Operation and Control in Power Systems Only MCQs
Operation and Control in Power Systems Only MCQs
I. Consider a power system with three identical generators. The transmission losses are
negligible. One generator (GI) has a speed governor which maintains its speed constant
at the rated value, while the other generators (G2 and G3) have governors with a droop
of 5%. If the load of the system is increased, then in steady state []
<if'
_I = 2.0 + O.OIPI
dPI
5. A power system has two synchronous generators. The Governer - turbine characteristics
corresponding to the generators are
P J = 50(50 - f), P2 = 100(51 - f)
Where f denotes the system frequency in Hz, and P J and P2 are respectively, the power
outputs (in MW) of turbines 1 and 2. Assuming the generators and transmission network
to be lossless, the system frequency for a total load of 400MW is []
(a) 4705Hz (b) 48.0Hz (c) 4805Hz (d) 49.0Hz
6. The bus impedance matrix of a 4-bus power system is given by
A branch having an impedance ofjO.2 ohm is connected between bus 1 and the reference.
Then the values of Z22,new and Z 23,new of the bus impedance matrix of the modified
network are respectively [ ]
(a) jO.5408 ohm and j0.4586 ohm (b) jO.1260 ohm and jO.0956 ohm
(c) jO.5408 ohm andjO.0956 ohm (d) jO.1260 ohm andjO.1630 ohm
7. A power system consists of 300 buses out of which 20 buses are generator buses, 25
buses are the ones with reactive power support and 15 buses are the ones with fixed
shunt capacitors. All the other buses are load buses. It is proposed to perform a load
flow analysis for the system using Newton - Raphson method. The size of the
Newton - Raphson Jacobian matrix is [ ]
(a) 553 x 553 (b) 540 x 540 (c) 555 x 555 (d) 554 x 554
8. Ifa generator of250 MVA rating has an inertia constant of6MJIMVA, its inertia constant
on lOOMVA base is [ ]
(a) 15MJIMVA (b) lOo5MJ/MVA (c) 6MJ/MVA (d) 2.4MJ/MVA
9. In load - flow analysis, the load at a bus is represented as [
(a) a constant current drawn from the bus
(b) a constant impedance connected at the bus
(c) constant real and reactive powers drawn from the bus
(d) a voltage - dependent impedance at the bus
Objective Questions 389
10. A transmission line has equal voltages at the two ends, maintained constant by two
sources. A third source is to be provided to maintain constant voltage (equal to end
voltages) at either the midpoint of the line or at 75% of the distance from the sending
end. Then the maximum power transfer capabilities of the line in the original case and
the other two cases respectively will be, in the following ration. []
(a) 1 : 1 : 1 (b) I : 2 : 1/0.75 (c)I:2:4 (d) I : 4: 16
11. The inertia constant ofa I OOMVA, 50Hz, 4-pole generator is 10MJ/MVA. If the mechanical
input to the machine is suddenly raised from 50MW to 75MW, the rotor acceleration
will be equal to [ ]
(a) 400kV (b) 260kV (c) 80kV (d) 40kV
12. Economic scheduling of generation is performed for a period of
(a) Y:z hr (b) 24 hr (c) I sec (d) I week
13. The input - output characteristic is plotted
(a) Fuel input Vs power output (b) Fuel input Vs time
(c) Fuel rate V s power output (d) Fuel rate Vs energy output
14. Hear rate curve is plotted in
(a) k-cal/kwhr Vs KW (b) K-cal/hr Vs KW
(c) k-callKW Vs Kw (d) K-cal Vs KW
15. Incremental production cost and incremental fuel cost are
(a) both the same (b) IPC > IFC
(c) IPC < IFC (d) They are not related
16. The incremental transmission loss for a 2-plant system is given by
(a) -dF ( 1 +
OPL-) (b) -dF ( 1 OPL
- -)
dPj oPi dP j oPI (c) (
1+_L
OP)
oPi
(d) (1- oP OPL )
19. IfR = 0.04 HzJMw by how much will the turbine power decrease, iffrequency rises by
O.IHZ [ ]
(a) 0.024Mw (b) 1I0.024MW (c) 0.0024Mw (d) 4.17MW
20. What is the load damping factor D for an area operated at 1000Mw, 50Hz
(a) 100 (b) 50 (c) 25 (d) 20
Kp
21. If the power system has a transfer function and given that the load damping
1 +STp
D = 25MW/Hz. What is the value of Kp
(a) 0.04HzJMW (b) OAHzJMW (c) 0.25HzJMW (d) 25HzJMW
22. Area frequency response characteristic is [
1 I D D
(a) D+- (b) R +- (c) - (d) - -
R D R R
23. A speed governing system has D = 20MWlHz. What is the frequency drop for 1% load
increase if the area is rated for 2000MW [ ]
(a) 1 Hz (b) 1.5 Hz (c) 0.5 Hz (d) 0.2Hz
24. Steady state frequency error in a single control area can be eliminated by
(a) proportional control (b) derivative control
(c) integral control (d) proportional plus derivative centro I
25. In a single uncontrolled area, area control error is defined by
d
(a) fddt (b) -M (c) df (d) - .!:df
dt R
26. When integral control is applied, if the control gain Kr is greater than critical gain, the
response is // [ ]
