter than 100 feet tall anda
burn att temperatures as high h as 3000 deg.
d F. Naatural gas iss non-toxic c and is ligh
hter
than air and risess up in open area an nd quickly dissipates. BPCL em mergency de esk
respond d quickly to
o any leak or
o pipeline damage
d & isolate the damaged sections of pipe
p
and sto o gas. Oncce the flow of gas is cu
op the flow of ut off, the firre burns itse
elf out and any
a
remainiing gas is harmlessly
h vented into
o the atmossphere at vvalves locatted away frrom
the fire..

BPCL works clossely with state s and local


l agenccies on em
mergency preparedne
ess.
Conducct joint traiining in mo ock emergency scenarios to ennsure the best possiible
responsse in the evvent of an emmergency.

Total PNG
P / CNG G systems have been n designed keeping in
n mind the
e potentiall of
uakes / any other natural phenom
earthqu mena. Leakk surveys and ground surveillance
e is
conduccted after an
ny incident / earthquake
e.

13
3.7 DEALIN
NG WITH GAS P
PIPELINES OR SSOCIATED
AS D EQUIPM
MENT-BPCL’S
AWAREENESS

 Assurre safety wo ork permit while


w workin
ng.
 Ensurre positive isolation thrrough blindss and wedge open.
 Use gas
g detecto or to check leaks.–Man n involved should
s ensuure cotton dress.–Ens
d ure
propeer purging before
b opening.
 Use Non-sparkin
N ng tools.
 Safe approach
a a clear em
and mergency ac ccess.
 Provission of fire fighting
f arra
angements//equipment..
 Position yourselff in up wind direction.
 No Sm moking in th he area.
 Strictlly control ig a naked flame, electrric heaters, welding, non-
gnition sourrces, such as
flameeproof electrric motors, ICI engines etc.
 Colorr-coding of the
t Pipeline e.
 All draain points / vent pointss should be properly bliinded / flang
ged.
 Releaase of ventss, safety valves at safe location.
 Line should be e completelly depressu urized, purrged with N N2 / Steam m etc. beffore
opening or charg ging with hyydraulic.

 
© Copyright MECON Limiited – All rightss reserved Page 32 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

13
3.8 HOW TO
T DEAL WITH
W FIRE SITUATION
S N

AT CNG STATIO
ON: -

The equipm ment/vessel on fire sh


hould be co ooled using water Spra ay. Storage
e of
sufficient quantity
q of water
w shoulld be availa
able for dispersion, alo
ong with Sa
and
bucket, at site.
s

Necessary Fire Fightting equipm ments along with other protectiv ve to prevvent
radiation off heat for the concern staffs
s should be availab
ble at the site.

Do not make any atte


empt to extinguish the fire till isola k. Instead, the
ation of leak
equipment & the zonne on fire should
s be kept
k cool to prevent explosion
e a
and
spreading of
o fire.

The fires can be exxtinguished by water, DCP, CO O2 and Hallon. Howevver,


potential co
onversation of gas fire into a combustion exp
plosion if gaas continuess to
escape afteer extinguisshment shouuld be taken care of so
o that it willl not presen
nt a
hazard of reigniting.

 Avvoid Paniccky/people gathering nearby.

 In
nform & guide fire ten
nders.

 
© Copyright MECON Limiited – All rightss reserved Page 33 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

144.0 EMER
RGENCY ORGANISAT
O TION AND RESPONS
SIBILITIES
 
 
 
 
ONSITTE EMERGEN
NCY TEAM A
AT RUPNAG
GAR 
 
 
PERSONAL AP
PPROACH    DETECTTION SYSTEM 
COONTROL ROOM/
  DIST. AUTHORRITY/ PUBLIC  EMERGEENCY CONTROL R
ROOM 
  COMMUN
NICATION SYSTEM
M
 
 
 
 
 
 
  SITE OF IN
NCIDENT  EM
MERGENCY EMERGENC CY EM
MERGENCY 
  L
LEVEL 1  LEVEL 2 LEVEL 3 
 
 
 
  DISASTER MANAGEMENT P
PLAN
  A
ACTIVATED 

 
 
 
   CHIEF INCIDENT  SITE CONTRO
OLLER
  CONTRO OLLER  Rajinder Kumar, CM (Gas) 
   Deepak Malik‐ GM –Gas  8588838690 
90999771868 
 
 
 
 
AMBULANCE 
 
 
 
COMMUN
NICATION TO BPC
CL
  CORPO
ORATE OFFICE
 
 
 
 
FIRE & RESCUE CO O‐ORDINATOR   MAINNTENANCE MEDICCAL & SECURITY  COMMUNICATION
  Manpreet Mann, S
M Sr. Mgr. (ECE)  CO‐OR RDINATOR  CO
O‐ORDINATOR  CO
O‐ORDINATOR  
  9212556077  Satish Sudhir. Sr.  Ravn
neet Singh, DY.  Him
meshwar Sharma. 
    Mggr(Ops.)  M
MGR. (Ops.)  (Ops.) 
82855162050  0
0725906041  7897196063 
 
 
 
 
 
 
© Copyright MECON Limiited – All rightss reserved Page 34 of 82
 
  D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR   
  BPCL ATT RUPNAGAAR   
     
D
DOC. NO. M
MEC/23T1/EERDMP  
MECON LTTD.

  ONSITTE EMERGEENCY TEAM  
 
 
 
PERSONAL AP
PPROACH    DETECTTION SYSTEM 
CONTROLL ROOM AT RUPN
NAGAR/
  DIST. AUTHORRITY/ PUBLIC  EMERGEENCY CONTROL R
ROOM 
  COMMUN
NICATION SYSTEM

 
 
 
 
 
 
  SITE OF IN
NCIDENT  EM
MERGENCY EMERGENC CY EM
MERGENCY 
  L
LEVEL 1  LEVEL 2 LEVEL 3 
 
 
 
  DISASTER MANAGEMENT P
PLAN
  A
ACTIVATED 

 
 
 
   CHIEF INCIDENTT  ONTROLLER SITE CONTRO
OLLER 
  Deepak Malikk‐ GM –Gas  Rajinder Kumar, CM (Gas) 
  909997
71868 8588838690 

 
 
 
 
AMBULANCE
 
 
 
COMMUN
NICATION TO BPC
CL
  CORPO
ORATE OFFICE
 
 
 
 
FIRE & RESCUE COO‐ORDINATOR   MAINNTENANCE MEDICCAL & SECURITY  COMMUNICATION
  Manpreet Mann, S
M Sr. Mgr. (ECE)  CO‐OR RDINATOR  CO
O‐ORDINATOR  O‐ORDINATOR  
CO
  9212556077  Satish Sudhir. Sr.  Ravn
neet Singh, DY.  Him
meshwar Sharma. 
  Mggr(Ops.)  M
MGR. (Ops.)  (Ops.) 
82855162050  0
0725906041  7897196063 
     
 
   

 
© Copyright MECON Limiited – All rightss reserved Page 35 of 82
 
  DISASTER
R/EMERGENCY M
MANAGEMENT PLAN FOR BPCLL AT RUPNAGAR
R  
     
  DOC. NO. MEC/23TT1/ERDMP  
 
MECON LIMITTED 

 
  OFF‐SITE EMERGEN
NCY TEAM 
 
 
DIST. DISASTTER MGT. AUTHORITY (D
DDMA) 
  DM, RUPNAGAR DIST. 
 
 
  EMERGENC CY  RESPONSE CO‐ORDIN
NATOR 
  NODAL OFFICER 
(CEO, RUP
PNAGAR MUNICIPAL CORRPN.) 
 
RUPN
NAGAR MUNICIPAL 
  CORPN. 
EMERGENC CY  RESPONSE CO‐ORDIN
NATOR 
  A
ALT. NODAL OFFICER 
  PNAGAR MUNICIPAL CORPN.) 
(EE‐III, RUP
 
 
  QUICK RESPONSE TTEAM, QUIC
CK RESPONSE TEAM, QUICK RESPONSE TEAM,
MC Nangal MCC AnanadpurSagib SDM Ruppnagar
 
 
 
  EXEC. ENG
GINEERS AE (MECH),  CIVIL. HOSPITAL FIRE BRIGADE POLICE STATION
N
PW
WD  MUUNICIPAL    BBMB‐ Nangal 
  TRANSSPORT WING  01881 228040  Nangal/Ropar 101 0188 722 32000 
 
  0188 722 3101 
 
 
 
  RUPNAGAR MUNICIPAL CORPN. WARD COUNCILOR/WARD 
  DM CORE COMMITTEE  VOLUNTEERS 

 
© Copyrigh
ht MECON Limited – All rights reserved
d Page 36 of 82
 
  DISASTER
R/EMERGENCY M
MANAGEMENT PLAN FOR BPCLL AT RUPNAGAR
R  
     
  DOC. NO. MEC/23TT1/ERDMP  
 
MECON LIMITTED 

 
  OFF‐SITE EMERG
O GENCY TEAM FO
OR RUPNAGAR
 
 
 
  DIST. DISASTER MGT.  AU
UTHORITY 
DM, Rupnagar
 
 
  EMER
RGENCY  RESPONSE CO‐‐ORDINATOR
  SDM Rupnagar
 
  MERGENCY OPERATION CENTRE 
EM
  TEAM

 
  EMERGENCY OPERATTION 
  SUB‐CENTRE

 
  ASTER 
SUB‐DIVISIONAL DISA
MANAGEMENT COMM MITTEE 
 
 
BLOCK
K & GRAM PANCHAYAT LLEVEL DISASTER
  MANAGEMENT COMM MITTEE 
 
 
 
  DISTRICT TTRANSPORT  DEPPTT. OF HEALTH POLICE  FIRE B
BRIGADE  MEDIA PUBLIC WORKSS  FOOD & CIVIL  DIST. WATER 
AUTHHORITY & FA
AMILY WELFARE DEPTT. SUPPLIES SUPPLY

 
© Copyrigh
ht MECON Limited – All rights reserved
d Page 37 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Res
sponsibilitiies and Dutties of DM Key Perso
onnel

In an
a emergen ncy situationn it is absolutely necesssity that ke
ey personneel function with
w full cla
arity
of th
heir responsibilities an
nd duties soo that there is no confuusion and ssituation is brought under
control.

Thee 2 most im mportant ke ey personn nel are “Inccident Conttroller” and


d “Site Con ntroller”. Whhile
Incident Controoller takes charge
c of th
he incident and is supported by aall other functionaries, the
Site
e Controllerr takes chaarge of Sea arch & Res dination with all otherr agencies for
scue, co-ord
support to Incid
dent Controoller and meedia briefing
g.

Site
e Controller takes respo
onsibility of the followin
ng:

 Direct commmunication n with Incident Controller for asse essment of the situatio on from timee to
time and take
t necesssary action for assista ance from within
w the ccompany orr from exterrnal
sources.
 Communiccation to to op managem ment of the e company regarding the inciden nt and brieffing
from time to time abo out the situa ation.
 Intimate DM/Collecto
D r of the Disttrict where the
t incidentt has taken place.
 Intimate In
n-charge O& &M for orga anising main ntenance fo or restoration of operatiion.
 Take full control
c of th
he operation of the en ntire system m and depen nding upon the gravityy of
the emergency decide e whether evacuation
e of staff is ne
ecessary.
 Review th he situation and decid de if any shut down required
r for the entire
e system oro a
section.
 If the emeergency is above
a Leveel 1, liaise with
w Police, Fire Briga ade, Medica al and Facttory
Inspector for
f intimatio on and nece essary help.
 Co-ordinatte with all agencies both intern nal and extternal to fa acilitate con
ntrol of trafffic,
restoration
n of infrastru
ucture, food d & civil sup
pplies and re ehabilitationn.
 Organise and mainta ain records of all incid dents, data//information n that takess place durring
and after emergency
e till normalccy is restored.

Incident Contro
oller takes responsibilit
r ty of the following:

 Take full control


c of wo
ork in the afffected areaa.
 Reporting to Emergen ncy Controll Room.
 Assessme ent of shutdown require ement and accordingly
a y direct the sshut down of
o the affeccted
facility and
d evacuation, if felt neccessary.
 Immediate e mobilisatio
on of mainte enance teamm to addresss fire and ssafety issue
es.
 Traffic management at a the incide ent site.
 Advise Sitte Controller for outside e emergenc cy service, if
i serious emmergency situation
s arisses
(Level 2 & Level 3).
 Rescue op peration andd shifting off casualties needing medical atten ntion.
 Organising g relief operration, if need arises.
 Collection and preserrvation of evvidence.

