Mobile PDF
Mobile PDF
User manual
MN.00224.E - 001
Volume 1/1
The information contained in this handbook is subject to change without notice.
Property of Siae Microelettronica S.p.A. All rights reserved according to the law and according to the inter-
national regulations. No part of this document may be reproduced or transmitted in any form or by any
means, electronic or mechanical, without written permission from Siae Microelettronica S.p.A.
Unless otherwise specified, reference to a Company, name, data and address produced on the screen dis-
played is purely indicative aiming at illustrating the use of the product.
MS-DOS®, MS Windows® are trademarks of Microsoft Corporation.
HP®, HP OpenView NNM and HP–UX are Hewlett Packard Company registered trademarks.
UNIX is a UNIX System Laboratories registered trademark.
Oracle® is a Oracle Corporation registered trademark.
Linux term is a trademark registered by Linus Torvalds, the original author of the Linux operating system.
Linux is freely distributed according the GNU General Public License (GPL).
Other products cited here in are constructor registered trademarks.
Contents
Section 1.
USER GUIDE 9
Section 2.
DESCRIPTIONS AND SPECIFICATION 17
4 ABBREVIATION LIST................................................................................................17
4.1 ABBREVIATION LIST .........................................................................................17
Section 3.
INSTALLATION 61
13 INSTALLATION ONTO THE POLE OF THE ODU WITH SEPARATED ANTENNA .............77
13.1 INSTALLATION KIT ...........................................................................................77
13.2 REQUIRED TOOLS FOR MOUNTING (NOT SUPPLIED) .............................................78
13.3 INSTALLATION PROCEDURE ...............................................................................78
13.4 GROUNDING ....................................................................................................80
15 INSTALLATION ONTO THE POLE OF THE ODU WITH INTEGRATED ANTENNA .........108
15.1 FOREWORD ................................................................................................... 108
15.2 INSTALLATION KIT ......................................................................................... 108
15.3 REQUIRED TOOLS FOR MOUNTING (NOT SUPPLIED) ........................................... 109
15.4 INSTALLATION PROCEDURE ............................................................................. 109
15.4.1 Installation onto the pole of the support system and the antenna ................ 109
15.4.2 Installation of ODU................................................................................ 110
15.4.3 ODU installation.................................................................................... 111
15.5 ANTENNA AIMING........................................................................................... 111
15.6 COMPATIBILITY.............................................................................................. 111
15.7 GROUNDING .................................................................................................. 112
17 INSTALLATION ONTO THE POLE OF THE ODU WITH RFS INTEGRATED ANTENNA...143
17.1 FOREWORD ................................................................................................... 143
17.2 INSTALLATION KIT ......................................................................................... 143
17.3 REQUIRED TOOLS FOR MOUNTING (NOT SUPPLIED) ........................................... 143
17.4 INSTALLATION PROCEDURE ............................................................................. 144
17.5 1+0 MOUNTING PROCEDURES ......................................................................... 144
17.5.1 Setting antenna polarization ................................................................... 144
Section 4.
LINE-UP 157
Section 5.
MAINTENANCE 191
Section 6.
PROGRAMMING AND SUPERVISION 201
Section 7.
COMPOSITION 205
29 ASSISTANCE SERVICE............................................................................................239
1 DECLARATION OF CONFORMITY
complies with the essential requirements of article 3 of the R&TTE Directive (1999/5/EC) and therefore is
marked CE.
- EN 301 489–4 V.1.3.1 (2002–8): “Electromagnetic compatibility and radio spectrum Matters (ERM);
Electromagnetic Compatibility (EMC) standard for radio equipment and services; Part 4. Specific con-
ditions for fixed radio links and ancillary equipment and services”
- ETSI EN 301 751 V.1.1. (2002–12): “Fixed Radio Systems; Point–to point equipment and antennas;
generic harmonized standard for point–to–point digital fixed radio systems and antennas covering the
essential requirements under article 3.2 of the 1999/5/EC Directive”.
Do not touch the bare hands until the circuit has been opened. pen the circuit by switching off the line
switches. If that is not possible protect yourself with dry material and free the patient from the con-
ductor.
It is important to start mouth respiration at once and to call a doctor immediately. suggested procedure
for mouth to mouth respiration method is described in the Tab.1.
This treatment should be used after the patient has regained consciousness. It can also be employed while
artificial respiration is being applied (in this case there should be at least two persons present).
Warning
10
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.1 - Artificial respiration
Lay the patient on his back with his arms parallel to the body.
If the patient is laying on an inclined plane, make sure that his
1 stomach is slightly lower than his chest. Open the patients
mouth and check that there is no foreign matter in mouth (den-
tures, chewing gum, etc.).
Kneel beside the patient level with his head. Put an hand under
the patient’s head and one under his neck.
Lift the patient’s head and let it recline backwards as far
2 as possible.
Shift the hand from the patient’s neck to his chin and his
mouth, the index along his jawbone, and keep the other fingers
closed together.
With your thumb between the patient’s chin and mouth keep
his lips together and blow into his nasal cavities
When the equipment units are provided with the plate, shown in Fig.1, it means that they contain compo-
nents electrostatic charge sensitive.
In order to prevent the units from being damaged while handling, it is advisable to wear an elasticized band
(Fig.2) around the wrist ground connected through coiled cord (Fig.3).
The units showing the label, shown in Fig.4, include laser diodes and the emitted power can be dangerous
for eyes; avoid exposure in the direction of optical signal emission.
12
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
2.3 CORRECT DISPOSAL OF THIS PRODUCT (Waste electrical &
electronic equipment)
(Applicable in the European Union and other European countries with separate collection systems). This
marking of Fig.5 shown on the product or its literature, indicates that it should not be disposed with other
household wastes at the end of its working life. To prevent possible harm to the environment or human
health from uncontrolled waste disposal, please separate this from other types of wastes and recycle it
responsibly to promote the sustainable reuse of material resources. Household users should contact either
the retailer where they purchased this product, or their local government office, for details of where and
how they can take this item for environmentally safe recycling. Business users should contact their supplier
and check the terms and conditions of the purchase contract. This product should not be mixed with other
commercial wastes for disposal.
CAUTION: Risk of explosion if battery is replaced by an incorrect type. Dispose of used batteries
according to law.
The purpose of this manual consists in providing the user with information which permit to operate and
maintain the ALS radio family.
Warning: This manual does not include information relevant to the SCT/LCT management program win-
dows and relevant application. They will provided by the program itself as help-on line.
The following knowledge and skills are required to operate the equipment:
The manual is subdivided into sections each of them developing a specific topic entitling the section.
Each section consists of a set of chapters, enlarging the main subject master.
It provides the information about the main safety rules and expounds the purpose and the structure of the
manual.
It traces the broad line of equipment operation and lists the main technical characteristics of the whole
equipment and units it consists of.
List of abbreviation meaning is also supplied.
Section 3 – Installation
The mechanical installation procedures are herein set down as well as the user electrical connections.
14
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Section 4 – Line–Up
Line–up procedures are described as well as checks to be carried out for the equipment correct operation.
The list of the instruments to be used and their characteristics are also set down.
Section 4 – Maintenance
In this section a description of alarms is given in order to help operators to perform equipment mainte-
nance and troubleshooting.
The ALS radio family is programmed and supervised using different software tools. Some of them are al-
ready available, some other will be available in the future.
This section lists the tools implemented and indicates if descriptions are already available.
Section 7 – Composition
Position, part numbers of the components the equipment consist of, are shown in this section.
This section contains the lists of figures and tables and the assistance service information.
4 ABBREVIATION LIST
- AF Assured Forwarding
- AL Access Link
- BB Baseband
- IF Intermediate Frequency
- NE Network Element
- ODU Outdoor Unit
18
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
5 SYSTEM PRESENTATION
5.1 RECOMMENDATION
• EN 300 019 environmental characteristics (Operation class 3.2 for IDU and class 4.1 for ODU; stor-
age: class 1.2; transport: class 2.3)
The ALS “plus2 family” is the new packet radio link from SIAE. These packet radio links are split mount
equipment made up of:
• an indoor unit called IDU for 19” rack mounting that interfaces tributaries and supervises the full
equipment
• an outdoor unit called ODU for pole or wall mounting with RF circuitry and antenna flange.
IDU units are available in the following mechanical versions
• modular: ALplus2. Main circuits are divided in modules, replaceable in case of failure
The LIM interfaces the in (out) E1 streams and Ethernet traffic and, through a multiplexing (demultiplex-
ing) and bit insertion (bit extraction) process, supplies (receives) the aggregate signal to the modulator
(from the demodulator). In addition the LIM performs the digital processing of the QAM modulator.
Moreover the module duplicates the main signals at the Tx side and performs the changeover at the Rx
side in the 1+1 version.
5.3.2 RIM
• the IF section of the programmable modemodulator (8 available profiles: 4QAM, 4QAM strong,
8PSK, 16QAM, 32QAM, 64QAM, 128QAM, 256QAM)
• the power supply unit that processes the battery voltage to supply power to the IDU circuits and
send the battery voltage towards the ODU
• the cable interface for the bidirectional communication between IDU and ODU via interconnecting
cable
• thanks to ACM (Adaptive Code Modulation) actual modulation can be automatically changed accord-
ing to available S/N.
5.3.3 Controller
• interfaces the service signals as 1x9600 bit/s or 2x4800 bit/s, 64 kbit/s, 2 Mbit/s (details are given
in the system technical specification)
• contains the equipment software that permits to control and to manage all the equipment function-
ality through a main controller and associated peripherals distributed within IDU and ODU
• interfaces the SCT/LCT management system through Ethernet, RS232 and USB ports
• receive external alarms and route them to relay contact along with the internal alarms generated
by the equipment.
20
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
The line interfaces contain the tributary connectors and, by means of processes of multiplexing/demulti-
plexing and of bit insertion/extraction, provide/receive the aggregate signal to/from the modulator/de-
modulator. The line interfaces realize the digital processing for the QAM modulator and, in 1+1
configuration, duplicate the main signals on the transmission side and execute the switch on the reception
side.
The interfaces to the ODU contain the interface of the cable for the bidirectional communication between
ODU and IDU, and implement the IF section of the mo-demodulator. The power supply units of the IDU
process the battery voltage and supply power to the circuits of IDU and ODU. The controller section of the
radio contains the interfaces of the service channels, stores the firmware of the IDU, interfaces the SIAE
management systems through dedicated supervision ports and forwards external and internal alarms to
the relay contacts.
5.5 ODU
The ODU unit contains IF and RF circuits that permits to transmit and receive the signals relevant the user
traffic, the management and the telemetry and it is connected with its IDU unit through a single cable.
The ODU employs four different passband filters with the following bandwidth: 7, 14, 28 and 56 MHz.
The ODU unit is available in two different versions: AS (only from hardware version 003) and ASN (opti-
mized).
The configuration of the ODU can be 1+0 or 1+1 with integrated or separated antenna.
In 1+1 configuration the antenna coupling is performed through a balanced or an unbalanced hybrid sys-
tem (branching unit).
5.6 MANAGEMENT
ALplus2 equipment can be locally and remotely controlled via an internal dedicated application software
called WEBLCT through Internet Browser and LAN connection. A serial/USB connection can be used through
the Web Lct console, an application that can be downloaded from SIAE site (http://www.siaemic.com)
It provides a friendly graphic interface complying with current standard use of keyboard, mouse, windows
and so on.
Other software available for management of a network of ALplus2 is SCT (Windows) and NMS5UX/NMS5LX
(Unix/Linux).
The hardware platform used by SCT/LCT is based on personal computer having at least following charac-
teristics:
• 1GB RAM
The SCT/LCT program is connected to the equipment via the following communication ports:
• LCT (USB)
• Embedded Overhead Channel (EOC) embedded into a 16 kbit/s or 4x16 kbit/s time slot of one of
the 2 Mbit/s tributary signals
• Connector RJ45
5.6.2.2 RS232
• Protocol PPP
• Protocol PPP
5.6.3 Protocols
SNMP along with IP or OSI protocol stacks are used to reach and manage the equipment operation.
1 2 3 ON 48V
SPEED
PoE
ACT FAIL
LINK
+
22
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1 2 3 ON 48V
SPEED
PoE
ACT FAIL
LINK
+
10-100-1000 BaseT/100-1000 BaseX 1 STM1 2 Trib: 1-8 Trib: 9-16
-
LINK LINK NURG URG 48V
ACT ACT WAY
SIDE
+
SW TEST
LCT RS232 USER IN/OUT MNGT/1 MNGT/2 CH1 CH2 2Mb/s
-
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON + -
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2
2
ON M 3.15A 48V
MNGT LAN 3 LAN 4 250V
NURG URG
1 LCT
SW
-
+
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2 2
2
ON M 3.15A
MNGT 48V
LAN 3 LAN 4 NURG URG 250V
1 LCT 1 2 1
SW
-
+
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16
1 2 1 2
2
M 3.15A
ON 250VAC 48VDC
MNGT NBUS
LAN 3 LAN 4 NURG URG
1 LCT
SW
+
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
24
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
6 TECHNICAL SPECIFICATIONS
In the following paragraphs are listed only the main characteristics of an IDU typology.
