Sample Report
Sample Report
Supplier Company
Address XX
Assessment date XX
Electricity Rules 1937
Pakistan Electric and Telecommunication Code
Building Code of Pakistan – Fire Safety Provisions 2016
Reference Standards Sindh Factories Act 2015
American Standard Testing Material (ASTM)
American Concrete Institute (ACI)
I-way must 1.5 Severe health or Safety hazards
Auditors XX
Supplier participants Compliance Officer and Health & Safety Officer
Site area 201,573 m2
Overall facility of Company comprises of 39 buildings spread across production area,
dormitories, godowns and office blocks with a total staff strength of 6400. Considering the
Assessment
size of the facility, our assessment was conducted over two days. During the first day of
Summary &
our assessment team covered the floor visits for electrical, fire and structural safety while
Limitations
the second day was for documentation review and compiling our preliminary site
observations with management close out meeting.
1.3.2 DG Room – OK
Generator facility had sufficient working space and generators were properly earthed with separate
controlling mechanism.
Risk Rating: Multiple instances of loose electrical connections were observed in dormitory area and
chances of electrical incidents are likely to happen. Therefore, likelihood is kept at high level. Further,
majority of loose wires were not live and their voltage level was also low, therefore, impact is categorized
as low.
Hence, Risk Rating=3 *1=3 which qualifies it as a medium risk observation.
Remark: In transformer yard, cables were lying on the floor without any protection and wires used for
incoming and outgoing connection of transformers were not properly dressed. This issue was only observed
at one place while other areas of facility were well maintained in terms of cable dressing. It is recommended
that all electrical cables shall be covered with protective materials and cable dressing shall be adequately
done.
Risk Rating: As per current practice, a shift engineer is the only person responsible for transferring load
from one end to another. Therefore, likelihood is kept at low level. Since energizing/ de-energizing is a vital
process that involves 400 volts of electric supply from generation panels to distribution panels. Therefore,
impact is categorized as high.
Hence, Risk Rating=1*3=3 which qualifies it as a medium risk observation
Remark: A detailed cable schedule was present containing information of individual cable size/ length,
however, cable layout drawing was not in place. As per better practice, an overhead and underground cable
layout drawing shall be formulated to ensure tracing of cables is made easy for users.
Remark: Performa for preventive maintenance of allied equipment of power house generation is in place,
however, preventive maintenance is not being carried out on required intervals and documented records of
preventive maintenance are also not available. It is recommended that preventive maintenance shall be
carried out as documented for all electrical equipment and relevant records shall be maintained to ensure
that equipment breakdowns are minimized and needs of any potential repairs are highlighted on a timely
basis.
Remark: Dormitory building A for workers has two emergency exits to allow safe evacuation of workers in
case of emergency. However, another spiral stair is also available in this building .This stair case is not
marked as an emergency exit, also the width of stair case was under 5 feet, however, there is a possibility
that workers can use it as an emergency exit. It is recommended that width of the spiral stairs shall be
increased up to 1.5 meter (5 feet) or replaced with other suitable ladder so the stair case can be used in a
safe manner.
Remark: Two instances were noted where access to emergency exit doors was partially obstructed (gas
turbine room and Jenbacher power house). It is required that all pathways of all emergency exits and
emergency exit doors shall be free from any sort of obstruction.
2.2.5 Exit stairs – OK
Exit stairs were present in good condition and emergency lighting was also provided. Random operational
check of emergency lighting was carried out and it was found operational.
Remark: Cables crossing from the wall of power generation room were not adequately secured from fire/
smoke spread. This finding was observed at power generation room only. It is recommended that cables
passing through a wall shall be protected by a fire stop system or device. Hence, it is necessary that all
openings shall be sealed with fire resistant material (expandable foam, plaster, grout etc.) so that fire and
smoke cannot penetrate through openings.
Remark: We noted that combustible material was placed beneath the waste heat recovery boiler that was
located in open area beside new power house and fluff was also evident in gas turbine room. Both
instances were found only once during our visit. It is recommended that accumulations of combustible
waste material, dust, and debris shall be removed from the structure and its immediate vicinity for safe
operations. Although waste management system is in place but adherence to such system shall also be
ensured by designated persons and waste shall be removed daily or more frequently as necessary.
