User Requirement Specification For Granulator (Super Mixer) Process Requirement No Requirement Yes/No
User Requirement Specification For Granulator (Super Mixer) Process Requirement No Requirement Yes/No
PROCESS REQUIREMENT
No Requirement Yes/No
1 Capacity of 300 liters
2 Speed range of chopper 0-3000 rpm
3 Speed range of impeller 0 -100 rpm
4 Single nozzle sprayer with adjustable droplet
5 Material SS316L mirrorless for product contact
6 Suction charging material
7 Set point of parameters should not be affected by power failure
8 Airseal impeller with sensor
9 Side chopper
10 Three blade impeller including scrapper
11 380 volt - 3000 watt electricity
12 Solution tank for binder with pressure
13 PLC control
SAFETY REQUIREMENT
No Requirement Yes/No
1 Interlock system
2 Explosion proof motor
3 Tank pressure 10 bar
4 Grounded electricity
5 Emergency stop
6 Power failure safety
GMP REQUIREMENT
No Requirement Yes/No
1 Control and monitoring of critical parameter via control panel
2 System failure alarm (audio-visual), including airseal failure
3 Run, start, stop and fault indication on control panel
4 access level control
5 process stopped during failure
GMP Business
No Equipment Equipment Use H M L H L
1 Super Mixer granulation process X X
1.1 Impeller speed to mix product in defined speed X X
Mixing time to mix product in defined time X X
1.2 Chopper speed to mix granule in defined speed X X
granulating time to mix granule in defined time X X
1.3 Sprayer to charge API X X
to spray binder X X
1.4 Suction charging material to charge material to mixing tank X X
Overall Impact
Direct Impact
Direct Impact
Direct Impact
Direct Impact
Direct Impact
Direct Impact
Direct Impact
Indirect impact
Test Items/ Funtion/ Process/
No Failure Mode
Component
Contamination of residue L H H H No
safety incident L H H H No
Qualification Step Risk After Control Measure
Risk Control/Action for
Correction
DQ IQ OQ PQ Risk Accepted
OQ
1 verify IQ report
2 verify impeller speed
3 verify timer
4 verify chopper speed
5 verify pressure regulator
6 verify alarm function
7 verify compressed air supply
8 verify spray droplet and spray rate
9 verify SOP on cleaning, operation, and maintenance
10 verify interlock testing
11 verify stop during failure
PQ
1 verify OQ report
2 Granule mass is formed
Calibration plan
1 speed
2 time
3 pressure