- 3 Ethernet ports: 2 RJ45, electrical (LAN1 and LAN2) and 2 SFP, optical (LAN1 and LAN3). LAN1
can be set electrical or optical.
• ALCplus2, max transmitted capacity 341 Mbit/s. Traffic options can vary depending on IDU version:
- 16E1 G.703 75/120 Ohm (2SCSI connectors, 8E1 each)
- 2 BUS for traffic connections with other ALCplus2 IDUs (same version).
Input side
Input side
Output side
The STM1 interface can be specialised for different applications, by simply equipping the STM1 interface
with the appropriate pluggable optical or electrical transceiver. Optical interface has LC connectors. Electric
interface has 1.0/2.3 connectors. The characteristics of all the possible optical interfaces are summarised
in Tab.2.
Launched Minimum
Operating Distance
Interface Ref. power sensitivity Transceiver Fibre
wavelength (km)
(dBm) (dBm)
I-1 ANSI -14 ... -20 -28 1263 - 1360 Laser MultiMode Up to 2
The LIM is provided with Automatic Laser Shutdown as prescribed by ITU-T G.664 Recommendation.
26
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
6.1.1.4 Ethernet interface
28
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
4QAMs 0.241 0.250 0.268 0.304 0.377 0.447 1.651
ALplus2 only.
- two channels (in the same connector) V.28 async. 4800 kbit/s
- one channel V.28 async. 9600 kbit/s with DTR and DSR
- one channel V.28 sync. 9600 kbit/s with DTR, DSR and DCD locally terminated
Input side
Output side
• Connector RJ45
• Connector RJ45
• Connector RJ45
30
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
6.1.3 Modulation and channel bandwidth
• Correction LDPC
Rx switch
Rx switch is hitless and the system has built in capabilities of minimizing errors during the detection time.
Branch 1 is preferential and the system switches to branch 2 only when branch 1 is error affected. The
switching facility provides automatic synchronization of the two incoming streams up to:
Levels Definition
Tx switch is not hitless. Maximum outage due to the Tx switching (sum of the maximum automatic change-
over + Rx IDU resynchronisation time), with ACM (Adaptive Code and Modulation) activated, is shown in
Tab.6.
• Interconnection with ODU unit single coaxial cable for both Tx and Rx
32
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
6.1.6 Consumption and max current adsorption
In this paragraphs are listed the following three characteristics: the max current (IMAX) at the power con-
nector of the IDU alone, the max current (IMAX) at the power connector of the IDU with the complete equip-
ment (IDU 1+1 and relevant 2 ODUs) and the consumption of the IDU alone. The consumption of the
complete equipment is described inside the ODU attachment (one for each frequency) with high precision,
at this point we have considered the ODU with the higher consumption (about 25W) among all the avail-
able.
Consumption
IDU IMAX (IDU only) IMAX (IDU+ODUs)
(IDU only)
ALplus2 1+0 1A (@40.8 Vdc) 1.7A (@40.8 Vdc) 40W (@57.6 Vdc)
ALplus2 1+1 1.2A (@40.8 Vdc) 1.7A (@40.8 Vdc) 48W (@57.6 Vdc)
ALCplus2 1+0 0.81A (@40.8 Vdc) 1.42A (@40.8 Vdc) 33W (@57.6 Vdc)
ALCplus2 1+1 0.92A (@40.8 Vdc) 2.15A (@40.8 Vdc) 38W (@57.6 Vdc)
ALCplus2 1+0
0.88A (@40.8 Vdc) 1.5A (@40.8 Vdc) 36W (@57.6 Vdc)
exp 16E1
ALCplus2 1+0
0.91A (@40.8 Vdc) 1.52A (@40.8 Vdc) 37W (@57.6 Vdc)
exp nodal
ALCplus2 1+1
1.1A (@40.8 Vdc) 2.23A (@40.8 Vdc) 41W (@57.6 Vdc)
exp 16E1
ALCplus2 1+1
0.91A (@40.8 Vdc) 2.33A (@40.8 Vdc) 45W (@57.6 Vdc)
exp nodal
6.1.7 Fuses
Power supply circuits are protected against overcurrent with fuses on supply line:
• ALplus2 there is an internal soldering fuse on the RIM PCB behind front panel
- Nominal current 3A
- Type timed
- Dimensions 5 mm x x20 mm
• Max RF level in Rx for BER 10-3 see attachment relevant to ODU frequency
• Additional Tx and Rx losses for 1+1 version see attachment relevant to ODU frequency
6.3.1 Dimensions
6.3.2 Weight
34
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
6.3.3 Environmental condition
7.1 CONFIGURATION
• Controller
• LIM
In Fig.18 you can find the block diagram of ALplus2 with 16E1, version 1+0 and 1+1 configuration. In
Fig.19 you can find the block diagram of Alplus2 with 16E1, 2x(1+0) configuration.
7.1.2 Controller
- USB port
- RS232 asynchronous used for SCT/NMS connection (using PPP protocol and baud rate speed up
to 57600)
- RS232 asynchronous used for connecting further NEs (using PPP protocol and baud rate speed
up to 57600)
- EOC embedded within the packet radio frame for connection to the remote NEs
• WEB LCT interface can be used with EOC capacity equal or bigger than 64 kbit/s
• log-in: the main controller manages the equipment or network login/logout by setting and then con-
trolling the user ID and relevant password
• database (MIB): equipment configuration is stored in a non-volatile memory
36
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
• user in and alarm out management: it receives external alarms and route them to relay contacts
along with the internal alarms generated by the equipment
• download: firmware, Web Lct and configuration file can be downloaded. Download activity is based
on FTP protocol.
The controller offers an electrical interface to the following three service channel:
Service signals connected to the controller modules are sent to the LIM module for MUX/DEMUX process-
ing.
7.1.2.2 Firmware
Equipment software permits to control and manage all the equipment functionality and it is distributed on
two hardware levels: main controller and ODU peripheral controllers.
Firmware can be updated through the Web Lct and it is stored in two different memory banks: one con-
taining the running firmware and the other the stand-by firmware. This permits to download a new
firmware release to the stand by bank without cutting the traffic
The Web Lct allows the configuration and the management of the local equipment. When the remote one
is configured properly, the whole radio link can be managed.
Web Lct runs on Internet Explorer and Firefox with Flash player plug-in.
WLC and Flash player plug-in for IE and Firefox can be downloaded from the site www.siaemic.com after
registration.
On Controller front panel are present four LEDs to summarize the terminal status:
Always on Controller front panel are present two Ethernet ports for management, MNGT1 and MNGT2,
whose LEDs are:
- green LED = ON
On the Controller board is present a slot, not accessible from the external, for the insertion of a memory
card.
The memory card allows the upload/download of the equipment configuration and the equipment firmware
7.1.3 LIM
• aggregation of the multiplexed signals along with services through a Bit Insertion circuit and vice-
versa. The aggregate frame contains:
- the main signal from the MUX(s)
- the EOC signals for supervision message propagation towards the remote equipment
• duplication of the digital processed signals to supply two RIMs in 1+1 configuration.
From the two RIMs the LIM receives I and Q analogue signals then digital converted for the following
processing:
• clock recovery
• frequency and phase carrier locking
• differential decoding
• parallel to serial conversion to recover the aggregate signal at the receive side.
The aggregate signal is then sent to a frame alignment circuit and CRC analysis and then to the error cor-
rector. The errors uncorrected by the FEC are properly counted to achieve:
38
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
• BER estimate measurement
• radio performances.
Inside LIM is present an Ethernet switch with 3 external ports (electrical 1000BaseT or optical 1000BaseX)
and one internal. Only port 1 is present with both kind of interface, the port 2 is electrical and port 3 optical.
The external interfaces (3 operational on 4 presents) are placed on the front panel. Internal port is repre-
sented by the local radio stream where through native Ethernet transport is connected with the remote
equipment.
• Speed
- one blinking = 10BaseT
- two blinking = 100BaseT
- three blinking = 1000BaseT
• LINK/ACT
- on = link up, no activity
- off = link down
- blinking = activity.
Switch function
LIM can operate like a switch between two or more separated LANs with the following advantages:
• to connect two separate LANs
• to keep separated the traffic into two LANs towards MAC filtering to get a total traffic greater than
the traffic in a single LAN.
The switch realised into LIM/Ethernet module is transparent (IEEE 802.1d and 802.q) into the same Vlan
described by VLAN Configuration Table.
It works at data link level, Layer 2 of OSI pile, and leave untouched Layer 3 and it takes care to send traffic
from a local LAN to another one (Local and Remote).
The operation is the following: when a LAN port receives a MAC frame, on the basis of destination address,
it decides which LAN to send it:
• if destination address is a known address (towards address learning procedure) and is present into
local address table, the frame is sent only on destination LAN (MAC switching)
• otherwise the frame is sent to all ports with the same VLAN ID (flooding).
Full duplex mode can be activated into 10/100BaseT interfaces manually or with autonegotiation.
100BaseFx operates always into full duplex mode.
Link Loss Forwarding (LLF) is an alarm status of Ethernet interface. LLF can be enabled or disabled.
If LLF is enabled, any linkdown alarm will generate the alarm status of Ethernet interface blocking any
transmission to it. LLF can be enabled for each ports at front panel.
With LLF enabled the equipment connected (routers, switches so on) can be notified that radio link is not
available and can temporarily re-route the traffic.
MDI/MDIX cross-over
The Ethernet electrical interface into FEM module can be defined by WebLct as MDI or MDIX to cross-over
between pairs so that external cross-over cable is not required.
VLAN functionality
LIM Ethernet module works with IEEE 802.1q and 802.1p tag. Tag is made up with:
• 1 fixed bit
• 12 bits VLAN identifier (VLAN ID) according with 802.1q.
Switch cross-connections are based on Vlan Configuration Table where input and output ports or only out-
put ports should be defined for any used VID. Vlan ID (VID) has a range from 1 to 4095.
Refer to Fig.16.
STM-1 frame generation requires that it is synchronised to a SDH network.
Into ALplus2 a synchronisation circuit, called SETS, gets the synchronisation signal from the following dif-
ferent sources:
• radio
• STM1
• tributary A/WST
• tributary B
• tributary n
• Lan3
• Lan4
• Internal source
As shown in Fig.16 the clocks extracted from the sources are sent to a selection circuit that chooses one
of the signals depending on the control sent by a selection logic.
This latter acts on the base of alarm roots (LOS-loss of input signal, LTI-loss of timing input, LOF-loss of
frame), on the base of assigned priority and manual forcing.
The selected clock drives an oscillator through a PLL circuit. The oscillator will generate the required syn-
chronisation for the STM-1 frame generation. If no input signals are available the internal oscillator source
is used for the local restart.
40
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Radio
Trib A
Trib B/n Synchronisation
Source
for
STM-1 selector
STM-1 interface
Lan3
Lan4
LOS
Logic circuit
LTI
for
Priority Control clock
Manual Forcing synchronisation
On LIM front panel are present two LEDs to describe the following aspect:
7.1.4 RIM
• power supply
• telemetry IDU/ODU.
Signals from LIM are connected to a programmable modulator. It consists of the following circuits:
The obtained 330 MHz QAM modulated carrier is then sent to the cable interface for connection with ODU.
7.1.4.2 Demodulator
At the receive side, from the cable interface, the 140 MHz QAM modulated carrier is sent to the QAM de-
modulator passing through a cable equalizer circuit.
The QAM demodulator within the RIM converts the signal to be sent to the digital part of the demodulator
within the LIM.
ACM profiles
In ALplus2/ALplus2 radio family uses Adaptive Code and Modulation (ACM) in order to employ the correct
modulation profile depending on the Rx signal quality.
• 4QAM strong
• 4QAM
• 8PSK
• 16QAM
• 32QAM
• 64QAM
• 128QAM
• 256QAM.
• 7 MHz
• 14 MHz
• 28 MHz
• 56 MHz.
ACM switching
The usage of the previous modulation profiles in a fixed channel bandwidth results in a variable capacity.
The criteria defining the necessity of an ACM switching, upshift or downshift, is the Rx S/N ratio.
• Upshift - When there is an increase of received S/N, within the same Channel Spacing, the modu-
lation complexity is increased in the direction from 4QAM strong to 256QAM increasing the spectral
efficiency
42
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
• Downshift - When there is a decrease of received S/N, within the same Channel Spacing, the mod-
ulation is reduced in the direction from 256QAM to 4QAM strong reducing the spectral efficiency,
In order to configure properly the radio link using ACM facility, an optimization must be found between
max traffic during good propagation conditions and max availability during bad propagation conditions. To
obtain this purpose the ACM in ALplus2/ALCplus2 family can be configured via software setting the follow-
ing parameters: ACM setting and Tx Power mode.
ACM setting
The ACM can vary modulation profiles between two extremes defined by the operator through software
configuration: Upper Modulation and Lower Modulation.
• Upper modulation - When propagation into the given radio channel is in the better condition (high
Rx S/N), the radio link is working at the maximum throughput defined at Upper Modulation: the
highest modulation profile that ACM can employ
• Lower modulation - When propagation into the given radio channel is in the worst condition (low
Rx S/N), the radio link is working at the minimum throughput, defined at Lower Modulation: the
lowest modulation profile that ACM can employ
Tx power mode
Tx power mode can be set as Constant Peak or Constant Average (constant bolometer measurement).
