D
DISAST
TER/EM
MERGE ENCY MANAG
M GEMENNT PLA
AN
FOR
CNG FACILIITIES OF
O BPCCL AT RUPNA
AGAR
MECON LIM
MITED
(A
A Govt. off India Un
ndertakin
ng)
D
Delhi, India
MECON N P
Prepared b
by Ch
hecked by
Name
N
D
Designatio
on
Signature
S
BPCLL A
Approved b
by
N
Name
D
Designatio
on
S
Signature
26thh March, 20
018
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
CONTE
ENTS
1.0 INT
TRODUCTION
2.0 DE
EFINITION
3.0 APPLICABILIT
TY
4.0 COPE AND INTENT OF
SC F ERDMP
5.0 CLA
ASSIFICAT
TION OF EM
MERGENCIES
‐ ON
N SITE EME
ERGENCY TEAM
T
‐ RE
ESPONSIBIL
LITIES & DUTIES OF DM KEY PE
ERSONNEL
‐ RE
ESPONSIBIL
LITIES & DUTIES OF OUTSIDE AGENCIES
A S
6.0 IMP
PLEMENTA
ATION SCH
HEDULE
7.0 CO
ONSEQUEN
NCE OF DE
EFAULT OR
R NON-COM
MPLIANCE
8.0 RE
EQUIREMEN
NTS UNDE
ER OTHER STATUTES
S
9.0 PR
RE-EMERGE
ENCY PLAN
NNING
10.0 RIS
SK ANALYS
SIS AND RISK ASSES
SSMENT
11.0 EM
MERGENCY
Y MITIGATION MEASU
URES
12.0 EM
MERGENCY
Y PREPARE
EDNESS
13.0 RE
ESPONSE PROCEDUR
P RES AND MEASURES
M S
14.0 EM
MERGENCY
Y ORGANIS
SATION AND RESPON
NSIBILITIES
S
15.0 INF
FRASTRUC
CTURE
16.0 DE
ECLARATIO
ON OF ONS
SITE AND OFFSITE
O EM
MERGENCY
Y
17.0 RE
ESOURCES
S FOR CON
NTROLLING
G EMERGENCY
18.0 DE
EMOGRAPH
HIC INFORM
MATION
19.0 ME
EDICAL FAC
CILITIES
20.0 EV
VACUATION
N
21.0 PUBLIC RELA
ATION AND
D INFORMA
ATION TO PUBLIC
P
22.0 OLES AND RESPONSI
RO R IBILITIES OF
O STAKE HOLDERS
H
23.0 RE
EPORTING OF INCIDE
ENT
24.0 AC
CTION AFTE
ER REPOR
RTING OF IN
NCIDENT
25.0 TERMINATION OF EMER
RGENCY
26.0 EM
MERGENCY
Y RECOVER
RY PROCE
EDURES
27.0 ER
RDMP FOR ROAD TRA
ANSPORTA
ATION
28.0 MIS
SCELLANE
EOUS
© Copyright MECON Limited
d – All rights reserved
r Page
P 2 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Enclo
osure and
a An
nnexu
ure:
MSDS of
o Natural Gas
G
Layout of Daughte
er Booster CNG
C Station
n
Typical NG installa
ation inside a domestic
c kitchen
Cold Work
W Permit (Annexure – I)
Hot Wo
ork Permit (Annexure
( – II)
Electriccal Isolation//Energisatio
on Permit (A
Annexure – III)
Clearan
nce Renewa
al format
Closing
g of Work Pe
ermit
Emerge
ency Action Plan for CN
NG Station
Emerge
ency Action Plan for PN
NG
Emerge
ency Mutual Aid
© Copyright MECON Limited
d – All rights reserved
r Page
P 3 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
1.0 INTRODU
UCTION
Emergenccy Responsse and Dissaster Man nagement Plan is esssential for oil & gass
installation
ns to ensuree that any eventual
e disaster is effe
ectively mannaged to minimise losss
of propertyy and life. M/s.
M Bhara at Petroleum Corpora ation Ltd. ((BPCL) is developing
d g
CNG & City
C Gas Distribution
D Infrastructure in the
e Geographical Area
as (GAs) of
o
Rupnagarr (Punjab) based on PNGRB au uthorization.
Bharat Petroleum
P Corporation Limited envissaged se et up forr creating g
prising of Steel Pip
infrastructture comp peline Nettwork (Priimary Nettwork), PEE
Pipeline Network (SSecondary Network) and GI Piping alongg with Coppper tubing
g
(Tertiary Network)
N in
n Rupnagar Geographical Areass (GAs) to o reach consumers of o
various se egments na amely Auto omobile, Ho ouseholds, Commercia al and Industrial. Thee
infrastructu NG stations of various types
ure shall alsso have CN t like M
Mother Statio
ons, On-line
e
Stations annd Daughte er Booster Stations
S to provide
p Com
mpressed N Natural gas (CNG).
BPCL shall receive Natural by ta apping from GAIL’s pipeline(Bawan na Nangal Pipeline) to
o
make the ciity grid netw
work for Rup
pnagar and adjacent
a are
ea in its GA..
CNG Statio
ons:
© Copyright MECON Limited
d – All rights reserved
r Page
P 4 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
b. Daughtter Stations: Daughter station dis spenses CN NG using m mobile casca ades. These e
mobile cascades ata daughter stations arre replaced when presssure falls an nd pressure
e
deplete
ed mobile cascades
c arre refilled at
a CNG mo other station or at CG GS. There iss
reductio
on in storag
ge pressure at daughte er station witth each succcessive filliing.
c. CNG mother
m station: On linee stations, connected to the pipe eline and ha
aving a high
h
compre ession faciliity. These stations su upply CNG G to both vvehicles annd daughter
stationss (through mobile
m casccades). Theese CNG stations com mprises of compressor
c r,
dispenssers, storag ge cascade es and fac cility for filling the mo
obile cascades. These e
stationss are also classified as Mother Staations.
nstallations
d. PNG in s:
District Regulatoryy Stations (DRS): Thhe gas preessure is reduced to distribution n
pressurre in DRS, for
f transmisssion and su
upply purpooses. The D
DRS is direcctly linked to
o
the main steel pip
peline. Fromm the DRS, takes off the
t Mediumm Density Polyethylene
P e
(MDPE) network. The
T MDPE network of pipes carrie es and distrributes PNG
G right up too
the customer’s pre
emises.
Meter Regulating
R S
Stations (MRS): It com
mprises of re
egulator andd meters for measuring
g
the gass supplied to
o the consuumers. The pressure re egulatory further reduc
ces the PNGG
peline to millibars.
pressurre in the pip
After MRS,
M the supply of natu ural gas is done to ind
dustrial, com
mmercial an
nd domesticc
customers. Pressu ure regulattors are insstalled to regulate thee pressure as per the
e
requirem
ment of cusstomers.
2.0 DEFINITIION
al terminolo
Essentia ogy / Definitions used
d in this do
ocument
In these regulations,
r , unless the
e context oth
herwise req
quires,-
(b) “Boardd” means th he Petroleum m and Natu ural Gas Re oard establlished under
egulatory Bo
sub-secction (1) of section
s 3 off the Act;
(c) “Boilin
ng liquid ex xpanding vapor
v explo
osion (BLE EVE)” mean ns the violennt rupture of
o
a presssure vessel containing saturated liiquid or vap por at a tem
mperature we ell above itss
atmosp pheric boiling point and d the resultin
ng flash eva
aporation o
of a large fra
action of the
e
superhe eated liquid
d which produces a larrge vapor cloudc which burns in th he form of a
large rissing fireballl due to igniition;
© Copyright MECON Limited
d – All rights reserved
r Page
P 5 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
(g) “Disastter manage ement plan““ means a well-coord dinated, commprehensivve responsee
plan to contain losss of life, property, environment and
a provide
e speedy and effective
e
recoverry by makiing the mo ost effective
e use of available
a re
esources in
n case of a
disaster;
(i) “Emerge ency Respoonse Vehiccle (ERV)” means a vehicle v for handling emergencies
e s
having necessary equipment meant for rescue
r and relief opera
ations and ERV
E can be
e
put to use
u within in
nstallation, outside
o of in
nstallation in
ncluding roaad incident;;
(k) “Inciden
nt” means an
a unplanned or uninttended or in ntended evvent having potential to
o
cause damage
d to life,
l property
ty and envirronment;
© Copyright MECON Limited
d – All rights reserved
r Page
P 6 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
(t) “Off-site emergencyy” means an a emergen ncy that takees place in an installattion and the
e
effects of emergen ncy extendss beyond th he premisess or the eme ergency creeated due too
an inciddent, catastrophic inciidents, natu ural calamiti
ties, etc. It no longer remains
r the
e
concern n of the insstallation management
m t alone but also becom mes a conc cern for the
e
generall public livving outside e and to deal with such even ntualities sh
hall be thee
responssibilities of district
d adm
ministration
(u) “Off-sitee emergenccy plan” me eans a respponse plan to t control aand mitigate e the effectss
of cata astrophic incidents
i in
n above ground
g insstallation (AAGI) or underground
u d
installattions (UGI) or road tra
ansportationn. This plan n shall be pprepared by y the districct
adminisstration bassed on the data provid ded by the installation n(s), to mak ke the mosst
effectivve use of coombined ressources, i.e.. internal ass well as exxternal to minimize
m losss
of life, property,
p en
nvironment and to restoore facilitiess at the earlliest;
(z) “Risk assessment”” means the quantitatiive evaluati tion of the llikelihood of
o undesired
d
events and the like
elihood of harm or dammage being caused by tthem, togetther with the e
value ju
udgments made
m conceerning the siignificance of
o the resullts;
(ab) “Site in
ncident con
ntroller” mea
ans the pers oes to the sccene of the emergencyy
son who go
and sup pervises the
e actions necessary too overcome
e the emerg gency at thee site of the
e
incident;
(ac) “Spill”” means an n unintendeed release or discharrge of hydrrocarbon orr any other
dangero ous liquid in
nto the enviironment;
© Copyright MECON Limited
d – All rights reserved
r Page
P 7 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
3.0 APPLICA
ABILITY
These reg
gulations ap
pply to:-
ERDMP P outlines on
o site emerrgency plann to be deveeloped for oil & gas insttallations ass
per the
e requirements of Th he Factoriees Act 194 48 (Amendment 1987 7) and The e
Environ
nment (Protection) Act, 1986 to miinimise a ga
as emergen ncy incidentt.
The ER
RDMP reporrt has been prepared to
o cover the proposed installations
s of BPCL.
© Copyright MECON Limited
d – All rights reserved
r Page
P 8 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
5.0 CLASSIF
FICATION OF
O EMERG
GENCIES
Level 1
This leve
el of emerge ency arisess out of an incident, wh hich can be e safely and
d effectivelyy
contained
d by using field
f resourcces.
The incid
dent is restrricted within
n the installation and iss not likely to pose da
anger to life
e,
property and
a environ nment.
Level 2
Level 2 emergencie
e es may not be possiblle to contaiin using fie
eld resource
es and mayy
require exxternal help
p.
There is possibility of
o danger to
o life, prope
erty and envvironment b
both within and outside
e
the installation.
Level 3
The incid
dent will ha
ave implicattion on tech ects of the installation, public life
hnical aspe e,
personneel and mediaa
Emerge
ency Scena
ario Threatss
Fatalityy, Serious in
njury or illne
ess
Medical
Cardiacc Problem
Fire an nd Explosion n
Structu ural failure
Operational Pipeline leakage o or rupture
Sabota age, pilfera age or terrorist
t
activityy
Flood
Natural Disaster Cyclone
Earthquake
© Copyright MECON Limited
d – All rights reserved
r Page
P 9 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Chemiccal/oil spill
Environme
ental Gas release
Atmosppheric emisssions
Bomb Threat
T
Security Sabota
age/terroristt activity
Kidnap
p & Ransom m
6.0 IMPLEME
ENTATION
N SCHEDUL
LE
ong Deliveryy Items should be tied up with mutual aid organizations, in case of any
* Lo a delay,
© Copyright MECON Limited
d – All rights reserved
r Paage 10 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
7.0 CONSEQ
QUENCE OF DEFAUL
LT OR NON-COMPLIA
ANCE
iii) In case
e of any de eviation or shortfall, in achievin
ng the reco
ommended d standardss
the enttities are liable to penal provisions underr the provissions of the technica
al
standaards, speciffications in
ncluding sa afety standards (T4S)).
ivv) Mutual Aid mem mbers not respondin ng to request for a assistance from site
e
inciden
nt controlle
er of the affected
a ins
stallation will
w attract penalty under these
e
regulattions.
v
v) For firsst default in response, the defa
aulting enttity shall ha
ave to sub
bmit written
n
explanation to afffected muttual aid meembers.
v
vi) For the
e second and
a successsive failurre, the deffaulting enttity shall have to payy
the double of thee billed am
mount of expenses in ncurred byy affected mutual aidd
membe ers in case
e of any evventuality occurs
o in the premisees of affeccted mutua
al
aid meembers.