(a) over damped (b) damped oscillatory
(c) un damped oscillatory . I( d) unstable operation
Objective Questions 391
-
27. Which of the following statements is correct?
(a) primary load frequency control is performed by integral control
(b) secondary load frequency control is performed by integral control
Cc)- speed governor action always keeps the speed constant with load changes
Cd) economic load scheduling is always required to be performed before load frequency
control
28. Turbine generator dynamics and speed governor actions affect the performance of the
frequency response with load [ ]
(a) seriously
(b) only negligible action at t = 0+
(c) may cause trouble if governor is fast in action
(d) may cause trouble if the rating of the turbine is very high
29. The time constant of the power system Tp is defined by
20 f~
2H
(a) Tp = -o- ( b) T = 2fo (c) Tp =-o- (d) 2HD
f D p HO f H
30. Which of the following correct? ]
(a) load frequency control has serious affect on voltage profile
(b) if a generator is connected to an infinite bus the frequency change with load is
negligible
(c) turbine power increment for load change does not depend upon the response
characteristic of the turbine
(d) all the generating stations in any country can be treated as belonging to a single
control area
31. Given til = 50Hz, 0 = 20Mw/Hz, area rated- power = 2000Mw and H =- 5 sec the area
time constant Tp is [ ]
(a) 5 sec (b) 10 sec (c) 15 sec (d) 20 sec
32. Unit commitment is
(a) Economic schedule among different units
(b) Planning of generating units for future load increase
Cc) Optimal combination of units for operation at anyone time
Cd) To choose proper units from thermal, hydro and nuclear plants
392 Objective Questions
( c) I. pI-< pmax
pmlO :os;
I I -J I
(d) Vmtn < pm3x 2 + Qmax 2
I
34. Which of the following is a valid dynamic programming equation I
(b) Fn(~Pi)-fn(Pn)+Fn_{~PI)
2 tv
load
What are the transmission loss when lOMw is supplied by plant 2 to the load [ ]
(a) 2Mw (b) 4Mw (c) O.OOIMW (d) zero
38. 0.04 regulation in speed for a 100Mw rated generator means [ ]
(i) 2.0Hz drop in frequency
(ii) 40Hz drop in frequency
(iii) R = 0.02 HZ/Mw
(a) (i) is only correct (b) (i) and (ii) are both correct
(c) (ii) and (iii) are both correct (d) (i) and (iii) are both correct
Objective Questions 393
~ (b)
(a) 1+ STe I +STe
53. The voltage regulator block diagram shows an ]
(i) inherent phase lag (ii) inherent phase lead
(iii) inherent steady state error (iv) inherent instability at larger gains
(a) (i) and (ii) are correct (b) (ii) and (iii) are correct
(c) (ii), (iii) and (iv) are correct (d) (i) iii) and (iv) are correct
54. Under sterdy state condition, if K is the over all forwar~ path gain. Then, the steady
state error .1ess is [ ]
I I
(a).1e =-- (b).1e ss =K-
ss 1+ K
I
(c) .1e ss is independent ofk (d) .:1e ss =1+ K
396 Objective Questions
~Q S
(a) - (b) J£. (d) l:!.Q + Sse
·Sse ~Q
where ~Q is the change in reactive-power and Sse is the short circuit capacity.
59. Which of the following are true?
(i) the quadrature voltage compensator would control active power flow in the system
(ii) an in-phase voltage booster would control the reactive power flow in the system
(iii) the natural loading limit is the lowest limit for power transfer
(iv) thermal limit is the highest limit for power .transfer
(a) (i) and (ii) are only correct (b) (ii) only is correct
(c) (i) (ii) and (iii) only are correct (d) all are correct
Objective Questions 397
66. The power flow from area 1 to area 2 is giv~n by with usual notation
70. If AP OJ = K\ and AP 02 = 0, in a two area system, the steady state frequency error is
71. What is the tie-I ine power deviation if AP D:! = Is and AP DI =0 for a two area system
72. For two equal areas, for a load disturbance of AP D in an area, the steady state frequency
error is [ ]
AP ~ 2~ (d) A~PD
(a) _D
(c) AP
2~
(b) 2AP 2
D D
Objective Questions 399
73. If two equal areas with tie line power interchange of P12 experience a load change f1P D
in one of the areas, the tie line power deviation is [ ]
L\PD • n. L\PD n. L\PD
(a) - (b) 1-'1 -2- (c) 1-'_1 ") (d) L\P o
2 ....
74. Which of the following is true
(i) A synchrono\ls generator at sub synchronous frequencies acts as an induction
generator
(ii) At sub synchronous frequencies the rotor resistance viewed from the armature
ter.minals is negative.
(iii) At sub synchronous frequencies resonance may occur between electrical and
mechanical system
(iv) Series compensation causes sub synchronous resonance at very low frequencies
(a) (i) is true (b) (i) and (ii) are true
(c) (i), (ii) and (iii) are true (d) (i), (ii), (iii) and (iv) are true
Answers to Objective Questions