• Constant Peak - Tx power is at maximum at 4QAM and at 256QAM is reduced (typical 4.5 dB) so
the RF Tx amplifier can operate in better linear conditions.
The Tx Power mode is set depending on the modulation license of the user and depending on the Lower
Modulation that has been set.
For example:
In case of a 4QAM licence, all the other modulations must remain into the 4QAM mask. In this condition
Tx power must be Constant Peak (Tx Power Constant Peak Mode = Enable): max Tx power at 4QAM and
reduced power at all the other modulations.
In case of a 16QAM licence (or higher complexity) and Lower Modulation is set at 4QAM, the emitted spec-
trum must remain into the emitted spectrum defined for 16QAM even if the equipment is transmitting at
4QAM. In this case Tx power must be Constant Average (Tx Power Constant Peak Mode = Disable): Tx
power is always the same at any modulation and typically is the Upper Modulation's power. As an alterna-
tive the Lower Modulation can be set at 16QAM so Tx power Constant Peak can be activated.
With Constant Average Tx power (Tx Power Constant Peak Mode = Disable), the Tx power at 4QAM and
any other modulation is the same of Upper Modulation, so if Upper Modulation is 256QAM the output power
at any modulation is the same of 256QAM which is 4.5 dB less than 4QAM. The result is that enabling
256QAM is a big advantage for traffic but less link budget margin at 4QAM.
E1 priority
One is Permanent E1 equal to High Priority E1 that will never be interrupted during modulation downshift.
Downshift modulation will be limited to the minimum to obtain the selected Permanent E1.
The second group is Extra E1 equal to Low Priority, these tributaries will be interrupted progressively during
modulation downshift. They will start to be cut from the highest e.g. tributaries 16th or 32nd up to the first.
In Tab.9 it is reported the priority of tributaries, the lowest will be cut first.
Ethernet traffic
Once defined the bandwidth, Permanent E1 and Extra E1 at any modulation the amount of Ethernet ca-
pacity is the total radio capacity minus the Permanent + Extra E1 at any modulation.
The -48 V battery voltage feeds the IDU and ODU circuitry. The service voltage for the IDU feeding are
achieved through a DC/DC converter for +3.6 V generation and a step down circuit for -5 V.
Both voltages are protected against overvoltages and overcurrents. The same battery running through the
interconnection cable gives the power to the ODU.
The dialogue IDU/ODU is made-up by the main controller and associated peripherals within the ODU. Con-
trols for ODU management and alarm reporting is performed making use of a bidirectional 388 kbit/s
framed signals.
The transport along the interconnecting cable is carried out via two FSK modulated carriers:
7.2 LOOPS
To control the IDU correct operation a set of local and remote loops are made available. The commands
are forwarded by the WEBLCT/NMS program. Loop block diagram is shown by Fig.17.
7.2.1 Tributary
Each input tributary is routed directly to the tributary output upon receiving the command. The Tx line
transmission is still on.
44
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tributary remote loop
Each tributary directed towards the Rx output line is routed back to the Tx line. The Rx line is still on.
This kind of loop permits to check the full IDU operation. When activated, the modulator output is connect-
ed to demodulator input.
The loop is assured by converting the frequency of the modulator from 330 MHz to 140 MHz.
330
DEMUX BE
Trib. OUT 140
IDU loop
140 MHz
from ODU
1000BaseSX,LX
LAN3
Permanent E1 Radio
up to 60E1 1+0
1+1
E1
cross-connect
STM-1 MSP
Extra E1
up to 19E1
16E1
WST
Up to 80E1
Fig.18 - ALplus2 with 16E1, 1+0 and 1+1 version, block diagram
10/100/1000BaseT
LAN2
Port B
1000BaseSX,LX
LAN3
Permanent E1 Radio A
up to 60E1
1+0
E1
cross-connect
Extra E1
STM1 MSP up to 19E1
16E1
E1 WST
Permanent E1 Radio B
up to 60E1 1+0
- Permanent = High Priority
- Extra = Low Priority
Extra E1
up to 19E1
48
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
8 ALCPLUS2 IDU DESCRIPTION
8.1 CONFIGURATION
• Controller
• LIM
Circuits for others 16xE1 or 32xE1 are inserted into the ALCplus2 IDU, one RU subrack, with exp16E1 or
exp32E1 options.
Please refer to chapter 7 ALPLUS2 IDU DESCRIPTION for any information relevant to functionalities of the
listed circuits.
Inside IDU is present an Ethernet switch with 4 external ports (electrical 1000BaseT or optical 1000BaseX)
and one internal. Port 3 and Port 4 have both interfaces, Port 1 and Port 2 are electrical only.
The external interfaces (4operational on 6 present) are placed on the front panel. Internal port is repre-
sented by the local radio stream where, through native Ethernet transport, is connected with the remote
equipment.
For Ethernet switch functionalities, please refer to chapter 7 ALPLUS2 IDU DESCRIPTION.
On the front panel a protected slot for the insertion of a memory card is present.
The memory card allows the upload/download of the equipment configuration and the equipment firmware.
On Fig.20, Fig.21, Fig.22 and Fig.23 you can find block diagrams of ALCplus2 with 32E1 expansion, with
16E1 expansion and NBUS, with 16E1 expansion and without any expansion.
10/100BaseT
LAN1 Ethernet
1000BaseT
packet switch
10/100/1000BaseT
LAN2 Port A
10/100/1000BaseT
LAN3 1000BaseT,SX,LX
10/100/1000BaseT
LAN4 1000BaseSX,LX
Radio
Permanent E1
1+0
up to 60E1
1+1
E1
cross-connect
32E1
2E1
Up to 80E1
Fig.20 - ALCplus2 with 32E1 expansion, STM-1, 1+0 and 1+1 version, block diagram
50
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
10/100BaseT
LAN1 Ethernet
1000BaseT
packet switch
10/100/1000BaseT
LAN2 Port A
10/100/1000BaseT
LAN3 1000BaseT,SX,LX
10/100/1000BaseT
LAN4 1000BaseSX,LX
Radio
Permanent E1
1+0
up to 60E1
1+1
E1
cross-connect
STM-1 MSP
Extra E1
16E1 up to 19E1
NBUS1
NBUS2
2E1
Up to 80E1
Fig.21 - ALCplus2 with 16E1 expansion, STM1, NBUS, 1+0 and 1+1 version, block diagram
10/100/1000BaseT
LAN3 1000BaseT,SX,LX
10/100/1000BaseT
LAN4 1000BaseSX,LX
Radio
1+0
1+1
2E1
Fig.22 - ALCplus2 with 2E1, 1+0 and 1+1 version, block diagram
10/100BaseT
LAN1 Ethernet
1000BaseT
packet switch
10/100/1000BaseT
LAN2 Port A
10/100/1000BaseT
LAN3 1000BaseT,SX,LX
10/100/1000BaseT
LAN4 1000BaseSX,LX
16E1 Radio
1+0
1+1
2E1
Fig.23 - ALCplus2 with 16E1, 1+0 and 1+1 version, block diagram
52
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
9 ODU DESCRIPTION
The ODU (refer to Fig.24) consists of a two shell aluminium mechanical structure, one shell housing all the
ODU circuits, the other forming the covering plate.
• the “N” type connector for cable interfacing IDU and ODU
• the “BNC” connector for connection to a multimeter with the purpose to measure the received field
strength
• a ground bolt.
The 1+1 configuration consists of two 1+0 ODUs mechanically secured to a structure housing the hybrid
(or branching unit) for the antenna connection.
9.1.1 AS ODU
The AS ODU is shown in Fig.24 (single ODU) and in Fig.25 (1+1 ODU with branching unit).
Electrical and mechanical characteristics are listed in a separate addendum relevant to ODU frequency.
The ASN ODU is shown in Fig.24 (single ODU) and in Fig.25 (1+1 ODU with branching unit).
Electrical and mechanical characteristics are listed in a separate addendum relevant to ODU frequency.
9.2 DESCRIPTION
• power supply
• Tx section
• Rx section
The cable interface permits to interface the cable interconnecting IDU to ODU and viceversa.
It receives/transmits the following signals:
The 17.5 MHz and 5.5 MHz FSK modulated carriers, carry the telemetry channel. This latter consists of two
388 kbit/s streams one from IDU to ODU with the information to manage the ODU (RF power, RF frequen-
cy, capacity, etc...) while the other, from ODU to IDU, sends back to IDU measurements and alarms of the
ODU. The ODU management is made by a µP.
The battery voltage is dropped from the cable interface and then sent to a DC/DC converter to generate
three stabilized output voltages to be distributed to the ODU circuitry.
9.5 TX SECTION
The IF carrier is converted to RF and then amplified making use of a MMIC circuit. The conversion mixer is
SSB type with side band selection.
The power at the MMIC output can be manually attenuated by 40 dB, 1 dB step (20dB, 1dB step for ODU
ASN).
The automatic adjustment is performed making use of an ATPC (see paragraph 9.5.1 ATPC operation for
details). The regulated output power is kept constant against amplifier stage gain variation by a feedback
including the AGC.
54
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Before reaching the antenna side the RF signal at the output of MMIC passes through the following circuits:
A particular setting of Tx and Rx RF oscillators allows to obtain a RF Loop, managed by Controller module.
The particular way used to perform the RF loop avoids the necessity to switch off the remote Transmitter.
RF Loop is available in AS ODU only.
The ATPC regulates the RF output power of the local transmitter depending on the value of the RF level at
the remote terminal. This value has to be preset from the local terminal as threshold high and low. The
difference between the two thresholds must be equal or higher than 3 dB.
As soon as the received level crosses the preset threshold level low (see Fig.29) due to the increase of the
hop attenuation, a microP at the received side of the remote terminal sends back to the local terminal a
control to increase the transmitted power. The maximum ATPC range is 40 dB (ODU AS, 20dB only in ODU
ASN)
If the hop attenuation decreases and the threshold high is crossed then the control sent by the microP
causes the output power to decrease.
9.6 RX SECTION
The RF signal from the Rx bandpass filter is sent to a low noise amplifier that improves the receiver sen-
sitivity. The following down–converter translates the RF frequency to approximately 765 MHz. The conver-
sion mixer is SSB type. The sideband selection is given through a µP control.
A second down converter generates the 140 MHz IF carrier to be sent to the demodulator within the IDU.
The level of the IF carrier is kept constant to –5 dBm thank to the IF amplifier stages, AGC controlled,
distributed in the IF chain.
Between two amplifiers a bandpass filter assures the required selectivity to the receiver. The filter is SAW
type and the bandwidth depends on the transmitted capacity.
The two ODUs are coupled to the antenna side via a balanced or unbalanced hybrid.
1+1 Tx switching occurs in the 1+1 hot stand–by 1 antenna or 2 antennas versions as shown in Fig.27 and
Fig.28.
The transmitter switchover is controlled by μProcessor and the attenuation of the stand-by transmitter is
at least 50 dB.
O-ring
ODU side flange
ASN version
"N"
"BNC"
Ground bolt
AS version
56
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
ASN version
Suncover (optional)
AS version
x
N type 330
Cable MHz Cable IF Tx
interface equaliz. T
MMIC
140 LNA
MHz
variable 140
µP bandwidth MHz
(capacity Rx LO
depending)
AGC
µP
SW control
Rx side
Antenna
side
Tx side
SW control
Rx side
Tx side
SW control
First
antenna
Rx side
Tx side
SW control
Second
antenna
Rx side
Local Remote
Tx Rx
Thresh High
PTx actuation PRx recording
Thresh Low level
µP µP
PTx control
Transmission
Rx Tx
of PTx control
Local PTx
dBm
PTx max.
40 dB (ODU AS)
20 dB (ODU ASN)
ATPC range
PTx min.
60
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Section 3.
INSTALLATION
The equipment is a split mount (indoor-outdoor) radio link system operating in the frequency ranges 4, 6,
7, 8, 13, 15, 18, 23, 25, 28 and 38 GHz, for low, medium and high transport capacity (from 4 up to 622
Mbit/s), designed to establish LAN-LAN connections and PDH/SDH access. For the details related to the
actual used frequency band refer to the label on the equipment.
The system is provided with an integral antenna; however, in case its antenna is not used, it should be
connected to an antenna conforming to the requirements of ETSI EN 302 217-4-2 for the relevant frequen-
cy band.
• Baseband (indoor)
Class 2 radio equipment subject to Authorisation of use. The equipment can operate only at the fre-
quencies authorised by the relevant National Authority.
The deployment and use of this equipment shall be made in agreement with the national regulation
for the Protection from Exposure to Electromagnetic Field.
The symbol indicates that, within the European Union, the product is subject to separate collec-
tion at the product end-of-life. Do not dispose of these products as unsorted municipal waste. For more
information, please contact the relevant supplier for verifying the procedure of correct disposal.
The equipment consists of IDU and ODU(s) units and is mechanically made up of a wired 19” subrack (IDU)
and a weather proof metallic container (ODU). The two units are shipped together in an appropriate card-
board box.
After unpacking, mechanical installation takes place followed by electrical connections as described in the
following paragraphs.
