0% found this document useful (0 votes)
255 views4 pages

Up-Dated Survey Questionnaire For IT Systems

The document contains an updated survey questionnaire for IT systems used by Punjab Land Records Society. It includes details of 3 systems - Computerized Land Record system, National Generic Document Registration System, and Revenue Court Management System. The systems are cloud-based, used for land records management, property registration and revenue court case management. The document provides information on system locations, architecture, software, users, data volumes, and networking details. It seeks to collect information on the operational status, investment and documentation of the IT systems.

Uploaded by

Pardeep Arora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
255 views4 pages

Up-Dated Survey Questionnaire For IT Systems

The document contains an updated survey questionnaire for IT systems used by Punjab Land Records Society. It includes details of 3 systems - Computerized Land Record system, National Generic Document Registration System, and Revenue Court Management System. The systems are cloud-based, used for land records management, property registration and revenue court case management. The document provides information on system locations, architecture, software, users, data volumes, and networking details. It seeks to collect information on the operational status, investment and documentation of the IT systems.

Uploaded by

Pardeep Arora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Up-dated Survey Questionnaire for IT Systems

Form1

1. Name of the Audited Entity:


Date of sending the data:____________________

2. Name of the IT system and a broad description about the functional areas covered by the IT
application :

The IT application “Computerized Land Record” is developed with the purpose to digitize
and update the Revenue Record of Punjab.
 Cloud based system.
 Bio metric authentication
 Computerised preparation of Jamabandi.
 Citizen services
 MIS reports
 Auto creation of day cash book regarding citizen services.

The Registration of deed is done using cloud based National Generic Document Registration
System (NGDRS) so that the citizens can easily make Online Property Registration.
 User can enter its vital data relating to property in transit.
 Cashless registration offices which includes e-stamp, e-registration duty, pasting fee,
facilitation charges, mutation charges etc.
 Appointment system.
 Deed Endorsements.
 Bio metric Authentication of parties (buyer, seller, witness) in the presence of Sub-
Registrar/ Registrar.
 Scanning of deeds.

Revenue Court Management System (RCMS) is a web based system designed and developed
by NIC, Punjab, to computerize all the revenue courts of Punjab and keep track of revenue
cases. The same is also integrated with CLR application.
 The proceeding of the cases including jimnins, next hearing date will be assigned.
 The final orders will be entered in the software.
 The case status can be viewed by public online.
 The details of the case instituted are reflected in the reference column of Jamabandi
of that particular Khewat on a real time basis.

3. Department head of auditee organization (name, phone no, email) : Member Secretary,
Punjab Land Records Society,0181-2254018,[email protected]
4. Information system in-charge person (name, phone no, email) : Joint Member Secretary,
Punjab Land Records Society,0181-2254018, [email protected]
5. What is (are) the location(s) of the IT systems installation(s)

The application is installed at 165 Fard Kendra established at Tehsil / Subtehsils of state
Punjab.
6. State the Category of IT system architecture :
Cloud based web enabled system

7. A. State the category of IT system:


Others: Land Records

B. Whether it is an E-Governance Project (Part of NEGP):


Central Mission Mode Project

C. Whether the above IT application has got a bearing on the financial and accounting
aspects of the organisation?
Yes
8. Software used and the Version :
Operating System(s):
Windows 10
Windows server 2016

Network Software:
Cloud based CLR software

Communication Software:
Internet connectivity: Internet Lease Lines / Broadband

RDBMS:
MS SQL Server 2017

Front End Tool:


a. Microsoft Visual Studio 2017(for application development)

Programming Language(s):
b. VB.net 2017
c. .net framework 4.6

Bespoke (Vendor Developed):


Sl.no Name of the software Version
-- -- --

Utility Software:
Sl.no Name of the software Version
-- -- --

9. Is the IT system a mission critical system or an essential system?


Mission critical system
10. Has the application system been/ being developed in house or by outsourcing?
The software development was initially outsourced to M/s Microsoft Applications. Total
Amount paid to Microsoft is 137.63 lac appx.
The software is upgraded to Cloud technology by in house team. Its support and further
upgradation is being done by in house team since 2013.
11. When the system was made operational? April 2008
12. What is the total investment on the IT system project? Indicate the amount in Lakhs of
rupees against each item:

Amount in lakhs
Hardware items 1150 clients 460
Proprietary software Included in cost of Cloud 541
setup
Application System Initially paid to Microsoft 137
development cost
Manpower training cost Inhouse training Branch
Maintenance of all the 92
components (recurring)

13. Number of persons engaged for operation of the system?


100-500
14.
15. Does the system Documentation provide for an audit trail of all transactions processed and
maintained
Yes
16. Are the manuals as indicated available?
a. Users documentation manual yes
b. Systems and programming documentation manual yes
17. Is there any system in place to make modifications to the application being used on a regular
basis to support the function?
Yes
18. Does the organisation transmit/receive data to/from other organisations
Transmit

Form2
19. Details of networking hardware employed:
Slno Category of H/W Name of the No of Units Cost
company
1 Hub -- -- --
2 Repeater
3 Modem -- -- --
4 NIC (network interface Card) -- -- --
5 Media Converters -- -- --
6 Basic Switch Cisco 164 2.62 lakh
7 Bridge -- -- --
8 Wireless Access Point -- -- --
9 Basic Router -- -- --
10 Basic Firewall -- -- --
11 Basic DHCP -- -- --
(Dynamic Host Configuration
Protocol Server)
20. Are more than one IT application(s) running on the same hardware? if Yes, specify the
name(s) of such IT application(s) apart from the application as indicated at Sl no2.
No
21. Size of database:

Date: 07/03/2019 size: Used: 3561720 MB

22. Average volume of monthly data:


Transaction data generated: 55-60 (in GB)
Master data : 58-62 (in GB)
23. Mode of access to the data : Online

Form3

24. What is the current status of the development of IT system if it is still under development?
Not applicable. Project is already implemented.
25. What is the projected cost for the IT system? (Not applicable)
26. What is the target date for completions? (Not applicable)

You might also like