This document provides a summary of rates for interior fit-out works in Noida, India. It includes 9 sections - civil works, flooring and wet works, ceiling, partitions and wall cladding, doors and windows, finishes, electrical work, and modular furniture. The total cost is estimated to be ₹662,949 based on a cost of ₹596.71 per square foot. Additional costs may apply for taxes, extra work, or customized designs.

Uploaded by

Taranjot Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
422 views

Boq

This document provides a summary of rates for interior fit-out works in Noida, India. It includes 9 sections - civil works, flooring and wet works, ceiling, partitions and wall cladding, doors and windows, finishes, electrical work, and modular furniture. The total cost is estimated to be ₹662,949 based on a cost of ₹596.71 per square foot. Additional costs may apply for taxes, extra work, or customized designs.

Uploaded by

Taranjot Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Summary of Interior Fit-Out Works Gurgaon

S.No. Description of Works

1 Masnory & Plaster Works.


2 Flooring and wet work
3 Ceiling Work
4 Partitions, Storage And Wall Cladding.
5 Doors & Windows.
6 Finishes.
7 Electrical Work.
9 Furntiure Works.

GRAND TOTAL

AMOUNT PER SQFT COST.


Note:
a) Extra Govt. Tax as per applicable.
b) If any extra work will be done at site that will be cost extra in bill.
c) Logo on reception area as per design Actual +10%.
12/3/2019

s Gurgaon

Amount
(in Rs.)

₹ 10,285.00
₹ 77,104.00
₹ 10,500.00
₹ 68,220.00
₹ 45,300.00
₹ 158,740.00
₹ 69,550.00
₹ 223,250.00

₹ 662,949.00

596.71
RATES AGAINST INTERIOR FIT-OUTS
AT NOIDA
S.No. Location DESCRIPTION UNIT

CIVIL WORKS

1 MASONRY AND PLASTER

1.1 POP PUNNING (12mm-15mm) : Providing and fixing Average 12mm to 15mm thick Sqft
POP Punning over cement plaster in line & plumb finished smooth to receive paint.
(Internal surfaces of walls). Sakarni

TOTAL FOR MASONRY & PLASTER WORKS

2 PAVING AND WET WORKS

2.1 director room VINYL FLOORING :- Providing and laying of vinyl flooring . 3mm tkh Sqft

2.2 GRASS FLOORING :- Providing and laying of grass flooring . Sqft

2.3 VINYL FLOORING :- Providing and laying of vinyl flooring . 3mm tkh Sqft

2.4 KITCHEN/ PANTRY/ HAND WASH COUNTER :- Providing and fixing pantry with Granite Sqft
stone top and 200 high back splash of base cabinet made of laminated shutter on 20mm
BWP board with maple wood frame. All internal surfaces to have balancing laminate. The
rate inclusive of necessary hardware, handle lock sets, self closing hinges, spring loaded
shutter, latch inside, all cabinet hardware complete as per Architects approval. (BR of
stone to be taken as Rs 125/Sqft). Width of work top counter 600mm/ detailed
drawings.
TOTAL FOR FLOOR & WET WORKS