 
© Copyright MECON Limited – All rights reserve
ed Page 38
8 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

Fire
e and Rescu
ue Co-ordin
nator takes responsibili
r ty of the following:

 Immediate e mobilisatio on of Fire & Rescue team t to site


e on receivving emerge ency call frrom
Site Contrroller.
 Work on the advice of o Incident Controller
C to
o isolate the site and h
help in shutting down the
affected in
nstallation.
 Assist Inciident Controoller and hiss maintenance team in n immediate e repair and
d restorationn of
operation strictly on his
h instructioon.
 Mobilise emergencyy power, fire f fightingg equipme ent, sparess for repair and ma ake
assessme ent for new purchases,
p if required.
 Make asse essment of damage occcurred.
 Logging ofo incidents and formin ng of incide ent manage ement team m for fire & safety relaated
advises.
 Advise sea arch & resccue, evacua ation, medic cal attention and safetyy of affected
d persons.

dical and Se
Med ecurity Co-o
ordinator takes the follo
owing respo
onsibility:

 Mobilisatio
on of Mediccal Aid Team m for immed diate first aid and isolattion of casuualties needding
hospitalisa
ation.
 Call ambulance in suffficient nummbers, if the situation so o demands.
 Alert all nearest hospitals and advise
a themm for imme ediate prepa aration to receive
r injured
persons.
 Assist Fire
e & Rescue Co-ordinattor and his team
t in fulfilling their re
esponsibilities.
 Liase with hospital an
nd make arrrangement for f sufficien nt quantity o of medicines s.
 Help Incid dent Co-orrdinator in securing the area by blockin ng the are ea, controllling
emergency exits and communica ation systemm.
 Co-ordinatte welfare activities
a i. e. arrangemment of foo od, water, sshelter and taking care e of
relatives of
o injured.

mmunication
Com n Co-ordina
ator takes th
he following
g responsibiilities:

 Communiccation Co-o ordinator shall


s act as
a one poiint communication ch hannel for all
agencies directly
d andd indirectly associated
a with
w Disaste er Managem ment.
 The Co-orrdinator sha all commun nicate with internal
i gro
oups, emplo oyees, secu
urity person
nnel
including persons
p in the
t neighbo ouring indus
stries or anyy other persson.
 Shall conta
act external agencies forf assistannce as may be advised by Site Co-ordinator.
 Shall com
mmunicate with Media a/press for passing on n informatioon after top
p management
approval

It iss imperative
e that for District
D Authority to make adequatte preparation, all info
ormation ab
bout
the operation and risk off the unit must
m be pro
ovided in advance.
a he informattion should be
Th
furnnished:

i) Inventory of
o hazardou us chemicals i.e. CNG in this partiicular case..
ii) Material Safety
S Data of hazardou us chemicals.
iii) Likely emeergencies th
he installatio
ons may cre
eate.

 
© Copyright MECON Limited – All rights reserve
ed Page 39
9 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

iv) Effects of such emerg


gencies on human life, natural hab
bitats and e
environmentt.

Disttrict Emergency Autho ority, depennding on th


he geograpphical locattions of the
e installatio
ons,
pop
pulation density aroun nd the insstallations and
a their risk of exxposure to the possiible
emeergencies, shall
s declare Off-site Emergency
E to
t face the same.
s

The gency team shall be ass follows:


e responsibiilities and duties of Off--site Emerg

Eme
ergency Re
esponse Co-ordinator

 To ensure that immed diate relief provisions are availab ble and their movemen nt activatedd in
the event of
o an emergency.
 To appraise Dist. Disa aster Mana agement Au uthority aboout the seveerity of incid
dent and se eek
help in casee the situation cannot be controlle ed within the
e available resources.
 Arrange for emergenccy power, communica
c ation equipm ment, vehiccles and fue el for vehiccles
and power generators.
 Activating Rescue
R and
d search operation.
 Instruct Ho
ospital and Ambulance
A Service to be in readiness for mmedical treattment and first
f
aid with meedicine.
 Maintenancce of law an nd order.
 Arrangeme ent of relief material,
m if need
n arisess.

ergency Su
Eme upport Functtions (ESFss)

In the event of an inttimation of an emerg gency, ESFs comprising variou us supportting


ageencies/deptss., will mana
age and co
o-ordinate specific
s kind
ds of assista
ance, which
h are comm
mon
to all
a types of disasters.
d

The ressponsibilitie
es, initial acctivities on receipt
r of warning
w and
d minimum standards for each ESF
E
are give
en in the following table e:

1 arning
Early wa Setting up Control Roo
S om/ Emergen ncy Operatioon Centre ro
ound the clocck
A
Arrangemen nt of vehicle and sound system forr information n
d
disseminatio
on
Proper record keeping and transmiission of infoormation to all the leveel
Ensure funcctioning of warning
w systtem & comm munication systems
s
C
Create awaareness with the targ get groups
2 Evacuatio
on T warn people
To p abou ut the impe
ending dang ger & to le
eave for
s
safer place
es.
T co-ordina
To ate with civil defence-NGOs/Secy. R Rajya Sainik
Board/Policee for support.
Evacuate peeople and ad dminister em
mergent relieff.
Deployment of police for maintaining law & order & peace kee eping during
e
evacuation. .
3 Search an
nd Deployment of Police/Firre Brigade fo or search andd rescue.
Rescue
C
Co-ordinatio n with the NC CC/NSS/Civvil Defence/R
Rajya Sainik Board
B etc. fo
or
r
rescue operaation
Ensure availlability of the
e rescue matterials.

 
© Copyright MECON Limited – All rights reserve
ed Page 40
0 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

4 Medical aid
a Deploymen nt of Medica al staff
S
Stock piling of Life savin
ng drugs
Protocol on n medical aida
T
Treatment of the injured persons and d Transportaation of the in
njured to
hospital.
5 Shelter A
Arrangemen nt of Shelter//Temporary shelter at a appropriate places
Managem ment A
Arrangemen nt of Food/Drrinking water/Medicine in n the shelterr places.
A
Arrangeme nt of transp portation
Providing the lighting fa acilities for shelter
s placees
Deploymen nt of Police Personnel
T
Temporary s
supply of drinking waterr
6 Emergen
nt Relief Deploymen nt of vehicle e
Procuremen nt and transp portation of Relief mate erials to affeected areass
7 Water Su upply Ensuring su upply of safee drinking water
w
and
Sanitation
8 Infrastru
ucture Assigning re
A esponsibilitie
es for specificc areas.
Restoratiion Emergency cleaning of debris to enable reconnaissance.
C
Coordinate road-cleanning activitiies to assist relief wo ork
Begin clearin
ng roads, asssemble casu ual labour prrovide a worrk team
c
carrying emergency too ol kits.
T
Towing veh
hicles, Earth moving eq quipments, ccranes, consstruct
t
temporary ro
oads
Keep Nationnal & other Highways
H cleear from disaaster effects.
Damage asssessment & Monitoring

The detaiils of the priimary and support


s age
encies for ea
ach type of ESF are givven below:

ESF Service Function


F Primary Agency Supp
port Agenc
cies
No.
1 Communication Police

2 Public He
ealth Departmeents of
Health an
nd Family
Welfare
3 Transportt Transporrt
Departmeent

4 Power
Departme
ent
Power

 
© Copyright MECON Limited – All rights reserve
ed Page 41
1 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

5 Search and
a Police
Rescue; Evacuation
E

6 Restoratioon of Public Works


W Dept.
Infrastructture

7 Relief Sup
pplies and Revenuee
Food Departmeent/District
Administrration.
8 Water Su upply and DWS
Sanitation
n/
9 Media ICAT

15.0 INFRASTRUCTURE

The
e infrastructu
ure comprisses of the fo
ollowing fac
cilities:

ERGENCY CONTROL
15.1 EME L ROOM

Eme ergency Coontrol Roomm is the ceentre point ofo activity during
d an eemergency situation. TheT
Conntrol Room shall be sett up away frrom the site
e such that during eme ergency it’s function is not
affe
ected. The Control
C Roo
om shall be manned rou und the clocck with all n
necessary communicat
c tion
equuipment andd importantt informatio
on like conttact nos. of key perso onnel of th he companyy &
exte
ernal agenccies, emerge
ency numbe ers, site lay
yout plan an
nd fire fightin
ng facility.

Following
g resources shall be ma
ade availab
ble at the Em
mergency Control
C Room

 On--site Emergency Plan


 Impportant draw wings like General
G Layyout Plan, la
ayout of ind ng layout plan,
dividual faccilities, pipin
fire fighting faccility layout and
a layout ofo electrical facility.
 Con ntact detaileed of key pe ersonnel & essential
e sta
aff.
 Loccation and inventory off emergenccy kits like personal prrotective kitt, first aid kit, k emergen ncy
tools, fire fighting equipme ent and emeergency lighht.
 Area a layout su urrounding site
s showin ng industries, habitatioon, hospital,, road layou ut, police post
p
etc.
 Esccape and evvacuation pllan.
 Loccation of asssembly poin nt.
 Vulnnerable areas.
 Eme ergency veh hicles and, name & contact details s of drivers.
 Reccord of prevvious emerg gency situattions.

15.2 ASS
SEMBLY PO
OINT

Asssembly poin
nt is a pre ed area, where perso
e-designate ons associa
ated with the
t operation/
maintenance of
o the unitt but are not
n part off emergenccy team arre assemblled during an
emeergency.

 
© Copyright MECON Limited – All rights reserve
ed Page 42
2 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

A head count is done by an authorised personn, who is asssigned to take responsibility of the
assembly area
a. The hea ad count help
h is iden
ntifying misssing perso
on for seaarch & resccue
eration.
ope

RE PROTEC
15.3 FIR CTION

e Fire Protecction system


The m has been
n designed as
a per OISD F Equipment
D 179. The details of Fire
shall be as folllows:

Eq
quipment DCP 75 KG DCP 10 KG CO2 4.5
4 KG
CO
OMPRESSO
OR 1 1 -
DISPENSOR
R - 1 -
CA
ASCADE - 1 -
LC
CV POINT - 1 -
EL
LECTRICAL
L PANEL - - 1

 6 nos. off fire bucketts are also provided as


a per CCO
OE guideline
es. 300 kg DCP trolleyy is
also provvided
 CO2 tota
al flooding system
s is provided for the protecttion of com
mpressor. 2 Nos. of L.E
E.L.
Detectorss in each pa
artition of th
he package provided to
o sense gass leakage. 2 Nos. of UV
U /
IR flame detectors provided
p in each
e partition of the pa
ackage to ssense Flame. The sign
nals
of each of
o these sen
nsors are continuously
c y monitored
d by the PL
LC system. Upon senssing
presence
e of Gas or Flame, the
e PLC trips the unit, an
nd isolates it from sucttion line, CNG
dispensers & the cascades. In
n case a flame is sensed, the CO2 Flood
ding system
m is
activated to immedia
ately extingu
uish the fire
e.
 300 KG DCP trolle
ey extinguissher are also
a provide
ed as an additional fire
f protecttion
measure..
 Fire extin
nguishers arre also provvided at the DRS & MR
RS.

15.4 Inte
er distance
es from bu
uildings an
nd outer boundaries to gas storage unitts as per
p
PESSO guidelines:

TOTAL CA
T APACITY OF GAS STORAG
GE MIN. DISTANCE
D FROM BUIILDINGS AND
A
U
UNITS (In Litres)
L BOUNDARIES (Inn Meters)
Upp to 4500 2.5
45
500 to 10000
0 4.0
10
0000 to 1000
000 10.0

 
© Copyright MECON Limited – All rights reserve
ed Page 43
3 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

In
nter distances betwee
en various facilities of
o natural gas
g handlin
ng at installlation

Sl.No Distance from


m in Meters 1 2 3 4 5 6 7

1 CNG Compre
essor - 3 2 3 6 6 T-1
(Min-3)

2 CNG Dispenssing Unit 3 2 4 6 4 -Do-

3 Storage casca
ade 2 2 T-1 T-1(Min-6) T-1(Min
n-4) -Do-

4 Outer bounda
ary wall/CLF 3 4 T-1 6 4 -Do-

5 MS/HSDdispe
enser 6 6 T-1 6 6 -Do-
(Min
n-6)

6 Vent of M
MS/HSD u/g 6 4 T-1 4 6 - 6
storage tankss (Min
n-6)

7 Filling point of MS/HSD ------------T-1 (M


Min -3)----------------------------------6

Salient safety
s featu
ures of CGD
D network
a. Unaattended fixxed surface facilities sh
hall be prote
ected from public
p access by fencin
ng and lockking
of valves
v and instrumentaation.
b. At stations
s pro
ovisions of CCOE shall be follow
wed in termss of providing fire extinguishers and
a
nd buckets at the CNG stations,, odorizing the CNG Gas, providing sectio
san onalizing vaalve
stattions at suuitable dista er PNGRB guideliness with ventting arrange
ance as pe ement as per
requirement.
c. Enttire pipeline
e (carbon stteel and MD
DPE) is burried with miin. 1.0 m off earth cove
er to eliminate
acccidental fraccture /leakag
ge.
d. Pro
ovision of wa
arning matss to preventt accidental pipe fracture during exxcavation by
b others.
e. Smoking and all open flames f shaall be prohibited in and around structure, or contain
ning
faciilities, where
e possible leakage of gas
g constituutes a hazard of fire or explosion.
f. When a hazardous amount of gas is to be vented v into open air, each potenntial sourcee of
igniition shall first be remo
oved from thhe area and uishers shall be provided.
d adequate fire extingu
All flashlights, lighting fixxtures, exte
ension cord
ds, and too e of a type approved for
ols shall be
hazzardous atm mosphere.
g. Suittable signs and flagme en or guard, if necessa
ary, shall be
e posted to warn otherrs approach
hing
or entering
e the
e area of the
e hazard.