Remark: Only two smoke detectors of spinning department were switched off because fluff was present
in air that was causing false alarm as informed by supplier’s fire team. It is recommended that smoke
detectors shall be replaced with heat detectors in spinning department to ensure fire detection system
remains intact and concern of false fire alarm is mitigated.
Remark: Upon review of documents we noted that 18 disable workers were present at the factory,
however, neither written procedure nor practical equipment for emergency rescue was available for
evacuation of disabled workers. It is recommend that a comprehensive SOP shall be formulated for
disabled persons that includes necessary guidelines for evacuation of disabled workers and necessary
emergency rescue equipment for disabled workers be arranged separately.
2.2.2 Width of stair case is less than 5 feet - 2.2.4 Emergency exits are partially blocked -
Remark Remark
2.3.1 Cables passing through a wall are not 2.3.4 Presence of fluff and garbage beneath boiler
protected – Remark - Remark
3. STRUCTURAL SAFETY ASSESSMENT
Index
3.1 Vertical Structural System (Gravity Loads)
3.2 Lateral Structural System (Wind and Seismic Loads)
3.3 Key Elements
3.4 Foundation Performance
3.5 Visible Stress in Structural Members
3.6 Visible Stress in Non-Structural Members
3.7 Performance of Extensions/Additions
3.8 Structural documentation
3.9 Annexure 5 | Structural – Documents Reviewed
3.10 Annexure 6 | Structural – Picture References
Risk Rating: Since this observation is based on SHT on sample basis, therefore, the likelihood is kept at
medium level. The impact is also medium because the building has extensive number of columns and
load can be sustained according to original loading plan.
Remark: We performed Ferro Scanning Testing (FST) on columns on random basis to examine
uniformity of the steel placement as designed by structural designer at the time of construction. We
concluded that during construction steel uniformity has been displaced in Jacquard Building. It is
recommended that all rebar (steel) placements shall be reassessed for the same building by structural
designer and corrective actions are taken in accordance with the guidance provided by structural
designer
3.3.2 Beam – OK
The design check on cantilever was completed. However, loading plan and mechanism control of loading
is to be proposed and implemented.
Risk Rating: Since this observation is based on visible stress and cracks, the likelihood is kept at
medium level. The impact of this observation is high because the building has considerable human
occupancy and regular usage.
Hence, Risk Rating= 2* 3 =6 which qualifies it as a high risk observation.
Remark: We observed visible cracks in the block masonry due to seepage in R-60 spinning and Finish
Folding units of Company facility. The cracks were non repetitive and they were observed in
abovementioned units only. As per chapter 21 of International Building Code, it is recommended that all
cracks of block masonry shall be repaired and rectified to ensure long term safety of buildings.
Remark: As-built drawings of only two buildings were made available out of 39 buildings of Company’s
overall facility. As communicated by civil team, preparation of as built drawings of remaining buildings was
under process. It is recommended that as built drawings of buildings shall be formulated at the earliest so
that amendments in original design of buildings is available in documented form which can also lead to
implementation of structural maintenance plan.
Remark: Upon review of documents, we noted that allowable loading plans for floors and accessible roof
areas were not available. It is recommended that loading plans for separate buildings indicating allowable
load on each floor shall be formulated to ensure that complete documentation is maintained for structural
safety.
3.9 Annexure 5 | Structural – Documents Reviewed
Remarks/
S.No. Document Name Reviewed
Comments
Architect As-Built Drawings # 2 No copies at full scale or
1 Yes -
A3 (1 copy for the assessment team to take away
As built drawings of
Structural & Electrical As built Drawings # 2 No copies at
only two buildings
2 full scale or A3 (1 copy for the assessment team to take No
out of 39 were
away
made available
Site/Building Layout Plans # (2 No copies at full scale or
3 Yes -
A3)
Factory Registration
Certificate, Building
Approval Plan,
All Relevant Permits including Occupancy Certificate- 1 No Building Stability
4 Yes Certificate,
copy of each permit.
Approval of
Environmental
Management Plan