10.3.1 IDU
On their sides the subracks making up the several IDU versions are provided with two holes for the M6
screws fastening the subracks to a rack or to a 19” mechanical structure. The front of the IDU mechanical
structure is provided with the holes at the sides. This permits to fasten the subrack to a 19” rack by means
of 4 M6 screws.
ALPlus2 - To avoid overtemperature problems the free space below and above an IDU must be 22 mm
(1/2RU) minimum.
The electrical wiring must be done using appropriate cables thus assuring the equipment responds to the
electromagnetic compatibility standards.
The cable terminates to flying connectors which have to be connected to the corresponding connectors on
the equipment front.
Position and pin–out of the equipment connectors are available in this section.
Tab.10 shows the characteristics of the cables to be used and the flying connector types.
62
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.10 - Characteristics of the cables
During the final installation, the IDU must be protected by a magneto-thermal switch (not supplied with
the equipment), whose characteristics must comply with the laws in force in one's country.
The disconnection from the supply mains is made disconnecting the connector SUB-D 3W3 from the IDU.
- Return loss (connectors included) batter than 22 dB (from 100 MHz to 400 MHz)
- Shielding effectiveness 90 dB
10.6.2 Connectors
With the 1/4” cable, the max length is 300m for all modulation profile.
Under development.
64
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
10.7 GROUNDING CONNECTION
Fig.30 and annexed legend show how to perform the grounding connections.
Indoor 3 4
3 4
ODU
unit
1 5
7 IDU 2
unit
(+) (-)
6
Station Local
ground ground
ground
rack
Legend
1 IDU grounding point, faston type. The cross section area of the cable used must be ≥ 4 sq. mm. The
faston is available on the IDU both sides.
2 ODU grounding bolt. The cross section area of the cable used must be ≥ 16 sq. mm
3 IDU–ODU interconnection cable type Celflex CUH 1/4” terminated with N–type male connectors at
both sides.
4 Grounding kit type Cabel Metal or similar to connect the shield of interconnection cable.
5 Matching cable (tail) terminated with SMA male and N female connectors.
6 Battery grounding point of IDU to be connected to earth by means of a cable with a section area
2.5 sq. mm. Length ≤ 10 m.
7 Grounding cords connected to a real earth internal of station. The cross section area of the cable
must be ≥ 16 sq. mm
Characteristics
The front panel of the ALplus2 modular IDU is made up by the front panels of the modules LIM, RIM and
Controller. See Fig.31.
Electrical port 1 and port 2 can be configured MDI or MDIX via WEBLCT.
• Trib 1-8, 75 Ohm and 120 Ohm E1 in/out 50 pin SCSI female
(Tab.12 for 75Ohm and Tab.13
for 120Ohm)
• Trib 9-16, 75 Ohm and 120 Ohm E1 in/out 50 pin SCSI female
(Tab.12 for 75Ohm and Tab.13
for 120Ohm)
E1, 75 Ohm and 120 Ohm interfaces are present in the same connector (different pins).
66
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
• MNGT/2, management RJ45 (see Tab.16)
Port MNGT/1 and port MNGT/2 set MDI or MDIX status automatically.
Ethernet Power
IDU-ODU
Port 1 Port 2 Port 3 2xSTM-1 16E1 cable supply
1 2 3 ON 48V
SPEED
PoE
ACT FAIL
LINK
+
10-100-1000 BaseT/100-1000 BaseX 1 STM1 2 Trib: 1-8 Trib: 9-16
-
LINK LINK IDU ODU 48V
ACT ACT WAY
SIDE
+
REM TEST
LCT RS232 USER IN/OUT MNGT/1 MNGT/2 CH1 CH2 2Mb/s -
Function
Pin RJ45
10/100BaseT 1000BaseT
4 nc BI_DD+
5 nc BI_DD-
7 nc BI_DC+
8 nc BI_DC-
Pin 75 Ohm
48 Ground A
50 Ground A
47 Ground A
45 Ground A
42 Ground A
43 Ground A
40 Ground A
39 Ground A
36 Ground B
37 Ground B
34 Ground B
33 Ground B
29 Ground B
31 Ground B
28 Ground B
26 Ground B
Note: Join pin 44 with ground A pins, join pin 32 with ground B pins.
25 1
.........................
.........................
50 26
68
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.13 - 8xE1, 50 pin SCSI female 120 Ohm)
44 Ground A
44 Ground A
44 Ground A
44 Ground A
44 Ground A
44 Ground A
44 Ground A
44 Ground A
32 Ground B
32 Ground B
32 Ground B
32 Ground B
32 Ground B
32 Ground B
32 Ground B
2 Tributary 8/16output
32 Ground B
25 1
.........................
.........................
50 26
Pin Description
1 DCD (IN)
2 RD (IN)
3 TD (OUT)
4 DTR (OUT)
5 GND
6 Not connected
7 RTS (OUT)
8 CTS (IN)
9 Not connected
70
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.15 - SUB-D 9 pin male USER IN/OUT)
Pin Description
5 User input 01
6 User input 02
7 User input 03
8 User input 04
9 Ground
Tab.16 - MNGT/1 and MNGT/2 100BaseT connector pin-out for 10/100BaseT Ethernet connec-
tion (RJ45)
Pin Description
1 Tx+
2 Tx-
3 Rx+
4 --
5 --
6 Rx-
7 --
8 --
Tab.17 - CH1 connector pin-out for 9600 bit/s synchronous V.24 interface (RJ45)
Pin Description
1 CKTx (OUT)
2 TD (IN)
3 DTR (IN)
4 DSR (OUT)
5 GND
6 RD9600 (OUT)
7 CKRx (OUT)
8 DCD (OUT)
Pin Description
1 --
2 TxD (IN)
3 DTR (IN)
4 DSR
5 GND
6 RxD (OUT)
7 --
8 DCD (OUT)
Tab.19 - CH1 connector pin-out for 1x9600 or 2x4800 kbit/s V.28 interface (RJ45)
Pin Description
1 --
4 --
5 GND
7 --
Tab.20 - CH2 connector pin-out for 64 kbit/s channel - V.11 interface (RJ45)
Pin Description
1 D-V11-Tx
2 D+V11-Tx
3 C-V11-Tx
4 C+V11-Tx
5 D-V11-Rx
6 D+V11-Rx
7 C-V11-Rx
8 C+V11-Rx
72
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.21 - 2 Mbit/s wayside connector pin-out (RJ45)
Pin Description
3 GND
7 GND
The front panel of the ALCplus2 IDU is made up by various connectors depending on IDU version: in the
following type of connectors and relevant pin-out are listed. On the body of each IDU there is the ground
connection: 6.3mm male (Faston).
In Fig.8 and Fig.9 are shown the 1+0 and 1+1 version. The following connectors are available:
• MNGT1, 2 management
Port MNGT 1, 2 set MDI or MDIX status automatically RJ45 (Tab.16)
3 GND
7 GND
74
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Tab.23 - SUB-D 9 pin male USER IN/OUT
1 C relay contact
2 NO relay contact
3 User Input 01
4 User Input 02
5 Ground
6 Do not use
7 NC relay contact
8 Not connected
9 Do not use
In Fig.10 and Fig.11 are shown the 1+0 and 1+1 version. The following connectors are presents:
• MNGT1, 2 management
Port MNGT 1, 2 set MDI or MDIX status automatically RJ45 (Tab.16)
In Fig.14 and Fig.15 are shown the 1+0 and 1+1 version. The following connectors are present:
• MNGT1, 2 management
Port MNGT 1, 2 set MDI or MDIX status automatically RJ45 (Tab.16)
In Fig.12 and Fig.13 are shown the 1+0 and 1+1 version. The following connectors are present:
• MNGT1, 2 management
Port MNGT 1, 2 set MDI or MDIX status automatically RJ45 (Tab.16)
• STM-1 1, 2 in/out
SFP can be I.1, S1.1, L1.1, L1.2, electrical coaxial 1.0/2.3 SFP
76
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
13 INSTALLATION ONTO THE POLE OF THE ODU
WITH SEPARATED ANTENNA
Following installation kits are supplied with the equipment depending on different versions:
• 1+0 version
- supporting plate plus 60–114 mm pole fixing bracket and relevant nuts and bolts (see Fig.35)
- adapting tools and relevant bolts and nuts for 219 mm pole (see Fig.36)
- connection to the antenna with flexible wave guide and possible use of a rigid elbow (optional)
(see Fig.37)
Besides the previous items a specific flange adaptor (kit V32409) must be used (see Fig.45). The
flange is UDR70.
• 1+1 version
- antisliding strip (see Fig.34)
- supporting plate plus pole fixing bracket and relevant nuts and bolts (see Fig.35)
- adapting tools and relevant bolts and nuts for 219 mm pole (see Fig.36)
Besides the previous items a specific flange adaptor (kit V32415) must be used (see Fig.46). The
flange is UDR70.
Warning: in order to avoid damages to flexible waveguides, don’t fold or twist them more than values
specified as limit in installation instructions of the waveguide supplier.
In case of flexible wave guide use, Tab.26 shows the maximum bending radius.
Warning: if screwing operation concerns more than one screw or bolt, tighten subsequently everyone and
its opposite, step by step.
• Version 1+0: installation onto the pole of the support plate by Band-it
• Version 1+1: installation onto the pole of the supporting plate 2
• ODU grounding
Fig.34 – Mount antislide strip around the pole. The position of the plastic blocks depends on the position
of the supporting plate (see next step)
Fig.35 – Adhere the supporting plate to the antisliding strip plastic blocks and then secure it to the pole
through the fixing bracket for 60–114 mm pole (see Fig.35). Bolts and nuts are available on the supporting
plate. Tightening torque must be 32 Nm.
Warning: As shown in Fig.36 an adapting kit must be used for the 219 mm pole. It consists of an additional
plate to enlarge the standard supporting plate dimension and relevant U–bolt for 219 mm pole fixing.
Fig.37 – Fix the flexible waveguide to the antenna side flange. Four fixing screws are available the dimen-
sions of which depend on the waveguide type. Tighten progressively and alternatively the four screws with
the following torque:
Fig.37 – Fix the antenna side flange to the support with ODU fast locking mechanism. The flange can be
mounted horizontally (as shown in Fig.37) or vertically as function of convenience.
Fig.38 – Fix the support with ODU fast locking mechanism to the supporting plate making use of available
bolts and nuts. Fig.38 shows the possible positions. Tightening torque must be 18 Nm.
78
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1+0 version – Installation onto the pole of the supporting plate by Band-it
In case of 1+0 ODU installation, a Band-it pole mounting kit can be used: through slots (see Fig.39) on
the supporting plate two metallic bands secure the plate on the pole. Band characteristics are:
• thickness 0.76 mm
• width 19 mm.
Fig.34 – Mount antislide strip around the pole. The position of the plastic blocks depends on the position
of the supporting plate (see next step)
Fig.35 – Position the supporting plate to the antisliding strip plastic blocks and then secure it to the pole
through the fixing bracket for 60–114 mm pole (see Fig.35). Bolts and nuts are available on the supporting
plate kit. Tightening torque must be 32 Nm.
Fig.40 – Secure the hybrid with ODU fast locking mechanism to the supporting plate using bolt and nuts
available on the support plate. Tightening torque must be 18 Nm.
Remove the plastic cover from the hybrid flange sides.
Warning: Do not remove the foil from the hybrid flange sides.
Fig.40 – Fix the flexible waveguide to the antenna side flange. Four fixing screws are available the dimen-
sions of which depend on the waveguide type. Tighten progressively and alternatively the four screws with
the following torque:
Warning: It is advisable to shape the waveguide flexible trunk, connecting ODU flange with antenna flange
as shown in Fig.43. This avoids possible condensate to be channelled towards the ODU flange.
1 Remove the plastic cover from the ODU flange side. Apply silicon grease e.g. type RHODOSIL PATE
4 to the O–ring of Fig.42.
Warning: Do not remove the foil from the flange.
2 Bring the ODU with the two hands and position the ODU handle at the bottom side.
3 Position the ODU body close to the support with ODU fast locking mechanism and align ODU side
flange (see Fig.42) to antenna side flange (see Fig.37 – 1+0 version) or hybrid side flange (see
Fig.40 – 1+1 version).
Note: For 1+0 version the ODU can assume positions of Fig.41 depending on the polarisation.
4 With respect to the flange alignment, turn the ODU body approx. 30° anti–clockwise and then insert
the ODU body into the support and search for alignment between reference tooth on the support
(see Fig.37 – 1+0 version or Fig.40 – 1+1 version) and ODU body reference tooth (see detail Fig.42)
5 When alignment is achieved, turn the ODU body clockwise until “clack” is heard and the ODU rota-
tion stops.
6 Secure ODU body on the support by tightening bolts (1) (see Fig.37 – 1+0 version or Fig.40 – 1+1
version). Tightening torque must be 6 Nm.
Final assembly of 1+1 version is shown in Fig.43. A parasol mounting is optionally possible.