3
CEILING

Page 2 Bill Of Quantities


S.No. Location DESCRIPTION UNIT

3.1 Hall GYPSUM BOARD CEILING :- Providing and fixing suspended false ceiling, which includes Sqft
providing and fixing GI perimeter channels of size 0.55mm thick having one flange of
20mm and another flange of 30mm and a web of 27mm along with perimeter of ceiling,
screw fixed to brick wall/ partition with the help of nylon sleeves and screws at 610mm
centre. The suspending GI 0.9mm thick with two flanges of 15mm each from the soffit at
1220mm centers with ceiling angle of width 25mm x 10mm x 0.55mm thick fixed to soffit
with GI cleat and steel expansion fastner. Ceiling section of 0.55mm thickness having
knurled web of 51.5mm and two flanges of 26mm each with clips of 10.5mm are then
fixed to the intermediate channel with the help of connecting clips and in direction
perpendicular to the intermediate channel at 457mm centres. 12.5mm tapered edge
Gypboard (Conforming to IS - 2095 - 1982) is then screwed fixed to ceiling. Finally the
boards are to be jointed and finished so as to have a flush look which includes filling as
finishing the tapered and square edge of the boards with joining paper tape and two coats
of primer suitable for gypboard (as equivalent) extra frame work for electrical fittings, A/C
diffusers, and / or any other cut-out, trap doors, wooden shadow battens (hollock wood
black enamel painted - 25x40mm) at wall peripheres and ends, 12mm thick MDF board
for pelmet etc. complete including opening to be made for AC grills, light fittings, trap
doors etc. (The quoted rate shall be inclusive of suspenders at all heights).

SUB TOTAL OF CEILING

4 PARTITIONS, STORAGES AND WALL CLADDING

4.1 GYSPUM PARTITIONING- Gypsum partition using 12mm gyspum fixed on both sides on Frame sqft
50mm x 50mm of aluminium or equivalent complete with jointing and compunding.

4.2 FRAMING PARTITIONING WITH ROPE- Wood Frame 50mm x 50mm of aluminium or Sqft
equivalent as per approved sample and architectural drawings. Wooden frame to be fixed
to floor and RCC Ceiling using fastners.

4.3 8' -6"Height TOUGHENED GLASS PARTITION- P/F 12mm thk toughened glass partition complete Sqft
Glass Partitions with SS/ Alloy U channel at bottom of the floor and inside the ceiling as per
manufacturer's specifications. (For Measurement only Installed area will be
considered)

Page 3 Bill Of Quantities


S.No. Location DESCRIPTION UNIT

SUB TOTAL OF PARTITIONS AND WALL CLADDING

5 DOORS/ WINDOWS

5.1 Providing & fixing Toughened Glass sliding doors upto 2450 x 825 mm with patch fitting Nos
including Patch fitting, handle, lock etc. complete handle, patch fitting, swing machine etc

5.2 Providing & fixing Toughened Glass doors upto 2450 x825 mm with patch fitting including Nos
Patch fitting, handle, lock etc. complete handle, patch fitting, swing machine etc

SUB TOTAL OF DOORS

6 FINISHES

6.1 Reapiring of wall surface with cement wall putty one coat with all material required. sqft

6.2 3 or more coats of Asian/Dulux premium acrylic emulsion paint of approved colour over Sqft
chalk putty to even out any aberrations on surface. Putty shall be on top of layer of
cement primer. Smooth aberration free roller finish to be ensured in all coats of paint.

6.3 PASTEL COLOUR :- Extra over Item No-1 of plastic emulsion paint but for pastel colour. Sqft

6.5 Glass film


a) Sparkle Film Sqft

6.7 providig and fixing custmize wall paper for the area sqft

providig and fixing 3D texture wallpaper sqft

providig and fixing paneling sqft

SUB TOTAL OF FINISHES

Page 4 Bill Of Quantities


S.No. Location DESCRIPTION UNIT

7 ELECTRICAL WORK

7.1b) P/F data and voice wiring D link and all sockets will be Dlink and termination. Conduites Sqft
of akg, polypack make. cat-6 internet. Cat6 for telephone. (Each Workstation two RJ45 &
one RJ11 ) Including server complete.

7.2 Providing & fixing 12w LED Light including cutting in false ceiling complete with 2 year Pcs
warranty. Make Syska

7.3 Providing and fixing of hanging light in cabins & reception. No's

7.4 Y Suspended light - 1.5mtr white No's

Providing and fixing linear light No's

7.5 pendant lights for meeting No's

Providing & Fixing cove Light rmtr

SUB TOTAL OF ELECTRICAL WORK

8 MODULAR FURNITURE
8.1 Modular Making & Providing modular workstation of size 3'-0"x 18" at the top in laminate finish No's
Workstation using 1mm th laminate of appropriate colour & 19mm th as directed by engineer
incharge. The inner side of the table is to be fininshed with 0.8mm th. laminate. PVC
taping.