8.0 REQUIRE
EMENTS UNDER
U OTH
HER STATU
UES
The follow
wing statuto
ory rules, re
egulations and
a Acts are
e compiled a
at the installlations:
• Thee Environmment (Protecction) Act, 1986 (ame ended 1991 1) and follo
owing Ruless
the
ere under:
• Thee Environment (Protecction) Rules,, 1986 (ame ended 20044).
• Thee Manufactture, Storag ge and Immport of Ha azardous C Chemicals Rules,
R 19899
(am
mended-199 94 and 2004 4).
• Thee Hazardou us Wastes (Managem ment and Handling)
H R
Rules, 1989 9 (amendedd
20000 and 2003 3).
• Thee Environment Impact Assessmen nt Notificatio
on, 2006.
• Thee Chemicall Accidentss (Emergen ncy Planning, Preparedness and Response))
Rulles, 1996.
• Bio
o-medical Wastes
W (Man a Handling) Rules. 1989.
nagement and
• Thee Factories Act, 1948 (amended
( 1987).
1
• Sta
ate Factory Rules.
• Thee Inflammab ble Substan nces Act, 19952.
• Thee Motor Veh hicles Act, 1988
1 (amen nded 2001)..
• Thee Central Motor
M Vehiclles Rules, 1989
1 (amended 2005).
• Thee Public Lia
ability Insura
ance Rules,, 1991 (ame ended 1992 2).
• Thee Public Lia
ability Insura
ance Rules,, 1991 (ame ended 1993 3).
• Thee Petroleumm Act, 1934.
• Thee Petroleumm Rules, 2002.
© Copyright MECON Limited
d – All rights reserved
r Paage 11 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
• The
e Insecticid
de Rules, 19
968 (amend ded 2000).
• The
e Insecticid
de Rules, 19
971 (amend ded 1999).
• The
e National Environmen
E nt Tribunal Act,
A 1995.
• The
e Explosivees Act, 1884
4 (amended d till 1983).
• The
e Gas Cylinnder Rules, 2004.
• The
e Static andd Mobile Pre
essure Vessels (Unfire ed) Rules, 1
1981 (amended 2002).
• The
e Explosivees Rules, 19
983 (amend ded 2002).
9.0 PRE-EME
ERGENCY PLANNING
G
Hazard Ide
entification
n
1) The firsst step towa
ards ERDM
MP shall be to
t identify potential
p on
n-site & off-s
site hazardss
such as gas leakk, spills, fire
e, explosion n, transporrtation incid
dent, pipelin
ne rupturess,
equipm
ment failure, natural callamities, etcc. and the types
ty of dammage cause ed by them
m.
The hazzard identifi
fication shalll include,
a) Infformation to
o toxicologiccal, physicall and chemiical propertties of the substances
beiing handledd in the form
mat of MSDS S
b) ide
entification of
o potential impact on downwind
d a quality orr downstrea
air am water
quality from ann incidentall release an
nd possible danger to h
human, flora
a, fauna &
aniimal health;;
c) Ha
azards to thee installatio
on shall also
o include Na
atural perils such as flo
oods,
earrthquakes, cyclones orr landslides s etc.
d) Ch
heck points for hazard identificatio
i on are given
n at Check liist-1
Leakag
ge of Natura
al Gas
Leakag
ge of odoran
nt
Fire
Fire
The fire is a process of o burning that
t produc
ces heat, lig
ght and ofte
en smokes and flamess.
The effect of fire on the people e takes the
e form of skin burn du ue to the exposure
e to
o
thermal raddiation. Thee severity of the burns depends upon
u the inttensity of th
he heat andd
exposure time.
t In geeneral term ms, the skin
n withstand ds heat en nergy of 10 0 kw/m2 for
approximattely 5 seconds and that of 30 kw w/m2 for 0.44 seconds b before pain is felt. Fire
e
can take seeveral differrent form i.e
e.
© Copyright MECON Limited
d – All rights reserved
r Paage 12 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
1 Flash Fiire:
1.
A flash fire
e occurs when
w a clou
ud of flammmable gas and air is ignited. Th he speed of
o
burning is function off the concentration of the flammaable compo onent in the
e cloud and
d
also the wind speed. Within
W a few
w second of ignition the flame sprreads both upwind and
d
downwind of the ignittion source es typical flame propaagation spe
eeds are the orders of
o
4m/sec. Thhe flame velocity and dispersion in
ncreases with wind speeed.
2 Jet Fire:
2.
3. Pool Firre:
3
A pool fire occurs on ignition of an
a accumulation of liqu uid as a pool on the ground or on n
water or otther liquid. A steadily burning fire is rapidlyy achieved as the flam
me vapor to o
sustain thee fire is prrovided by evaporatio on of liquidd by heat from the flames.
f The e
maximum burning
b rate
e is function
n of the net heat of com
mbustion and heat reqquired for itss
vaporization.
Fire damage occurs more freq quently than n losses byb explosion but the damage iss
generally le es are less dangerous to human life that flas
ess extensivve. Pool fire shes fire bu
ut
their longer duration’ss results in greater strructural dam
mages. The e jet fires mainly
m affecct
the mechanical prope erties of thee structuress. Material of construcction loses mechanica al
strengths when
w exposed to high temperature
t es.
Explosion
The explossion mainly occurs duee to the rapid combusstion of a fflammable material
m but
can be bro ought abouut the chem
mical reactions other than comb bustion, pro
ovided theyy
release large amount of energy. Examples of these reactions arre polymerizations, the e
decomposition of unstable substa
ances and exothermic
e interactionss of many kiinds.
Vapor Clou
ud Explosion:
© Copyright MECON Limited
d – All rights reserved
r Paage 13 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Calorific value
v 86 m3
600 KCal/Nm
Molecular weight 16
6.3
Explosivee Range 5.3
3 to 14%
Auto-ignittion Temperature 53
35 Deg.C
3
TLV 3 Mg/m
M
The degree
e of fire and
d explosion hazards off natural ga
as is high, m
mainly for th
he following
g
reasons:
Odorizing Unit
1. ant Leakage
Odora e from flang
ges valves etc.
e
2. Malfun
nction of system leadin
ng to non-injection.
Potentiaal on-site ha
azard of CG
GD network k include occcasional lea aks, and ex
xplosions. In n
case off non-injectiion of odora
ant the leak
kage of nattural gas will not be de etected and d
vapor cloud
c may beb formed leading
l to explosion
e iff it finds any source off ignition. In
n
the indiividual housses and smmall businessses, intern
nal leaks may cause lo ow intensityy
explosioons with so ome damag ge to the structures
s a
and minor to moderatee injuries to o
people inside. De eadly explossions may occur if siignificant amount of gas g collectss
inside.
Natural gas heatinng systemss are known n to cause carbon mo onoxide deaths. Whenn
such syystem malfu
unctions, it produces carbon monooxide. With no fumes or
o smoke too
give a warning, people
p insid phyxiated. Carbon Mo
de get asp onoxide de
etectors can
n
preventt such occurrences.
© Copyright MECON Limited
d – All rights reserved
r Paage 14 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Materia
al Safety Data
D Sheett for natura d Odorant have been prepared
al gas and d
Annexuure-1.
Identifiication of Possible
P Em
mergency Situations
S
Therefo
ore lookingg to the hazard pote ential associated with
h the insta
allation and
d
complying with reg
gulatory obliigations, HA
AZOP studyy has been conducted.
The HA
AZOP studyy for the insttallations un
nder Pilot Project
P Decompression Facilityy
i.e. D
& Daug
ghter Booste
er CNG Sta ation has be een carried out.
o
0
10.0 RISK ANALYSIS
A A
AND RISK ASSESSM
MENT
© Copyright MECON Limited
d – All rights reserved
r Paage 15 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
(c) Evaluate th
he consequences of suuch occurre
ences based
d on scenarrios such ass
most probaable and wo
orst case ev
vents.
(e) After assesssing the rissk, the "Maaximum Tollerable Crite erion" mustt be defined
d
and above which the risk shall be b regarded d as intolerrable. Whattever be thee
benefit leve
el must be reduced
r bellow this leve
el.
Note- a rissk of 10 pe
er million pe 1 -5 /Year, effectively
er year, or 10 e m
means that any person n
standing at
a a point off this risk would
w have a 1 I 10000 00 chance o of being fattality injured
d
per year.
10.1
1 PHASES OF DISAS
STER
Warning Phase
© Copyright MECON Limited
d – All rights reserved
r Paage 16 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Occurren
nce Phase
Relief Phase
Relief Ph
hase is meaant to put in
n place relief operation with or w
without external agencyy
dependinng upon the magnitude of disasterr.
Rehabilita
ation Phase
e
10.2
2 CAUSES
S OF DISAS
STER
In additio
on to CNG Stations, BPCL
B havee also laid network off pipelines to transporrt
piped nattural gas (P
PNG) to dom
mestic and industrial co
onsumers.
CNG is available
a om the Cityy Gate Stattion of GAIL (India) Limited located at NFL
fro L.
BPCL dra aws gas fro om the abo ove stations (after me
etering and custody trransfer) and
d
transporte
ed to variouus CNG Sta
ations and PNG
P networrk through C
CS pipelines
s.
The posssible accideent scenarios on acc count of gaas leakage and explo
osion during
g
ation and dispensing of
transporta o gas are id
dentified as::
© Copyright MECON Limited
d – All rights reserved
r Paage 17 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
Due to stringent qu
uality requirrements in the
t design, procureme ent (of key equipment
e &
accessoories) and construction it is ensu ured that noo failure takke place unnder normaal
ng condition. It is repo
operatin orted that frequency
f o leakage o
of of gas is very minimaal
unless caused by accidental
a d
digging, fau
ulty maintenance and in nappropriatee operation.
10.3
3 POSSIB
BLE DISAS
STERS DUE
E TO GAS LEAKAGE
L
If, howe
ever, safetyy disc gets ruptured
r atches fire it may caus
and vehicle ca se extensive
e
fire com
mpletely burrning the ve
ehicle and damaging eq quipment w within the sta
ation.
City gaas pipe piiping netwo ork leading
g to dome estic, comm mercial and d industria
al
consum mers mostlyy consist of PE Pipes and
a has the e risk of third party daamage. Gass
leakagee caused du ue to such damages
d m result into gas fire.
may
10.4
4 CONSE
EQUENCES
S
© Copyright MECON Limited
d – All rights reserved
r Paage 18 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
CO
ONSEQUENCE ANA
ALYSIS TYPICAL TE
EMPLATE RESULTS
S
(In
n the initia
al Phase, Conseque
C ence Analy
ysis, only
y For Dome estic Connection -
Loow Pressure & that for
f CNG Station
S shaall remain relevant)
Hig
gh Pressu
ure Line Section- La
arge Leak
High pressurre line section leakage –Large Leak
Vertical Sectio
on through Origin
40
35
He
eat Flux
30
4.5 kW/m2
25 12.5 kW/m2
37.4 kW/m2
20 Unused
Unused
15 Unused
FLAME
10
5
Dow
wn Wind
0 3 m/s
-20 -15 -10 -5 0 5 10 15 20
© Copyright MECON Limited
d – All rights reserved
r Paage 19 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
H
High Pressu
ure Line Se
ection – Sm
mall Leak
High pressure
e line section leakage –Smalll Leak
V
Vertical Section
n through Origiin
40
35
Heat Flux
30
4
4.5 kW/m2
25 12.5 kW/m2
1
37.4 kW/m2
3
20 U
Unused
U
Unused
15 U
Unused
F
FLAME
10
5
Down Wind
0 3m
m/s
-20 -1
15 -10 -5 0 5 10
0 15 20
Lo
ow Pressure Line Se
ection – Small Leak
k
lo
ow pressure lin
ne section leak
kage –Small Le
eak
V
Vertical Section
n through Origiin
20
18
Heat Flux
16
14
4
4.5 kW/m2
12 12.5 kW/m2
1
37.4 kW/m2
3
10 U
Unused
U
Unused
8
U
Unused
6 F
FLAME
2 Down Wind
0 3m
m/s
-10 -8 -6 -4 -2 0 2 4 6 8 10
© Copyright MECON Limited
d – All rights reserved
r Paage 20 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
11.0
0 EMERGE
ENCY MITIG
GATION ME
EASURES
After dete
ermining th
he risk leve
el, the follow
wing actions shall be taken for mitigation
m o
of
emergenccy:-
11.1
1 BASIC REQUIREME
ENT OF ER
RDMP
11.2
2 RESOUR
RCE MOBIL
LISATION
Resourcee mobilisatio
on shall incclude manpower requirrement, fire e fighting apppliances or
equipmennt, safety equipment,
e communic port, list of emergencyy
cation facilitties, transp
drugs and
d appliancees, etc. (Sch
hedule-IV).
11.3
3 THE INCIDENT PRE
EVENTION MEASURE
ES AND PR
ROCEDURE
ES
Incident preventing
p dures at insstallation or locations include the
measures and proced e
following::-
i) Safetyy, Health an
nd Environm ment Policy y
ii) Propeer layout and inter facility distance
es.
iii) Safetyy Committeees.
iv) Safetyy Audits and Inspections.
v) Work permit systtem.
vi) Fire protection
p and HSE Ma anagement system in place.
p
0 EMERGE
12.0 ENCY PREP
PAREDNES
SS
11.1
1 EMERGE
ENCY SKIL
LL TRAININ
NG
Emergency Skill Tra aining shall be imparted d to all the staff at the time of the
eir induction
n.