6 GHz or 7 GHz
200 (7,9) 500 (19,8) 300 (11,9) 600 (23,7)
low
7 GHz high 200 (7,9) 500 (19,8) 250 (9,9) 600 (23,7)
a. Bending E-plane
Rmin/E
Bending E-plane
(short side of the section)
b. Bending H-plane
Rmin/H
Bending H-plane
(long side of the section)
80
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Plastic blocks
Antisliding strip
Supporting plate
Use 15 mm wrench
(32Nm torque)
82
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.36 - Adapting kit for 219 mm pole
Reference tooth
Reference tooth
1
1
Position of antenna
side flange
1 13 mm wrench
6 Nm torque
84
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
A
B C
Fig.38 - Possible positions of the support with ODU fast locking mechanism
86
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Use 13 mm wrench
(18 Nm torque)
Optional vawe
guide
RT1 RT2
Fig.41 - Position of the ODU body depending on the polarisation for 1+0. For 1+1 the polarisa-
tion is always vertical: handle at the left side.
88
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Reference tooth
O-ring
ODU side flange
ASN version
"N"
"BNC"
Ground bolt
AS version
AS version
90
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
2
3
4
5
ASN version
AS version
Washer
Screw M5x25
Screw M4x8
92
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
UDR70 flange
Screw M4x18
Spring
Washer
O-Ring
Hybrid 6 GHz
(balanced or
unbalanced)
Following installation kits are supplied with the equipment depending on different versions:
• 1+0 version
- wall supporting plate with additional contact surface extension plates (see Fig.47)
- connection to the antenna with flexible wave guide and possible use of a rigid elbow (optional)
(see Fig.48)
Besides the previous items a specific flange adaptor (kit V32409) must be used (see Fig.55). The
flange is UDR70.
• 1+1 version
- supporting plate with additional contact surface extension tools (see Fig.47)
- connection to the antenna with flexible wave guide and possible use of a rigid elbow (optional)
(see Fig.48)
Besides the previous items a specific flange adaptor (kit V32415) must be used (see Fig.56). The
flange is UDR70.
In case of flexible wave guide use, Tab.29 shows the maximum bending radius.
Warning: if screwing operation concerns more than one screw or bolt, tighten subsequently everyone and
its opposite, step by step.
94
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
14.3 INSTALLATION PROCEDURE
• ODU grounding.
Fig.47 – Fix on the supporting plate the two supplied extension plates to increase the wall contact surface.
Fig.47 – Secure the supporting plate on the wall using the more suitable screws.
Fig.48 – Fix the flexible waveguide to the antenna side flange. Four fixing screws are available the dimen-
sions of which depend on the waveguide type. Tighten progressively and alternatively the four screws with
the following torque:
Fig.48 – Fix the antenna side flange to the support with ODU fast locking mechanism. The flange can be
mounted horizontally (as shown in Fig.48) or vertically as function of convenience.
Fig.49 – Fix the support with ODU fast locking mechanism to the supporting plate making use of available
bolts and nuts. Fig.49 shows three possible positions. Tightening torque must be 18 Nm.
Fig.47 – Fix on the supporting plate the two supplied extension plates to increase the wall contact surface.
Fig.47 – Secure the supporting plate on the wall using the more suitable screws.
Fig.50 – Secure the hybrid with ODU fast locking mechanism to the supporting plate using bolt and nuts
available on the support plate. Tightening torque must be 18 Nm.
Remove the plastic cover from the hybrid flange sides.
Warning: Do not remove the foil from the hybrid flange sides.
Fig.50 – Fix the flexible waveguide to the antenna side flange. Four fixing screws are available the dimen-
sions of which depend on the waveguide type. Tighten progressively and alternatively the four screws with
the following torque:
Warning: It is advisable to shape the waveguide flexible trunk, connecting ODU flange with antenna flange
as shown in Fig.53 This avoids possible condensate to be channelled towards the ODU flange.
1 Remove the plastic cover from the ODU flange side. Apply silicon grease e.g. type RHODOSIL PATE
4 to the O–ring of Fig.52.
Warning: Do not remove the foil from the flange.
2 Bring the ODU with the two hands and position the ODU handle at the bottom side.
3 Position the ODU body close to the support with ODU fast locking mechanism and align ODU side
flange (see Fig.52) to antenna side flange (see Fig.48 – 1+0 version) or hybrid side flange (see
Fig.50 – 1+1 version).
Note: For 1+0 version the ODU can assume positions of Fig.51 depending on the polarisation.
4 With respect to the flange alignment, turn the ODU body approx. 30° anti–clockwise and then insert
the ODU body into the support and search for alignment between reference tooth on the support
(see Fig.48 – 1+0 version or Fig.50 – 1+1 version) and ODU body reference tooth (see detail Fig.52)
5 When alignment is achieved, turn the ODU body clockwise until “clack” is heard and the ODU rota-
tion stops.
6 Secure ODU body on the support by tightening bolts (1) (see Fig.48 – 1+0 version or Fig.50 – 1+1
version). Tightening torque must be 6 Nm.
Final assembly of 1+1 version is shown in Fig.53. A parasol mounting is optionally possible.
96
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
14.4 GROUNDING
6 GHz or 7 GHz
200 (7,9) 500 (19,8) 300 (11,9) 600 (23,7)
low
7 GHz high 200 (7,9) 500 (19,8) 250 (9,9) 600 (23,7)
a. Bending E-plane
Rmin/E
Bending E-plane
(short side of the section)
b. Bending H-plane
Rmin/H
Bending H-plane
(long side of the section)
Supporting plate
98
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
In option
Reference tooth
Reference tooth
1
1
13 mm wrench
6 Nm torque
Position of antenna
side flange
100
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Use 13 mm wrench
(18 Nm torque)
Optional wave
guide
RT1 RT2
Fig.51 - Position of the ODU body depending on the polarisation for 1+0. For 1+1 the polarisa-
tion is always vertical: handle at the left side.
102
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Reference tooth
O-ring
ODU side flange
ASN version
"N"
"BNC"
Ground bolt
AS version
ASN version
AS version
104
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
2
3
4
5
ASN version
AS version
1 Bolt
2 Spring washer
3 Flat washer
5 Flat washer
Washer
Screw M5x25
Screw M4x8
106
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
UDR70 flange
Screw M4x18
Spring
Washer
O-Ring
Hybrid 6 GHz
(balanced or
unbalanced)
15.1 FOREWORD
The installation onto the pole of the ODU with integrated antenna concerns both 1+0 and 1+1 versions.
Following installation kits are supplied with the equipment depending on different versions:
1+0 version
1+1 version
108
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
15.3 REQUIRED TOOLS FOR MOUNTING (NOT SUPPLIED)
Warning: if screwing operation concerns more than one screw or bolt, tighten subsequently everyone and
its opposite, step by step.
1+0 version
3 installation of ODU
4 antenna aiming
5 ODU grounding
1+1 version
5 antenna aiming
6 ODU grounding.
15.4.1 Installation onto the pole of the support system and the antenna
Fig.57 – Set the antenna in such a position as to be able to operate on its rear side. Locate the five threaded
holes around antenna flange. Mount centring ring onto antenna flange and tight it with 3 calibrated bolts.
Caution: centring ring should be mounted so that the screws do not stick out.
Define if the antenna will be mounted with vertical or horizontal polarization. Check that free drain holes
stay at bottom side. Mount bolt type M10x30, in position A leaving it loose of 2 cm approx. With horizontal
polarization mount bolt type M10x30 in position D, leaving it loose of 2 cm approx.
Fig.58 – Mount antislide strip onto the pole. Place blocks as in Fig.58 following antenna aiming direction.
Tighten the strip with screwdriver.
Fig.59 – Mount pole supporting system with relevant pole fixing brackets following antenna aiming direc-
tion as indicated by arrow. Antislide strip should result at the centre of supporting plate. Supporting system
should lean against antislide clamp with the tooth as in Fig.60. Position the antenna in such a way that bolt
Fig.62 – Rotate the antenna body until the remainder three antenna holes coincide with the three support
holes. Secure the antenna to the support by thightening the relevant passing through bolts.
1+0 version
1 Apply silicon grease e.g. RHODOSIL PATE 4” to the O–ring (4) of Fig.65 by protecting finger hands
with gloves.
2 Bring the ODU with the two hands and position the ODU handle at the bottom side. The ODU handle
can assume position of Fig.63 depending on the polarization.
3 Position the ODU body near the support system and align ODU side flange to antenna side flange
(see Fig.64). With respect to the flange alignment, turn the ODU body approx. 30° anti–clockwise
and then insert the ODU body into the support and search for alignment between reference tooth
on the support (see Fig.64) and ODU body reference tooth (see detail of Fig.65).
4 When alignment is achieved, turn the ODU body clockwise until “clack” is heard and the ODU rota-
tion stops.
Fig.66 and Fig.67 show ODU housing final position for vertical and horizontal polarization respec-
tively.
5 Secure ODU body on the support system by tightening bolts (1) of Fig.64.
1+1 version
Fig.68 – Apply silicon grease, type “RHODOSIL PATE 4” to O–rings (1). Insert O–rings (1) and (6) into twist
polarization disk (2).
Vertical polarization
Fix the disk on hybrid flange placing marker (4), on disk, close to V mark.
Horizontal polarization
Fix the disk on hybrid flange placing reference (4), on disk, close to H mark.
In 13 GHz and 15 GHz ODUs the polarization disk is fixed to the hybrid flange by means of 3 screws as
shown in Fig.69.
Caution: Twist disk has two planes. Take care of position marker (4) on twist disk. The position of marker
(4) plane should be in contact to hybrid like in figure. Tighten progressively and alternatively screws (7)
with the same number of spring washers (8) with the following torque:
Fig.70 – Fix hybrid to support system with four bolts (1) taking care of RT1/RT2 position shown by labels
of Fig.70. Tighten progressively and alternatively four bolts (1).
110
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
15.4.3 ODU installation
1 Apply silicon grease e.g. RHODOSIL PATE 4” to the O–ring (4) of the Fig.65 by protecting finger
hands with gloves.
2 Bring the ODU with the two hands and position the ODU handle at the bottom side. For 1+0 the
ODU can assume position of Fig.63 depending on the polarisation. For 1+1 the handle ODU position
is always placed at the right side (horizontal polarization).
3 Position the ODU body near the support system and align ODU side flange to antenna side flange
(see Fig.64). With respect to the flange alignment, turn the ODU body approx. 30° anti–clockwise
and then insert the ODU body into the support and search for alignment between reference tooth
on the support (see Fig.64) and ODU body reference tooth (see detail of Fig.65).
4 When alignment is achieved, turn the ODU body clockwise until “clack” is heard and the ODU rota-
tion stops.
Fig.66 and Fig.67 show ODU housing final position for vertical and horizontal polarization respec-
tively for 1+0 version.
Fig.71 shows ODU housing final position for 1+1 version.
5 Secure ODU body on the support system by tightening bolts (1) of Fig.64.
Antenna aiming for 1+0 version and 1+1 version is the same. The antenna aiming devices allow to perform
the following adjustments with respect to the starting aiming position:
- Horizontal ± 15° operating on the nut (3) shown in Fig.72, only after having loosen
the nuts (7), (8), (9), (10) of Fig.73.
- vertical ± 15° operating on vertical adjustment worm screw (2) shown in Fig.72
only after having loosen nuts (1), (2), (11) of Fig.73 and (4) and (5) of
Fig.72.
For adjustment from 0° to +30° extract nut (1) Fig.73 and position it in
hole (4), extract nut (2) Fig.73 and position it in hole (6). Operate on
vertical adjustment worm screw (2) after having loosen nuts (1), (2), (11) of
Fig.73 and (4) of Fig.72.
For adjustment from 0° to –30° extract nut (1) of Fig.73 and position it in
hole (3), extract nut (2) of Fig.73 and position it in hole (5). Operate on
vertical adjustment worm screw (2) after having loosen nuts (1), (2), (11) of
Fig.73 and (4) of Fig.72.
For vertical adjustment some markers, every 10°, are available on support.
The bigger marker gives 0° starting aiming position. Once the optimum aiming
position is obtained, tighten firmly the four nuts (1), (2), (11) of Fig.73 and
(4) and (5) of Fig.72 for vertical adjustment and the four nuts (7), (8), (9),
(10) of Fig.73 for horizontal adjustment. Tighten with 15 mm wrench and
32 Nm torque.
15.6 COMPATIBILITY
The pole installation kit of the ODU unit in 1+0 and 1+1 configuration is compatible with integrated antenna
complying with SIAE standard with measures 0.2 m, 0.4 m, 0.6 m, 0.8 m of diameter.
See Fig.74.
On ODU grounding can be connected with the available bolt spring washer and flat washers as shown.
112
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
A D D C
B C A B
3 mm allen key 2
2,5 Nm torque
A
1
C
1 Antenna
3 Centring ring
1 Steel belt
2 Plastic blocks
114
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
15 mm wrench
32 Nm torque 3
3 3
3
1 Pole fixing brackets
2 Tooth
3 Bolt
1 Tooth
Fig.61 - Hole E
116
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
B C
A D
15 mm wrench
32 Nm torque
A, B, C, D Bolt slots
Vertical Horizontal
Fig.63 -Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polari-
sation is always horizontal. Handle at the right side.
