Estimates Template
Estimates Template
3. Formworks
-Fabrication and installation of -for footings and beams,
formworks with consideration of column,slab
renting steel scaffoldings -1/4" plywood pcs
-1/2" plywood pcs
-2x2x12 lumber pcs
-2" common nails kgs
-3" common nails kgs
-4" common nails kgs
-for scaffoldings
-2x2x12 lumber pcs
-2x3x13 lumber pcs
4. Concrete Works
-Concreting of column footing,wall -for col ftg.,wall ftg.,beams,
footing, columns, beams,slab columns,slab
-Waterproofing on toilet and bath, -portland cement 40 kgs bags
septic tank -white sand cu.m.
-gravel (3/4 passing) cu.m.
-premix concrete cu.m.
mixture,3000psi
w/ 3/4 crushed gravel
5.Masonry
-CHB Laying and plastering of walls -6" CHB for exterior walls pcs
-4" CHB for interior walls pcs
-12mmØ pcs
-#16 G.I. tie wire kg
-portland cement 40kgs bags
-white sand cu.m.
Project: Proposed 2-Storey Residential Building
Location: # 32 B. Gonzales Xavierville 1, Loyola Heights, Quezon City
Owner: Dr. Lordbert Parungao
J Tileworks Php
-Installation of tiles on ground floor, -china granite tiles sq.m.
T&B, and other specified areas -ceramic tiles sq.m.
-laminated vinyl sq.m.
L Perimeter Fence
-Laying out of chb for perimeter fence - 4" CHB for exterior walls pcs
and concreting of post and footings - portland cement 40kgs bags
-Concreting of concrete pavements - white sand cu.m.
-Concreting of basketball court - gravel (3/4 passing) cu.m.
- 10mmØ pcs
- 12mmØ pcs
- #16 G.I. tie wire kg
TOTAL 3,501,470.26
Php 4,842,266.46
lumber for
materials for structural scaffoldings common nails
and stagging
MEMBER PERIMETER AREA VOLUME CHB 6" CHB 4" CEMENT SAND GRAVEL 16mmØ 12mmØ 10mmØ G.I.WIRE 1/4 PLY 1/2 PLY 2X2X12 2X2X12 2X3X13 1 1/2 2 3 4
(m) (sq.m.) (cu.m.) (pcs) (pcs) (bags) (cu.m.) (cu.m.) (pcs) (pcs) (pcs) (kgs) (pcs) (pcs) (pcs) (pcs) (pcs) (kgs) (kgs) (kgs) (kgs)
col.ftg. 20.7 186.3 10.35 20.7 76 11.6 11
wall ftg 51.56 4.13 37.17 2.065 4.13 26 15 5.86 4
tie beam 65.63 4.92 44.28 2.46 4.92 66 63 19.86 9
beam 2nd 170.93 14.93 134.37 7.465 14.93 170 190 51.65 62.3 290 200 157 20 40 30
beam 3rd 170.93 12.82 115.38 6.41 12.82 170 163 51.65 56.38 350 200 157 20 60 30
r.beam 19.26 1.44 12.96 0.72 1.44 20 18 5.86
column 28.95 260.55 14.475 28.95 228 334 76.06 76 563 690 90 100 20
slab 1st 180.41 21.6 194.4 10.8 21.6 200 15.4
slab 2nd 223.18 33.5 301.5 16.75 33.5 210 210 41.88 312 60
slab 3rd 24.82 3.7 33.3 1.85 3.7 35 35 8.19 8
T&B-2nd f. 36.2 5.43 48 48 11.95 13
garage 66.5 11.9 107.1 5.95 11.9 70 5.39
septic 8.8 0.9 114 25.75 1.54 0.9 7 10 1.3 1
(below)ext.wall 137.5 1788 209.83 11.61 98 5.78
int.wall 112.9 1468 89.42 4.91 80 4.74
(expose)ext.wall 477.2 6204 957.26 59.36 340 20.04
int.wall 421.9 5485 536.66 35.23 300 17.72
col.fence 11.7 105.3 5.85 11.7 137 65 33.38 12 24
fence(up) 206.7 2687 414.64 25.71 147 8.68
fence(emb) 82.08 1067 125.25 6.93 58 3.44
court 48 8.64 77.76 4.32 8.64 56 4.43
dirty kitchen 22.3 2.7 24.3 1.35 2.7 26 1.9