Periodic refresher’s
r courses, wo orkshops sh hall be orgaanised to keeep them ab breast of thee
entire sysstem from th
heir techniccalities, operation, mainntenance an nd hazards involved.
© Copyright MECON Limited
d – All rights reserved
r Paage 21 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
These tra
aining coursses shall cover:
Cha aracteristicss of CNG, highlighting hazard
h invo olved in han ndling the medium.
m
Ope erational proocedures & practices including fam miliarisation
n of the equ
uipment.
All types
t of maaintenance activities
a of the facilities
Eme ergency situ uations, the eir implicatio
ons and shu utdown requ uirement.
Detection of CN NG leak and need for immediate
i a effectivve isolation.
and
Acccounting of product
p to detect
d leakaage or pilferrage.
Han nds on expe erience on operation
o off equipmentt
Safeety regulatio ons and acccident preve ention
Fire
e fighting faccilities, methods of fire fighting an nd their maiintenance.
Evaacuation and d safe egress of the ve ehicles
Safeety in transportation off CNG throu ugh Cascad des.
Maintenance of o medical aida facility
Hou usekeeping, maintenan nce of signa age, area illumination e etc.
Eme ergency pla an
© Copyright MECON Limited
d – All rights reserved
r Paage 22 of 822
DISASTER/EMERGENCY MANAGEMENT PLAN FOR
BPCL AT RUPNAGAR
Keep the areas around all gas appliances and equipment clean and unblocked to
permit proper airflow.
Follow manufacturer instructions for the care and use of gas appliances and
equipment.
Look for the blue flame. If pilot lights and burners have a steady, blue flame, they
are operating correctly. (Decorative gas fire logs are the only exception; their
flame is usually yellow.)
Make sure there is at least one multipurpose fire extinguisher in your home.
Business owners should follow local fire code regulations.
Review natural gas safety regularly with ALL family members and/or employees.
Include your natural gas company's emergency contact information on your list of
important phone numbers (e.g. fire, police, physicians, etc.) and/or in your
company manual.
DON'TS
Ever let children play with or near natural gas appliances or pipes, even the
knobs on the oven or stovetop.
Use your stove or oven for anything other than cooking (for instance, to heat your
home), under any circumstances.
Move or install a gas appliance or change the connector in any way without
professional assistance.
Use a space heater UNTIL you are sure it has been vented properly. If using a
vent-free heater, make sure the automatic cut-off switch is operational.
In case of
o gas leakage following
g procedure
e shall be fo
ollowed:
If Gas Su
upply can no
ot be stoppe
ed
Inform
m Area conttrol room an nd Area Marketing Officer
Inform
m (Fire & Sa afety) In-chaarge
Inform
m Rupnagarr Fire Servicce, Rupnag gar Police and Ambulan nce (in case
e of injury).
Placee “DANGER R” board and d barricade the area.
Assist Rupnagarr Fire Servicce & Rupna agar Police.
Put poositive Isola
ation after closing
c the valve
v and taag on the eq
quipment.
Arrange for repair & Mainten nance of thee Equipmen nt.
Carryy out Leak check.
c
Do noot start the station
s unleess clearancce is obtaine
ed from the
e Control Rooom.
Submmit Accident Report to fire
f & safety y departmen nt.
In case of
o Fire/Explo
osion
Stop Dispensing at all Dispe ensers
Stop all
a compresssors.
Isolatte gas suppply - Close suction va alve, Isolatee storage ca
ascade, Iso
olate mobile
e
cascaade.
Cut off power supply.
Use appropriate
a extinguisheer to extingu
uish fire.
Inform
m Area conttrol room an nd Marketinng Officer.
Inform
m (Fire & Saafety) In-chaarge
Simulltaneously inform - Rupnagar
R Fire
F Servicee, Rupnaga ar Police & Rupnagar
Ambu ulance (in ca
ase of injuryy)
Remo ove all vehhicles out ofo station and
a restrict entry of u
unauthorize
ed/unwantedd
persoons and vehhicles at stattion.
Placee "DANGER R” board" an nd barricade
e the area.
Assist Rupnagarr Fire Service & Police e and otherr external a
agencies responding at
a
the site.
Ensurre fire is exttinguished
Put poositive Isola
ation after closing
c the valve
v and put tag on th
he equipmennt
Arrange for repair & mainten nance of the
e equipmen nt
Carryy out leak chheck
Do noot start the station
s unle
ess clearancce is obtaine
ed from the
e Control Ro
oom
Submmit accident report to firre & safety department
d t
© Copyright MECON Limited
d – All rights reserved
r Paage 26 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
In case of
o Gas Leakage from Vehicle at CN
NG Station
Stop dispensing
d at all the pooints
If thee leakage is from the e Bus, imm mediately operate
o DCCP under BusB system
m
installed at the dispenser po oint or opera ate DCP exxtinguisher
Try too stop gas leeakage by closing
c he cylinder valves
all th
Do no ot start the engine,
e kee
ep ignition off
o
Remo ove all vehiccles out of station
s by manual
m pushhing only
Push leaking veh hicle to a plaace outside e the station
n
Informm Area conttrol room an nd Marketin ng Officer
Informm (Fire & Sa afety) In-cha arge
Informm (if required) - Rupnagar Firre Service, Rupnagarr Police & Rupnagar
Ambu ulance (in caase of injuryy)
Ensurre no smoking / no flam me /no sparrk near leakking vehicle
Placee "DANGER R” board" an nd barricade e the area
Keep public awa ay from the e leaking vehicle
v andd place DC CP fire extin
nguisher ass
stand by at a saffe distance on upwind direction fro om the vehicle
If stop
ppage of ga as is not po ossible then n allow the release of the same in controlledd
and safe
s mannerr in atmosphere
Assist Rupnagarr Fire Servicce
Do no ot start the station
s unle
ess clearanc ce is obtaineed from the
e Control Ro
oom
Subm mit accident report to Fiire & Safety y Departmen nt
In case of
o Fire in Vehicle at CNG Station
Stop dispensing
d all dispenseers
Stop all
a compresssors
Exting guish fire byy using DCP P extinguishher & DCP under bus ssystem
Informm Area conttrol room an nd Marketin ng Officer
Informm (Fire & Sa afety) In-cha arge
Informm Fire Serviice, Rupnag gar Police and
a Ambula ance (in case of injury)
Remo ove all vehiicles out off station and restrict th he entry of unauthoriz zed personss
and vehicles
v at station
s
If posssible, push the vehicle e out of statiion.
Keep public awa ay from the vehicle
v
Place e "DANGER R” board" an nd barricade e the area
Assist Rupnagarr Fire Servicce & Police
Ensurre fire is exttinguished
Do no ot start the station
s unle
ess clearancce is obtaineed from the
e Control Ro oom
Subm mit accident report to Fiire & Safety y departmen nt
In case of
o Accident in Cascade Mounted Light
L Commercial Vehiccle (LCV):
Stop the
t vehicle to roadside e away fromm fire sourcee and switch
h off ignition
n.
If gass is leaking close
c all iso
olation valve
es.
Use fire extinguissher to extinnguish the fire.
f
Informm transporte er supervisoor/ area conntrol room.
Do no ot allow the public to coome near th he vehicle/ leaking
l gas.
© Copyright MECON Limited
d – All rights reserved
r Paage 27 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
13.2
2 POSSIBL
LE FAILURE
ES AND TH
HEIR REAS
SONS
Failure typ
pes ns for Failure
Reason
Human Faiilure Inapprop
priate opera
ation of Com
mpressor, D
Dispensers & valves;
Changinng Operating Conditionns, Shutdow
wn, Preparation for
maintenance
System Pro
ocedural Inspectio
on, Operation Start-up / shutdown n, Communication,
Failures Maintenance, Leak k detection, Emergencyy temporary repair,
Material, Specificattion and tessting, Modiffications
Failure due
e to Externa
al Caving in of earth due
d to excesssive rain/flo
ood, Earthq quake effecct,
Factors Lighting, external Fire,
F Vandalism/ sabotaage/terroristt activity
© Copyright MECON Limited
d – All rights reserved
r Paage 28 of 822
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
EM
MERGENCY
Y ACTION PLAN
P FOR CNG STAT
TION
Chief Inccident
Controller//Incident
Contro oller
Areea Control Room/Marketing Inform ‐in‐Ch
harge (Operattions)/
Officer/ Fire & Safety S
Station Operato
or /Technician Sr.Manager(Project)/MD
Rush too Site, Control Inform
Incident, EEnsure Station && Inform
m MD
Rush To Site & Take
Public Safety, Assist &
Chargge, Bring
Guidee Fire/Police Statio
on To
Rup
pnagar Ambulanc Operaation Inform
F
Fire CCOE & Cif (As Per Law
w)
Rupnagar Police
Ro
oll # 3, 4, 5
Sto
op Refilling; Take Out Nozzless From
Roll ## 2 Veehicles, Close Diispenser Valve.
Roll # 1
Push Esd, Main Switch, Ups Opperate DCP Sys/Extinguishe
S er till
Guide Dsm And Seecurity Staff,
Switcch, Cascadess Isolation Veehicle is Safe.
Evacuatte Vehicle Safely, Inform
Fire Service, Police And
A Control Valvees. ush Vehicle to a Safe Location.
Pu
Room. Arrange To Push
P Vehicle Assistt In Operrating Fire
Away Saafely. Extingguishers From Station.
Assistt To Push Away Sick
Vehiccle.
Instant Common Ro ole
Dsm:: Stop Refilling, Take Out No ozzles From Roll # 7 (Lcv Driver)
Roll # 6 (Security Guard) Stop Reffilling. Discoonnect
Vehiccles
Shout “Not To Start Vehicle”, Stop
p Refilling Hosse.
.
Vehicles Entry. Push Out LC CV Safely, If, Clo
ose To
Securrity Guard: Sho out ‘’ Not To Staart
Evacuate V Vehicle From Sttation. Sick Vehicle..
Vehiccle’’ In Gas Leakk. Stop Entry Off
Arrange Fiire Extinguisherrs.
Vehiccles.
Assist Out Sick Vehicle.
Techn nician: Rush To T Push Esd. Switch Off
Poweer Supply, Clo ose Cascade Isolation
Valvee.
© Copyright MECON Limiited – All rightss reserved Page 29 of 82
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
13
3.3 FOR CN
NG/PNG PIPELINE
P N
NETWORK & SYSTEM
M
The Em
mergency Response Plan has bee
en described
d for the en
nvisaged pip
pelines :
steel pipeline
PE Netw work
Possible emergen
ncies that may
m create at the abo
ove pipeline
e network are
a elabora
ated
below:
Thus, pipeline
p failu
ures can in
nvolve more e than just pipe failure es. Table 133-1 presentts a
d listing of potential incidents for a pipeline system. While these incidents ha
detailed ave
been grrouped into human errrors, equipm ment failuress, failure off systems annd procedures
and exxternal even nts, these categories
c do not neccessarily co orrespond to the wayy in
which faailure rate data
d are collected. Ratther, they re
efer to geneeral categorries to haza
ards
that willl be consid dered for Qualitative
Q hazard
h iden
ntification aand as furthher input to
o a
Quantittative study and Emerg gency plann ning.
13
3.4 POSSIB
BLE FAILURE MODES
S OF PIPEL
LINE
In case
e of emergency such as leak etc. in the City Gas
G system
m PNG follo
owing activitties
are required to be taken by O & M In-Cha
arge:
© Copyright MECON Limiited – All rightss reserved Page 30 of 82
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
viii) No
otifying policce and fire departments
d s
13.5
5 EMERGE N & PROCEDURE ES
ENCY PLAN STABLISHE
ED BY BPCL
L IN PRACT
TICE
Plan and Procedu ure - Prep paration off an full proofp emerrgency han ndling plan in
consultation with ad djoining esta
ablishments s and locall authoritiess e.g. fire brigade,
b police
and otherr District em
mergency Au uthorities ettc., for the following
f cirrcumstance
es:-
h) Im
mportant tellephone numbers rela ated to eme ergency han ndling shalll be displayyed
prrominently, so as to ma
ake it acces
ssible to all the staffs.
i) M
Means of com
mmunication shall be always
a available at the station on 24 hrs. bassis.
13
3.6 DEALIN
NG WITH GAS
G ESCAP
PE & ACTIO
ON CRITER
REA
Inform local
l emerg
gency respo
onse agency
y such as fire department or police etc.
Total PNG
P / CNG G systems have been n designed keeping in
n mind the
e potentiall of
uakes / any other natural phenom
earthqu mena. Leakk surveys and ground surveillance
e is
conduccted after an
ny incident / earthquake
e.