H
H
1
1
H
H
H
H
1
H: Reference tooth
Fig.64 - Support system for ODU housing and reference tooth in evidence
118
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Reference tooth
O-ring
ODU side flange
ASN version
"N"
"BNC"
Ground bolt
AS version
5
30
5
30
120
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
7
2
4
6
1 O–ring
2 Polarization twist disk
6 O–ring
7 Allen screws
8 Spring washer
Vertical polarization
122
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
RT1
2
1
RT2
13 mm wrench
18 Nm torque
1 Bolts
2 Spring washer
AS version
124
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
3
4
5 1
2
1 Marker
2 Vertical adjustment
3 Horizontal adjustment
4 Bolt
5 Fixing nut
7
4 11 1 8
3
10
9 15 mm wrench
6 32 Nm torque
5 2
15 mm wrench
32 Nm torque
126
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
2
3
4
5
ASN version
AS version
1 Bolt
2 Spring washer
3 Flat washer
5 Flat washer
16.1 FOREWORD
The description concerns pole mounting of ODU, in 1+0 and 1+1 version, using following installation kits:
Differences regard the dimensions and the presence of the centring ring (see Fig.75):
Following installation kits are supplied with the equipment depending on different versions.
1+0 version
- pole support system plus antenna (already assembled) and pole fixing brackets
1+1 version
- pole support system plus antenna (already assembled) and pole fixing brackets
- 1+0 ODU support
128
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
16.3 REQUIRED TOOLS FOR MOUNTING (NOT SUPPLIED)
• N.2 17 mm spanner.
Warning: if screwing operation concerns more than one screw or bolt, tighten subsequently everyone and
its opposite, step by step.
1+0 version
1 antenna polarization
5 installation of ODU
6 antenna aiming
7 ODU grounding
1+1 version
1 antenna polarization
5 installation of hybrid
6 installation of ODUs
7 antenna aiming
8 ODU grounding.
Fig.75 – Set the antenna in such a position to operate on its rear side. Locate the four M3 Allen screws
around the antenna flange. Unscrew them (use 2.5 mm Allen wrench) and position the antenna flange ac-
cording on: horizontal wave guide –> vertical polarization, vertical wave guide –> horizontal polariza-
tion. Screw again the four Allen screws (torque = 1 Nm).
Fig.75 – Set the antenna in such a position to operate on its rear side. Locate the three holes around the
antenna flange. Mount the centring ring onto antenna flange and tight it with the 3 Allen screws M4 (use
3mm Allen wrench, torque 2 = Nm).
Fig.75 – Mount the support onto assembled structure (pole support system plus antenna) using the four
M8 Allen screws (use 6 mm Allen wrench, torque 18 = Nm). Two of the four screws, diagonally opposed,
must be mounted with the two bushes around.
Fig.75 – Mount the assembled structure on the pole using the two pole fixing brackets and the four M10
screws (use 17 mm spanner, torque = 13 Nm); the heads of the screws are inserted on the antenna side,
the four nuts and the springs between nut and brackets are inserted on bracket side.
Fig.76 – Apply silicon grease (e.g. RHODOSIL PATE 4”) on the O–ring by protecting fingers with gloves.
Fig.77 – Bring the ODU with the two hands and position the ODU handle at the bottom side. The handle
can assume the positions shown in the figure depending on the polarization. Position the ODU body near
the support and align the wave guide of the ODU to the Wave guide of the antenna: respect to the position
of wave guide alignment, turn the ODU body approx. 30° counter–clockwise into the support and search
for matching between reference tooth on the support (see Fig.78) and reference tooth on the ODU body.
Fig.79 – When alignment of the references teeth is achieved, turn the ODU body clockwise until rotation is
stopped. In figure are shown ODU final position for both polarizations.
Fig.78 – When ODU positioning is over, secure ODU body on the support by tightening bolts (use 13mm
spanner, torque = 6Nm).
130
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
16.5.6 Antenna aiming
Antenna aiming procedure for 1+0 version or 1+1 version is the same.
Horizontal aiming: ±5° operating on the 17 mm nut shown in Fig.80 with a 17 mm spanner, only after
having loosen the two 17 mm nut on the pivot.
Vertical aiming: ±20° operating on the 13 mm nut shown in Fig.80 with a 13 mm spanner, only after having
loosen the three 13 mm nut on the pole support.
Once optimum position is obtained, tighten firmly all the nuts previously loosen.
as shown in Fig.81.
In further page are explained all the mounting step not already discussed in paragraph “16.5 1+0 MOUNT-
ING PROCEDURES”.
Fig.82 – The polarization disk must be always fixed on hybrid flange. Apply silicon grease (e.g. RHODOSIL
PATE 4”) on the O–rings by protecting fingers with gloves. Bring the polarization twist disk with the position
marker down. Insert the O–ring into polarization twist disk.
Vertical polarization: fix the twist disk on hybrid flange placing the marker of the disk towards V mark.
Horizontal polarization: fix the twist disk on hybrid flange placing the marker of the disk towards H mark.
In 13 GHz and 15 GHz ODUs the polarization disk is fixed to the hybrid flange by means of 3 screws as
shown in Fig.83.
Tighten progressively and alternatively the screws and the spring washer with following torque:
Fig.84 – Fix hybrid body to 1+0 support with four M8 bolts (use 13 mm spanner, torque = 18 Nm), tighten
progressively and alternatively the bolts.
Fig.76 – Apply silicon grease e.g. RHODOSIL PATE 4” to the O–ring by protecting fingers with gloves.
Fig.77 – Bring the ODU with the two hands and position the ODU handle at the bottom side. The handle
can assume the positions shown in the figure depending on the polarization. Position the ODU body near
the support and align the wave guide of the ODU to the wave guide of the hybrid: respect to the position
of wave guide alignment, turn the ODU body approx. 30° counter–clockwise and then insert the ODU body
into the support. For 1+1 system the handle of the ODU is always positioned on the right. The polarization
twist disk on the hybrid matches the antenna polarization.
Fig.85 – When alignment of the reference teeth is achieved, turn the ODU body clockwise until the rotation
stops. In figure are shown ODUs final position.
Fig.78 – When ODU positioning is over, secure ODU body on the support by tightening bolts (use 17 mm
spanner, torque = 6 Nm).
WARNING: Internal codes (e.g. installation items, antennas, PCB) are here reported only as example. The
Manufacturer reserves the right to change them without any previous advice.
Four 13mm
screws
Centring ring
(not present in V32309)
1+0 support
Two bushes
132
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Reference tooth
O-ring
ODU wave guide
"N"
"BNC"
Ground bolt
Vertical Horizontal
Fig.77 - Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polari-
sation is always horizontal. Handle at the right side.
1
5
4 4
1
2
3
1 6 mm Allen screw
134
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1+0 ODU HP with handle on the right:
horizontal polarization
Vertical aiming:
13mm block screws
Pole support
136
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
1
2
3
4
5
ASN version
AS version
1 Bolt
2 Spring washer
3 Flat washer
5 Flat washer
2
4
6
1 O–ring
2 Polarization twist disk
6 O–ring
7 Allen screws
8 Spring washer
138
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Horizontal polarization
Vertical polarization
140
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
ASN version
AS version
17.1 FOREWORD
The installation onto the pole of the ODU with integrated antenna concerns both 1+0 and 1+1 version.
Following installation kits are supplied with the equipment depending on different versions.
1+0 version
- pole support system plus antenna (already assembled) and pole fixing brackets
1+1 version
- pole support system plus antenna (already assembled) and pole fixing brackets
• N.2 17 mm spanner.
Warning: if screwing operation concerns more than one screw or bolt, tighten subsequently everyone and
its opposite, step by step.
1+0 version
1 antenna polarization
5 installation of ODU
6 antenna aiming
7 ODU grounding
1+1 version
1 antenna polarization
5 installation of hybrid
6 installation of ODUs
7 antenna aiming
8 ODU grounding.
Fig.75 – Set the antenna in such a position to operate on its rear side. Locate the four M3 Allen screws
around the antenna flange. Unscrew them (use 2.5 mm Allen wrench) and position the antenna flange ac-
cording on: horizontal wave guide –> vertical polarization, vertical wave guide –> horizontal polariza-
tion. Screw again the four Allen screws (torque = 1 Nm).
144
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
17.5.2 Installation of the centring ring on the antenna
Fig.75 – Set the antenna in such a position to operate on its rear side. Locate the three holes around the
antenna flange. Mount the centring ring onto antenna flange and tight it with the 3 Allen screws M4 (use
3mm Allen wrench, torque 2 = Nm).
Fig.75 – Mount the support onto assembled structure (pole support system plus antenna) using the four
M8 Allen screws (use 6 mm Allen wrench, torque 18 = Nm). Two of the four screws, diagonally opposed,
must be mounted with the two bushes around.
Fig.75 – Mount the assembled structure on the pole using the two pole fixing brackets and the four M10
screws (use 17 mm spanner, torque = 13 Nm); the heads of the screws are inserted on the antenna side,
the four nuts and the springs between nut and brackets are inserted on bracket side.
Fig.76 – Apply silicon grease (e.g. RHODOSIL PATE 4”) on the O–ring by protecting fingers with gloves.
Fig.77 – Bring the ODU with the two hands and position the ODU handle at the bottom side. The handle
can assume the positions shown in the figure depending on the polarization. Position the ODU body near
the support and align the wave guide of the ODU to the Wave guide of the antenna: respect to the position
of wave guide alignment, turn the ODU body approx. 30° counter–clockwise into the support and search
for matching between reference tooth on the support (see Fig.78) and reference tooth on the ODU body.
Fig.79 – When alignment of the references teeth is achieved, turn the ODU body clockwise until rotation is
stopped. In figure are shown ODU final position for both polarizations.
Fig.78 – When ODU positioning is over, secure ODU body on the support by tightening bolts (use 13mm
spanner, torque = 6Nm).
Antenna aiming procedure for 1+0 version or 1+1 version is the same.
Horizontal aiming: ±5° operating on the 17 mm nut shown in Fig.80 with a 17 mm spanner, only after
having loosen the two 17 mm nut on the pivot.
Vertical aiming: ±20° operating on the 13 mm nut shown in Fig.80 with a 13 mm spanner, only after having
loosen the three 13 mm nut on the pole support.
Once optimum position is obtained, tighten firmly all the nuts previously loosen.
as shown in Fig.81.
In further page are explained all the mounting step not already discussed in paragraph “16.5 1+0 MOUNT-
ING PROCEDURES”.
Fig.82 – The polarization disk must be always fixed on hybrid flange. Apply silicon grease (e.g. RHODOSIL
PATE 4”) on the O–rings by protecting fingers with gloves. Bring the polarization twist disk with the position
marker down. Insert the O–ring into polarization twist disk.
Vertical polarization: fix the twist disk on hybrid flange placing the marker of the disk towards V mark.
Horizontal polarization: fix the twist disk on hybrid flange placing the marker of the disk towards H mark.
In 13 GHz and 15 GHz ODUs the polarization disk is fixed to the hybrid flange by means of 3 screws as
shown in Fig.83.
Tighten progressively and alternatively the screws and the spring washer with following torque:
Fig.84 – Fix hybrid body to 1+0 support with four M8 bolts (use 13 mm spanner, torque = 18 Nm), tighten
progressively and alternatively the bolts.
Fig.77 – Bring the ODU with the two hands and position the ODU handle at the bottom side. The handle
can assume the positions shown in the figure depending on the polarization. Position the ODU body near
the support and align the wave guide of the ODU to the wave guide of the hybrid: respect to the position
of wave guide alignment, turn the ODU body approx. 30° counter–clockwise and then insert the ODU body
into the support. For 1+1 system the handle of the ODU is always positioned on the right. The polarization
twist disk on the hybrid matches the antenna polarization.
Fig.85 – When alignment of the reference teeth is achieved, turn the ODU body clockwise until the rotation
stops. In figure are shown ODUs final position.
146
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.78 – When ODU positioning is over, secure ODU body on the support by tightening bolts (use 17 mm
spanner, torque = 6 Nm).
WARNING: Internal codes (e.g. installation items, antennas, PCB) are here reported only as example. The
Manufacturer reserves the right to change them without any previous advice.
Three 3 mm
Centering ring Allen screws
Antenna Four 13mm screws
1+0 support
O-ring
ODU wave guide
"N"
"BNC"
Ground bolt
Vertical Horizontal
Fig.88 - Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polari-
sation is always horizontal. Handle at the right side.
148
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
2
1
1
4
3 3
1
150
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Pole support
Vertical aiming
2
1
Horizontal aiming
4
5
ASN version
AS version
1 Bolt
2 Spring washer
3 Flat washer
5 Flat washer
152
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
7
2
4
6
1 O–ring
2 Polarization twist disk
6 O–ring
7 Allen screws
8 Spring washer
Vertical polarization
154
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.95 - Hybrid installation
ASN version
156
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Section 4.
LINE-UP
• equipment switch–on
• check measurements.
In order to have the link working properly, in the local and remote equipment the same parameters have
to be set:
• system layout (1+0, 1+1 hot stand-by, 1+1 frequency diversity.....) (Equipment - Configuration)
• ACM Engine (Equipment - Modulation&Capacity): during Line-up “ACM Engine” must be disable
You can download Web Lct Console program and Flash Player from http://www.siaemic.com.
Proceed as follows:
The relationship between AGC voltage and received field is shown by Fig.97.
The received field level has a tolerance of ±4 dB in the full temperature range.
A factory default address is assigned to each network element that must normally be reconfigurated on
site following the network administrator rules.
