Ishu Download
Ishu Download
Meter Last Current Multiplying Consumed Solar Power Actual Status Bill Date PayableDate(Due
No. Reading(KWH/KVAH) Reading(KWH/KVAH) Factor Units(KWH/KVAH) Units(KWH/KVAH) Factor Demand Date)
NB80390 3386 / 0 3489 / 0 1.00 103 / 0 0/0 0.90 1.00 Normal 20/10/2019 27/10/2019
Bill Alloted Units Adjustment Units Total Units Total Demand Excess Solar Units Inoperative Security Extra Disconnection
Base Amount Amount Amount Date
3. Rebate upto Payable Date (-) 6.77 i) Previous Arrears / Arrear Count 0.00 + 0.00 / 0
5. Due for Minimum Charges / Regulatory Surcharge : 0.00/0.00 13. Previous Delay Surcharge 0
A) Assesment (+) 0.00 16. Total Payable Amount Before Due Date 703.00
11. Credit 18. Total Payable Amt. After Due Dt. 710.00
B) Temporary (-) (ISD Interest ) of (-) 0.00 20. Bill Date 20/10/2019
Assistant Engineer
PLEASE NOTE THAT EVERY BILL MUST BE PAID ON DUE DATE OR BEFORE DUE DATE OTHERWISE YOUR ELECTRICITY SUPPLY WILL BE DISCONNECTED WITHOUT ANY
WARNING
INFORMATION UNDER THE 24(1) ACT OF INDIAN ELECTRICITY RULE 1910.
Book No. Sc No. Account No. Meter No. Meter Reading Date
1/2
10/25/2019 Bill
S51D 33172860 33172860 NB80390 0 25/10/2019
Consumer Signature
1. Please mention connection no., book no., account no, name and address on the back of cheque/draft.
In case the present meter reading on verification found to be wrong/tampered. In such case consumer shall be penalised as per the revenue assesment.
Back
Print this Online Bill
Privacy Policy | Terms and Conditions| Refund Policy | Feedback | Admin
© Kanpur Electricity Supply Company Limited., All Rights Reserved
2/2