13
3.7 DEALIN
NG WITH GAS P
PIPELINES OR SSOCIATED
AS D EQUIPM
MENT-BPCL’S
AWAREENESS
© Copyright MECON Limiited – All rightss reserved Page 32 of 82
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
13
3.8 HOW TO
T DEAL WITH
W FIRE SITUATION
S N
AT CNG STATIO
ON: -
Necessary Fire Fightting equipm ments along with other protectiv ve to prevvent
radiation off heat for the concern staffs
s should be availab
ble at the site.
In
nform & guide fire ten
nders.
© Copyright MECON Limiited – All rightss reserved Page 33 of 82
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
144.0 EMER
RGENCY ORGANISAT
O TION AND RESPONS
SIBILITIES
ONSITTE EMERGEN
NCY TEAM A
AT RUPNAG
GAR
PERSONAL AP
PPROACH DETECTTION SYSTEM
COONTROL ROOM/
DIST. AUTHORRITY/ PUBLIC EMERGEENCY CONTROL R
ROOM
COMMUN
NICATION SYSTEM
M
SITE OF IN
NCIDENT EM
MERGENCY EMERGENC CY EM
MERGENCY
L
LEVEL 1 LEVEL 2 LEVEL 3
DISASTER MANAGEMENT P
PLAN
A
ACTIVATED
CHIEF INCIDENT SITE CONTRO
OLLER
CONTRO OLLER Rajinder Kumar, CM (Gas)
Deepak Malik‐ GM –Gas 8588838690
90999771868
AMBULANCE
COMMUN
NICATION TO BPC
CL
CORPO
ORATE OFFICE
FIRE & RESCUE CO O‐ORDINATOR MAINNTENANCE MEDICCAL & SECURITY COMMUNICATION
Manpreet Mann, S
M Sr. Mgr. (ECE) CO‐OR RDINATOR CO
O‐ORDINATOR CO
O‐ORDINATOR
9212556077 Satish Sudhir. Sr. Ravn
neet Singh, DY. Him
meshwar Sharma.
Mggr(Ops.) M
MGR. (Ops.) (Ops.)
82855162050 0
0725906041 7897196063
© Copyright MECON Limiited – All rightss reserved Page 34 of 82
D
DISASTER/E
EMERGENC CY MANAGEEMENT PLA
AN FOR
BPCL ATT RUPNAGAAR
D
DOC. NO. M
MEC/23T1/EERDMP
MECON LTTD.
ONSITTE EMERGEENCY TEAM
PERSONAL AP
PPROACH DETECTTION SYSTEM
CONTROLL ROOM AT RUPN
NAGAR/
DIST. AUTHORRITY/ PUBLIC EMERGEENCY CONTROL R
ROOM
COMMUN
NICATION SYSTEM
M
SITE OF IN
NCIDENT EM
MERGENCY EMERGENC CY EM
MERGENCY
L
LEVEL 1 LEVEL 2 LEVEL 3
DISASTER MANAGEMENT P
PLAN
A
ACTIVATED
CHIEF INCIDENTT ONTROLLER SITE CONTRO
OLLER
Deepak Malikk‐ GM –Gas Rajinder Kumar, CM (Gas)
909997
71868 8588838690
AMBULANCE
COMMUN
NICATION TO BPC
CL
CORPO
ORATE OFFICE
FIRE & RESCUE COO‐ORDINATOR MAINNTENANCE MEDICCAL & SECURITY COMMUNICATION
Manpreet Mann, S
M Sr. Mgr. (ECE) CO‐OR RDINATOR CO
O‐ORDINATOR O‐ORDINATOR
CO
9212556077 Satish Sudhir. Sr. Ravn
neet Singh, DY. Him
meshwar Sharma.
Mggr(Ops.) M
MGR. (Ops.) (Ops.)
82855162050 0
0725906041 7897196063
© Copyright MECON Limiited – All rightss reserved Page 35 of 82
DISASTER
R/EMERGENCY M
MANAGEMENT PLAN FOR BPCLL AT RUPNAGAR
R
DOC. NO. MEC/23TT1/ERDMP
MECON LIMITTED
OFF‐SITE EMERGEN
NCY TEAM
DIST. DISASTTER MGT. AUTHORITY (D
DDMA)
DM, RUPNAGAR DIST.
EMERGENC CY RESPONSE CO‐ORDIN
NATOR
NODAL OFFICER
(CEO, RUP
PNAGAR MUNICIPAL CORRPN.)
RUPN
NAGAR MUNICIPAL
CORPN.
EMERGENC CY RESPONSE CO‐ORDIN
NATOR
A
ALT. NODAL OFFICER
PNAGAR MUNICIPAL CORPN.)
(EE‐III, RUP
QUICK RESPONSE TTEAM, QUIC
CK RESPONSE TEAM, QUICK RESPONSE TEAM,
MC Nangal MCC AnanadpurSagib SDM Ruppnagar
EXEC. ENG
GINEERS AE (MECH), CIVIL. HOSPITAL FIRE BRIGADE POLICE STATION
N
PW
WD MUUNICIPAL BBMB‐ Nangal
TRANSSPORT WING 01881 228040 Nangal/Ropar 101 0188 722 32000
0188 722 3101
RUPNAGAR MUNICIPAL CORPN. WARD COUNCILOR/WARD
DM CORE COMMITTEE VOLUNTEERS
© Copyrigh
ht MECON Limited – All rights reserved
d Page 36 of 82
DISASTER
R/EMERGENCY M
MANAGEMENT PLAN FOR BPCLL AT RUPNAGAR
R
DOC. NO. MEC/23TT1/ERDMP
MECON LIMITTED
OFF‐SITE EMERG
O GENCY TEAM FO
OR RUPNAGAR
DIST. DISASTER MGT. AU
UTHORITY
DM, Rupnagar
EMER
RGENCY RESPONSE CO‐‐ORDINATOR
SDM Rupnagar
MERGENCY OPERATION CENTRE
EM
TEAM
EMERGENCY OPERATTION
SUB‐CENTRE
ASTER
SUB‐DIVISIONAL DISA
MANAGEMENT COMM MITTEE
BLOCK
K & GRAM PANCHAYAT LLEVEL DISASTER
MANAGEMENT COMM MITTEE
DISTRICT TTRANSPORT DEPPTT. OF HEALTH POLICE FIRE B
BRIGADE MEDIA PUBLIC WORKSS FOOD & CIVIL DIST. WATER
AUTHHORITY & FA
AMILY WELFARE DEPTT. SUPPLIES SUPPLY
© Copyrigh
ht MECON Limited – All rights reserved
d Page 37 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Res
sponsibilitiies and Dutties of DM Key Perso
onnel
In an
a emergen ncy situationn it is absolutely necesssity that ke
ey personneel function with
w full cla
arity
of th
heir responsibilities an
nd duties soo that there is no confuusion and ssituation is brought under
control.
Site
e Controller takes respo
onsibility of the followin
ng:
Direct commmunication n with Incident Controller for asse essment of the situatio on from timee to
time and take
t necesssary action for assista ance from within
w the ccompany orr from exterrnal
sources.
Communiccation to to op managem ment of the e company regarding the inciden nt and brieffing
from time to time abo out the situa ation.
Intimate DM/Collecto
D r of the Disttrict where the
t incidentt has taken place.
Intimate In
n-charge O& &M for orga anising main ntenance fo or restoration of operatiion.
Take full control
c of th
he operation of the en ntire system m and depen nding upon the gravityy of
the emergency decide e whether evacuation
e of staff is ne
ecessary.
Review th he situation and decid de if any shut down required
r for the entire
e system oro a
section.
If the emeergency is above
a Leveel 1, liaise with
w Police, Fire Briga ade, Medica al and Facttory
Inspector for
f intimatio on and nece essary help.
Co-ordinatte with all agencies both intern nal and extternal to fa acilitate con
ntrol of trafffic,
restoration
n of infrastru
ucture, food d & civil sup
pplies and re ehabilitationn.
Organise and mainta ain records of all incid dents, data//information n that takess place durring
and after emergency
e till normalccy is restored.
Incident Contro
oller takes responsibilit
r ty of the following:
© Copyright MECON Limited – All rights reserve
ed Page 38
8 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Fire
e and Rescu
ue Co-ordin
nator takes responsibili
r ty of the following:
dical and Se
Med ecurity Co-o
ordinator takes the follo
owing respo
onsibility:
Mobilisatio
on of Mediccal Aid Team m for immed diate first aid and isolattion of casuualties needding
hospitalisa
ation.
Call ambulance in suffficient nummbers, if the situation so o demands.
Alert all nearest hospitals and advise
a themm for imme ediate prepa aration to receive
r injured
persons.
Assist Fire
e & Rescue Co-ordinattor and his team
t in fulfilling their re
esponsibilities.
Liase with hospital an
nd make arrrangement for f sufficien nt quantity o of medicines s.
Help Incid dent Co-orrdinator in securing the area by blockin ng the are ea, controllling
emergency exits and communica ation systemm.
Co-ordinatte welfare activities
a i. e. arrangemment of foo od, water, sshelter and taking care e of
relatives of
o injured.
mmunication
Com n Co-ordina
ator takes th
he following
g responsibiilities:
It iss imperative
e that for District
D Authority to make adequatte preparation, all info
ormation ab
bout
the operation and risk off the unit must
m be pro
ovided in advance.
a he informattion should be
Th
furnnished:
i) Inventory of
o hazardou us chemicals i.e. CNG in this partiicular case..
ii) Material Safety
S Data of hazardou us chemicals.
iii) Likely emeergencies th
he installatio
ons may cre
eate.
© Copyright MECON Limited – All rights reserve
ed Page 39
9 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Eme
ergency Re
esponse Co-ordinator
To ensure that immed diate relief provisions are availab ble and their movemen nt activatedd in
the event of
o an emergency.
To appraise Dist. Disa aster Mana agement Au uthority aboout the seveerity of incid
dent and se eek
help in casee the situation cannot be controlle ed within the
e available resources.
Arrange for emergenccy power, communica
c ation equipm ment, vehiccles and fue el for vehiccles
and power generators.
Activating Rescue
R and
d search operation.
Instruct Ho
ospital and Ambulance
A Service to be in readiness for mmedical treattment and first
f
aid with meedicine.
Maintenancce of law an nd order.
Arrangeme ent of relief material,
m if need
n arisess.
ergency Su
Eme upport Functtions (ESFss)
The ressponsibilitie
es, initial acctivities on receipt
r of warning
w and
d minimum standards for each ESF
E
are give
en in the following table e:
1 arning
Early wa Setting up Control Roo
S om/ Emergen ncy Operatioon Centre ro
ound the clocck
A
Arrangemen nt of vehicle and sound system forr information n
d
disseminatio
on
Proper record keeping and transmiission of infoormation to all the leveel
Ensure funcctioning of warning
w systtem & comm munication systems
s
C
Create awaareness with the targ get groups
2 Evacuatio
on T warn people
To p abou ut the impe
ending dang ger & to le
eave for
s
safer place
es.
T co-ordina
To ate with civil defence-NGOs/Secy. R Rajya Sainik
Board/Policee for support.
Evacuate peeople and ad dminister em
mergent relieff.
Deployment of police for maintaining law & order & peace kee eping during
e
evacuation. .
3 Search an
nd Deployment of Police/Firre Brigade fo or search andd rescue.
Rescue
C
Co-ordinatio n with the NC CC/NSS/Civvil Defence/R
Rajya Sainik Board
B etc. fo
or
r
rescue operaation
Ensure availlability of the
e rescue matterials.
© Copyright MECON Limited – All rights reserve
ed Page 40
0 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
4 Medical aid
a Deploymen nt of Medica al staff
S
Stock piling of Life savin
ng drugs
Protocol on n medical aida
T
Treatment of the injured persons and d Transportaation of the in
njured to
hospital.
5 Shelter A
Arrangemen nt of Shelter//Temporary shelter at a appropriate places
Managem ment A
Arrangemen nt of Food/Drrinking water/Medicine in n the shelterr places.
A
Arrangeme nt of transp portation
Providing the lighting fa acilities for shelter
s placees
Deploymen nt of Police Personnel
T
Temporary s
supply of drinking waterr
6 Emergen
nt Relief Deploymen nt of vehicle e
Procuremen nt and transp portation of Relief mate erials to affeected areass
7 Water Su upply Ensuring su upply of safee drinking water
w
and
Sanitation
8 Infrastru
ucture Assigning re
A esponsibilitie
es for specificc areas.
Restoratiion Emergency cleaning of debris to enable reconnaissance.
C
Coordinate road-cleanning activitiies to assist relief wo ork
Begin clearin
ng roads, asssemble casu ual labour prrovide a worrk team
c
carrying emergency too ol kits.
T
Towing veh
hicles, Earth moving eq quipments, ccranes, consstruct
t
temporary ro
oads
Keep Nationnal & other Highways
H cleear from disaaster effects.
Damage asssessment & Monitoring
2 Public He
ealth Departmeents of
Health an
nd Family
Welfare
3 Transportt Transporrt
Departmeent
4 Power
Departme
ent
Power
© Copyright MECON Limited – All rights reserve
ed Page 41
1 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
5 Search and
a Police
Rescue; Evacuation
E
7 Relief Sup
pplies and Revenuee
Food Departmeent/District
Administrration.