For this purpose it is required to connect the PC, where the WEB LCT program has been installed, to the
network interfaces: this has to be done via USB cable or Ethernet cable.
Warning: the checks that follow require the knowledge of the program use.
Run the program and perform the connection to equipment by choosing from menu “Option” the connec-
tion made via USB cable.
• IP Address: select Port Configuration. Enter the required port addresses in the available communi-
cation ports.
• Routing Table and Default Gateway: select Routing table: add the routes and default gateway if nec-
essary.
Warning: the routing policy depends on the routing type: static IP/OSPF/IS–IS. The relevant rout-
ing rules must be normally given by network administrator.
• Remote Element Table: select Remote Element Table. Add station name. Add local equipment IP
address, add remote equipment IP address selecting Remote Link.
• Agent IP Address: select Equipment Properties. Assign the address in accordance to the address of
Ethernet port.
3 If the connection is made via USB cable, the IP address is automatically achieved.
158
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
18.1.4 Few considerations about addresses
Here are listed few observation to follow during the address/netmask setup:
1 PPP connection (RS232 and LCT ports) - PC address can be selected among:
b broadcast address -1
c a given address.
For a correct management, solutions b) and c) must be different than Ethernet port address.
2 PPP connection (RS232 and LCT ports) - if Unnumbered is used, the netmask relevant RS232 and
LCT ports must be equal or wider than the Ethernet port netmask
3 PPP connection (RS232 and LCT ports) - never assign network addresses to RS232 or LCT ports
(check that they are hosts).
It is advisable to perform the following measurements to check the correct operation of the radio hop:
• transmitted power
• received power
• RF frequency
• S/N measurement
- on top of the window Tx/Rx power and frequency values are displayed. In case of Tx power and
frequency setup proceed to Branch 1/2 and Power/Frequencies submenus.
• S/N measurement
- Run WLC program and then perform the connection to the equipment you want to check.
- Perform the S/N measurement and check that values comply with the requirements.
2,625
2,25
1,875
1,5
1,125
0,75
0 dBm
160
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
19 BACK UP FULL EQUIPMENT CONFIGURATION
WITHOUT POSSIBILITY OF MODIFYING THE PA-
RAMETERS
19.1 SCOPE
This chapter describes the procedure to back up the full equipment configuration. This permits to recover
the original equipment configuration in case of faulty CONTROLLER module replacement with spare.
Foreword: it is advisable to backup the configuration after the first installation. Proceed as follows:
1 Select “Equipment Configuration Wizard” from menu “Tools”; “Equipment Configuration Wiz-
ard” window will be displayed.
2 Select “Upload” and then “Backup Full Equipment Configuration”; “Template Selection” win-
dow will be displayed.
3 Select the correct equipment template (in case of uncorrected choice the backup will be aborted).
4 Press OK and then select the equipment to be uploaded from “Upload Configuration File” window.
5 Press OK and then edit the file name from “Save backup as” window.
6 Press Save; “Equipment Configuration Wizard: Complete Backup” window will appear.
The window shows dynamically the backup procedure. If everything is OK, at the end of the upload
will appear the word “done” showing the procedure success.
7 Press OK to finish.
Once the spare controller has been installed, or everytime you need the primitive configuration, proceed
as follows:
1 Select “Equipment Configuration Wizard” from menu “Tools”. “Equipment Configuration Wizard”
window will be displayed.
2 Select “Download” and than “Restore Full Equipment Configuration” from Equipment Config-
uration Wizard. “Select Backup File” window will be displayed.
3 Select the wanted backup file with extension .bku and then press Open. “Download Configuration
File” window will be displayed.
5 Press OK to finish.
Foreword: it is advisable to backup the configuration after the first installation. Proceed as follows:
2 in the field “Backup File name” write the name of the configuration file you are going to upload in
the PC, complete with the full path of its folder
3 push Backup. The status of the backup procedure is shown in the “Operation Status” field.
Once the spare Controller has been installed or every time the saved configuration is necessary, proceed
as follow:
3 Push Restore. The status of the backup procedure is shown in the “operation Status” field. During
Restore operation the equipment creates a backup configuration, you can come back to this config-
uration at the end of the restore pushing Revert.
A SD card slot is available on the ALplus2 Controller module (on the board) or on the front panel of
ALCplus2.
Using a SD memory card is possible to perform an auto restore of Configuration and of Equipment Firmware
everytime a mismatch between running ones and saved occurs.
1 select “SD Memory Management” in the “Main menu”
2 in the “Actions” field select the operation you want to perform (......”Enable automatic restore (all)”
for example)
3 Select Execute.
162
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
20 LINE-UP FOR ETHERNET TRAFFIC
This paragraph deals with line-up of ALplus2 LIM Ethernet and ALCplus2 IDU with details of WEB LCT pro-
gram related only to Ethernet application.
Main difference is the number of LAN ports: three in ALplus2 and four in ALCplus2, moreover in ALplus2
the LAN2 port can manage POE functionality besides in ALCplus2 Sync Signal can be taken from LAN ports
also (see relevant paragraph).
Assuming that the radio link is already in service, with correct frequency, output power and correct antenna
alignment, the line up procedure for two different kinds of connection set up of a radio link ALplus2,
equipped with LIM module with Ethernet ports, is hereafter described:
• Local Lan-1 port to remote Lan-1 port connection Lan per port, see Fig.98
• from 3 ports to 3 ports connections and segregated traffic for Untagged Traffic, see Fig.106
• from 3 ports to 3 ports connections and segregated traffic for Tagged and Untagged Traffic, see
Fig.116.
Settings here below are intended to be done both into local and remote radio equipment. The software to
be used to configure the equipment is WEB LCT. In the following chapters all configuration steps are shown
using WEB LCT.
switch switch
Lan-2 AL AL Lan-2
radio radio
Lan-3 Lan-3
Nx2 Nx2
Mbit/s Mbit/s
Local Remote
The first example is local Lan1 port to remote Lan1 port transparent connection for tagged and untagged
traffic please refer to Fig.98.
ACM Engine, Upper Modulation, Lower Modulation, Permanent Traffic and extra TDM Capacity at any mod-
ulation must be the same local and remote.
The troughput at any modulation with 28 MHz bandwidth is shown in Fig.100 with View Current Config but-
ton of Fig.99.
So with 4QAMstrong modulation the Ethernet capacity is 20 Mbit/s and with 256QAM modulation the Eth-
ernet capacity is 140 Mbit/s.
164
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.101 - Switch general settings
See Fig.101 for general settings of the switch. All the used ports must be Enabled, so enable Lan-1 and
Internal Port A, see Fig.102.
Please notice the MAC Address Aging Time reduced, only for this test at 15 sec.
The other ports should be disabled. The correct cable crossover arrangement must be selected too (see
Fig.102). Enable LLF, if needed, only at the end of link line up.
Switch connections are done with Lan per port selections. Referring to Fig.103, incoming traffic at Lan-1
exits at internal Port A and as in Fig.104 and in Fig.105 incoming traffic at internal Port A exits at Lan-1
port. This connection are done for all Untagged packets and all Tagged packets with Vlan Id not described
into Vlan Configuration Table.
If Vlan Configuration Table is blank all Tagged traffic follows the rules of Lan per port.
Possible selections of Ingress Filtering Check:
• "Disable 802.1q": no check of Virtual Lan tag is done and all packets follow Lan per port settings
• "Fallback": if Tagged packets have their Vlan Id into Vlan Configuration Table they follow the con-
nection described into the table, otherwise they follow the Lan per port settings as Untagged pack-
ets
• "Secure": no Untagged packet transits; only Tagged packets with Vlan Id listed into the table can
transit.
For all previous configuration "Disable 802.1" should be selected. With Egress Mode as Unmodified the out-
going packets at Lan-1 port exit Untagged or Tagged exactly as they were Untagged or Tagged at the in-
coming port.
166
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.104 - Vlan settings for Port A
switch switch
Lan-2 AL AL Lan-2
radio radio
Lan-3 Lan-3
Nx2 Nx2
Mbit/s Mbit/s
Local Remote
In this example 3 local port must communicate with corresponding 3 remote ports. All the ports share the
same radio channel but traffic originated and directed to Lan1 should be kept separated from traffic from
Lan2 and Lan3 and viceversa.
Lan-2 and Lan-3 have the same requirements. Please refer to Fig.106.
Please refer to Fig.107. First selection is channel bandwidth and modulation, in this example we selected
28MHz and 16QAM.
ACM Engine, Upper Modulation, Lower Modulation, Permanent Traffic and extra TDM Capacity at any mod-
ulation must be the same local and remote.
The troughput at any modulation with 28 MHz bandwidth is shown in Fig.108 with View Current Config but-
ton of Fig.107.
168
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.108 - View Current Configuration
So with 4QAMstrong modulation the Ethernet capacity is 20 Mbit/s and with 256QAM modulation the Eth-
ernet capacity is 140 Mbit/s.
See Fig.109 for Switch general settings of the switch. All the used ports must be Enabled, so enable Lan-
1, Lan-2, Lan-3 and Internal Port, see Fig.110.
Please notice the MAC Address Aging Time reduced, only for this test, at 15 sec. The correct cable crossover
arrangement must be selected too (see Fig.110). Enable LLF if needed only at the end of link line up.
For Untagged traffic, connections are done with Lan per port selections. Referring to Fig.111 incoming traf-
fic at Lan-1 exits at internal Port A and into Fig.114 incoming traffic at internal Port A exits at Lan-1 port.
If Vlan Configuration Table is blank all Tagged traffic follows the rules of Lan per port.
• "Disable 802.1q": no check of Virtual Lan tag is made and all packets follow Lan per port settings
• "Fallback": if Tagged packets have their Vlan Id into Vlan Configuration Table they follow the con-
nection described into the table, otherwise they follow the Lan per port settings as Untagged pack-
ets
• "Secure": no Untagged packet transits; only Tagged packets with Vlan Id listed into the table can
transit.
Untagged traffic transits only if the selection for Ingress Filtering Check is disabled at each input port and
a separated Vlan for Untagged traffic is set up for each port.
Each port of the switch must be associated with a different Default VLAN ID, Lan-1 with Default VID 4001,
Lan-2 with Default VID 4002, Lan-3 with Default VID 4003, for Lan-1 see Fig.110 and Fig.111.
Untagged packets coming at physical ports are tagged on common radio channel but tagged with different
Vlans. At receiving end packets are distributed at their ports and untagged.
Vlan Configuration Table will be defined in order to group traffic from Lan-1, Lan-2, Lan-3 to Port A.
170
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.111 - Lan1 Vlan settings
172
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.115 - Vlan Configuration Table
switch switch
Lan-2 AL AL Lan-2
radio radio
Lan-3 Lan-3
Nx2 Nx2
Mbit/s Mbit/s
Local Remote
Fig.116 - 3 ports to3 ports connections with segregated Tagged and Untagged traffic
In this example 3 local port must communicate with corresponding 3 remote ports. All the ports share the
same radio channel but traffic originated and directed to Lan1 should be kept separated from traffic from
Lan2 and Lan3 and viceversa.
Lan-1 to Lan-1, connection must transfer tagged and untagged packets. Lan-2 and Lan-3 have the same
requirements. Please refer to Fig.116.
ACM Engine, Upper Modulation, Lower Modulation, Permanent Traffic and extra TDM Capacity at any mod-
ulation must be the same local and remote.
The troughput at any modulation with 28 MHz bandwidth is shown in Fig.118 with View Current Config but-
ton of Fig.117.
174
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
So with 4QAMstrong modulation the Ethernet capacity is 20 Mbit/s and with 256QAM modulation the Eth-
ernet capacity is 140 Mbit/s.
See Fig.119 for Switch general settings of the switch. All the used ports must be Enabled, so enable Lan-
1, Lan-2, Lan-3 and internal Port A, see Fig.102.
For already Tagged traffic we need to add a second Vlan Tag to the packets creating the Vlan of Vlan into
radio channel, so we need a Max packet size of 2048.
176
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.123 - Port A Vlan settings
21.1 TOOLS
The following procedure can be done with SCT/LCT or with Web LCT and similar windows.
21.2 PROCEDURE
178
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.125 - Subnetwork Craft Terminal - Communication setup
Configuration
Configure:
If you have other port to configure ex. PPP RS232 - 2Mbit/s EOC ecc. configure it with IP and netmask
180
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.128 - PPP Radio
At the end select Set Values -> Confirm and Store -> Confirm.
Select menu Equipment -> Configuration Setup -> Stored Routing Table
In this menu delete all lines and default gateway, push Apply and then Save.
182
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.130 - Stored Routing Table
Add new routine lines (relevant the new addresses configuration) pushing the Add button.
When the Stored Routing Table is complete, push Apply and then Save.
Select menu Equipment -> Properties. Set new Agent (equal to Ethernet port address).
Push Restart and then Confirm.
After the restart, the Remote Equipment disappears from SCT display.
Configure the local equipment with the same procedure seen before. Then restart the local equipment.
To see both local and remote equipment the new subnetwork (station and equipment) must be prepared.
184
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.132 - Subnetwork Configuration Wizard - Actual Configuration
186
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.134 - Add New Network Element
188
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Fig.136 - Subnetwork Configuration Wizard
When the remote equipment appears in Actual Configuration, prepare again the network configuration you
have set before (or select the local equipment, push Retrieve) and send the configuration to remote equip-
ment.