Major Inb
built Safety
y System at
a CNG Stattion
Metering
g Skid (Optional)

 PS
SV providedd,
 Ea
arthing
 Flow regulation

 
© Copyright MECON Limited – All rights reserve
ed Page 44
4 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

 Meter proverr connection


n an by-pass facility
 De
esign safetyy

Compres
ssors

 Saafety valvess are provid


ded
 Flame and GasG detectorrs are provid ded inside the
t compressor to dete
ect the fire
 Dooor interlocks,
 Over and und der pressurre protection
n
 COO2 floodingg system ass a fire prote
ection meassure
 Accoustic enclosure
 Independent double earrthing

es
Cascade

 Saafety discs provided


 Deesign safetyy
 Eaarthing
 Cut-off valvess
 Coommon ven nt
 PSSV provided d
 Stturdy steel structure
s fra
ame for cylinders

Pressure
e Piping

 De
esigned at 1.6 times thhe Maximumm Allowable e Operating Pressure (MAOP)
 Cut off valvess
 Re
egular inspe ection and maintenancce carried out
o

LCV Filling

 Eaarthing
 Emmergency cut-off
c
 Sttopper blocks for preve
enting the ro
olling of veh
hicles
 Prressure gauuges

Dispense
ers

 Eaarthing
 Prressure cut--off
 Veent
 Brreak-away coupling
c
 Brraided flexib
ble hose forr CNG filling
g

Safety sy
ystem insta NG vehicles:-
alled on CN

 CNG Kit com mponents:


 d under chassis / dickey at vehicle
CNG cylinders: Installed es to store fu
uel
 High-pressurre tubing: Connecting the
t cylinderss and enginne.
 A low-pressuure regulator: Supply Gas
G to engin ne as per neeed.
 A refueling co
onnector: For
F refueling g gas in the vehicle.
 A low-pressuure hose: Suupply gas frrom regulato
or to engine
e.
 
© Copyright MECON Limited – All rights reserve
ed Page 45
5 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

16 DEC
CLARATIO
ON OF ONSITE AND OFFSITE
O EM
MERGENCY
Y

16.1 ON-SITE EM
MERGENCY
Y:

Whe en incidentt take place e, immediattely the Em


mergency organisation chart sha all be put into
action. IF the situation
s goe t control the on site emergencyy plan will be
es beyond the b activated
d by
chie
ef Controllerr at the app
propriate sta
age as cons
sidered nece
essary.

16.2 OFF SITE -E


EMERGENC
CY:

Wheen emerge ency becommes catasttrophic and d evacuatio on beyond d the plantt premises is
considered neccessary by the chief In ncident Conntroller situation will be handed over
o to Disttrict
Auth
hority for im
mplementing
g the off-site
e emergenccy plan.

17 RES
SOURCES FOR CONT
TROLLING
G EMERGEN
NCY

17.1 EMERGENCY
Y VEHICLE
Fully functiona
al emergen ncy vehiclees shall be e available 24x7 at Main Conttrol Centre at
Ruppnagar. Du uring emergencies O&M M departme ent shall use the vehiccle for reach
hing the sce
ene
of any
a accidentt with the ob
bjective of controlling
c the
t same.

Eacch of the em
mergency ve
ehicles shall be provide
ed with the following
f m
minimum equ
uipment:
 Depressurrization of a particular segment
s of the pipeline
e
 Portable LEL
L / Oxyge
en meters
 Non-sparkking tools likke Brass haammer 2.0 Kg, Double e ended D-sspanners’ (ssizes: 23 x 27,
24 x 26, 25
2 x 28, 30 x 32 & 30 x 36 mm), Single
S endeed ring sluggging spanner (32, 36, 41,
46, 50, 55 & 60 mm) and Pipe wrench
w of 24
4mm
 General to ools like Scale, divide
er & measu uring tape, set of screw drivers,, double op pen
ended spa anner, Plier Combinatioon (200mm), Long nosse pliers (16 60 mm) andd Pipe wren nch
(12 inch), Allen key set
s (metric, inch) Seala ant & sealan nt gun for G
Gate Valves / Ball valve
es /
Plug Valve es
 SS fittingss (instrumen
nts): ¼”, ½” & ¾”.
 Electrofusion M/cs.
 PE Squee eze tools forr 20 – 180 mm
m NB pipe e.
 Pipe Scrap pper.
 PE Pipe Cutter.
C
 Cleaning Pads/Brush
P h.
 Pipe alignment Clamp ps.
 Manual Exxcavating Tools.
 Pipe Straig ghtener.
 GI Plumbing kit.
 GI Plugs ½”½ to 1 ½”.
 PE Closurre Lugs.
 Hydraulic pump accessories for opening & closing
c of valves
v
 Chain pulley block (1 / 3 Ton) with tripod
 Multimeterr
 
© Copyright MECON Limited – All rights reserve
ed Page 46
6 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

 Portable diesel
d generrator set of 1 KVA
 Explosion--proof lamp p and floodlight
 Communiccation facilitties like mobile PA sysstem, wireless commun nication sets
s etc.
 Distribution board
 First Aid kit
k
 Personal safety
s itemss like hand gloves (bo
oth rubber and
a cotton), face mask k, ear mufflers
etc.
 Maintenan nce Consum mables like Marking / Hosiery
H clotth, Teflon T
Tape, M-Seal, #600 sp piral
wound gasskets of for 2”, 4”, 6”, 8”,
8 10” & 12”, Gland paacking, Gre ease, Rustooline, O – Ring
R
Kit etc.
 Safety torcch
 Portable fiire extinguisshers (DCPP)
 Hydraulic oil for actuaator HPU

18 MOGRAPH
DEM HIC INFORM
MATION

18.1 DEM
MOGRAPHY OF RUPN
NAGAR CIT
TY

ERD
DMP shall be d based on the followin
b prepared ng informatio
on:-

a) Neighboring population in a 5 km radius


b) Housing co olonies of in
ndustries
c) Sensitive in
nstitution su
uch as scho
ool, hospitals
s, religious establishments and olld aged
homes
d) Cattle and live stock
e) Flora faunaa

Geo
ographical Area

 Rupnagar is a city a
and a municipal
m council inn Rupnagarr districct in
the Indian state of Pu
unjab. Rupn nagar is a newly crea ated fifth Diivisional He eadquarterss of
Punjab comprising Rupnagar, Mohali,
M and its
i adjoining
g districts. Itt is also one
e of the bigger
sites belonging to the Indus Va alley Civilizaation. Rupnagar is nea arly 50 km (31 mi) to the
northwest of Chandig garh (the nearest
n airpo
ort and the
e capital off Punjab). It is bordered
by Himach hal Pradeshh to the nortth and Shah hid Bhagat Singh Naga ar district (fo
ormerly kno own
as Nawanshahr district) to its we
est.

 There are many histo


orical and re
eligious pla
aces in Rup
pnagar, inclu
uding gurdw
waras such as
Gurudwaraa Bhhatha Sahib
S and Gurudwara
G Tibbi Sahib
b.

 Rupnagar district, inccluded in thhe Patiala Division of Punjab falls between north latitu ude
30°-32' annd 31°-24' and
a east lon ngitude 76°-18' and 76
6°-55'. Rupn nagar (formmerly known as
Ropar) tow wn, the disttrict headqu
uarters is 42 Kms from
m Chandiga arh, the statte capital. The
T
district adjjoins Nawannshahar, Mohali
M and Fatehgarh
F S
Sahib Districcts of Punja
ab. The disttrict
comprisess 4 Tehsilss, Rupnaga ar, Anandpur Sahib, Nangal and Chamkaur Sahib and a
includes 624
6 villagess and 6 tow wns namely Rupnagar,, Chamkaurr Sahib, An nandpur sah hib,

 
© Copyright MECON Limited – All rights reserve
ed Page 47
7 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Morinda, Kiratpur
K Sahhib and Nan
ngal. All the
e towns exccept Chamkkaur sahib fall
f on railwa
ays
line. The Satluj riverr passes close (2 to 5 km) to th he towns o
of Nangal, Rupnagar
R a
and
Anandpur Sahib.

De
emographiics

Ass per 2001 India censuus,[6] Rupna


agar had a population of 48,165. Males constitute
e
53
3% of the population
p and femalees 47%. Ru upnagar haas an avera age literacy
y rate of 755%,
highe
er than the national
n ave
erage of 59..5%: male liiteracy is 78
8%, and femmale literacyy is
82
2%. In Rupn nagar, 11%% of the popu
ulation is un
nder 6 yearss of age.

Rupnagar GA
A comprisess of Rupnag
gar Urban and
a Rural Districts
D

Rupnagar Urban Distriict:

upnagar Urrban districtt located at 21° 25' Norrth Latitude


Ru e&76°20’ Ea
astLongitudewith 1370S
Sq.
km
m.

upnagar ha
Ru as three Tah
hseel, five blocks,
b 593
3villages. Po
opulation off Rupnagar is 6,84,627
7as
pe
er census 2011.

 
© Copyright MECON Limited – All rights reserve
ed Page 48
8 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

IMAGE OF
O RUPNAG
GAR

18.2 Thee Rupnagarr Geograph


hical Area (GA) is div
vided unde
er four charge Areas which are as
follo M above showing GA
ows, (ref. Map As):

R
Rupnagar C
Charge Are
eas
Sl.
S Charge
C Area
as
N
No.
1 C
CA-01 NANG
GAL SH
H 22
2 C
CA-02 ANANDPUR NH
H21, SH 22
SAHIB
B
3 C
CA-03 RUPNAGAR NH
H21, SH 22
4 C
CA-04 CHAM
MKAUR NH
H 95, NH 21
1
SAHIB
B

 
© Copyright MECON Limited – All rights reserve
ed Page 49
9 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

18.3 RUPNAGAR MUNICIPA


AL COUNCIIL DISASTE
ER MANAG
GEMENT PL
LAN OBJEC
CTIVES:

The
e main purpose of prep
paring the pllan is: ‐

a) To ascertaain the sta atus of existing resou urces and facilities a available, with
w the other
agencies/and residencces of wards, those ma ay be involvved in the m
managemen nt of disaste
er in
AMC area.
b) Assessmen nt of the deficiencies
d , inadequacies if anyy in renderring effectiv ve servicess in
disaster and post disaster situatioon.
c) Suggestingg in institutional infrasttructural strrengtheningg, technolog
gical suppoort, up gradding
and updating of inform mation and data base for overall improveme ent of administrative and
a
community responses to disasterr at the mun nicipal level..
d) Developingg codes an nd standarrd operatin ng procedu ures for an n effective and smo ooth
coordinatio
on between various dep partments and
a relief ag gencies invo
olved.

19 MED
DICAL FAC
CILITIES

e first aid faccility shall be


The b available at each CN
NG station with
w trained personnel.
Hosspitals in Ruupnagar are e as follows:

20 ACUATION
EVA N

On declaration of evacuattion by on-ssite emergen ncy team, loocal district authorities in associattion
with
h the personnnel from th
he facility sh
hall initiate action
a afe evacuattion. All the personnel not
for sa
form
ming part off emergencyy team in th he area shalll leave the area quickly and gathe er at assem
mbly
poin
nt.

Thee local policce and fire departmentt shall assis


st while eva
acuating th
he public an
nd ensure that
t
emeergency asssistance thrrough co-orrdinated mo ovement of Fire Brigadde, Ambulance/ First Aid,
A
resccue vehicless function properly.
p

21 PUB
BLIC RELA
ATION AND
D INFORMA
ATION TO PUBLIC
P
In case
c of a se
erious emergency, whicch might afffect general public, imm mediate res sponses of the
commpany should be to eva acuate the people
p surrrounding the
e area or if felt safe, to
o be advised
d to
rem
main confineed in their ho
ouses.

Effe
ective comm munication methods must
m be followed to in ntimate pubblic in geneeral about the
dannger and safety measures to be ta aken. Initial danger ala
arm may be e through a siren follow
wed
by public anno ouncement in local laanguage through televvision chan nnels, radio or any other
meaans. If evaccuation is ne
ecessary, th
hen details of relocatio outes to be followed must
on areas, ro m
be announced.
a .

e authority shall
The s activate Emergency Control Room
R at the
e earliest an
nd take follo
owing actions:

 Assess thee emergencyy situation anda declare e level of em


mergency.
 Continuouss evaluationn of emerge on to announce public e
ency situatio evacuation..
 List of DOss and DON’T Ts to be followed for evvacuation.
 If the emerrgency is likkely to posee health risks due to le
eakage of g gas, generaation of smo
oke
etc. necesssary informa ation to be passed
p on to
t the publicc and off-sitte Emergen
ncy Team.
 Prepare listt of immediaate contact persons wiith their mobile/telepho one numberrs.
 
© Copyright MECON Limited – All rights reserve
ed Page 50
0 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

 Gather and
d record wea
ather condition details and make assessmen
a nt for off-site
e effects.

ergency Co
Eme ommunication to Extternal Agen
ncies
he emerge
If th ency is sevvere, the Incident Co ontroller may
m notify Off-site Emmergency Co-
C
ordiination, who
o will activa
ate Disasterr manageme
ent processs. Incident C
Controller may
m also nootify
major emergen ncies to:

 District Maggistrate/SDM/District Collector


C
 Fire Brigade
 Ambulance e services
 Hospital annd emergency medical services
 Police
 Factory Insspectorate
 District Transport Authhority
 District Water Supply
 Public Worrks Departm ment (PWD)
 Neighbouring industrie es, who mayy help with manpower and equipm
ment

The notice
n shall include the following in
nformation:

 Brief descrription of th
he incident indicating location, tim
me when no oticed, natu
ure of incident
and likely effect
e on surrrounding area.
a .
 The namess, designatio on, addresss and teleph
hone numbe ers of the ca
aller.
 Any known or anticipa ated acute or
o chronic heealth risks associated
a w
with the em
mergency.
 The name(s) and te elephone number(s) of o the persson(s) to b be contacteed for further
informationn
 Weather co onditions, in
ncluding win
nd direction, speed and d expected spread of leeakage.