8 Water Su upply and DWS
Sanitation
n/
9 Media ICAT
15.0 INFRASTRUCTURE
The
e infrastructu
ure comprisses of the fo
ollowing fac
cilities:
ERGENCY CONTROL
15.1 EME L ROOM
Eme ergency Coontrol Roomm is the ceentre point ofo activity during
d an eemergency situation. TheT
Conntrol Room shall be sett up away frrom the site
e such that during eme ergency it’s function is not
affe
ected. The Control
C Roo
om shall be manned rou und the clocck with all n
necessary communicat
c tion
equuipment andd importantt informatio
on like conttact nos. of key perso onnel of th he companyy &
exte
ernal agenccies, emerge
ency numbe ers, site lay
yout plan an
nd fire fightin
ng facility.
Following
g resources shall be ma
ade availab
ble at the Em
mergency Control
C Room
15.2 ASS
SEMBLY PO
OINT
Asssembly poin
nt is a pre ed area, where perso
e-designate ons associa
ated with the
t operation/
maintenance of
o the unitt but are not
n part off emergenccy team arre assemblled during an
emeergency.
© Copyright MECON Limited – All rights reserve
ed Page 42
2 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
A head count is done by an authorised personn, who is asssigned to take responsibility of the
assembly area
a. The hea ad count help
h is iden
ntifying misssing perso
on for seaarch & resccue
eration.
ope
RE PROTEC
15.3 FIR CTION
Eq
quipment DCP 75 KG DCP 10 KG CO2 4.5
4 KG
CO
OMPRESSO
OR 1 1 -
DISPENSOR
R - 1 -
CA
ASCADE - 1 -
LC
CV POINT - 1 -
EL
LECTRICAL
L PANEL - - 1
15.4 Inte
er distance
es from bu
uildings an
nd outer boundaries to gas storage unitts as per
p
PESSO guidelines:
TOTAL CA
T APACITY OF GAS STORAG
GE MIN. DISTANCE
D FROM BUIILDINGS AND
A
U
UNITS (In Litres)
L BOUNDARIES (Inn Meters)
Upp to 4500 2.5
45
500 to 10000
0 4.0
10
0000 to 1000
000 10.0
© Copyright MECON Limited – All rights reserve
ed Page 43
3 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
In
nter distances betwee
en various facilities of
o natural gas
g handlin
ng at installlation
1 CNG Compre
essor - 3 2 3 6 6 T-1
(Min-3)
3 Storage casca
ade 2 2 T-1 T-1(Min-6) T-1(Min
n-4) -Do-
4 Outer bounda
ary wall/CLF 3 4 T-1 6 4 -Do-
5 MS/HSDdispe
enser 6 6 T-1 6 6 -Do-
(Min
n-6)
6 Vent of M
MS/HSD u/g 6 4 T-1 4 6 - 6
storage tankss (Min
n-6)
Salient safety
s featu
ures of CGD
D network
a. Unaattended fixxed surface facilities sh
hall be prote
ected from public
p access by fencin
ng and lockking
of valves
v and instrumentaation.
b. At stations
s pro
ovisions of CCOE shall be follow
wed in termss of providing fire extinguishers and
a
nd buckets at the CNG stations,, odorizing the CNG Gas, providing sectio
san onalizing vaalve
stattions at suuitable dista er PNGRB guideliness with ventting arrange
ance as pe ement as per
requirement.
c. Enttire pipeline
e (carbon stteel and MD
DPE) is burried with miin. 1.0 m off earth cove
er to eliminate
acccidental fraccture /leakag
ge.
d. Pro
ovision of wa
arning matss to preventt accidental pipe fracture during exxcavation by
b others.
e. Smoking and all open flames f shaall be prohibited in and around structure, or contain
ning
faciilities, where
e possible leakage of gas
g constituutes a hazard of fire or explosion.
f. When a hazardous amount of gas is to be vented v into open air, each potenntial sourcee of
igniition shall first be remo
oved from thhe area and uishers shall be provided.
d adequate fire extingu
All flashlights, lighting fixxtures, exte
ension cord
ds, and too e of a type approved for
ols shall be
hazzardous atm mosphere.
g. Suittable signs and flagme en or guard, if necessa
ary, shall be
e posted to warn otherrs approach
hing
or entering
e the
e area of the
e hazard.
Major Inb
built Safety
y System at
a CNG Stattion
Metering
g Skid (Optional)
PS
SV providedd,
Ea
arthing
Flow regulation
© Copyright MECON Limited – All rights reserve
ed Page 44
4 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Compres
ssors
es
Cascade
Pressure
e Piping
De
esigned at 1.6 times thhe Maximumm Allowable e Operating Pressure (MAOP)
Cut off valvess
Re
egular inspe ection and maintenancce carried out
o
LCV Filling
Eaarthing
Emmergency cut-off
c
Sttopper blocks for preve
enting the ro
olling of veh
hicles
Prressure gauuges
Dispense
ers
Eaarthing
Prressure cut--off
Veent
Brreak-away coupling
c
Brraided flexib
ble hose forr CNG filling
g
Safety sy
ystem insta NG vehicles:-
alled on CN
16 DEC
CLARATIO
ON OF ONSITE AND OFFSITE
O EM
MERGENCY
Y
16.1 ON-SITE EM
MERGENCY
Y:
Wheen emerge ency becommes catasttrophic and d evacuatio on beyond d the plantt premises is
considered neccessary by the chief In ncident Conntroller situation will be handed over
o to Disttrict
Auth
hority for im
mplementing
g the off-site
e emergenccy plan.
17 RES
SOURCES FOR CONT
TROLLING
G EMERGEN
NCY
17.1 EMERGENCY
Y VEHICLE
Fully functiona
al emergen ncy vehiclees shall be e available 24x7 at Main Conttrol Centre at
Ruppnagar. Du uring emergencies O&M M departme ent shall use the vehiccle for reach
hing the sce
ene
of any
a accidentt with the ob
bjective of controlling
c the
t same.
Eacch of the em
mergency ve
ehicles shall be provide
ed with the following
f m
minimum equ
uipment:
Depressurrization of a particular segment
s of the pipeline
e
Portable LEL
L / Oxyge
en meters
Non-sparkking tools likke Brass haammer 2.0 Kg, Double e ended D-sspanners’ (ssizes: 23 x 27,
24 x 26, 25
2 x 28, 30 x 32 & 30 x 36 mm), Single
S endeed ring sluggging spanner (32, 36, 41,
46, 50, 55 & 60 mm) and Pipe wrench
w of 24
4mm
General to ools like Scale, divide
er & measu uring tape, set of screw drivers,, double op pen
ended spa anner, Plier Combinatioon (200mm), Long nosse pliers (16 60 mm) andd Pipe wren nch
(12 inch), Allen key set
s (metric, inch) Seala ant & sealan nt gun for G
Gate Valves / Ball valve
es /
Plug Valve es
SS fittingss (instrumen
nts): ¼”, ½” & ¾”.
Electrofusion M/cs.
PE Squee eze tools forr 20 – 180 mm
m NB pipe e.
Pipe Scrap pper.
PE Pipe Cutter.
C
Cleaning Pads/Brush
P h.
Pipe alignment Clamp ps.
Manual Exxcavating Tools.
Pipe Straig ghtener.
GI Plumbing kit.
GI Plugs ½”½ to 1 ½”.
PE Closurre Lugs.
Hydraulic pump accessories for opening & closing
c of valves
v
Chain pulley block (1 / 3 Ton) with tripod
Multimeterr
© Copyright MECON Limited – All rights reserve
ed Page 46
6 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Portable diesel
d generrator set of 1 KVA
Explosion--proof lamp p and floodlight
Communiccation facilitties like mobile PA sysstem, wireless commun nication sets
s etc.
Distribution board
First Aid kit
k
Personal safety
s itemss like hand gloves (bo
oth rubber and
a cotton), face mask k, ear mufflers
etc.
Maintenan nce Consum mables like Marking / Hosiery
H clotth, Teflon T
Tape, M-Seal, #600 sp piral
wound gasskets of for 2”, 4”, 6”, 8”,
8 10” & 12”, Gland paacking, Gre ease, Rustooline, O – Ring
R
Kit etc.
Safety torcch
Portable fiire extinguisshers (DCPP)
Hydraulic oil for actuaator HPU
18 MOGRAPH
DEM HIC INFORM
MATION
18.1 DEM
MOGRAPHY OF RUPN
NAGAR CIT
TY
ERD
DMP shall be d based on the followin
b prepared ng informatio
on:-
Geo
ographical Area
Rupnagar is a city a
and a municipal
m council inn Rupnagarr districct in
the Indian state of Pu
unjab. Rupn nagar is a newly crea ated fifth Diivisional He eadquarterss of
Punjab comprising Rupnagar, Mohali,
M and its
i adjoining
g districts. Itt is also one
e of the bigger
sites belonging to the Indus Va alley Civilizaation. Rupnagar is nea arly 50 km (31 mi) to the
northwest of Chandig garh (the nearest
n airpo
ort and the
e capital off Punjab). It is bordered
by Himach hal Pradeshh to the nortth and Shah hid Bhagat Singh Naga ar district (fo
ormerly kno own
as Nawanshahr district) to its we
est.
Rupnagar district, inccluded in thhe Patiala Division of Punjab falls between north latitu ude
30°-32' annd 31°-24' and
a east lon ngitude 76°-18' and 76
6°-55'. Rupn nagar (formmerly known as
Ropar) tow wn, the disttrict headqu
uarters is 42 Kms from
m Chandiga arh, the statte capital. The
T
district adjjoins Nawannshahar, Mohali
M and Fatehgarh
F S
Sahib Districcts of Punja
ab. The disttrict
comprisess 4 Tehsilss, Rupnaga ar, Anandpur Sahib, Nangal and Chamkaur Sahib and a
includes 624
6 villagess and 6 tow wns namely Rupnagar,, Chamkaurr Sahib, An nandpur sah hib,
© Copyright MECON Limited – All rights reserve
ed Page 47
7 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Morinda, Kiratpur
K Sahhib and Nan
ngal. All the
e towns exccept Chamkkaur sahib fall
f on railwa
ays
line. The Satluj riverr passes close (2 to 5 km) to th he towns o
of Nangal, Rupnagar
R a
and
Anandpur Sahib.
De
emographiics
Rupnagar GA
A comprisess of Rupnag
gar Urban and
a Rural Districts
D
upnagar ha
Ru as three Tah
hseel, five blocks,
b 593
3villages. Po
opulation off Rupnagar is 6,84,627
7as
pe
er census 2011.
© Copyright MECON Limited – All rights reserve
ed Page 48
8 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
IMAGE OF
O RUPNAG
GAR
R
Rupnagar C
Charge Are
eas
Sl.
S Charge
C Area
as
N
No.
1 C
CA-01 NANG
GAL SH
H 22
2 C
CA-02 ANANDPUR NH
H21, SH 22
SAHIB
B
3 C
CA-03 RUPNAGAR NH
H21, SH 22
4 C
CA-04 CHAM
MKAUR NH
H 95, NH 21
1
SAHIB
B
© Copyright MECON Limited – All rights reserve
ed Page 49
9 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
The
e main purpose of prep
paring the pllan is: ‐
a) To ascertaain the sta atus of existing resou urces and facilities a available, with
w the other
agencies/and residencces of wards, those ma ay be involvved in the m
managemen nt of disaste
er in
AMC area.
b) Assessmen nt of the deficiencies
d , inadequacies if anyy in renderring effectiv ve servicess in
disaster and post disaster situatioon.
c) Suggestingg in institutional infrasttructural strrengtheningg, technolog
gical suppoort, up gradding
and updating of inform mation and data base for overall improveme ent of administrative and
a
community responses to disasterr at the mun nicipal level..
d) Developingg codes an nd standarrd operatin ng procedu ures for an n effective and smo ooth
coordinatio
on between various dep partments and
a relief ag gencies invo
olved.
19 MED
DICAL FAC
CILITIES
20 ACUATION
EVA N
On declaration of evacuattion by on-ssite emergen ncy team, loocal district authorities in associattion
with
h the personnnel from th
he facility sh
hall initiate action
a afe evacuattion. All the personnel not
for sa
form
ming part off emergencyy team in th he area shalll leave the area quickly and gathe er at assem
mbly
poin
nt.
21 PUB
BLIC RELA
ATION AND
D INFORMA
ATION TO PUBLIC
P
In case
c of a se
erious emergency, whicch might afffect general public, imm mediate res sponses of the
commpany should be to eva acuate the people
p surrrounding the
e area or if felt safe, to
o be advised
d to
rem
main confineed in their ho
ouses.