22.1 GENERAL
In these pages a description of alarms is given in order to help operators to perform equipment trouble-
shooting.
A faulty condition is pointed out by LEDs on front panel (alarm area) or by alarms reported by management
software. Power ON LEDs are not considered (equipment are ON).
ALplus2
SCT
Active and old alarms can be monitored in Event History Log area, with alarm correlation between starting
and clearing time. Alarms are from all the equipment reached by SCT.
Active alarms only, can be monitored in Current Alarms window. Alarms are from selected equipment only.
WEBLCT
In Event List area of WEBLCT all alarms are listed, local ones on the left, remote ones on the right (.... if
Remote List is well configured).
Moving the mouse over an alarm, its starting time, severity and group information are pointed out. There
is correlation between starting and clearing time.
When an alarm occurs, its origin can be hardware or can be a problem caused by failures or a bad situation
(propagation and/or configuration mismatch) in previous parts of the equipment: an alarm can be caused
by previous alarms and, not only, the same alarm can produce further alarms.
In this way, it/s important to understand the direction of the problem described by alarms.
A problem in LIM can cause alarms in ODU also: when a situation of more alarms is occurring, the most
significant alarm is at the beginning of Tx chain, all the others following are due to this.
A problem in ODU, or in far end terminal, can cause alarms in LIM also: when a situation of more alarms
is occurring, the most significant alarm is at the beginning of Rx chain, all the others following are due to
this.
Alarms are divided in groups regarding the module that has generated them or the described function.
192
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Common
ETH LAN
Alarms (internal and external) regarding Ethernet traffic and relevant ports.
LIM
• Rx direction - alarms in previous module (RIM, ODU) or external failure (bad propagation or remote
alarmed or no remote)
Node
Alarm relevant the connections between the IDUs composing the node.
Performance Monitoring
Plug-in module
Port service
Radio
RIM
• Rx direction - alarms in previous module (IDU-ODU cable, ODU) or external failure (bad propagation
or remote alarmed or no remote)
RT
• Tx direction - alarms in previous module (LIM, RIM, IDU-ODU cable) or external failure (tributary
LOS)
Alarms (internal and external) relevant to the synchronism sources and their setting.
SNTP
STM1
22.3 ALARMS
2Mb/s G704 Line Side AIS Trib with EOC has AIS
2Mb/s G704 Line Side Fail Trib with EOC is missing EOC trib LOS
2Mb/s G704 Radio Side AIS Trib with EOC has AIS from remote
2Mb/s G704 Radio Side Fail Trib with EOC is missing from remote EOC trib LOS
Comm. 2Mb/s EOC Data Link Trib with EOC is missing EOC trib LOS
194
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
22.3.2 ETH LAN alarms
Alarm Causes
The following list of measurements can generate alarms if their thresholds are exceeded for a configurable
amount of seconds (regarding periods of 15 minutes or 24 hours):
• status change
• module mismatch
• module
• los
196
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
22.3.7 Service Port alarms
Alarm Causes
Tab.40 - RT alarms
Alarm Causes
Alarm Causes
198
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
22.3.13 STM1 alarms
B2ExcessiveBer HBER
B2SignalDegraded LBER
23.1 GENERAL
• NMS5–UX Network Management. It is used for the remote control of an entire network consisted of
different SIAE equipment including radio equipment.
For details refer to relevant documentation. SCT/LCT documentation is available as help on–line.
23.2 WEBLCT
Equipment can be locally controlled by an embedded Web Server, the WEB LCT, and an http browser run-
ning on PC.
It is also available a software named SCT that can manage sub networks of SIAE Network Elements.
The hardware platform used by SCT is based on Personal Computer with at least the following character-
istics:
The operator can check the status the equipment through an "Alarm Display Panel" that is automatically
updated by the system.
Alarm records are stored by the equipment in an history log together with all information which could be
of interest for the user, among which:
• alarm description
The operator can access the history log using different filters.
Equipment Configuration
The configuration parameters the operator can update from the WebLCT are:
• Channel bandwidth
• ACM profiles
• RF channel
• ATPC enable/disable
• ATPC Rx thresholds
• RTPC
• Synchronisation parameters
• Alarm enable
• Alarm severity
Equipment Maintenance
The main maintenance parameters that the operator can update from the WebLCT are:
• transmitter enable/disable
• carrier only
• PRBS
The following figure shows the loops that can be set from the WEBLCT, for any IDU configuration.
4 Line loops can be done for E1, STM-1 and Ethernet interfaces. Internal loops can be done for E1 and
STM-1 interfaces.
202
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Internal
loop (2)
IDU ODU
Fig.137 - Loop
Software management
A new firmware or a new WEBLCT release can be downloaded from the WEBLCT itself. Actual software re-
lease is reported to the operator.
Performance management
G828, Rx Power, Tx Power and ACM counters are calculated both on radio side and line side
All counters are available on 15 minutes basis and daily, the WEBLCT collects 16 blocks of 15 minutes
counters showing in this way the history of 4 hours.
The user can Start and Stop the Performance Monitoring function.
The user can define a threshold for each counter, when the threshold is crossed an alarm is set by the
equipment, the performance alarm severity can be set by the operator.
Fig.138 reports all the Termination points for the performance monitoring supported by ALplus2.
G828 Radio 1
G828 - 2 Mbit/s Rx&Tx
radio side Power Radio 1
ODU1
G828 - B1 STM-1
G.829 B2 & M1 STM-1 IDU
Line side
Rx&Tx
G828 - 2 Mbit/s ODU2 Power Radio 2
line side
G828 Radio 2
• RMON for Ethernet port statistics, both on tributary and radio side
Security Management
The WEBLCT Administrator creates and manages a set of user accounts, the security information (Pass-
word and User profile) is used for identification, authentication purpose.
Two operator levels are enabled depending on the profile assigned to the operator:
• full privilege level allows the operator to perform all the available options.
• partial privilege level allows the operator to read alarm and configuration parameters and mainte-
nance commands (e.g. force switch over in 1+1 systems).
204
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Section 7.
COMPOSITION
24.1 GENERAL
• 1RU 1+1
• 1RU 2+0
All the units consist of plug-in modules as LIM/RIM/Controller that can individually be replaced.
Module part number, hardware layout and equipment composition are subject to change without notice.
Every version is identified by a specific part number shown on a label (see Fig.149) attached on IDU, top
left side. Important power supply informations are also written.
2 A AL equipment
3 I Indoor installation
The IDU consists of LIM/RIM/CONTROLLER modules. Each module is identified through internal label indi-
cating the relevant P/N.
- LIM
- RIM
- CONTROLLER.
1 2 3 ON 48V
SPEED
PoE
ACT FAIL
LINK
+
1 2 3 ON 48V
SPEED
PoE
ACT FAIL
LINK
+
REM TEST
LCT RS232 USER IN/OUT MNGT/1 MNGT/2 CH1 CH2 2Mb/s
-
206
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
YELLOW SPEED LAN 2 LAN 4 Trib. B
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
Fig.141 - GAI0157
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
Fig.142 - GAI0152
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
Fig.143 - GAI0155
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
Fig.144 - GAI0156
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2
2
ON M 3.15A 48V
MNGT LAN 3 LAN 4 250V
NURG URG
1 LCT
SW
-
+
Fig.145 - GAI0169
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2 2
2
ON M 3.15A
MNGT 48V
LAN 3 LAN 4 NURG URG 250V
1 LCT 1 2 1
SW
-
+
Fig.146 - GAI0168
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16
1 2 1 2
2
M 3.15A
ON 250VAC 48VDC
MNGT NBUS
LAN 3 LAN 4 NURG URG
1 LCT
SW
+
Fig.147 - GAI0163
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
Fig.148 - GAI0162
208
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
25 COMPOSITION OF COMPACT IDU
25.1 GENERAL
The ALCplus2 IDU is available in many versions depending on he kind and the number of user connections
and facilities.
The versions are listed in the following chapter and are offered in two different configuration:
• 1RU 1+0
• 1RU 1+1.
• All of them consist of a single unit.
• Unit part number, hardware layout and equipment composition are subject to change without no-
tice.
Every version is identified by a specific part number shown on a label (seeFig.149) attached on IDU, top
left side. Important power supply informations are also written.
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
2
M 3.15A
250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
2 2
M 3.15A
250VAC
MNGT 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON -
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2
2
ON M 3.15A 48V
MNGT LAN 3 LAN 4 250V
NURG URG
1 LCT
SW
-
+
GREEN LINK LAN 1 LAN 3 Trib. A SD USER IN/OUT TEST ON
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16 Trib. 17-24 Trib. 25-32
1 2 2
2
ON M 3.15A
MNGT 48V
LAN 3 LAN 4 NURG URG 250V
1 LCT 1 2 1
SW
-
+
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16
1 2 1 2
2
M 3.15A
ON NBUS 250VAC 48VDC
MNGT LAN 3 LAN 4 NURG URG
1 LCT
SW
+
YELLOW SPEED LAN 2 LAN 4 STM1 Trib. B Trib. 1-8 Trib. 9-16
1 2 1 2
2 2
M 3.15A
ON 250VAC
MNGT NBUS 48VDC
LAN 3 LAN 4 NURG URG
1 LCT 1 2 1
SW
+
210
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
26 COMPOSITION OF OUTDOOR UNIT
26.1 GENERAL
The ODU consists of a mechanical structure that houses all the transceiver circuitry. In 1+1 HSB version
the connection to the antenna is performed through a passive hybrid.
Both transceiver and hybrid are offered in different versions depending on the operating bands, the anten-
na configuration etc...
A label (see Fig.158) attached on the ODU structure shows the most significant parameters as go/return
frequency value, subband, operating band and part number.
Part number identifies the ODU type. ODU description in the following tables shows frequency, go-return,
channel and capacity if specified.
For example:
In Tab.45 and Tab.46 various ODU versions and hybrid part number are listed.
Part number, hardware layout and equipment composition are subject to change without notice.
212
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
214
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
216
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
218
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
220
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
222
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
224
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
226
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
228
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
RF band in GHz ODU description Part number
230
ALS - ALplus2, ALCplus2 - MN.00224.E - 001
Section 8.
LISTS AND SERVICES
27 LIST OF FIGURES
Fig.18 - ALplus2 with 16E1, 1+0 and 1+1 version, block diagram ........................................ 47
Fig.20 - ALCplus2 with 32E1 expansion, STM-1, 1+0 and 1+1 version, block diagram ............ 50
Fig.21 - ALCplus2 with 16E1 expansion, STM1, NBUS, 1+0 and 1+1 version, block diagram .... 51
Fig.22 - ALCplus2 with 2E1, 1+0 and 1+1 version, block diagram ........................................ 52
Fig.23 - ALCplus2 with 16E1, 1+0 and 1+1 version, block diagram ...................................... 52
Fig.38 - Possible positions of the support with ODU fast locking mechanism .......................... 85
Fig.51 - Position of the ODU body depending on the polarisation for 1+0. For 1+1 the polarisation
is always vertical: handle at the left side. ........................................................................ 102
Fig.63 -Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polarisation
is always horizontal. Handle at the right side.................................................................... 117
Fig.64 - Support system for ODU housing and reference tooth in evidence .......................... 118
Fig.66 - ODU housing final position for vertical polarization ............................................... 120
Fig.69 - Polarization disk fixing (only for 13GHz and 15 GHz) ............................................ 122
Fig.71 - ODU housing final position for 1+1 version ......................................................... 124
Fig.72 - Vertical and horizontal adjustments ................................................................... 125
Fig.77 - Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polarisation
is always horizontal. Handle at the right side.................................................................... 133
Fig.78 - 1+0 support ................................................................................................... 134
Fig.79 - ODU housing final position for both polarization ................................................... 135
Fig.83 - Polarization disk fixing (only for 13 GHz and 15 GHz) ........................................... 139
Fig.88 - Position of the ODU handle depending on the polarisation for 1+0. For 1+1 the polarisation
is always horizontal. Handle at the right side.................................................................... 148
Fig.89 - 1+0 support ................................................................................................... 149
Fig.90 - ODU housing final position for both polarization ................................................... 150
Fig.94 - Polarization disk fixing (only for 13 GHz and 15 GHz) ........................................... 154
Fig.116 - 3 ports to3 ports connections with segregated Tagged and Untagged traffic ........... 173
Tab.3 - Guaranteed Ethernet Throughput (Mbit/s) for ALplus2/ALCplus2 (Ethernet only) ..........27
Tab.16 - MNGT/1 and MNGT/2 100BaseT connector pin-out for 10/100BaseT Ethernet connection
(RJ45) ...........................................................................................................................71
Tab.17 - CH1 connector pin-out for 9600 bit/s synchronous V.24 interface (RJ45)...................71
Tab.18 - CH1 connector pin-out for 9600 bit/s asynchronous V.24 interface (RJ45) .................72
Tab.19 - CH1 connector pin-out for 1x9600 or 2x4800 kbit/s V.28 interface (RJ45) .................72
Tab.20 - CH2 connector pin-out for 64 kbit/s channel - V.11 interface (RJ45) .........................72
For more information, refer to the section relevant to the technical support on the Internet site of the com-
pany manufacturing the product.