22 LE AND RE
ROL ESPONSIBILITY OF STAKE
S HOL
LDERS

oles and responsibili


1) Ro r ties of sta
akeholders including external
e ag
gencies succh as Disttrict
Au
uthority, Po
olice, Fire Services,
S Revenue dep partment, Health
H depa
artment, Po
ollution Con
ntrol
Bo
oard, Nation
nal Disasterr Response e Force (ND
DRF) & State Disaster R
Response Force
F (SDR
RF).
2) Foor roles an nd responssibilities off above sta akeholders and respo onders, priimarily disttrict
co
ollector as head
h of emmergency op peration an
nd other au
uthorities un nder his charge includ ding
exxternal ageencies, has been defin ned in Schhedule-V. These
T roless and respoonsibilities are
geenerally in line
l with Na
ational Disa
aster Manag gement Guiidelines on Chemical Disaster,
D Appril,
20007, broughht out by Naational Disaster Manag gement Authhority.

 
© Copyright MECON Limited – All rights reserve
ed Page 51
1 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

SCHEDULE
E–V
(Refer Regulattion 22.0)
The important
i R
Roles and Responsib
R bilities of Various
Va Stak
keholders

a) Oil and
d Gas Installlations & Areas
A (Menti
tioned in Re
egulation 3)..

The abovve mentione ed Installattion in Regu ulation 3 shhould provid


de necessa
ary Informa
ation to Muttual
Aid Assocciation, Disttrict Authoriity, and Poliice & Fire Services.
S

i) List of Ha
azardous Chemical
C & Systems
S wh
hich have potential
p to cause dang
ger to Hum
man,
Environmment & Prop
perty.
ii) On-Site Emergency
E Plan & Perriodic Mock Drill.

The abovve entities should


s supp
port authoritties in mitig
gation, rescu
ue and reha
abilitation, with
w resourcces
identified
d and agreeed with the
e authorities in advan nce. Such areas
a shalll be includded in Off-S
Site
Emergency Plans.

b) Thhe districtt authority y is respon nsible for the


t Off-Sitee emergenccy plan an nd it shall be
eqquipped wiith up-to-da ate Major Accident
A Hazard
H unitss, website, control ro
oom etc., with
w
prrovisions for monitoringg the level of prepared
dness at alll times. Reg
gular meetiings of vario
ous
sttakeholderss of Che emical Dissaster Man nagement will be conducted d by disttrict
addministration/District Disaster
D M
Managemen t Authorityy to revieww the pre eparedness of
Ch hemical Dissaster Mana agement.

gistrate being the chairman of


Diistrict Mag o “District Crisis gro
roup” the entire disttrict
dministration will act as per the
ad eir specified authorityy & Responnsibilities in
n the Off-S
Site
Em
mergency Plan
P to mitig
gate emerge
ency.

Th
he emergen ncy situation
n may call in
i for partic
cipation from
m other section of the administrati
a ion,
which may as
wh a per the requiremen nt and appllication mayy be calledd upon for mitigation
m a
and
co
ontrol of em
mergency.

Thhe power to o call upon Military Forrces and Pa aramilitary forces


f durin
ng the time of emergen
ncy
orr in any casse as may arise, is restted with the District Magistrate.

c) Thhe police will


w be an im mportant co omponent off all disaste er managemment plans as
a they willl be
asssociated with
w investig gation of acccidents/disa asters. Policce take overall charge of the Off-S
Site
situation untill the arrivall of the distrrict collectorr or its repre
esentative a
at the scene
e.

Thhe Police department


d constitutess the first lin
ne of action
n during the time of emergency,
e as
hey are the first and fo
th oremost rep presentative e of the adm ministration is any give en region. The
T
poolice out-po
ost of the region
r wherre such pla ant is locateed is the firrst place frrom where the
poolice setup comes into action durin ng the time of emergen ncy.

erintendent of Police (S
Att district levvel the Supe SP), is in-ch harge of the e entire pollice setup. The
T
va
arious sectiions of the police setu up in the disstrict like th
he civil policce; the armed policem man,
th
he traffic dep partment an
nd the contrrol room settup etc are under the ssupervision of the SP.

Th
he responsiibility of polilice departm
ment should
d be:

 
© Copyright MECON Limited – All rights reserve
ed Page 52
2 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

 To
o maintain the
t law and d order situa
ation in the affected
a areea including g emergenc cy shelter
ce
entres.
 Guard of inciident site du
uring and affter the incid
dent.
 o preserve evidences for
To f accidentt investigation.
 To
o provide coommunicatiion support to emergen ncy teams.
 To
o ensure smmooth move ement of em mergency ve ehicles like Ambulance es, Fire tend
ders Rescue e
ve
ehicles etc.
 To
o manage smooth
s flow
w of normal traffic, diverrsions of tra
affic if requirred.
 To
o provide suupport to evvacuation teeam in shiftiing of publicc from affeccted area to o emergencyy
sh
helter homees.
 To
o inform Disstrict Emerggency Contrrol Room ab bout the sig gnificant devvelopments s at incidentt
site.

De
epending on
o the type of duties an nd responsiibilities restted with the
e entire Poliice set up may
m
be
e broadly cllassified intto following categories:: - A. Civil Police,
P B. A
Armed Policce, & C. Tra affic
Po
olice.

d) Thhe fire serrvices are one of the e first respponders annd shall be adequatelly trained and
a
eqquipped to handle chemical
c em
mergencies s. Fire serrvices are to acquiree a thorou ugh
kn
nowledge of likely haza
ards at the incident
i site
e and the em
mergency ccontrol meas
sures requiired
to
o contain it.

e) In
n a chemicaal emergenccy, the reveenue deparrtment sha er agencies for
all coordinatte with othe
evvacuation, establishme
e ent of shelte
ers and prov
vision of foo
od, etc.

f) When requirred for eva


W acuation pu urposes in a chemica
al emergen
ncy, the department
d of
tra hould made transport promptly ava
ransport sh ailable.

g) he role of ciivil society


Th y and private sector in
n the Off-Site plan shalll be defined
d.

h) Thhe health departmen


d t needs to assure thatt all victims get immed diate medica al attention on
th
he site as well
w as at the e hospitals//health-care
e facility whhere they arre shifted. In n addition, the
deepartment needs
n to ne
etwork all thhe health-ca
are facilitiess available iin the viciniity for effecttive
m
management t and also ta
ake effectivve measuress to prevent the occurrrence of any y epidemic.

i) Poollution co
ontrol boarrds need to o ascertain
n the develo oping seveerity of the emergencyy in
acccordance with responnsive meassures by co onstant moonitoring of the enviro onment. If and
a
wh an area is fit for entry
when e will de
epend uponn the resultss of the mo
onitoring. A contaminattion
opperation wo
ould be requ
uired to be carried
c out with
w the hellp of other aagencies an nd industriess.

j) Thhe NDRF anda SDRF are


a the spe ecialized forrces to man
nage these disasters in n a longer run
acccording to the severity
ty and naturre of the dis
saster. The
eir specialize ed training is an effecttive
m
measure thatt needs to be
b built up and
a maintaiined with tim me for achie eving a high her standard d of
prreparednesss. They ne eed to coo ordinate witth other loocal agenciies such as a the Cen ntral
In
ndustrial Seccurity Force
e that may be
b responsiible for secuurity at the iindustrial sitte.

*R
Role of abovve external Agencies have
h been defined
d in Annexure-E
A of Nationall Disaster
M
Management t Guideliness Chemical Disaster, April-2007
A

 
© Copyright MECON Limited – All rights reserve
ed Page 53
3 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

ND
DRF- Natio
onal Disastter Respon
nse force
SD
DRF- State
e Disaster Response
R F
Force

23 REP
PORTING OF
O INCIDEN
NT

23.1 COM
MMUNICAT
TION OF AC
CCIDENTS
S IN PIPELIN
NE

1. All incide
ents covere ed under Level-1 shou uld be maiintained by the entity for inspecttion
wheneve n and Levell-II & Level--III shall be reported to
er called forr inspection o the Boardd in
the formaat specifiedd and placed ule-IV including near m
d at Schedu miss inciden
nts. The aboove
report shhould be su ubmitted wiithin 48 hrs after occurrence of th he incidents
s or any otther
reason trriggering ma ajor inciden
nt.
2. Investiga
ation report of all Majorr incidents shall
s be sub
bmitted to P
PNGRB. An
n incident sh
hall
be treate
ed as Majorr if any of the following occurs;

a) Fire fo
or more than
n 15 minute
es
b) Explossion / Blowo
out
c) Fatal Incident.
I
d) Loss above
a Rs.10
0.0 Lac.
e) Cumullative man hours
h lost more
m than 500
5 hrs.
f) Plant Shutdown
S / Outage due
e to the inciident
g) Level III
I incident

 
© Copyright MECON Limited – All rights reserve
ed Page 54
4 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

S
SCHEDUL
LE-VI
(REFER
R REGUL
LATION-2
23)
INCIDE ENT REPORTIING FORMAT T
1.Organisa ation 2.S
Sector
3.Location n 4.In
ncident Sr. Noo.
5.Date of Incident
I 6.T
Time of Inciden nt
7.Major / Minor
M / Near miss
m 8.R
Report - Prelim
minary / Final
9.Fire / Inccident 10.Duration of Fiire - Hrs. /
Minn.
11.Typ of Incident with loss of life / Innjury / Fire / Explosion
E / Blo
owout / Electro
ocution / Fall ffrom Height /
Inhalation of Gas / Driviing / Slip / Trip
p / Others
12. Locatio
on of Incident (Name of Pla ant / Unit / Area
a / Facility / Tank
Ta Farm/ Ga antry / Road / P Parking Area
etc.)

13. Wheth her Plant Shutd down / Causeed outage of th he facility ? Yees / No
14.Fatalitie
es nos. a)Empployees = b)Contractor = c)Others =
15.Injuriess nos. a)Empployees = b)Contractor = c)Others =
16.Man Ho ours Lost a)Empployees = b)Contractor = c)Others =
17. Direct Loss due to the t Incident (R Rs. In Lacs).Looss to Equipm ment / Machine ery as per Insu urance claim
etc.
18.Indirect Losses : Thrrough put / Pro oduction Loss etc.
19.Status of the Facility ty : Constructiion / Commisssioning / Ope eration / Shuttting down / T Turn around,
Maintenan nce / Startup / any other
20.Brief deescription of thhe Incident Inccluding post In
ncident Measu ures .(Attach detail
d in separrate sheet)
21. Wheth her similar Inccident has occcurred in past at the same location,
l If yess, give brief ddescription of
the incidennt and attach details
d in sepa
arate sheet.
22. Wheth her Internal Invvestigation hass been comple eted. If no like
ely dates by which
w it will be completed.
23. Wheth her Internal Innvestigation reeport (Major Inncident) has beenb submitteed to PNGRB. If no, likely
date by wh hich it will be submitted.
s
24.Cause of Incident ( Tick the mos st relevant ca ause preferab bly one, maxiimum two)
A)Deviatio
on from Proceddure I)Noot Using PPEss
B)Lack of Job Knowledg ge J)E
Equipment failuure
C)Lack of Supervision K)PPoor design / LLayout etc.
D)Impropeer Inspection L)In
nadequate Facility
E)Impropeer Maintenancce M)PPoor Houseke eeping
F)Impropeer Material Han
ndling N)NNatural Calammity
G)Neglige
ent Driving O)PPilferage / Sab
botage
H)Carelesss Walking / Cllimbing etc. P)AAny other(givee details)
25.Cause of Leakage - Oil ,Gas or Chemical
C ( Tiick one only)
E)L
Leakage due to Improperr
A)Weld lea
ak from equip
pment / Lines ope
eration
F)L
Leak due to improperr
B)Leak fro
om flange, glan
nd etc. Maintenance
G)N
Normal Opera
ation - Venting
g
C)Leak fro
om rotary equiipment /Dra
raining
D)Metallurrgical Failure H)A
Any other
26.Cause of Ignition le eading to Fire
e (Tick only one
o cause)
A)Near too Hot work F)SStatic Electricitty
B)Near to Furnace / Fla are etc. G)HHammering / F Fall of Object
C)Auto Ign
nition H)HHeat due to friiction
D)Loose electrical
e connnection I)Liightening
E)Near to Hot surface J) Any
A other (Pyrrophoric etc.)
27. Was thhe Incident Avoidable?
A Yees / No
28.The Inccident could have been av voided by the e use of / or by
b :
(Tick the most
m relevan
nt point preferrably one , maximum
m two )

 
© Copyright MECON Limited – All rights reserve
ed Page 55
5 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

F)P
Personal Protectiv
ve
A)Better Supervision
S Equuipment
B)Adhering to specified operating pro
ocedure G)BBetter Equipm
ment
C)Impartin
ng Training H)MManagement C Control
D)Giving adequate tim me to do the e activity thrrough I)Addhering to
o specifie
ed
proper pla
anning maintenance Proocedure
J)A
Adhering to
o specifie
ed
Insppection / Testin
ng
E)Adhering to the work permit system
m Proocedures
K)Any othe
er information
n:

Guideline
es for filling the Inciden
nt Report:

1. All Ma
ajor, Minor an
nd Near misss incidents sh
hall be reporrted in the qu
uarterly reporrt.
2. Incident reporting form shall be
e filled up forr all Major, Minor
M and Near Miss Incid
dents.
mary report sh
3. Summ hall be enclo
osed with eve
ery quarterly
y report.
4. Investtigations shall be carried out for all Ma
ajor, Minor and
a Near misss Incidents.
5. Investtigation report of all Majo
or incidents shall be sub
bmitted to PNGRB.
P An iincident shall be treated
d as
Major if any of the following occcurs;
- Fire for more than 15 minutess
osion / Blowo
- Explo out
- Fatall Incident.
- Losss above Rs. 5.0
5 Lac.
- Cum
mulative man hours lost more
m than 500
0 hrs.
- Plant Shutdown / Outage due
e to the incid
dent
6. Loss time
t Incidentt shall be mo
onitored till th
he affected person
p joins duty. In casse the affecte
ed person is yet
to join
n the duty, then
t the sta
atus of reporrt submitted will be prelliminary. Final report ag
gainst the sa
ame
inciden
nt shall be se
ent once he joins
j duty an
nd the man - hours lost are
a known.
7. All collumns must be
b filled up.
8. For an
ny additional information use separate
e sheets as required.
r
9. Quarte
erly report sh
hall be sent to
t PNGRB within
w 15 to 30
0 days of end
d of quarter.
10. Immed
diate reportin
ng of inciden
nt through faxx/telephone shall
s continue as per the prevailing sy
ystem.