Effe
ective comm munication methods must
m be followed to in ntimate pubblic in geneeral about the
dannger and safety measures to be ta aken. Initial danger ala
arm may be e through a siren follow
wed
by public anno ouncement in local laanguage through televvision chan nnels, radio or any other
meaans. If evaccuation is ne
ecessary, th
hen details of relocatio outes to be followed must
on areas, ro m
be announced.
a .
e authority shall
The s activate Emergency Control Room
R at the
e earliest an
nd take follo
owing actions:
Gather and
d record wea
ather condition details and make assessmen
a nt for off-site
e effects.
ergency Co
Eme ommunication to Extternal Agen
ncies
he emerge
If th ency is sevvere, the Incident Co ontroller may
m notify Off-site Emmergency Co-
C
ordiination, who
o will activa
ate Disasterr manageme
ent processs. Incident C
Controller may
m also nootify
major emergen ncies to:
The notice
n shall include the following in
nformation:
Brief descrription of th
he incident indicating location, tim
me when no oticed, natu
ure of incident
and likely effect
e on surrrounding area.
a .
The namess, designatio on, addresss and teleph
hone numbe ers of the ca
aller.
Any known or anticipa ated acute or
o chronic heealth risks associated
a w
with the em
mergency.
The name(s) and te elephone number(s) of o the persson(s) to b be contacteed for further
informationn
Weather co onditions, in
ncluding win
nd direction, speed and d expected spread of leeakage.
22 LE AND RE
ROL ESPONSIBILITY OF STAKE
S HOL
LDERS
© Copyright MECON Limited – All rights reserve
ed Page 51
1 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
SCHEDULE
E–V
(Refer Regulattion 22.0)
The important
i R
Roles and Responsib
R bilities of Various
Va Stak
keholders
a) Oil and
d Gas Installlations & Areas
A (Menti
tioned in Re
egulation 3)..
i) List of Ha
azardous Chemical
C & Systems
S wh
hich have potential
p to cause dang
ger to Hum
man,
Environmment & Prop
perty.
ii) On-Site Emergency
E Plan & Perriodic Mock Drill.
Th
he emergen ncy situation
n may call in
i for partic
cipation from
m other section of the administrati
a ion,
which may as
wh a per the requiremen nt and appllication mayy be calledd upon for mitigation
m a
and
co
ontrol of em
mergency.
erintendent of Police (S
Att district levvel the Supe SP), is in-ch harge of the e entire pollice setup. The
T
va
arious sectiions of the police setu up in the disstrict like th
he civil policce; the armed policem man,
th
he traffic dep partment an
nd the contrrol room settup etc are under the ssupervision of the SP.
Th
he responsiibility of polilice departm
ment should
d be:
© Copyright MECON Limited – All rights reserve
ed Page 52
2 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
To
o maintain the
t law and d order situa
ation in the affected
a areea including g emergenc cy shelter
ce
entres.
Guard of inciident site du
uring and affter the incid
dent.
o preserve evidences for
To f accidentt investigation.
To
o provide coommunicatiion support to emergen ncy teams.
To
o ensure smmooth move ement of em mergency ve ehicles like Ambulance es, Fire tend
ders Rescue e
ve
ehicles etc.
To
o manage smooth
s flow
w of normal traffic, diverrsions of tra
affic if requirred.
To
o provide suupport to evvacuation teeam in shiftiing of publicc from affeccted area to o emergencyy
sh
helter homees.
To
o inform Disstrict Emerggency Contrrol Room ab bout the sig gnificant devvelopments s at incidentt
site.
De
epending on
o the type of duties an nd responsiibilities restted with the
e entire Poliice set up may
m
be
e broadly cllassified intto following categories:: - A. Civil Police,
P B. A
Armed Policce, & C. Tra affic
Po
olice.
d) Thhe fire serrvices are one of the e first respponders annd shall be adequatelly trained and
a
eqquipped to handle chemical
c em
mergencies s. Fire serrvices are to acquiree a thorou ugh
kn
nowledge of likely haza
ards at the incident
i site
e and the em
mergency ccontrol meas
sures requiired
to
o contain it.
e) In
n a chemicaal emergenccy, the reveenue deparrtment sha er agencies for
all coordinatte with othe
evvacuation, establishme
e ent of shelte
ers and prov
vision of foo
od, etc.
i) Poollution co
ontrol boarrds need to o ascertain
n the develo oping seveerity of the emergencyy in
acccordance with responnsive meassures by co onstant moonitoring of the enviro onment. If and
a
wh an area is fit for entry
when e will de
epend uponn the resultss of the mo
onitoring. A contaminattion
opperation wo
ould be requ
uired to be carried
c out with
w the hellp of other aagencies an nd industriess.
*R
Role of abovve external Agencies have
h been defined
d in Annexure-E
A of Nationall Disaster
M
Management t Guideliness Chemical Disaster, April-2007
A
© Copyright MECON Limited – All rights reserve
ed Page 53
3 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
ND
DRF- Natio
onal Disastter Respon
nse force
SD
DRF- State
e Disaster Response
R F
Force
23 REP
PORTING OF
O INCIDEN
NT
23.1 COM
MMUNICAT
TION OF AC
CCIDENTS
S IN PIPELIN
NE
1. All incide
ents covere ed under Level-1 shou uld be maiintained by the entity for inspecttion
wheneve n and Levell-II & Level--III shall be reported to
er called forr inspection o the Boardd in
the formaat specifiedd and placed ule-IV including near m
d at Schedu miss inciden
nts. The aboove
report shhould be su ubmitted wiithin 48 hrs after occurrence of th he incidents
s or any otther
reason trriggering ma ajor inciden
nt.
2. Investiga
ation report of all Majorr incidents shall
s be sub
bmitted to P
PNGRB. An
n incident sh
hall
be treate
ed as Majorr if any of the following occurs;
a) Fire fo
or more than
n 15 minute
es
b) Explossion / Blowo
out
c) Fatal Incident.
I
d) Loss above
a Rs.10
0.0 Lac.
e) Cumullative man hours
h lost more
m than 500
5 hrs.
f) Plant Shutdown
S / Outage due
e to the inciident
g) Level III
I incident
© Copyright MECON Limited – All rights reserve
ed Page 54
4 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
S
SCHEDUL
LE-VI
(REFER
R REGUL
LATION-2
23)
INCIDE ENT REPORTIING FORMAT T
1.Organisa ation 2.S
Sector
3.Location n 4.In
ncident Sr. Noo.
5.Date of Incident
I 6.T
Time of Inciden nt
7.Major / Minor
M / Near miss
m 8.R
Report - Prelim
minary / Final
9.Fire / Inccident 10.Duration of Fiire - Hrs. /
Minn.
11.Typ of Incident with loss of life / Innjury / Fire / Explosion
E / Blo
owout / Electro
ocution / Fall ffrom Height /
Inhalation of Gas / Driviing / Slip / Trip
p / Others
12. Locatio
on of Incident (Name of Pla ant / Unit / Area
a / Facility / Tank
Ta Farm/ Ga antry / Road / P Parking Area
etc.)
13. Wheth her Plant Shutd down / Causeed outage of th he facility ? Yees / No
14.Fatalitie
es nos. a)Empployees = b)Contractor = c)Others =
15.Injuriess nos. a)Empployees = b)Contractor = c)Others =
16.Man Ho ours Lost a)Empployees = b)Contractor = c)Others =
17. Direct Loss due to the t Incident (R Rs. In Lacs).Looss to Equipm ment / Machine ery as per Insu urance claim
etc.
18.Indirect Losses : Thrrough put / Pro oduction Loss etc.
19.Status of the Facility ty : Constructiion / Commisssioning / Ope eration / Shuttting down / T Turn around,
Maintenan nce / Startup / any other
20.Brief deescription of thhe Incident Inccluding post In
ncident Measu ures .(Attach detail
d in separrate sheet)
21. Wheth her similar Inccident has occcurred in past at the same location,
l If yess, give brief ddescription of
the incidennt and attach details
d in sepa
arate sheet.
22. Wheth her Internal Invvestigation hass been comple eted. If no like
ely dates by which
w it will be completed.
23. Wheth her Internal Innvestigation reeport (Major Inncident) has beenb submitteed to PNGRB. If no, likely
date by wh hich it will be submitted.
s
24.Cause of Incident ( Tick the mos st relevant ca ause preferab bly one, maxiimum two)
A)Deviatio
on from Proceddure I)Noot Using PPEss
B)Lack of Job Knowledg ge J)E
Equipment failuure
C)Lack of Supervision K)PPoor design / LLayout etc.
D)Impropeer Inspection L)In
nadequate Facility
E)Impropeer Maintenancce M)PPoor Houseke eeping
F)Impropeer Material Han
ndling N)NNatural Calammity
G)Neglige
ent Driving O)PPilferage / Sab
botage
H)Carelesss Walking / Cllimbing etc. P)AAny other(givee details)
25.Cause of Leakage - Oil ,Gas or Chemical
C ( Tiick one only)
E)L
Leakage due to Improperr
A)Weld lea
ak from equip
pment / Lines ope
eration
F)L
Leak due to improperr
B)Leak fro
om flange, glan
nd etc. Maintenance
G)N
Normal Opera
ation - Venting
g
C)Leak fro
om rotary equiipment /Dra
raining
D)Metallurrgical Failure H)A
Any other
26.Cause of Ignition le eading to Fire
e (Tick only one
o cause)
A)Near too Hot work F)SStatic Electricitty
B)Near to Furnace / Fla are etc. G)HHammering / F Fall of Object
C)Auto Ign
nition H)HHeat due to friiction
D)Loose electrical
e connnection I)Liightening
E)Near to Hot surface J) Any
A other (Pyrrophoric etc.)
27. Was thhe Incident Avoidable?
A Yees / No
28.The Inccident could have been av voided by the e use of / or by
b :
(Tick the most
m relevan
nt point preferrably one , maximum
m two )
© Copyright MECON Limited – All rights reserve
ed Page 55
5 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
F)P
Personal Protectiv
ve
A)Better Supervision
S Equuipment
B)Adhering to specified operating pro
ocedure G)BBetter Equipm
ment
C)Impartin
ng Training H)MManagement C Control
D)Giving adequate tim me to do the e activity thrrough I)Addhering to
o specifie
ed
proper pla
anning maintenance Proocedure
J)A
Adhering to
o specifie
ed
Insppection / Testin
ng
E)Adhering to the work permit system
m Proocedures
K)Any othe
er information
n:
Guideline
es for filling the Inciden
nt Report:
1. All Ma
ajor, Minor an
nd Near misss incidents sh
hall be reporrted in the qu
uarterly reporrt.
2. Incident reporting form shall be
e filled up forr all Major, Minor
M and Near Miss Incid
dents.
mary report sh
3. Summ hall be enclo
osed with eve
ery quarterly
y report.
4. Investtigations shall be carried out for all Ma
ajor, Minor and
a Near misss Incidents.
5. Investtigation report of all Majo
or incidents shall be sub
bmitted to PNGRB.
P An iincident shall be treated
d as
Major if any of the following occcurs;
- Fire for more than 15 minutess
osion / Blowo
- Explo out
- Fatall Incident.
- Losss above Rs. 5.0
5 Lac.
- Cum
mulative man hours lost more
m than 500
0 hrs.
- Plant Shutdown / Outage due
e to the incid
dent
6. Loss time
t Incidentt shall be mo
onitored till th
he affected person
p joins duty. In casse the affecte
ed person is yet
to join
n the duty, then
t the sta
atus of reporrt submitted will be prelliminary. Final report ag
gainst the sa
ame
inciden
nt shall be se
ent once he joins
j duty an
nd the man - hours lost are
a known.
7. All collumns must be
b filled up.
8. For an
ny additional information use separate
e sheets as required.
r
9. Quarte
erly report sh
hall be sent to
t PNGRB within
w 15 to 30
0 days of end
d of quarter.
10. Immed
diate reportin
ng of inciden
nt through faxx/telephone shall
s continue as per the prevailing sy
ystem.
Sign
nature
Namme
Dessignation o
of the Occu
upier/Manag
ger
© Copyright MECON Limited – All rights reserve
ed Page 56
6 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
PROCEDUR
P RE FOR SU
UBMISSION
N OF INCIDE
ENT REPO
ORTS AND INVESTIGA
ATION
R
REPORTS T PNGRB
TO B AS PER ERDMP
E REG
GULATION
N-2010
OBJECTIVE:
ABILITY:
APPLICA
These reg
gulations sh
hall apply to
o:-
(a) Hyydrocarbons processsing installation (refinery, gas processin ng, LNG Regasificattion
installations etc.);
e
(b) Piipeline suchh as natura al gas, propane, butane etc. and d the hydro ocarbons products whhich
re
emain in gasseous state e at NTP;
(c) Liquid petroleeum producct pipeline;
(d) Coommercial petroleum storage faccilities, gas storage facilities and terminals including
i LNG
te
erminals;
(e) Hyydrocarbons gas botttling Installations hav ving receiving, storage e and handling facilitties
including storrage for LPG, propane e and butane e;
(f) City or local natural
n gas distribution
n facilities;
(g) Dispensing stations
s andd POL retail outlet;
(h) Trransportatioon of petroleeum produccts by road;
(i) Anny other insstallation ass may be nootified by the e Board from
m time to tim
me;
PNGRB Guideline
G
Incident Report: An
ny incident which is ca
ategorized as
a an emerg gency of Le evel 2 or Le
evel 3 shall be
reported to
t PNGRB. As per regulation 6 off ERDMP em mergenciess are classiffied as-
(i) Ca annot be effectively and safelyy managed d, and con ntained with hin the site
e, location or
installation byy the availa
able resourcces;
(ii) Iss having or has the po otential to have
h an effe
ect beyond the site, loocation or in
nstallation and
a
wh
where externnal support of
o mutual aiid partner may
m be invo olved
(iii) Iss likely to be
e danger to life, the envvironment or
o to industriial assets o
or reputation
n.
under the
e purview ofo District Authority
A bu
ut till the sttep in, it sh
hould be ressponsibility
y of the unitt to
manage the
t emergency.