Page 5 Bill Of Quantities


S.No. Location DESCRIPTION UNIT

8.2 Conference Table Conference Table in 25mm thk commboard and structure in Particle board of 19 mm thk No's
with electrial box .Laminate finish on all surface.4'-6"x2'-6". The edges are to be treated
with PVC taping. The surface is to be finished with laminated board.

8.30 Director's Table. Making & Providing Director's table of size 6'X2'6" using 45 mm particle board & No's
Laminate. The edges of the table are to be treated PVC taping.

Making and providing back unit in director room sqft

8.4 Staff's Cabinet. Making & Providing using 19mm Particle board & lamiante of appropriate colour. The Sqft
edges of the table are to be treated with PVC taping. The cabinet is to be finished with
lamiante.

Pantry Provoding and fixing pantry table No's

SUB TOTAL OF MODULAR FURNITURE

Page 6 Bill Of Quantities


S.No. Location DESCRIPTION UNIT

Page 7 Bill Of Quantities


Date:- 12/3/2019

REF PIC BOQ QTY RATE AMOUNT

605.00 ₹ 17.00 ₹ 10,285.00

₹ 10,285.00

140.00 ₹ 76.00 ₹ 10,640.00

78.00 ₹ 78.00 ₹ 6,084.00

380.00 ₹ 76.00 ₹ 28,880.00

42.00 ₹ 750.00 ₹ 31,500.00

₹ 77,104.00

Page 8 Bill Of Quantities


REF PIC BOQ QTY RATE AMOUNT

140.00 ₹ 75.00 ₹ 10,500.00

₹ 10,500.00

328.00 ₹ 85.00 ₹ 27,880.00

70.00 ₹ 242.00 ₹ 16,940.00

90.00 ₹ 260.00 ₹ 23,400.00

Page 9 Bill Of Quantities


REF PIC BOQ QTY RATE AMOUNT

₹ 68,220.00

2.00 ₹ 15,400.00 ₹ 30,800.00

₹ -
1.00 ₹ 14,500.00 ₹ 14,500.00

₹ 45,300.00

600.00 ₹ 18.00 ₹ 10,800.00


₹ -
3900.00 ₹ 20.00 ₹ 78,000.00

₹ -
216 ₹ 45.00 ₹ 9,720.00
₹ -

120.00 ₹ 55.00 ₹ 6,600.00

145.00 ₹ 96.00 ₹ 13,920.00

95.00 ₹ 290.00 ₹ 27,550.00

135.00 ₹ 90.00 ₹ 12,150.00

₹ 158,740.00

Page 10 Bill Of Quantities


REF PIC BOQ QTY RATE AMOUNT

₹ -
75.00 ₹ 90.00 ₹ 6,750.00

₹ -
4.00 ₹ 800.00 ₹ 3,200.00

2.00 ₹ 6,400.00 ₹ 12,800.00

2.00 ₹ 6,000.00 ₹ 12,000.00

8.00 ₹ 3,600.00 ₹ 28,800.00

1.00 ₹ 3,000.00 ₹ 3,000.00

40.00 ₹ 75.00 ₹ 3,000.00

₹ 69,550.00

6.00 ₹ 4,600.00 ₹ 27,600.00

₹ -

Page 11 Bill Of Quantities


REF PIC BOQ QTY RATE AMOUNT

1.00 ₹ 13,600.00 ₹ 13,600.00

1.00 ₹ 26,000.00 ₹ 26,000.00

86.00 ₹ 725.00 ₹ 62,350.00

145.00 ₹ 580.00 ₹ 84,100.00

1.00 ₹ 9,600.00 ₹ 9,600.00

₹ 223,250.00

Page 12 Bill Of Quantities


REF PIC BOQ QTY RATE AMOUNT

Page 13 Bill Of Quantities

You might also like