Sign
nature
Namme
Dessignation o
of the Occu
upier/Manag
ger

 
© Copyright MECON Limited – All rights reserve
ed Page 56
6 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

PROCEDUR
P RE FOR SU
UBMISSION
N OF INCIDE
ENT REPO
ORTS AND INVESTIGA
ATION
R
REPORTS T PNGRB
TO B AS PER ERDMP
E REG
GULATION
N-2010

OBJECTIVE:

To ensuree timely andd proper submission off Incident Reports,


R andd subsequent Investiga
ation reportss, if
any, to PNGRB
P for all the applicable insta wned and operated by BPCL (Ind
allations ow dia) Limited, in
terms of the
t Regulattion 23 (1) and
a (2) of PNGRB
P (Co
odes of Pracctices for Emergency Response
R a
and
Disaster Manageme
M nt Plan) Re
egulations, 2010
2 (ERDMMP).

ABILITY:
APPLICA

These reg
gulations sh
hall apply to
o:-

(a) Hyydrocarbons processsing installation (refinery, gas processin ng, LNG Regasificattion
installations etc.);
e
(b) Piipeline suchh as natura al gas, propane, butane etc. and d the hydro ocarbons products whhich
re
emain in gasseous state e at NTP;
(c) Liquid petroleeum producct pipeline;
(d) Coommercial petroleum storage faccilities, gas storage facilities and terminals including
i LNG
te
erminals;
(e) Hyydrocarbons gas botttling Installations hav ving receiving, storage e and handling facilitties
including storrage for LPG, propane e and butane e;
(f) City or local natural
n gas distribution
n facilities;
(g) Dispensing stations
s andd POL retail outlet;
(h) Trransportatioon of petroleeum produccts by road;
(i) Anny other insstallation ass may be nootified by the e Board from
m time to tim
me;

PNGRB Guideline
G

Incident Report: An
ny incident which is ca
ategorized as
a an emerg gency of Le evel 2 or Le
evel 3 shall be
reported to
t PNGRB. As per regulation 6 off ERDMP em mergenciess are classiffied as-

Level 1: This is an emergency


e or an incide
ent whic:-

(i) Caan be effecctively and safely


s mana aged, and contained
c w
within the siite, location
n or installattion
byy the availab
ble resourcces;
(ii) Haas no impact outside th he site, loca
ation or insttallation

Level 2: This is an emergency


e or an incide
ent which:-

(i) Ca annot be effectively and safelyy managed d, and con ntained with hin the site
e, location or
installation byy the availa
able resourcces;
(ii) Iss having or has the po otential to have
h an effe
ect beyond the site, loocation or in
nstallation and
a
wh
where externnal support of
o mutual aiid partner may
m be invo olved
(iii) Iss likely to be
e danger to life, the envvironment or
o to industriial assets o
or reputation
n.

Level 3: This is an emergency


e or an incid
dent with offf-site impacct which cou
uld be catas
strophic and d is
likely to affect the population,
p property and
a environnment insid de and outsside the ins
stallation, and
a
managem ment and co ontrol is do
one by distrrict adminisstration. Alth
though the Level-III em
mergency falls
fa
 
© Copyright MECON Limited – All rights reserve
ed Page 57
7 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

under the
e purview ofo District Authority
A bu
ut till the sttep in, it sh
hould be ressponsibility
y of the unitt to
manage the
t emergency.
Note: Levvel-I and Le
evel-II shalll normally be
b grouped d as onsite emergencyy and Leve el-III as off-ssite
emergenccy.

The entityy shall put in place a documented in house accident re eporting pro ocedure and its respon nse
plan for all
a kind of accident/em
a mergencies such s as i) near
n miss accidents,
a ii)
i) accident without
w losss of
productioon, supply or
o human life fe, iii) accide
ent with loss of producction, supplyy or human life, iv) fire
e, v)
explosionn or other emergencie
e es leading to t disaster effecting ou utside publlic. The lev vel of reportting
shall also
o be mentio oned in the procedure. The Boarrd shall be informed in n respect off the accide ent/
emergenccies under category iiii), iv) & v) above with remedial measures
m fo
for avoiding recurrence e in
the formaat placed at Enclosure e-1 of Sche edule-1E. The
Th entities shall
s ort each of the
investitigate & repo
above inccident/acciddent to differrent level ass specified in the abovve enclosure e.

23.2 Nattional Disa


aster Man
nagement Plan
P

O 23rd Deccember 200


1) On 05, the Govvt. of India took
t a defin
nite step towwards NDM MP by enactting
the NDM MP Act, 20005. The ND DMP act is a Paradigm m shift fromm a respon nse and rellief-
centric approach
a to a proactivee and comp prehensive mind
m set tow
wards NDM MP covering g all
aspects from preve ention, mitig
gation, prepparedness to rehabilita ation, recon
nstruction and
a
recoveryy.

2. Similar to
o National Authority
A at the Centre, the State Govt. is to e
establish a State Disasster
Managem ment Autho ority for the State. Thee State Autthority is to be headed d by the Ch hief
Minister of the State as the Chairperson
C n. Every Sttate Govt. in turn, is to establish h a
district Disaster
D Maanagement Authority for f every District
D in th
he State wiith the Disttrict
Collectorr as the Cha
airperson.

3. The Cen ntral Govt. iss empowereed to take further


f measures as it deems fit fo or the purpo ose
of disastter manage ement like deployment
d t of naval, military
m andd air forces s, other arm
med
forces off the union or
o any othe
er civilian pe
ersonnel as army be re equired for the
t purpose e of
this NDMMP act. Govvt. of India is
i empowerred to estab blish instituttion for rese
earch, trainiing,
and deveelopmental programs in n the field of
o disaster managemen
m nt as per thiis Act.

4. The natioonal vision is to build a safer and disaster re


esilient India
a by developping a holisstic,
proactive
e, multi-disa
aster and te echnology driven
d strate
egy for NDM MP. This wiill be achievved
through a culture ofo preventio on, mitigatio
on, and preeparedness to reduce the impactt of
disaster on people. The entirre process will centerr stage the e communitty and will be
providedd momentum m and susstenance through the collective e efforts of all
a governm ment
agenciess supported d by Non-Go overnmentaal Organizattions.

5. National Disaster Managemen


M nt Structure showing thhe interactivve linkage among
a vario
ous
agenciess for synerg
gized manag
gement of disaster
d is given
g below..

 
© Copyright MECON Limited – All rights reserve
ed Page 58
8 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Note: Sin
nce PNGRB B has been
n constituteed by PNGRB Act-200
06, it shoulld be identtified underr
Ministrie
es/Departments of Go
ovt. of India
a.

 
© Copyright MECON Limited – All rights reserve
ed Page 59
9 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

Submiss
sion of Incid
dent Report

For all sites

For near miss and minor


m incide
ents, the in
ncident repoorting forma at to be fille
ed and keptt at respecttive
sites for record. Fo or major in ncidents, Inncident repport as per schedule e VI of PN NGRB-ERDMP
regulation
n, duly signed by the e respectivve site in charges
c whho is the F Factory Ma anager will be
forwarded d to CEO office with a copy to o, DGM (Prroj. Devp), Corporate Communic cation & HSE
H
departme ent through e-mail within 24 hrs affter occurre ence of incid dent. After d
due concurrence of CE EO,
the incide
ent report .wwill be forwaard to PNGR RB within 48 hrs of occcurrence of incident. All the incide ents
(Near Misss, Minor & Major) shall be filled in n Schedule--VI of PNGR RB ERDMP P Regulation n-2010).
All factua
al data / info
ormation sha all be provid
ded in the Incident Rep port. Detailss / information which may
m
urther invesstigation or further estimation sha
require fu all be mentioned in the e Investigation report, as
the case may be. In such cases, it may be e mentioned d in the Inccident Report that the required
r data /
informatio
on (like esttimated Dire ect/Indirect loss, Causses etc.) sh hall be provvided in the e Investigattion
Report.

DGM (Pro hall ensure the submisssion of the Incident Report to the
oj. Devp) sh e PNGRB within
w 48 ho
ours
after occurrence of the inciden an copy of the Inciden
nt. The sca bmitted to the
nt Report sshall be sub
PNGRB ('secretary@ @pngrb.govv.in') with copies mark to CEO O, HSE dep partment and concern ned
Director. Hard copy shall be submitted to o “The Secrretary, PNG GRB, 1st flooor, World Trade Centre,
Babar Ro oad, New De elhi - 11000
01”.

Submission Investiga ation Reporrt:


Internal in
nvestigation
n shall be carried
c out for
f all minor and near miss incide ents at resp
pective sitess to
find out the
t root ca
ause of thee incident and
a necess sary correcctive action shall be ta aken to avvoid
recurrencce. The inveestigation of
o the major incidents shall
s be carrried out by multidisciplinary team as
decided byb CEO and d/or from exxternal ageency, after due
d approva al by Comp petent Authoority for all the
major inccidents as mentioned
m in
n regulation
n 23(2) of ERDMP
E - Invvestigation report shall be submittted
to the Boaard.

An incideent shall be treated as Major


M if anyy of the follo
owing occurrs:
(a) Fire fo
or more than n 15 minute
es
(b) Explossion / blowo out
(c) Fatal incident
i
(d) Loss above
a Rs. 10.0
1 Lac
(e) Cumu ulative man hours lost more
m than 500
5 hrs.
(f) Plant shut
s down / outage duee to the inciident
(g) Level--III incident

24 ACT
TION AFTE
ER REPORT
TING INCID
DENT

In case
c of an emergencyy the Incident Controller should immediate ely make arrrangementt to
intim
mate the incident to keey personn
nel, emerge
ency task fo
orces, Gove
ernment au
uthorities, lo
ocal
ageencies, policce and hosp
pitals.

It sh b ensured to intimate the followin


hould also be ng authoritie
es:

 Chief Contrroller of Exp


plosives

 
© Copyright MECON Limited – All rights reserve
ed Page 60
0 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

 Chief Inspe
ector of Facctories
 State Pollution Control Board

COMMUNICAT
TION

Rais
sing the alarm
 Personnel noticing firre or any ab
bnormality will
w raise an alarm to inttimate all pe
ersonnel.
 arm securityy personnel shall operrate the nea
After receiiving the ala arby hand siren or elecctric
siren at ga
ate to give the signal off emergenc
cy

Dec
claring the major eme
ergency (du
uring work
king hours))
 On receiptt of emerge
ency call from stations located with
hin Rupnagar Municipaal Corporation,
Emergenccy Responsse Co-ordin nator of AM MC shall activate DMM process intimating Fire
F
Brigade, Police,
P Distt Administration etc. as
a has bee en indicate
ed in Off-sitte Emergen
ncy
Responsee Team flow w chart.

Dec
claring the major eme
ergency (be
eyond norm
mal workin
ng hours)
Anyy emergenccy situation n noticed by
b Security y guard be eyond norm mal workingg hours sh hall
imm
mediately coontact fire co
ontrol room
m and if requ
uired, neare
est fire statio
on. He shou
uld also info
orm
Heaalth Safety Environmen
E nt (HSE) Maanager and Factory Ma anager of th he company y.

ety Instruc
Safe ctions to be
e followed at the time
e of fire

 Any perso on noticing a fire, explo osion or the o gas shall immediately shout "G
e release of GAS
LEAK", "FIRE", or "HELP".
 Immediate ely break thee glass of nearest
n mannual call poiint and activvate Fire Alarm.
 He shall in
nform fire coontrol room, shift-in-charge on dutty and contrrol room immediately.
 He shall make an effort to issolate the affected section to m minimize spread
s of gas
g
leakage/firre.
 He shall also
a make effort
e to extin
nguish the fire
f using fire extinguissher availab ble nearby and
a
also use fiire water moonitors.
 harge on receiving emergency ca
Shift In-ch all shall rush
h to the inccident site with
w necesssary
protection, assess the e situation and
a take im mmediate me easures to ccontrol the situation.
 Shift In-ch
harge shall advise all other people to evaccuate quickkly and ass semble at the
Assembly Point.
 Restrict unnauthorisedd persons to o enter the area.
a
 Diffuse an ny panic conditions am mong the people

plementatio
Imp on of Emerrgency Res
sponse Acttions
Dep pending on type of em
mergency, disaster man
nagement plan
p (DMP) must be in
nitiated to ta
ake
follo
owing respo
onse actionss:

 Dispatchin ng emergen ncy responsse team to thhe accidentt site.