Note: Levvel-I and Le
evel-II shalll normally be
b grouped d as onsite emergencyy and Leve el-III as off-ssite
emergenccy.
The entityy shall put in place a documented in house accident re eporting pro ocedure and its respon nse
plan for all
a kind of accident/em
a mergencies such s as i) near
n miss accidents,
a ii)
i) accident without
w losss of
productioon, supply or
o human life fe, iii) accide
ent with loss of producction, supplyy or human life, iv) fire
e, v)
explosionn or other emergencie
e es leading to t disaster effecting ou utside publlic. The lev vel of reportting
shall also
o be mentio oned in the procedure. The Boarrd shall be informed in n respect off the accide ent/
emergenccies under category iiii), iv) & v) above with remedial measures
m fo
for avoiding recurrence e in
the formaat placed at Enclosure e-1 of Sche edule-1E. The
Th entities shall
s ort each of the
investitigate & repo
above inccident/acciddent to differrent level ass specified in the abovve enclosure e.
2. Similar to
o National Authority
A at the Centre, the State Govt. is to e
establish a State Disasster
Managem ment Autho ority for the State. Thee State Autthority is to be headed d by the Ch hief
Minister of the State as the Chairperson
C n. Every Sttate Govt. in turn, is to establish h a
district Disaster
D Maanagement Authority for f every District
D in th
he State wiith the Disttrict
Collectorr as the Cha
airperson.
© Copyright MECON Limited – All rights reserve
ed Page 58
8 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Note: Sin
nce PNGRB B has been
n constituteed by PNGRB Act-200
06, it shoulld be identtified underr
Ministrie
es/Departments of Go
ovt. of India
a.
© Copyright MECON Limited – All rights reserve
ed Page 59
9 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Submiss
sion of Incid
dent Report
DGM (Pro hall ensure the submisssion of the Incident Report to the
oj. Devp) sh e PNGRB within
w 48 ho
ours
after occurrence of the inciden an copy of the Inciden
nt. The sca bmitted to the
nt Report sshall be sub
PNGRB ('secretary@ @pngrb.govv.in') with copies mark to CEO O, HSE dep partment and concern ned
Director. Hard copy shall be submitted to o “The Secrretary, PNG GRB, 1st flooor, World Trade Centre,
Babar Ro oad, New De elhi - 11000
01”.
24 ACT
TION AFTE
ER REPORT
TING INCID
DENT
In case
c of an emergencyy the Incident Controller should immediate ely make arrrangementt to
intim
mate the incident to keey personn
nel, emerge
ency task fo
orces, Gove
ernment au
uthorities, lo
ocal
ageencies, policce and hosp
pitals.
© Copyright MECON Limited – All rights reserve
ed Page 60
0 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Chief Inspe
ector of Facctories
State Pollution Control Board
COMMUNICAT
TION
Rais
sing the alarm
Personnel noticing firre or any ab
bnormality will
w raise an alarm to inttimate all pe
ersonnel.
arm securityy personnel shall operrate the nea
After receiiving the ala arby hand siren or elecctric
siren at ga
ate to give the signal off emergenc
cy
Dec
claring the major eme
ergency (du
uring work
king hours))
On receiptt of emerge
ency call from stations located with
hin Rupnagar Municipaal Corporation,
Emergenccy Responsse Co-ordin nator of AM MC shall activate DMM process intimating Fire
F
Brigade, Police,
P Distt Administration etc. as
a has bee en indicate
ed in Off-sitte Emergen
ncy
Responsee Team flow w chart.
Dec
claring the major eme
ergency (be
eyond norm
mal workin
ng hours)
Anyy emergenccy situation n noticed by
b Security y guard be eyond norm mal workingg hours sh hall
imm
mediately coontact fire co
ontrol room
m and if requ
uired, neare
est fire statio
on. He shou
uld also info
orm
Heaalth Safety Environmen
E nt (HSE) Maanager and Factory Ma anager of th he company y.
ety Instruc
Safe ctions to be
e followed at the time
e of fire
Any perso on noticing a fire, explo osion or the o gas shall immediately shout "G
e release of GAS
LEAK", "FIRE", or "HELP".
Immediate ely break thee glass of nearest
n mannual call poiint and activvate Fire Alarm.
He shall in
nform fire coontrol room, shift-in-charge on dutty and contrrol room immediately.
He shall make an effort to issolate the affected section to m minimize spread
s of gas
g
leakage/firre.
He shall also
a make effort
e to extin
nguish the fire
f using fire extinguissher availab ble nearby and
a
also use fiire water moonitors.
harge on receiving emergency ca
Shift In-ch all shall rush
h to the inccident site with
w necesssary
protection, assess the e situation and
a take im mmediate me easures to ccontrol the situation.
Shift In-ch
harge shall advise all other people to evaccuate quickkly and ass semble at the
Assembly Point.
Restrict unnauthorisedd persons to o enter the area.
a
Diffuse an ny panic conditions am mong the people
plementatio
Imp on of Emerrgency Res
sponse Acttions
Dep pending on type of em
mergency, disaster man
nagement plan
p (DMP) must be in
nitiated to ta
ake
follo
owing respo
onse actionss:
ACT
TUATION OF
O ON-SITE
E EMERGE
ENCY PLAN
N
DEC
CLARATION FOR ACT
TUATION OF
O OFFSIT
TE EMERGE
ENCY PLAN
N
25 RMINATION
TER N OF EMER
RGENCY
Terrmination activities
a iss aimed at giving ac
ccurate infformation to people who need
d it
mosst, and beg
gin as soon n as the em
mergency phase of the operatioon is comp
pleted.
Thee terminatio
on of emergency is declared
d th
hrough sire en as per tthe Siren Code
C defin
ned
by industry in
n case of Level- I & II. For Le
evel-III, termination of emerge ency shall be
decclared by District
D Auth
hority
26 EME
ERGENCY RECOVER
RY PROCED
DURE
© Copyright MECON Limited – All rights reserve
ed Page 62
2 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
All necessary
n p
personal sa
afety protection shall be taken by the team a
at the time of
o re-entry and
a
resttoration of services.
s Fo
ollowing con
nsiderationss have to be
e made by the team beefore re-entrry:
27 ERD
DMP FOR ROAD
R TRA
ANSPORTA
ATION
es and resp
Role ponsibilitiess of consign
nor, consign
nee, transpo ers and autthority shall be
orters, drive
as specified
s in operating practice.
p
- Koolkata Batta
alion
- Arrakkonam battalion
© Copyright MECON Limited – All rights reserve
ed Page 63
3 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
- Pu
une Battalio
on
- Gh
haziabad Ba attalion
In th
he support of
o NDRF, SDRF
S are th
he available
e forces at state
s level. IIn some cas
ses SDRF has
h
not been createed.
ese battalio
The ons are eq quipped to handle all types of the chemiccal emerge encies. The ese
batttalions are trained
t at various place eams should be called for
es. In emerrgency thesse nearby te
help
p as per Tab ble
Ta
able
© Copyright MECON Limited – All rights reserve
ed Page 64
4 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Directorate General,
G NDRF
F,
Shri Sanjay Antyodaaya Bhawan,
Kumar 011-2436
69278, 011-
Director General B-2 Wing, 9th
9 floor , CGO
O 011-24363261
1 [email protected]
243
369280
(IPS) Complex, Loodhi Road, New
w
Delhi- 110003
Shri Ravi
Joseph Lokku Inspectorr General -- Do -- 011-24363268 011-24363261
1 [email protected]
(IPS)
A
A-Wing, Secon
nd Floor Lok Na
ayak
Deputy Inspe
ector General dig.ss.ndrf@
@ni
S K K Singh
Shri B
Bhawan Khan Market New Deelhi- 011-24654994 011-24611519
9
(Trg/Soutth Sector) c.in
11
10003
A-Wing, Secon
A nd Floor Lok Na
ayak
Shri Muneesh Deputy Co
ommandant dcproccell-
B
Bhawan Khan Market New Deelhi- 011-24611518 011-24363261
1
Kumar (PROOC) [email protected] n
11
10003
Directorate General,
G NDRFF,
Shri Rakesh Deputy Co
ommandant Antyodaya Bh hawan, B-2 Wing, rakeshr76@ @re
011-24363
3263 011-24363261
1
Ranjan (OPS) 9th floor , CGO
O Complex, Loodhi diffmail.com
m
Road, New w Delhi- 110003
3
A-Wing,
A S
Second Floor
F
Shri Ritesh Deputy Coommandant L
Lok Nayyak Bha
awan dcrd-
011-24629279 011-24363261
1
Dwivedi (R&
&D) K
Khan Ma
arket [email protected]
N
New Delhi-1100
003
A-Wing, Secon
A nd Floor Lok Na
ayak
Shri Anil
AC(Tra
aining) B
Bhawan Khan Market New Deelhi- 011-24611518 011-24363261
1 -
Shekhawat
11
10003
© Copyright MECON Limited – All rights reserve
ed Page 65
5 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Name Designation Ad
ddress Teleph
hone No. Fax No. E-Mail
Shri M
AC(JJAO) ---Do-- 011-24362164 011-24363261
1 ac.hq.ndrf@
@ni
Natarajan
c.in
Directorate General,
G NDRFF,
Antyodaya Bh hawan, B-2 Winng,
Control Room -
-- 011-24363260 011-24363261
1 [email protected]
9th floor , CGO
O Complex, Loodhi
Road, New w Delhi- 110003
3
A-Wing, Second
S Floor
Lok Nayyak Bhawan
Exchange -
-- 011-24611518 011-24363261
1 -
Khann Market
New De elhi-110003
Source: We
eb Site of National Disaster Response Fo
orce (Ministry of
o Home affairrs, Govt. of Ind
dia)
28 scellaneous
Mis s.
(2) If anyy dispute ariises with regards to the e interpretation of any of the proviisions of the
ese
regula ations, the decision off the Board d shall be final.
fi Furtheer, the Boarrd may at anya
time effect
e approopriate mod difications in
n these reguulations.
© Copyright MECON Limited – All rights reserve
ed Page 66
6 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-1
(Refer Regulatio
on 10.1 (d)))
Eme
ergency Re
esponse an
nd Disaster Managem ment Plan (ERDMP)
Hazzard Identification
Sr.
Check-pointt Yes
s_ No_ Rem
marks
No
Haazard Anallysis & Risk Assessm ment
Which of the following prrocedures or techniques
W s for hazard
d
I
ide
entification has
h been ussed in the te
erminal/ insta
allation :
1) HAZO OP/HAZAN
2) Accide ent Consequuences & Annalysis HAZOP study of the
e
3) Eventt Tree Analyysis installattion has be
een done
4) Fault Tree Analyssis
5) Failure Modes, Efffects & Criticality Analy
ysis
6) Risk Assessment
A t
7) What if, analysis
8) Other accredited practices
Haazard Identification :
Sr.
Check-pointt Yes
s_ No_ Rem
marks
No
Vu ulnerability y Analysis :
W
Whether zonnes of influence or vulnerable zones are e Yes
XV esstimated by considering g the maxim mum single e storage off
ha azardous substance & maximum
m losss scenario
W
Whether effects of influe
ence on the e vulnerable e zones are e Yes
XVI made after considerin ng the po opulation, facilities &
en nvironment encompasse
e ed inside thaat zone
Risk Analysis :
W
Whether a relative measure
m o the pro
of obability & Yes
XVII co onsequences of variou us possible hazardous events are e
taken into acccount
W
Whether riskss are calcula
ated by multiplying the probability
p off Yes
XVIII occcurrence of o each eve ent by the consequen nces of thatt
evvent and the en summing up the results.
W
Whether all types of events possiblep in petroleum m NA
insstallations area conside ered includin ng i) storag ge tanks on n
c firre, ii) pool fire [burning pool of liqu uid fuel], iii) Flange jointt
lea akage in pip pelines,
iv)) Fire in TT or o TW gantrry, and v) rupture of hos ses
Risk Reducttion Measu ures :
W
Whether mea asures for reeduction of identified high risks are e Yes
XX inccluded by reducing the consequences th hru’ hazard d
mitigation measures
W
Whether step
ps have bee en considerr to reduce risks to the e Yes
XXI exxposed pop pulation byy increasing safe dis stances byy
accquiring prop perty aroundd the facility, if possible
HA AZOP stud dy
W
Whether the above
a metho od is appliedd if the locattion handless Yes
XXII
more than spe ecified stora
age and /or critical
c opera ation
W
Whether the study sysstematically identifies all possible e Yes
XXIII
de eviations from normal op perations
W
Whether risk levels are established
e for each de eviation afterr Yes
XXIV co onsidering th he probabilitty and consequences of o each such h
evvents
W
Whether poteential meanss for detectiion of such events and d Yes
XXV
prreventive me easures are recommend ded by the study
s
© Copyright MECON Limited – All rights reserve
ed Page 68
8 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-2
(Refer Regulatio
on 11.3 (xiii))
Incident Preventio
on Measure
es
© Copyright MECON Limited – All rights reserve
ed Page 69
9 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-3
[Referr Regulation 12.1(i)]]
MUTUA
AL AID / MO
OCK DRILL
LS
Sr.