 Pipeline shhutdown an nd depressuurisation of affected segment
 Clamping the leaking point of thee pipeline
 peline segm
Filling the affected pip ment with wa ater / nitrog
gen
 
© Copyright MECON Limited – All rights reserve
ed Page 61
1 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

 Shutdown of local insstallation


 Depressurrization of a particular system
s
 Closing off Sectionalizzing Valves
 Closing fuel gas liness in case of any leakage from the fuel
f gas line
es at SV Sta
ations
 Fire fightin
ng operationn
 Rescue an nd Evacuatiion
 Announce ement of emmergency
 Seeking assistance frrom Off-site e Disaster Managemen
M nt Team
 Repair wo ork on the pipeline after
a emerg
gency is co
oncluded and the affe ected pipelline
segment hash been pu urged with nitrogen
n
 Safe re-co ommissionin ng of the pip
peline

ACT
TUATION OF
O ON-SITE
E EMERGE
ENCY PLAN
N

Incident Controoller has ann importantt role in handling an emergency


e situation. As
A soon as an
incid
dent is noticed, Incident Controlle
er should be able to coontrol the ssame or if itt goes beyoond
control, should
d immediate ely put in pla
ace the on--site emergency plan. Assessmen nt of the sta
age
of emergency
e and the time for intrroduction of
o emergenccy plan are e very important. Tim mely
control of incid
dent and timely action ation of emergency plan can min
n for actua nimise losss of
propperty and fa
atalities.

Eme ergency situations notticed beyon


nd working hours or du uring holida
ays shall be
e managed by
security personnnel as perr the organiisation charrt of the company. However, any y such incident
shall immediattely be repo
orted to the
e concerned d authority for
f all nece essary help to control the
situation.

DEC
CLARATION FOR ACT
TUATION OF
O OFFSIT
TE EMERGE
ENCY PLAN
N

Whe en an emerrgency cond dition becomes grave and Incidennt Controlle


er feels thatt evacuation
n is
neccessary, hee should immmediately seek help p of Districct Disaster Managem ment Authorrity.
Intim uld also be passed on to
mation shou t the Facto
ory Inspecto
orate and other Statutoory Authoritie

25 RMINATION
TER N OF EMER
RGENCY

Terrmination activities
a iss aimed at giving ac
ccurate infformation to people who need
d it
mosst, and beg
gin as soon n as the em
mergency phase of the operatioon is comp
pleted.

Thee terminatio
on of emergency is declared
d th
hrough sire en as per tthe Siren Code
C defin
ned
by industry in
n case of Level- I & II. For Le
evel-III, termination of emerge ency shall be
decclared by District
D Auth
hority

26 EME
ERGENCY RECOVER
RY PROCED
DURE

Actiion plan for restoratio


on of servicces shall be
e prepared after termination of emergency
e by
Disaaster Manaagement Te eam. The te eam, whichh will prepare re-entry & restoratio
on action plan
p
shall be heade ed by a senior techniccal person and shall be b working in close in nteraction with
w
eration and maintenanc
ope m ce staff of th
he shift.

 
© Copyright MECON Limited – All rights reserve
ed Page 62
2 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

All necessary
n p
personal sa
afety protection shall be taken by the team a
at the time of
o re-entry and
a
resttoration of services.
s Fo
ollowing con
nsiderationss have to be
e made by the team beefore re-entrry:

 Inspection of the affeccted area.


 Bring to the e knowledge of the peo ople that em mergency has
h been co oncluded an nd it is safe to
work for resstoration an nd resumption of servic ce.
 Notify emplloyees to re eport for woork after care eful scrutinyy of their skkill & experie
ence.
 Initiation off an investig
gation into th
he causes of o the emerrgency.
 Assessmen nt of the daamage to the t facility and
a preparration of lisst of items that would be
necessary to restore th he system.
 Transfer off necessary operations to alternative locationss, if required and feasible.
 Clearing up p & restoration of site.
 Restoration n of servicess.

Piipeline Faillure Investigation


Faailure invesstigating shall be undeertaken by a team com mprising members tra ained in failure
investigationss. The teamm shall record all inform
mation relate e and analyse the reasson.
ed to failure
Thhe team sh hall also make
m detaile
ed assessm ment of da amage caussed to the property and a
ennvironment..

Thhe outcomee of the re


eport shall be the bas
sis for furth
her training of the staff to minim
mise
ecurrence off such emergencies
re

27 ERD
DMP FOR ROAD
R TRA
ANSPORTA
ATION

Stanndard operrating pracctice (SOP)) shall be followed fo or manage ement of LCV


L Transp
port
Acccidents. Pre
e-designated d transportt routes shall be follow
wed for tra
ansportation
n of cascad
des
from
m the storag
ge site to the delivery point.
p

es and resp
Role ponsibilitiess of consign
nor, consign
nee, transpo ers and autthority shall be
orters, drive
as specified
s in operating practice.
p

Onlyy authorise ed persons & agenciess shall be engaged


e fo
or the opera
ation and th
hey should be
periiodically tra
ained. A neetwork of communicat
c tion shall be
b establishhed for quic
ck emergenncy
meddical service es and hosp
pitalisation for
f accidentts on highw
ways.

egration off ERDMP with


Inte w NDMP

Thiss ERDMP document has h been developed


d all possible inputs on the
taking into account a
ake holders. Efforts ha
subjjects from various sta ave also beeen made tto synergize e this with the
doccument on Disaster managemen
m nt guide (CChemical Disaster)
D ndustrial brrought out by
in
Nati
tional Disaster Manageement Authoority.

For the purp pose of specialized d response e to a threatening


t disaster situation or
disa
asters/emerrgencies bo oth natural and man nmade succh as thosse of CBR RN (chemiccal,
biological, radiological and
d nuclear) origin,
o the DM
D Act, 200 05 has man
ndated the constitution
n of
a NDRF. The following
f ba
attalions are
e made resp ponsible for CBRN disa
asters:

- Koolkata Batta
alion
- Arrakkonam battalion
 
© Copyright MECON Limited – All rights reserve
ed Page 63
3 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

- Pu
une Battalio
on
- Gh
haziabad Ba attalion
In th
he support of
o NDRF, SDRF
S are th
he available
e forces at state
s level. IIn some cas
ses SDRF has
h
not been createed.

ese battalio
The ons are eq quipped to handle all types of the chemiccal emerge encies. The ese
batttalions are trained
t at various place eams should be called for
es. In emerrgency thesse nearby te
help
p as per Tab ble
Ta
able

 
© Copyright MECON Limited – All rights reserve
ed Page 64
4 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Contactt Details off NDRF is as below


Name Designation Ad
ddress Teleph
hone No. Fax No. E-Mail

Directorate General,
G NDRF
F,
Shri Sanjay Antyodaaya Bhawan,
Kumar 011-2436
69278, 011-
Director General B-2 Wing, 9th
9 floor , CGO
O 011-24363261
1 [email protected]
243
369280
(IPS) Complex, Loodhi Road, New
w
Delhi- 110003

Shri Ravi
Joseph Lokku Inspectorr General -- Do -- 011-24363268 011-24363261
1 [email protected]
(IPS)

-- Financial Advisior -- Do -- 011-26160366 011-24363261


1 --

Shri. J. K. S. Deputy Inspe


ector General dig.ndrf@n
nic.i
-- Do -- 011-24363267 011-24363261
1
Rawat (AD
DM) n

Deputy Inspeector General A-Wing, Second


S Floor
Shri Sudhir Lok Nayyak Bhawan dig.es.ndrf@
@ni
(Proc & Commn)/ (Central 011-24611518 011-24611519
9
Kumar Singh c.in
Secctor) Khan
n Market
New De elhi-110003
Directorate General,
G NDRF F,
Deputy Inspeector General
Shri Randeep Antyodaya Bh hawan, B-2 Wing, dig.ns.ndrf@
@ni
(Ops) / (East /North East 011-24363266 011-24363261
1
Kumar Rana 9th floor , CGO
O Complex, Lo odhi c.in
Secctor)
Road, New w Delhi- 1100033

A
A-Wing, Secon
nd Floor Lok Na
ayak
Deputy Inspe
ector General dig.ss.ndrf@
@ni
S K K Singh
Shri B
Bhawan Khan Market New Deelhi- 011-24654994 011-24611519
9
(Trg/Soutth Sector) c.in
11
10003

Directorate Geeneral , NDRF,B-


Seco ond in Blo
ock, 9th keshavkum
mar1
Shri Keshav
Command (Staff
( Officer F
Floor, Antyodaya Bhawan, CGO
C 011-24363265 011-24363261
1 28
Kumar
of DG)
D Complex, Loodhi Road, Neww @rediffmail.co
Delhii-110003 m

A-Wing, Second Floor Lok Na


A ayak
Shri Rajesh Second in Command rajeshnegi3
30s
B
Bhawan Khan Market New Delhi- 011-24656932 011-24611519
9
Negi (Trrg.) @gmail.coom
1
110003

Shri Ashish Second in Command


---Do-- 011-24656
6932 - -
Sharma (Prrov)

A-Wing, Secon
A nd Floor Lok Na
ayak
Shri Muneesh Deputy Co
ommandant dcproccell-
B
Bhawan Khan Market New Deelhi- 011-24611518 011-24363261
1
Kumar (PROOC) [email protected] n
11
10003

Directorate General,
G NDRFF,
Shri Rakesh Deputy Co
ommandant Antyodaya Bh hawan, B-2 Wing, rakeshr76@ @re
011-24363
3263 011-24363261
1
Ranjan (OPS) 9th floor , CGO
O Complex, Loodhi diffmail.com
m
Road, New w Delhi- 110003
3

A-Wing,
A S
Second Floor
F
Shri Ritesh Deputy Coommandant L
Lok Nayyak Bha
awan dcrd-
011-24629279 011-24363261
1
Dwivedi (R&
&D) K
Khan Ma
arket [email protected]
N
New Delhi-1100
003

A-Wing, Secon
A nd Floor Lok Na
ayak
Shri Anil
AC(Tra
aining) B
Bhawan Khan Market New Deelhi- 011-24611518 011-24363261
1 -
Shekhawat
11
10003

Shri Krishan krishan.04


405
AC (IT
T/PRO) ---Do-- 011-24363263 011-24363261
1
Kumar @gov.in
n

 
© Copyright MECON Limited – All rights reserve
ed Page 65
5 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

Name Designation Ad
ddress Teleph
hone No. Fax No. E-Mail

Shri M
AC(JJAO) ---Do-- 011-24362164 011-24363261
1 ac.hq.ndrf@
@ni
Natarajan
c.in

Shri Bhawani dc.adm.ndrrf@


Singh AC(A
ADM) ---Do-- 011-24363263 011-24363261
1
nic.in
A-Wing, Second
S Floor
Shri P K
AC (NCD
DC/PROC) Lok Nayyak Bhawan
Sharma 011-24629279 011-24363261
1 -
Khann Market
New De elhi-110003

Directorate General,
G NDRFF,
Antyodaya Bh hawan, B-2 Winng,
Control Room -
-- 011-24363260 011-24363261
1 [email protected]
9th floor , CGO
O Complex, Loodhi
Road, New w Delhi- 110003
3

A-Wing, Second
S Floor
Lok Nayyak Bhawan
Exchange -
-- 011-24611518 011-24363261
1 -
Khann Market
New De elhi-110003
Source: We
eb Site of National Disaster Response Fo
orce (Ministry of
o Home affairrs, Govt. of Ind
dia)

28 scellaneous
Mis s.

(1) When never any deviation


d froom this cod de of practiices is requ
uired to be implementted,
the enntity shall seek
s approvval of the Board
B with mitigation
m m
measures proposed
p to be
carrie
ed out givingg full detailss and justific
cation for su
uch deviatio
on.

(2) If anyy dispute ariises with regards to the e interpretation of any of the proviisions of the
ese
regula ations, the decision off the Board d shall be final.
fi Furtheer, the Boarrd may at anya
time effect
e approopriate mod difications in
n these reguulations.