C
Check-poin
nt Yes
s_ No_ Rem
marks
No
1 W
Whether mo
ock fire / em
mergency re
esponse drills are held Yes
2 If yes, periodicity of em
mergency response drills Once in
n Year
3 M
Mock drills cover
c all typ
pes of proba
able emerge
encies Yes
4 D
Does the loccation have
e Mutual Aid
d Plan Seek help from district
authoriity
6 List of firefig
L ghting equip
pment availa
able with ea
ach Mutual Availab
ble with dis
strict
A memberrs including District Fire
Aid e Service authoriity
10 Details of le
D ead time forr response of Mutual Aid
A memberrs Yes
including District Fire Service haas been doccumented in
i
the DMP
Periodicity of
P o safety tra
aining as pe
er OISD-1544 for officerss,
11 ng has been
Trainin n
s
staff, contra
actor workerrs, TT crew and securiity personneel
imparteed at regular
m
mentioned in the DMP
interva
als
M
Mutual Aid Plans
12 D
Does the loccation have
e established Mutual Aiid Plans Seek help from District
authoriity
W
Which are th
he Mutual Aid
A Team members
m & the
t
13 Seek help from District
a
assistance o
offered authoriity
© Copyright MECON Limited – All rights reserve
ed Page 70
0 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Sr.
C
Check-poin
nt Yes
s_ No_ Rem
marks
No
14 Does the pllan clearly indicate typ
D pes of poss
sible hazard
ds Yes
a firefightting measurres required
and d
17 Periodic jo
P oint exerccise & meetings
m fo
or practicee, Yes
f
familiarizatio
on and ideentifying & resolving compatibilitty
isssues.
© Copyright MECON Limited – All rights reserve
ed Page 71
1 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-4
(Refe
er Regulattion 13.0)
ERD
DMP Respo
onse Measures/Infras
structure
Sr. No Chec
ck-point Yes_ No_
_ Remarks
5 Does th
he Fire Hyd
drant Layout conspicuo
ously displayyed. N/A
Manpo
ower
Ye
es
1 Is the Fire
F Organo
ogram clearrly displayed
d?
Ye
es
2 Does the
t Organoogram include all dutie
es to be attended in
connecction with an
n emergenccy
Ye
es
3 Is the organogram
o m include ke
ey personne
el by their names
n or,
work poosition
Ye
es
4 Does iti have thee alternate coverage to take ca are of the
absencce of a partiicular perso
on [ in cases
s where org
ganogram
is deve
eloped basiss names]
Ye
es
5 Does it include assignment of all key coordinator
c rs viz. the
Inciden
nt Controller, Administration & Comm munication
Controller & Safetty Coordinattor?
Emerg
gency Conttrol Centre
Ye
es
1 Does the ECC well define
ed & clea
arly marked
d on the
displayyed layout
Ye
es
2 Is it strategically positioned to be outs
side the periphery of
immediate affected area?
Yes (pagiing & VHF
3 Does the
t centre have adeqquate commmunication channels
NAA)
includin
ng internal & externa ne connections, PA,
al telephon
© Copyright MECON Limited – All rights reserve
ed Page 72
2 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Sr. No Chec
ck-point Yes_ No_
_ Remarks
paging &VHF systtems
Ye
es
4 Does a list of keyy personnel & essentia
al telephone
e nos. are
prominently displaayed.
Ye
es
5 Does the
t layout of
o firefightin
ng system, different hazardous
h
zones, Assembly Points are prominently
p y displayed.
Emerg
gency Asse
embly Poin
nts
Ye
es
1 Does the EAPs well defin
ned & clea
arly marked
d on the
displayyed layout
Ye
es
2 Do th he EAPs have prre-defined in-chargess during
emerge encies who keep in tou uch with the
e Emergenccy Control
Centre and Administrative Controllers
C and update
es on the
roll calll on people reporting.
© Copyright MECON Limited – All rights reserve
ed Page 73
3 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Check Lis
st-5
Referr regulation
n 14.2.1 (a)
Review and
a Updation of ERDM
MP
Ye
es
5 Do thee Mutual AidA memberrs participa ate in the drills and
based on the acctual response & difficulties exp perienced,
correcttive actions initiated forr refinement of the plan
n
Ye
es
6 Does a procedu ure exist in incorporating the findings/
leaning
gs of the acctual disaste
er managem ment handliing, if any
so thatt the plan ca
an be revise
ed accordingly.
© Copyright MECON Limited – All rights reserve
ed Page 74
4 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-6
[Refer Regulatio
on 17.0 (5))]
Availab
bility of re
esources
s [internall / externa
al]
Sl.
Check-point Ye
es_ No_ Re
emarks
No.
Details of fire
D efighting equipment of the
e location is
1 Yes
ncorporated in the DMP
in
2 Information ono critical resources like no. of fire hydrants,
h wa
ater Y
Yes (only poortable
monitors, firrefighting pu
m umps, staticc water sto orage, Portaable firefig
ghting equippment are
f
firefighting eq
quipment and d foam syste
ems are incluuded. available
e)
3 A
Available ressources as pe
er Schedule
e-IV Yes
6 R
Requirement
t & availability of Persona
al Protective Equipment Yes
7 Whether man
W npower availlable during regular as well
w as idle shift
s Yes
h
hours includin
ng security personnel
p cle
early indicate
ed in the plan
n
E
External & In
nternal Reso
ources for combating
c Emergency
E
© Copyright MECON Limited – All rights reserve
ed Page 75
5 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
CHECK LIST-7
(Refer Regulatio
on 26.0 (2)))
ERDMP
P- Recoverry Measure
es
Sl. No Check
k-point Yes_ No_
_ Remarks
Post Eme
ergency Re
ecovery
Salvage of
o product
3 Check tha
at correct stock accounting of spilled producct as loss NA
has been completed
c in accountin
ng system.
5 Declare th
hat affected area after salvage
s ope
erations is fully
f clean Yes
& safe for movement of the workking personnel.
10 Whether physical
p acccounting off all personn
nel on dutyy during & Yes
after the incident are ascerttained by the Main Incident
Controller and reconcciled immed
diately
© Copyright MECON Limited – All rights reserve
ed Page 76
6 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
MECO
ON LTD.
Sl. No Check
k-point Yes_ No_
_ Remarks
13 Whether the records for such h first aid & treatment of the Yes
affected pe
ersonnel arre maintaine
ed in a well--defined forrmat
Addressin
ng media & outside bodies
b
14 Whether th
he DMP evvent was apppropriately informed to
o the local Yes
media in line with the respective compan ny’s Press & Media
Policy
© Copyright MECON Limited – All rights reserve
ed Page 77
7 of 82
DISASTEER/EMERGEENCY MANA AGEMENT PLAN FOR
BPCCL AT RUPNAGAR
DOC. NO
O. MEC/23TT1/ERDMP
ON LTD.
MECO
Sl. No Check
k-point Yes_ No_
_ Remarks
Whether repairs & maintenancce cost of property, assets &
25 Yes
equipmentt are assesssed.
Whether any penaltty by statu utory autho orities like SPCB /
26 Yes
Factory Inspector and mmissioner are assesse
d labor Com ed.
Whether possible
p impact on environment are
a also asssessed &
27 Yes
appropriatte measuress are taken
Whether damage
d asssessment also
a include
e potential erosion
e of
28 Yes
reputation – from commpany, indu onal perspectives
ustry & natio
Clean up and Restoration
Whether the affected d area has been fully cleaned an nd cleared
29 Yes
after due clearance
c frrom investig
gation team
Check whether heat detectors, high h level alarms,
a in built
b safety
30 Yes
systems (NRV, TSV etc.) are fu ully functionnal after thee disaster
incident.
Check whether all fire efighting eq
quipment lik ke – hoses / nozzles /
31 Yes
Fire Extinnguishers etc.
e have been put back at designated
places andd are fully reeady for reu
use
Whether a clearly deffined steps are in place e to allow re
esumption
32 Yes
of normal operations
29 EPORTING ACCIDENT
RE TS TO PRE
ESS AND MEDIA
M
Onlyy facts an
nd accurate figures shall be given g durin
ng media briefing and under no
circumstances should hide neous facts for fear of company re
e facts or prrovide erron eputation.
© Copyright MECON Limited – All rights reserve
ed Page 78
8 of 82
DISA
ASTER/EMEERGENCY MMANAGEMEENT PLAN FOOR BPCL
AT RU
UPNAGAR
DOC. NO.. MEC/23M6/05/25/O
O & M/002, R0
MECON LTD.
M
MSDS OF NATURAL
N GAS
G
Secction - I: Matterial Identificcation and Use
Maaterial Natural Gas
G
Chemical Name e Natural gas
g
Chemical Identtity Aliphatic Mixture
Tra
ade Name an nd Synonym as Natural Gas
G
Pro
oduct Use Domestic c/ Industrial/ Commercial
Codes / Labels Flammab ble Gas - Claass 2
Hazchem code 2S-E
Eth
hane (C2H6 ) 2 - 8 % v/v
Oth
her Higher Hydrocarbonss < 2 % v/v
v
Secction - III : Ph
hysical Data
Phyysical State Gas
Appearance Colourlesss
Odour Primarily Odourless
O (B
But Ethyl Merrcaptan (C2H5SH) is adde
ed
for odouris
sation)
Spe
ecific Gravityy 0.55-0.65
Solubility in Wa
ater at 30°C Soluble
pH Not Pertin
nent
Boiling Point - 161.5°C
Me
elting Point - 182.6°C
Secction - IV: Re
eactivity Data
a
Chemical Stabiility Stable
Inccompatibility with
w other su
ubstances Strong Ox
xidisers.
Reactivity and under
u what conditions
c No reactio
on with comm
mon material but may rea
act with
oxidising agent.
a
Fla
ammability Highly Fla
ammable
Meeans of Extinction CO2, DCPP Type Fire Extinguisher
E & Water Sprray.
Speecial Proced dures Keep spra
aying water to
o cool
Upper Explosivve Limit (UELL) 15 % Volu
ume of Gas in Air
Lowwer Explosivve Limit (LEL) 5 % Volum
me of Gas in Air
Fla
ash Point (UE EL) -222.5°C (CC)
(
Autto-ignition Te
emperature 540°C
© Copyright MECON Limited
d – All rights reserved
r Paage 79 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
LAY
YOUT OF ON NLINE CNG STATION
Storage C
Cascade
Gas in
Statio
on
Isolation V
Value
Gas Compre essors Priiority
C
Car Dispense
er
Paanel
C
Car Dispense
er
LAYO
OUT OF MOTHER
M CNG
C STAT
TION
Storage C
Cascade
Gas in
Statio
on
Isolation V
Value
Gas Compre essors
Priiority L
LMV Dispensser
Paanel
H
HMV Dispensser
Mobile Casscade
Storage C
Cascade
© Copyright MECON Limited
d – All rights reserved
r Paage 80 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
LA
AYOUT OF
F DAUGHT
TER BOOS
STER CNG
G STATION
Storage C
Cascade
Gas Boosster
Priiority L
LMV Dispensser
Compresssors Paanel
Statio
on
Isolation V
Value
Gas in from LCV
Casscades
SCHEMATIC GAS FFLOW DIAGRAM OF CITTY GAS DISTRIBUTION N
Appliance Vaalve
To Domesttic
ONGCC consumerrs
GI Pip
pe above
ground (¾” + ½”)
GAIL Regulator
21/30 mbar
Main Line (CS
S) Meeter Isolation
100 mm
(
(Pr. 4/6 Kg/Cmm2 Valve
Transition Fitting
To Commercial user
City G
Gate Stn. D RS 100 ~2000 mbar
Pressure 4 bar MDDPE Line
180 tto 20 mm
© Copyright MECON Limited
d – All rights reserved
r Paage 81 of 822
DISASTER/EM
MERGENCY MANAGEM MENT PLAN FOR
BPCL AT R
RUPNAGARR
DO
OC. NO. MEC/23T1/ERDMP
MECON LTD
D.
TYPICAL NG INSTA ALLATION IN
NSIDE A DO
OMESTIC KITTCHEN
Gaas Meter
Valvee
Valvve
PRV Flexible Hose
G
GI Pipe
Gas Appliancee
Valve
Floor Level
Ad
dopter
Groun
nd Level
Saddle PE Pipe
© Copyright MECON Limited
d – All rights reserved
r Paage 82 of 822