 
© Copyright MECON Limited – All rights reserve
ed Page 66
6 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-1
(Refer Regulatio
on 10.1 (d)))
Eme
ergency Re
esponse an
nd Disaster Managem ment Plan (ERDMP)
Hazzard Identification
Sr.
Check-pointt Yes
s_ No_ Rem
marks
No
Haazard Anallysis & Risk Assessm ment
Which of the following prrocedures or techniques
W s for hazard
d
I
ide
entification has
h been ussed in the te
erminal/ insta
allation :
1) HAZO OP/HAZAN
2) Accide ent Consequuences & Annalysis HAZOP study of the
e
3) Eventt Tree Analyysis installattion has be
een done
4) Fault Tree Analyssis
5) Failure Modes, Efffects & Criticality Analy
ysis
6) Risk Assessment
A t
7) What if, analysis
8) Other accredited practices
Haazard Identification :

Is the termina al / installatiion covered


d under the definition off No
II
Major Accide
“M ent Hazard Installation” as per the Manufacture
M e
Sttorage & Imp port of hazaardous Chem micals Rules s 1989
If yes, whethe er major acccident hazards identified and stepss NA
III
taken for theirr prevention
W
Whether design deficien ncies, failure
es or errors s which can n Yes
IV
coontribute to hazards
h andd cause abn normalities le eading to ann
acccident are identified.
W
What are th he measure es undertakken to cou unter above e Emergency respo
onse plan
n
V
deeficiencies or,
o errors exists
Co onsequence es of a majo or accident on the work kers, peoplee Yes
VI
in the neighbo orhood and the environm ment are considered.
Stteps envisag ged for mitiggation of thee consequen nces of such h Done
VII
acccident.
Do oes the insttallation prodduce / hand dle / use / im
mport / storee Piped natural gas and d
VIII
anny hazardou us chemicalls as define ed under MS SIHC Ruless Compreessed Natuural gas is
s
19989 handled
d and store
ed
If yes, wheth her a list of o these ch hemicals, preferably
p in
n Yes
IX
alphabetical order with their maximum licens sed storage e
quuantities is displayed
d
Arre material safety
s data sheets (MSDS) of these chemicalss Yes
X
arre prepared / obtained d in the pre escribed forrmat as perr
MSIHC Ruless and State Factory
F Rulees
W
Whether a sysstem for disseminating information about these e Yes
XI
MSDS to conccerned workkers are exissting
Arre there a system
s of la
abeling of co ontainers/storage tankss Yes
XII
for these chem micals/hazardous substtances
W
Whether esttimation of maximum possible quantity off N/A
XXIII
eaach hazardo ous substance are con nsidered including anyy
veehicle (TT/T TW) on site or within 50 00 mtrs of th he site.
W
Whether locaation, configuration and condition underu whichh Yes
XIV
the hazardouss substance es are stored & handled d are clearlyy
deeclared
 
© Copyright MECON Limited – All rights reserve
ed Page 67
7 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Sr.
Check-pointt Yes
s_ No_ Rem
marks
No
Vu ulnerability y Analysis :
W
Whether zonnes of influence or vulnerable zones are e Yes
XV esstimated by considering g the maxim mum single e storage off
ha azardous substance & maximum
m losss scenario
W
Whether effects of influe
ence on the e vulnerable e zones are e Yes
XVI made after considerin ng the po opulation, facilities &
en nvironment encompasse
e ed inside thaat zone
Risk Analysis :
W
Whether a relative measure
m o the pro
of obability & Yes
XVII co onsequences of variou us possible hazardous events are e
taken into acccount
W
Whether riskss are calcula
ated by multiplying the probability
p off Yes
XVIII occcurrence of o each eve ent by the consequen nces of thatt
evvent and the en summing up the results.
W
Whether all types of events possiblep in petroleum m NA
insstallations area conside ered includin ng i) storag ge tanks on n
c firre, ii) pool fire [burning pool of liqu uid fuel], iii) Flange jointt
lea akage in pip pelines,
iv)) Fire in TT or o TW gantrry, and v) rupture of hos ses
Risk Reducttion Measu ures :
W
Whether mea asures for reeduction of identified high risks are e Yes
XX inccluded by reducing the consequences th hru’ hazard d
mitigation measures
W
Whether step
ps have bee en considerr to reduce risks to the e Yes
XXI exxposed pop pulation byy increasing safe dis stances byy
accquiring prop perty aroundd the facility, if possible
HA AZOP stud dy
W
Whether the above
a metho od is appliedd if the locattion handless Yes
XXII
more than spe ecified stora
age and /or critical
c opera ation
W
Whether the study sysstematically identifies all possible e Yes
XXIII
de eviations from normal op perations
W
Whether risk levels are established
e for each de eviation afterr Yes
XXIV co onsidering th he probabilitty and consequences of o each such h
evvents
W
Whether poteential meanss for detectiion of such events and d Yes
XXV
prreventive me easures are recommend ded by the study
s

 
© Copyright MECON Limited – All rights reserve
ed Page 68
8 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-2
(Refer Regulatio
on 11.3 (xiii))
Incident Preventio
on Measure
es

Sr. No Check-p point Yes_ No_ Remarks


R
1 Whether Sa afety, Health h and Enviro onment Policy of the loccation is Yes
displayed
2 Whether th he Safety Po olicy is docu umented and d duly appro oved by Yes
the top man nagement
3 Whether the Safety Po olicy is well structured
s to
o cover all ellements Yes
of Safety, Health
H and Environment
E t protection
4 Whether the layout is convenie ent from operation
o & safety Yes
aspects and meets min nimum distance norms as a per OISD D-118
5 Whether a duly constituted Safetty Committe ee is functiooning in Yes
the locationn with repressentation fro om workmen n/staff
6 Whether all unsafe devvelopments & likely risks are deliberated in Yes
the meetin ngs and ap ppropriate steps are recommend ded for
eliminating such risks
7 Whether co ompliance sttatus of reco ommendatio ons of earlierr Safety Yes
Committee meetings are discussed before tak king up new issues.
8 Whether performance & shortcom mings observed during g recent Yes
mock disa aster drills form part of the disc cussions in safety
committee meetings
9 Is the safetty committee e minutes arre recorded & signed byy all the Yes
attending members
m
10 Whether pe eriodical sa afety audits & inspectio ons by intern nal and Yes
external auudit teams arre conducted in defined intervals
11 Whether a system of regularr monitoring of such h audit Yes
compliance es by controlling offices / HO are in place
12 What is th he composiition of extternal audit teams to ensure TP
PIA autho
orized by
impartiality of audit find
dings PNGRB
13 Whether Work
W Permit System in line with OISD-105 havve been Yes
implemente ed
14 Whether work
w permitts are issued for hot work, cold d work, Yes
electrical work
w & vesse el entry jobs
15 Whether th he location-in n-charge rem main the isssuer for all hot
h work Yes
& vessel en ntry permits for enhance ed safety & control
c
16 Whether work
w permitss are duly closed at completion of the Yes
stipulated jo
obs, duly ce ertified by thee supervisin
ng officer
17 Whether heat detecto ors in tank sprinkler sy ystems, hig gh level NA
alarms of tank farm managem ment system m are provvided &
checked for regular fun nctioning
18 Whether in n-built safetyy interlocks provided in n the design n of the Yes
terminal are
a adequa ately speciffied & che ecked for regular
functioning

 
© Copyright MECON Limited – All rights reserve
ed Page 69
9 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-3
[Referr Regulation 12.1(i)]]
MUTUA
AL AID / MO
OCK DRILL
LS
Sr.
C
Check-poin
nt Yes
s_ No_ Rem
marks
No
1 W
Whether mo
ock fire / em
mergency re
esponse drills are held Yes

2 If yes, periodicity of em
mergency response drills Once in
n Year

3 M
Mock drills cover
c all typ
pes of proba
able emerge
encies Yes

4 D
Does the loccation have
e Mutual Aid
d Plan Seek help from district
authoriity

5 If yes, the details


d of other
o memb bers includin
ng names & Seek help from district
ccontact nos. of concernned officialss authoriity

6 List of firefig
L ghting equip
pment availa
able with ea
ach Mutual Availab
ble with dis
strict
A memberrs including District Fire
Aid e Service authoriity

7 Compatibilitty of safetty equipme


C ent of all Mutual Aiid Yes
m
members including District
D Fire
e Servicess with saiid
lo
ocation hass been teste
ed and docu
umented in the DMP
D
Details of water storage
e available with Mutual Aid
8 Installa
ation have
m
member inccluding Distrrict Fire Serrvice and mechanism
m tto firefigh
hting equipment
u
utilize the same
s in the
e said locatiion well documented in i availabble and see
ek help
the DMP from loocal authorrity in
case off emergenc cy

9 Details of firefighting foams concentrate/chemicals Availab


D ble with loc
cal fire
a
available with Mutual Aid
A memberrs including nearest Firre brigade
e.
S
Service hass been incorrporated.

10 Details of le
D ead time forr response of Mutual Aid
A memberrs Yes
including District Fire Service haas been doccumented in
i
the DMP
Periodicity of
P o safety tra
aining as pe
er OISD-1544 for officerss,
11 ng has been
Trainin n
s
staff, contra
actor workerrs, TT crew and securiity personneel
imparteed at regular
m
mentioned in the DMP
interva
als

M
Mutual Aid Plans

12 D
Does the loccation have
e established Mutual Aiid Plans Seek help from District
authoriity
W
Which are th
he Mutual Aid
A Team members
m & the
t
13 Seek help from District
a
assistance o
offered authoriity

 
© Copyright MECON Limited – All rights reserve
ed Page 70
0 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Sr.
C
Check-poin
nt Yes
s_ No_ Rem
marks
No
14 Does the pllan clearly indicate typ
D pes of poss
sible hazard
ds Yes
a firefightting measurres required
and d

15 Does the plan


D p include
e expected assistance
e from eacch Yes
m
members

16 Does the Plan spell ou


D ut the comm
munication protocol an
nd Yes
the channels in times of
o emergenccy

17 Periodic jo
P oint exerccise & meetings
m fo
or practicee, Yes
f
familiarizatio
on and ideentifying & resolving compatibilitty
isssues.

 
© Copyright MECON Limited – All rights reserve
ed Page 71
1 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-4
(Refe
er Regulattion 13.0)
ERD
DMP Respo
onse Measures/Infras
structure

Sr. No Chec
ck-point Yes_ No_
_ Remarks

Zones, maps & la


ayouts

1 Does the Location n have Eme


ergency Zones clearly identified Ye
es
for acccident prone
e areas
Ye
es
2 Do thee Maps indicate locaation of Em
mergency Assembly
A
Points and Emergency Contrrol Rooms
Ye
es
3 Is the process
p Layy-out promin
nently displayed
Ye
es
4 Does the
t P&I Dia
agram inclu ude emerge ency controol valves,
shutdown system, isolation valves,
v important control valves
etc.

5 Does th
he Fire Hyd
drant Layout conspicuo
ously displayyed. N/A

Manpo
ower
Ye
es
1 Is the Fire
F Organo
ogram clearrly displayed
d?
Ye
es
2 Does the
t Organoogram include all dutie
es to be attended in
connecction with an
n emergenccy
Ye
es
3 Is the organogram
o m include ke
ey personne
el by their names
n or,
work poosition
Ye
es
4 Does iti have thee alternate coverage to take ca are of the
absencce of a partiicular perso
on [ in cases
s where org
ganogram
is deve
eloped basiss names]
Ye
es
5 Does it include assignment of all key coordinator
c rs viz. the
Inciden
nt Controller, Administration & Comm munication
Controller & Safetty Coordinattor?

Emerg
gency Conttrol Centre
Ye
es
1 Does the ECC well define
ed & clea
arly marked
d on the
displayyed layout
Ye
es
2 Is it strategically positioned to be outs
side the periphery of
immediate affected area?
Yes (pagiing & VHF
3 Does the
t centre have adeqquate commmunication channels
NAA)
includin
ng internal & externa ne connections, PA,
al telephon

 
© Copyright MECON Limited – All rights reserve
ed Page 72
2 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Sr. No Chec
ck-point Yes_ No_
_ Remarks
paging &VHF systtems
Ye
es
4 Does a list of keyy personnel & essentia
al telephone
e nos. are
prominently displaayed.
Ye
es
5 Does the
t layout of
o firefightin
ng system, different hazardous
h
zones, Assembly Points are prominently
p y displayed.

Emerg
gency Asse
embly Poin
nts
Ye
es
1 Does the EAPs well defin
ned & clea
arly marked
d on the
displayyed layout
Ye
es
2 Do th he EAPs have prre-defined in-chargess during
emerge encies who keep in tou uch with the
e Emergenccy Control
Centre and Administrative Controllers
C and update
es on the
roll calll on people reporting.

 
© Copyright MECON Limited – All rights reserve
ed Page 73
3 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Check Lis
st-5
Referr regulation
n 14.2.1 (a)
Review and
a Updation of ERDM
MP

Sl. No. Check points Yes


s/No
Ye
es
1 Freque
ency of mocck-drills for practice,
p reffinement & updating.
Ye
es
2 Does thhe records for periodicc Mock drills
s maintained
d in a
well-de
efined forma
at.
Ye
es
3 After each
e drill, whether
w asssembly me eetings invvolving all
staff and
a contraact personnel are conducted
c to share
experieence of the event as also
a to identtify the shortcomings
and sccopes for further improvvement in procedures.
p . Whether
the issu
ues are disccussed & th
he plan moddified suitab
bly.
Ye
es
4 Does thet review ensures effficiency of the plan particularly
w.r.t. re ommunication & coordiination aspe
esponse, co ects.

Ye
es
5 Do thee Mutual AidA memberrs participa ate in the drills and
based on the acctual response & difficulties exp perienced,
correcttive actions initiated forr refinement of the plan
n
Ye
es
6 Does a procedu ure exist in incorporating the findings/
leaning
gs of the acctual disaste
er managem ment handliing, if any
so thatt the plan ca
an be revise
ed accordingly.

 
© Copyright MECON Limited – All rights reserve
ed Page 74
4 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-6
[Refer Regulatio
on 17.0 (5))]
Availab
bility of re
esources
s [internall / externa
al]
Sl.
Check-point Ye
es_ No_ Re
emarks
No.
Details of fire
D efighting equipment of the
e location is
1 Yes
ncorporated in the DMP
in
2 Information ono critical resources like no. of fire hydrants,
h wa
ater Y
Yes (only poortable
monitors, firrefighting pu
m umps, staticc water sto orage, Portaable firefig
ghting equippment are
f
firefighting eq
quipment and d foam syste
ems are incluuded. available
e)

3 A
Available ressources as pe
er Schedule
e-IV Yes

4 Location hass storage of water for 4 hours firefig


L ghting. In ca
ase NA
w
water availab
bility is lesss, a plan forr replacemen
nt from neaarby
s
sources

5 Details of drrainage systtem including


D g Oil Water Separator are NA
a
available in DMP,
D wherevver applicable.

6 R
Requirement
t & availability of Persona
al Protective Equipment Yes

7 Whether man
W npower availlable during regular as well
w as idle shift
s Yes
h
hours includin
ng security personnel
p cle
early indicate
ed in the plan
n

E
External & In
nternal Reso
ources for combating
c Emergency
E

8 Does the pllan enumera


D ate the follo owing resou
urces availaable Yes
in
nternally witth the location as also from exte ernal agenccies
in
ncluding Muttual Aid Mem mbers and go gencies like fire
overnment ag
b
brigade, policce, municipal authorities etc. :
a) Wateer – from stattic reservoir as also mobile water a) NA
tankeers b) NA
b) Fire Hoses
H c) NA
c) Speccialized nozzzles e.g. fog, jet, triple purrpose etc. d) NA
d) Mobiile water mon nitors e) Yes
e) Fire Extinguisher
E rs – type & caapacity f) NA
f) Wateer Gel Blanke ets g) NA
g) Foamm Compound ds h) NA
h) First Aid material, Medicines, Stretchers i) NA
i) Mobiile / fixed ladders j) Yes
j) Vehiccles available
Yes
T
Trained manp
power for co
ombating eme
ergency
Any other
o resourcces considerred necessarry NA
9

 
© Copyright MECON Limited – All rights reserve
ed Page 75
5 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

CHECK LIST-7
(Refer Regulatio
on 26.0 (2)))
ERDMP
P- Recoverry Measure
es

Sl. No Check
k-point Yes_ No_
_ Remarks

Post Eme
ergency Re
ecovery

Salvage of
o product

1 Check thaat spilled / acccumulatedd product co


ontents are Used oil are
a stored
transferred
d to the OW WS or colleccted in drum
ms. in a drum

2 Check whether the quality


q & quuantity estim
mation of th
he product NA
extracted from OWS has been done for further disposal in line
with standding QC gu uidelines by either tra ansferring to
t service
tanks or to efinery for blending / reprocessing or not.
o nearest re

3 Check tha
at correct stock accounting of spilled producct as loss NA
has been completed
c in accountin
ng system.

4 Check tha at affected area has been completely clea


aned and Yes
dried afterr evacuation
n of spilled product.
p

5 Declare th
hat affected area after salvage
s ope
erations is fully
f clean Yes
& safe for movement of the workking personnel.

6 Check thaat all drainss are not having


h any residual oiil and are Yes
thoroughlyy cleaned & dried.

7 Check thaat all contrrol valves on


o product lines & OWS
O lines NA
outside dyke area and drainss are com mpletely clo
osed after
removal off the spilled
d product.

8 Check tha at interlockking system


m of tanks / gantry has
h been NA
reactivated
d for normaal operationss.

9 Check whether the soil testing of


o the affeccted area, iff required, NA
has been done to asssess the soil
s contamination leve el to meet
the Enviro
onmental – SPCB
S normms / requiremments.
Taking ca
are of affec
cted manpo
ower

10 Whether physical
p acccounting off all personn
nel on dutyy during & Yes
after the incident are ascerttained by the Main Incident
Controller and reconcciled immed
diately

11 Whether thhe first-aid treatment


t & post-incide
ent health check
c of Yes
the affecte
ed personne el has beenn undertakenn in time

 
© Copyright MECON Limited – All rights reserve
ed Page 76
6 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
MECO
ON LTD.

Sl. No Check
k-point Yes_ No_
_ Remarks

12 Whether these perso onnel are de


eclared fully
y physicallyy fit before Yes
allowing th
hem to resu
ume their no
ormal dutiess

13 Whether the records for such h first aid & treatment of the Yes
affected pe
ersonnel arre maintaine
ed in a well--defined forrmat
Addressin
ng media & outside bodies
b

14 Whether th
he DMP evvent was apppropriately informed to
o the local Yes
media in line with the respective compan ny’s Press & Media
Policy

15 Whether thet role off neighboriing population during


g the drill Yes
/disaster is suitably informed to the population during
subsequen nt meetingss with local administration / panch
hayat etc.
for necesssary improveements
Whether thhe awareneess & prepa
aredness onn disaster iss regularly
16 Yes
assimilated / shared with nearb
by public / societies and
a stake
holders.
Reporting
g
Check whether that disaster
d inccident report was comm municated
17 Yes
to respective controolling office / HQ on time in a standard
format.
Whether the
t incident reports are
a also se ent to conccern State
18 Yes
Level Indu
ustry Coordiinator on tim
me.
Check thaat detailed report on disaster in n proper format was
19 Yes
communiccated to PNGRB/ Facto ory inspecto
or / Labor in
nspector /
SPCB / District Magisstrate /PESO O.
Investigattion
Whether investigation n teams arre constituteed as per respective
r
20 Yes
company policies
p
Whether RCA (Roo ot Cause Analysis) of the diisaster is
21 Yes
conducted d by the inve
estigating te
eam
Whether detailed an nalysis including effeective functtioning of
22 Yes
interlocks, detection devices, au utomation controls
c & applicable
a
norms are e carried out
o to find out possib ble improve ements in
design / construction / operatiions / maintenance & training
aspects
Whether a system off initiating appropriate
a corrective measures
23 Yes
including suitable revvisions to the
t Disaste
er Managem ment Plan
are adopteed based on n findings of
o the investtigation
Damage Assessmen
A nt – Moneta
ary & Phys
sical
Check the
e valuation / cost of prroduct loss / down gra
adation on
24 Yes
account of
o contamin nation, if any
a / Propperty / Strructures /
damaged assets – eqquipments.

 
© Copyright MECON Limited – All rights reserve
ed Page 77
7 of 82
 
  DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR   
  BPCCL AT RUPNAGAR   
     
DOC. NO
O. MEC/23TT1/ERDMP  
ON LTD.
MECO

Sl. No Check
k-point Yes_ No_
_ Remarks
Whether repairs & maintenancce cost of property, assets &
25 Yes
equipmentt are assesssed.
Whether any penaltty by statu utory autho orities like SPCB /
26 Yes
Factory Inspector and mmissioner are assesse
d labor Com ed.
Whether possible
p impact on environment are
a also asssessed &
27 Yes
appropriatte measuress are taken
Whether damage
d asssessment also
a include
e potential erosion
e of
28 Yes
reputation – from commpany, indu onal perspectives
ustry & natio
Clean up and Restoration
Whether the affected d area has been fully cleaned an nd cleared
29 Yes
after due clearance
c frrom investig
gation team
Check whether heat detectors, high h level alarms,
a in built
b safety
30 Yes
systems (NRV, TSV etc.) are fu ully functionnal after thee disaster
incident.
Check whether all fire efighting eq
quipment lik ke – hoses / nozzles /
31 Yes
Fire Extinnguishers etc.
e have been put back at designated
places andd are fully reeady for reu
use
Whether a clearly deffined steps are in place e to allow re
esumption
32 Yes
of normal operations

29 EPORTING ACCIDENT
RE TS TO PRE
ESS AND MEDIA
M

Newws of the em mergency, injuries


i or casualties
c shall
s be rele
eased to the
e press/media only by an
authhorized officcial. The ne
ews shall be nt Controller at
e based on information gathered ffrom Inciden
site.

Onlyy facts an
nd accurate figures shall be given g durin
ng media briefing and under no
circumstances should hide neous facts for fear of company re
e facts or prrovide erron eputation.

 
© Copyright MECON Limited – All rights reserve
ed Page 78
8 of 82
 
  DISA
ASTER/EMEERGENCY MMANAGEMEENT PLAN FOOR BPCL   
  AT RU
UPNAGAR  
     
DOC. NO.. MEC/23M6/05/25/O
O & M/002, R0  
MECON LTD.

M
MSDS OF NATURAL
N GAS
G
Secction - I: Matterial Identificcation and Use
Maaterial Natural Gas
G
Chemical Name e Natural gas
g
Chemical Identtity Aliphatic Mixture
Tra
ade Name an nd Synonym as Natural Gas
G
Pro
oduct Use Domestic c/ Industrial/ Commercial
Codes / Labels Flammab ble Gas - Claass 2
Hazchem code 2S-E

Secction - II: Hazzardous Ingrredients of material


m

Hazardous Ingrredients Approximmate Concentration


Me
ethane (CH4) 88 - 98 % v/v

Eth
hane (C2H6 ) 2 - 8 % v/v
Oth
her Higher Hydrocarbonss < 2 % v/v
v

Secction - III : Ph
hysical Data
Phyysical State Gas
Appearance Colourlesss
Odour Primarily Odourless
O (B
But Ethyl Merrcaptan (C2H5SH) is adde
ed
for odouris
sation)
Spe
ecific Gravityy 0.55-0.65
Solubility in Wa
ater at 30°C Soluble
pH Not Pertin
nent
Boiling Point - 161.5°C
Me
elting Point - 182.6°C

Secction - IV: Re
eactivity Data
a
Chemical Stabiility Stable
Inccompatibility with
w other su
ubstances Strong Ox
xidisers.
Reactivity and under
u what conditions
c No reactio
on with comm
mon material but may rea
act with
oxidising agent.
a

Secction - V: Fire and Explossion hazard

Fla
ammability Highly Fla
ammable
Meeans of Extinction CO2, DCPP Type Fire Extinguisher
E & Water Sprray.
Speecial Proced dures Keep spra
aying water to
o cool
Upper Explosivve Limit (UELL) 15 % Volu
ume of Gas in Air
Lowwer Explosivve Limit (LEL) 5 % Volum
me of Gas in Air
Fla
ash Point (UE EL) -222.5°C (CC)
(
Autto-ignition Te
emperature 540°C

 
© Copyright MECON Limited
d – All rights reserved
r Paage 79 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

LAY
YOUT OF ON NLINE CNG STATION 
 
 
 
Storage C
Cascade
 
 
Gas in   
Statio
 
on 
Isolation V 
Value
 
 
 
Gas Compre essors  Priiority 
  C
Car Dispense
er
Paanel 
 
 
 
  C
Car Dispense
er
 
 
 

LAYO
OUT OF MOTHER
M CNG
C STAT
TION
 
 
 
  Storage C
Cascade
 
Gas in   
Statio
 
on 
Isolation V 
Value
 
 
 
Gas Compre essors 
  Priiority  L
LMV Dispensser
  Paanel 
 
 
  H
HMV Dispensser
 
 
Mobile Casscade
  Storage C
Cascade
 
 
 

 
© Copyright MECON Limited
d – All rights reserved
r Paage 80 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

LA
AYOUT OF
F DAUGHT
TER BOOS
STER CNG
G STATION
 
 
 
  Storage C
Cascade
 
 
 
 
 
 
 
Gas Boosster 
  Priiority  L
LMV Dispensser
Compresssors Paanel 
 
 
Statio  
on 
Isolation V 
Value
 
Gas in from LCV 
 
Casscades 
 
 
 
SCHEMATIC GAS FFLOW DIAGRAM OF CITTY GAS DISTRIBUTION N 
 
 
 
  Appliance Vaalve
  To Domesttic 
ONGCC    consumerrs 
  GI Pip
pe above 
  ground (¾” + ½”) 
 
GAIL  Regulator 
 
21/30 mbar 
 
Main Line (CS
  S)  Meeter Isolation 
100 mm 

(
(Pr. 4/6 Kg/Cmm2  Valve 
 
  Transition Fitting
To Commercial user 
  City G
Gate Stn.  D RS  100 ~2000 mbar 
 
  Pressure 4 bar  MDDPE Line 
  180 tto 20 mm 
 
 
 
© Copyright MECON Limited
d – All rights reserved
r Paage 81 of 822
 
  DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR   
  BPCL AT R
RUPNAGARR   
     
DO
OC. NO. MEC/23T1/ERDMP  
MECON LTD
D.

 
TYPICAL NG INSTA ALLATION IN
NSIDE A DO
OMESTIC KITTCHEN 
 
 
 
 
  Gaas Meter
 
 
  Valvee 
  Valvve

PRV  Flexible Hose
G
GI Pipe 
Gas Appliancee

Valve 
Floor Level

Ad
dopter 
Groun
nd Level

Saddle  PE Pipe

 
© Copyright MECON Limited
d – All rights reserved
r Paage 82 of 822
 

You might also like